Indigo Residency

INDIGO CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200000995

INDIGO RESIDENCY is a residential apartment project in Kapra, Medchal-Malkajgiri district. The TG-RERA record prints “Secunderabad” as mandal, and the registered promoter is INDIGO CONSTRUCTIONS. It comprises one residential building, Building - A (SY20), on land with a total area of 625.92 sq. m, with 1 Stilt + 5 upper floors and 15 apartments: 10 DOUBLE BEDROOM and 5 TRIPLE BEDROOM units. Its TG-RERA registration number is P02200000995, and the proposed completion is 19/12/2021.

More from Indigo Constructions · 4 projects →

01What we found

Period endedTG-RERA registration ran to 20 Dec 2020 - check its extension on TG-RERA
9documents on file - each fact links to its page
6court cases on this project's land (survey 20, Kapra)
11items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.inPhoto from nobroker.in
▦ View all 2 photos
Kapra, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered project nameINDIGO RESIDENCY RERA record
Project typeResidential apartment project RERA filing
Phase / registered portionRegistered record identifies the site as Survey No. 20 PART; a separate phase name is not disclosed. RERA record
TG-RERA registrationP02200000995, granted under section 5; valid 08/07/2019 to 20/12/2020. The certificate records a stated validity period of “1 years.” Registration validity is not the project’s completion deadline.
RERA statusRegistration term shown in the certificate has ended; no extension is recorded in the supplied certificate. This does not establish the project’s current completion or occupancy status.
Registered promoterINDIGO CONSTRUCTIONS; entity type recorded as Partnership. RERA record Corporate record RERA filing

Land and geographic identity

FieldProject record
Locality / revenue villageKapra is the locality and village in the RERA identity record. The title report and GHMC permit refer to Yellareddyguda, including “Yella Reddy Guda”; the supplied material does not separately resolve the revenue-village naming. RERA record Land records
MandalNot disclosed in the project land identity. The registration certificate prints “Secunderabad” as mandal; the parcel-level mandal is not independently established here. Land records
District / PINMedchal-Malkajgiri / 500073 in the project identity record. RERA record RERA filing
Survey identity20 PART (also recorded in title material as Survey No. 20 (Part) and Sy. No. 20 part). RERA record Land records
Site areaRERA land record: total 625.92 sq. m, affected area 13.8 sq. m, net area 612.12 sq. m. GHMC permit separately states site area 612.07 m2. RERA filing Land records
BoundariesEast: 30 FEET ROAD; West: NEIGHBOURS LAND; North: PLOT NO 6 TO 11; South: OPEN LAND. RERA filing
Permit’s land extentBuilding permit states 612.07 m2; see the permit evidence index below.

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building approvalBuilding Permit Order No. 2/C1/02270/2019, File No. 2/C1/23640/2018, approved 07 February, 2019. Approvals record
Approved buildingBuilding - A (SY20), residential; 1 Stilt + 5 upper floors.
HeightPermit states 14.75 m.
Approved-area figures in permitResidential upper floors area 1,491.45 m2; stilt area 306.51 m2. The same permit also contains “Proposed Covered builtup area 104,402.00”; the supplied record does not explain that figure’s basis.
Building / unit countsOne building is recorded. RERA filing records 15 units: 10 DOUBLE BEDROOM and 5 TRIPLE BEDROOM. RERA filing RERA unit table RERA unit details
Parking levels / provisionThe permit identifies the stilt and cellar parking conditionally (“Cellar and stilts approved for parking”); the extracted floor configuration identifies a stilt, but does not specify a cellar level or parking-space count.

Offering and status

FieldProject record
RERA-filed configurations2BHK: 10 units; 3BHK: 5 units. RERA unit table RERA unit details
RERA-filed saleable area2BHK: 46.45 sq. m; 3BHK: 112.47 sq. m. RERA unit table RERA unit details
Booking / availabilityPortal-derived counts show 0 booked and 10 available 2BHK units; 0 booked and 5 available 3BHK units. The portal record has no as-of date, so counts are indicative, not a current inventory confirmation. RERA unit table RERA unit details
Completion datesRegistration certificate: validity through 20/12/2020. Form B declaration: promoter undertook completion by 20 December 2020. Project header separately records proposed completion 19/12/2021. These are completion-related records, distinct from registration validity; no revised completion order is supplied. RERA record
Construction / OC statusThe supplied record does not establish current construction progress or an issued occupancy certificate (OC) for Building - A. The GHMC permit requires an OC before occupation. RERA amenities

2. The project story

INDIGO RESIDENCY is recorded with TG-RERA as a residential apartment project on Survey No. 20 PART in Kapra, Medchal-Malkajgiri district. The land identity record gives a total area of 625.92 sq. m and a net area of 612.12 sq. m; the GHMC permit describes one residential building, Building - A (SY20), with a stilt and five upper floors. RERA record Land records

The RERA filing lists 15 apartments: 10 two-bedroom units and 5 three-bedroom units. The counts shown as booked and available come from a portal record with no as-of date and should be treated as indicative. The supplied material does not provide independently verified site progress, a current construction-stage certificate, or an OC for the building. RERA unit table RERA unit details

3. Master plan, architecture & building design

The GHMC building permit describes a single residential building, Building - A (SY20), with 1 Stilt + 5 upper floors and a stated height of 14.75 m. It gives a residential upper-floors area of 1,491.45 m2 and a stilt area of 306.51 m2. These are permit-extracted area figures; the supplied material does not identify them as carpet area or saleable area.

The permit lists setbacks of 3.5 m Side I, 2.5 m Side II, 4.5 m Front, and 3 m Rear. It also lists a tot-lot area of 0 m2, four rainwater-harvesting pits (RWHPs), and 30 Trees. The extracted information does not establish the detailed floor-by-floor apartment arrangement, flats per floor, building footprint, lift or stair configuration, or internal circulation.

The permit includes the figure “Proposed Covered builtup area 104,402.00,” without an explanation of its basis in the supplied extraction. It is reported as written and is not treated here as a verified gross, FSI-counted, carpet, or saleable-area measure.

4. Homes, configurations & floor plans

The RERA-filed apartment inventory is 10 DOUBLE BEDROOM units and 5 TRIPLE BEDROOM units. The filing provides saleable area; drawing measurements are a separate, software-measured source and are not RERA disclosures. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK (filed as DOUBLE BEDROOM)1001046.45 sq. mNot measured in supplied drawing dataNot supplied
3BHK (filed as TRIPLE BEDROOM)505112.47 sq. mSoftware-measured median 102.9 sq. m; range 102.9–103.0 sq. m (2 drawings)Not supplied

The 3BHK drawing measurement is software-measured from approved floor-plan drawings and flagged as needing review; it is not a RERA-filed carpet-area figure. The measured 3BHK drawing lists bedrooms, living/dining, kitchen and toilets. Room dimensions include a living/dining area of 5.49 × 6.71 m, kitchen 2.0 × 5.0 m, and bedrooms of 2.65 × 4.0 m, 2.64 × 4.0 m, and 3.17 × 5.0 m. RERA unit details Floor plans

Saleable area and measured carpet area are different measures: saleable area includes a share of common areas, while the drawing-based carpet measurement relates to the home’s internal area under the measurement method used. The supplied records do not provide a separate loading figure or drawing-based 2BHK carpet measurement. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC permit states that the cellar and stilt approved for parking are to be used exclusively for vehicle parking and not partitioned or converted to another use. The building configuration identifies one stilt, but the supplied permit extraction does not confirm the number of parking spaces, whether a cellar is included in the final built configuration, or any visitor, accessible, two-wheeler, or EV spaces.

A RERA-filed unit schedule marks the 10 2BHK units as mortgaged and the 5 3BHK units as not mortgaged; that field does not establish parking allocation. No unit-specific parking allotment or exclusive ownership arrangement is evidenced in the supplied documents. RERA unit table

6. Amenities, recreation & open spaces

The RERA amenity record lists proposed facilities and shows 0% progress against each listed item. The GHMC permit separately requires certain site provisions. The supplied evidence does not verify that any facility has been completed. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsSize not suppliedRERA amenities0% recorded; completion not verified
Green strip / tot-lot / parkPermit states tot-lot 0 m2 and requires a fenced tot-lot maintained as greenery before OC; it also requires a peripheral greenery strip.RERA amenitiesRERA amenity progress 0%; completion not verified
Community buildingsSize / capacity not suppliedRERA amenities0% recorded; completion not verified
Water conservation / rainwater harvestingPermit specifies 4 RWHPs and requires a rainwater-harvesting structure (percolation pit).RERA amenitiesRERA amenity progress 0%; installation not verified
Street lightingDetails not suppliedRERA amenities0% recorded; completion not verified

7. Utilities, building services & safety

The RERA amenity schedule marks water supply, sewerage (including chamber, lines, septic tank and STP), storm-water drains, and water conservation/rainwater harvesting as “YES”; each corresponding progress entry is 0%. This indicates a filed or declared provision, not verified delivery. RERA amenities

The GHMC permit requires a transformer space, a garbage house, rainwater harvesting, and public amenities such as water and electricity connections only upon production of an OC. It specifies separate underground static water storage of 25,000 lts. and a separate residential terrace tank of 25,000 lts. The permit also requires services including sanitation, plumbing, fire safety, lifts and electrical installations to be executed under qualified technical supervision.

The permit states that structural and fire-safety requirements are the responsibility of the owner, builder/developer, architect and site engineer, including provision of firefighting installations as stipulated in the National Building Code of India, 2005. The supplied record does not establish installed fire systems, lift number or capacity, backup power, water treatment, sewerage-treatment capacity, waste-segregation arrangements, CCTV, access control, or accessibility features.

8. Location, access & connectivity

The project is recorded in Kapra, Medchal-Malkajgiri district, PIN 500073, on Survey No. 20 PART. The project record gives the eastern boundary as a 30 FEET ROAD; the GHMC permit also refers to an 18 mt. road-width condition in its printed conditions. RERA record RERA filing

A supplied location record identifies the Financial District (Nanakramguda) at 1.2 km from the cadastral parcel centroid. The supplied data does not provide verified public-transport details or other measured access distances. Location record

9. Developer & development status

The TG-RERA registered promoter is INDIGO CONSTRUCTIONS, recorded as a partnership. The RERA record names OM PRAKASH RATHI and RAJU KOTA as partners and MEHUL ASHOK KUMAR SHAH and SUBHASH CHANDER REDDY as authorised signatories. The supplied corporate information does not establish a company registration number or a separate verified registered-office/contact record. Corporate record Parties record

In a Form B affidavit dated 25 June 2019, Mehul Shah declared on behalf of the promoter that the promoter held legal title, that the land was free from encumbrances, and that the project would be completed by 20 December 2020. These are promoter declarations in the filing, not independent verification of title or completion.

The GHMC permit records one Building - A and requires an OC before occupation. No supplied progress certificate or OC establishes the building’s present construction or occupancy status. RERA amenities

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200000995, issued 08/07/2019; valid through 20/12/2020
What the supplied record establishesForm C registration for INDIGO RESIDENCY under section 5; certificate includes a separate-account condition.
GHMC building permit order
Identifier / dateNo. 2/C1/02270/2019; File No. 2/C1/23640/2018; approved 07 February, 2019
What the supplied record establishesBuilding permission for Building - A (SY20), residential, on Survey No. 20 PART.
Legal title report
Identifier / dateDocument 58841, dated 07-06-2019
What the supplied record establishesAdvocate’s title report concerning Survey No. 20 (part), Block No. 2, Yellareddyguda, Kapra; reports a title opinion and notes the GHMC mortgage in its account.
Registered sale deed cited in title material
Identifier / dateDoc. No. 6368/2018, dated 12-NOV-18
What the supplied record establishesSale deed in favour of M/s. Indigo Constructions for 748.72 Sq.Yards., or 625.92 Sq.Mtrs. in Survey No. 20 (Part), as extracted in the title report.
Encumbrance statement filed with RERA
Identifier / dateStatement No. 35508433; search period 01-10-2007 to 19-11-2018
What the supplied record establishesFiled statement includes recorded transactions for the stated search period; it is not a current encumbrance search.
Form B declaration
Identifier / dateDocument 59019, dated 25 June 2019
What the supplied record establishesPromoter affidavit and undertakings, including its completion-date declaration.
Floor-plan record
Identifier / dateDocument 60078
What the supplied record establishesDrawing record used for the software-measured 3BHK carpet-area estimate; this measurement is not a RERA disclosure.

The supplied documents do not establish an issued OC or completion certificate for Building - A. The permit itself says an OC is compulsory before occupation.

Frequently asked questions

Is INDIGO RESIDENCY registered with Telangana RERA?

Yes. INDIGO RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02200000995; the registration status is New Project.

Who is the developer of INDIGO RESIDENCY?

The promoter named in the RERA registration is INDIGO CONSTRUCTIONS.

Where is INDIGO RESIDENCY located?

INDIGO RESIDENCY is in KAPRA, Medchal-Malkajgiri, Telangana (500073).

When will INDIGO RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 19/12/2021. This is the promoter's declaration, not a guarantee.