Tripada Residency
GUNUGANTI · Hyderabad · RERA P02500001655
TRIPADA RESIDENCY is a residential apartment project in Biramalguda, Hyderabad district; the mandal is not disclosed in the project identity and land record. The TG-RERA record names Mr./Ms. Gunuganti Rameshwar Rao as the registered promoter. The project covers 628.75 sq. m and comprises one building with 1 Stilt + 5 upper floors and 10 3BHK apartments, each with a saleable area of 82.17 sq. m. Its TG-RERA registration number is P02500001655, and its proposed completion date is 25/03/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | TRIPADA RESIDENCY |
| Project type | Residential apartment project RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; registration is for the project |
| TG-RERA registration | P02500001655 |
| Registration validity | 18 February 2020 to 25 March 2025; the supplied certificate says five years and that extension would require Authority action. This is the registration period, not the construction deadline. |
| RERA-filed promoter | Mr./Ms. Gunuganti Rameshwar Rao |
| Status in project record | “New Project” RERA filing. Current registration status after 25 March 2025 is not established by the supplied record. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / site description | BIRAMALGUDA; the GHMC permit describes the site as BAIRAML GUDA. RERA filing |
| Revenue village | Biramalguda in the project identity record; Bairamalguda village (Champapet-3B) in the GHMC permit; the title documents also use Bairamalguda/Bairavpulguda spellings. [header; land; doc:91380 p1; doc:103110; doc:103111; doc:103151] |
| Mandal | Not disclosed in the project identity/land record. The RERA certificate lists Amberpet. [land; doc:REGCERT-12723 p1] |
| District | Hyderabad [header; fields: Address Details] |
| PIN | 500079 [header; doc:REGCERT-12723 p1] |
| Project survey number | Survey No. 56; no subdivision is stated. [header; land; doc:91380 p1; doc:REGCERT-12723 p1] |
| Site extent | 628.75 sq. m; total area 628.75 sq. m and net area 628.75 sq. m in the project land record. [land; doc:91380 p1] |
| Boundaries in RERA land record | East: NEIGHBORS LAND; West: 40 FEET WIDE ROAD; North: OPEN SPACE; South: 30 FEET WIDE ROAD. Land records |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) [approvals; doc:91380 p1] |
| Principal building permit | 2/C4/05542/2019, dated 03 April, 2019; file no. 2/C4/03393/2019. [approvals; doc:91380 p1] |
| Approved building use and configuration | One proposed residential building, “PROPO BLDG (RESIDENCE),” with 1 Stilt + 5 upper floors; sanctioned height 14.95 m. |
| Approved built-up area | The project record gives 1600.62 sq. m; the permit extraction separately records residential area 1,600.60 and stilt area 324.99. These are the figures as recorded, not interchangeable area measures. RERA filing |
| Building / tower count | One building/unit in the RERA project fields; one building in the GHMC permit. RERA filing |
| RERA-declared units | 10, all 3BHK; booked 0 and available 10 in the portal data, whose as-of date is not supplied. [units; unit_details] |
| Sanctioned unit count | The permit says the number of units sanctioned must not be increased without prior GHMC approval, but the extracted permit text does not state the sanctioned count. |
| Parking levels / number | Stilt is sanctioned; the permit says approved cellar and stilt areas for parking must be used exclusively for vehicle parking. No cellar level or parking-space count is established in the supplied material. |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configuration | 3BHK; 10 units [units; unit_details] |
| RERA-filed saleable area | 82.17 sq. m per unit [units; unit_details] |
| Booked / available | 0 booked / 10 available, as last read from the TG-RERA portal; no as-of date is provided, so the counts are indicative. [units; unit_details] |
| Construction stage | No independently verified or dated construction-progress evidence is supplied. The amenities record gives selected progress percentages, but does not establish overall building completion. RERA amenities |
| Completion date | The project header lists 25/03/2025 as proposed completion; the Form B declaration states a completion undertaking of 16 months, but its date is OCR-rendered as “25 day of 2920” and is not reliably readable. [header; doc:103148 p1] |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied documents. The GHMC permit requires a completion notice and occupancy certificate before occupation. |
2. The project story
TRIPADA RESIDENCY is recorded with TG-RERA as a residential apartment project on Survey No. 56 at Biramalguda, Hyderabad district. The registered project information describes a site of 628.75 sq. m and one building; the GHMC permit identifies a proposed residential building with stilt parking and five upper floors. [header; land; fields: Land Details; doc:91380 p1]
The RERA unit schedule lists ten 3BHK apartments. The portal counts show none booked and all ten available, but lack an as-of date. The supplied material does not establish the building’s current construction stage or independently verify completion. The proposed completion date in the project record and the registration-validity end date are separate dates; neither, by itself, establishes that the project is complete or occupied. No occupancy/completion certificate is supplied. [unit_details; units; header; doc:REGCERT-12723 p1; documents]
3. Master plan, architecture & building design
The RERA land record describes a single-building residential project on a 628.75 sq. m site, with the same figure recorded as net area. The GHMC permit describes a single building named “PROPO BLDG (RESIDENCE)” with 1 Stilt + 5 upper floors and a height of 14.95 m. [land; doc:91380 p1]
The project fields list approved built-up area as 1600.62 sq. m. The permit extraction records residential area as 1,600.60 and stilt area as 324.99; the permit’s extracted sanctioned-parameter text also contains “Proposed Covered builtup area 112,043.00,” whose label/value formatting is unclear in the extraction. These figures are reported as recorded and are not treated as equivalent area categories. No floor-plan detail sufficient to establish the building footprint, flats per floor, room arrangement, lifts, stairs, entrances, or internal circulation is available in the supplied material. RERA filing
The permit refers to a tot-lot, a peripheral greenery strip, and rainwater harvesting; it also records 30 Trees and 93.36 RM of compound wall in its extracted parameters. The permit requires greenery at the tot-lot and around the site. No landscape drawing or measured open-space schedule is supplied.
4. Homes, configurations & floor plans
The TG-RERA unit schedule records ten 3BHK units, each with a saleable area of 82.17 sq. m. The portal booking counts are indicative because their as-of date is not given. [unit_details; units]
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 82.17 sq. m | Not established | Not supplied |
The supplied floor-plan review reports two drawings measured, but zero 3BHK flat designs measured; it therefore provides no software-measured carpet area or room dimensions for these units. The RERA-filed saleable area is not a carpet-area measurement. [floor_plans; unit_details]
5. Parking & vehicle circulation
The GHMC permit describes a stilt level and requires the approved cellar and stilt areas for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied extraction does not establish a cellar in this building’s floor configuration, nor does it provide the number or allocation of parking spaces, visitor or accessible parking, vehicle ramps, EV charging, or unit-specific parking rights. A parking bay or parking-level provision alone does not establish exclusive ownership or allocation.
6. Amenities, recreation & open spaces
The RERA amenities record includes selected development-progress entries; the percentages shown are reported values and do not independently verify completion. The permit also requires specified site facilities. [amenities; doc:91380 p1–2]
| Description / size | Permit calls for a tot-lot, to be fenced and maintained as greenery before occupancy certificate; no area or capacity supplied. |
|---|---|
| Declared progress / verified status | Permit condition; delivered status not verified. RERA amenities entry: 0%. |
| Description / size | No size or facility description supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenities entry: 0%. |
| Description / size | Listed in third-party vendor material only; no size supplied. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Marketing/listing claim; not established as RERA-filed or delivered. |
| Description / size | Listed in third-party vendor material only; no size supplied. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Marketing/listing claim; not established as RERA-filed or delivered. |
| Description / size | Listed in third-party vendor material only; no size supplied. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Marketing/listing claim; not established as RERA-filed or delivered. |
7. Utilities, building services & safety
The permit requires a rainwater-harvesting structure (percolation pit), records No. of RWHPs 6, and requires space for a transformer and a garbage house within the premises. It also records fire-protection and fire-safety requirements among the sanctioned parameters, but the supplied extraction does not describe the installed systems or confirm completion.
| Service | Supplied evidence |
|---|---|
| Water | RERA amenities record marks water supply “YES” at 50%; source, storage and treatment details are not supplied. RERA amenities |
| Sewerage / drainage | Sewerage is marked “YES” at 0% in the RERA amenities record. No STP, reuse, storm-water or capacity details are supplied. RERA amenities |
| Rainwater harvesting | Required by the GHMC permit; six RWHPs are listed in its extracted parameters. Installation is not verified. |
| Electrical | The RERA amenities record lists electrical meter room/sub-station/receiving station as “YES” at 10%; the permit requires transformer space. Capacity and completion status are not supplied. [amenities; doc:91380 p1] |
| Fire and life safety | Fire-protection/fire-safety requirements appear in the amenities record; the supplied evidence does not detail systems, escape routes, clearances or completion. RERA amenities |
| Waste | The permit requires a garbage house; the record does not establish its completion or a waste-segregation system. |
| Lifts, backup, security and accessibility | No project-specific lift, power-backup, CCTV/security or accessible-circulation specifications are established in the supplied RERA documents. Third-party vendor listings mention power backup and 24×7 security, but those are not verified project records. Promoter website |
8. Location, access & connectivity
The registered project location is Biramalguda, Hyderabad district, PIN 500079, on Survey No. 56. The RERA land record gives the site’s west and south boundaries as 40-foot and 30-foot-wide roads respectively. The GHMC permit identifies the site as Bairamalguda village (Champapet-3B). [header; fields: Address Details; land; doc:91380 p1]
A supplied cadastral-parcel centroid is 17.41528, 78.35459. The location record lists Financial District (Nanakramguda) at 1.2 km. The evidence does not provide measured distances to public transport or other landmarks. Location record
9. Developer & development status
The TG-RERA registration certificate names Mr./Ms. Gunuganti Rameshwar Rao as promoter. The project’s promoter field is “GUNUGANTI”; the legal entity type is not disclosed, and no corporate registration identifier, official contact details or promoter website is supplied. The certificate lists promoter office as House No.: 2218/15/E.
The GHMC permit names G.RAMESWAR RAO as applicant and SAI BALAJI CONSTRUCTIONS as developer/builder. The project record identifies one building, with no phase-wise development schedule supplied. Current construction progress and completion are not independently verified; no occupancy/completion certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P02500001655; issued 18/02/2020; validity stated to 25/03/2025 |
|---|---|
| What the supplied record establishes | Form C registration for TRIPADA RESIDENCY; includes a 70% separate-account condition. |
| Identifier / date | Approval no. 2/C4/05542/2019; file no. 2/C4/03393/2019; 03 April, 2019 |
|---|---|
| What the supplied record establishes | Conditional permission for a proposed residential building on Survey No. 56, with 1 Stilt + 5 upper floors. |
| Identifier / date | LRS/2297/CR-3/EASTZONE/GHMC/2008 |
|---|---|
| What the supplied record establishes | Reference recorded in the building permit; a separate approved-layout plan is not supplied. |
| Identifier / date | Doc. 103148 |
|---|---|
| What the supplied record establishes | Promoter declaration includes title and encumbrance assertions, a 16-month completion undertaking and fund-management statements; the declaration date is OCR-rendered and not reliably readable. |
| Identifier / date | Docs 91246 and 91247 |
|---|---|
| What the supplied record establishes | Filed encumbrance-statement documents; the supplied project record notes that a fresh current EC is not included. |
| Identifier / date | Docs 103110, 103111, 103151 |
|---|---|
| What the supplied record establishes | Filed sale-deed/title-report material and an advocate’s title opinion concerning Survey No. 56. |
| Identifier / date | Doc. 103150 |
|---|---|
| What the supplied record establishes | RERA-form agreement document; the supplied extraction says allottee, unit, price, possession date and execution particulars remain unfilled. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The GHMC permit says a completion notice and occupancy certificate are required before occupation. |
1. Project at a glance
Project identity
Registered project name: TRIPADA RESIDENCY
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; registration is for the project
TG-RERA registration: P02500001655
Registration validity: 18 February 2020 to 25 March 2025; the supplied certificate says five years and that extension would require Authority action. This is the registration period, not the construction deadline.
RERA-filed promoter: Mr./Ms. Gunuganti Rameshwar Rao
Status in project record: “New Project”. Current registration status after 25 March 2025 is not established by the supplied record.
Land and geographic identity
Locality / site description: BIRAMALGUDA; the GHMC permit describes the site as BAIRAML GUDA.
Revenue village: Biramalguda in the project identity record; Bairamalguda village (Champapet-3B) in the GHMC permit; the title documents also use Bairamalguda/Bairavpulguda spellings. [header; land; doc:91380 p1; doc:103110; doc:103111; doc:103151]
Mandal: Not disclosed in the project identity/land record. The RERA certificate lists Amberpet. [land; doc:REGCERT-12723 p1]
District: Hyderabad [header; fields: Address Details]
PIN: 500079 [header; doc:REGCERT-12723 p1]
Project survey number: Survey No. 56; no subdivision is stated. [header; land; doc:91380 p1; doc:REGCERT-12723 p1]
Site extent: 628.75 sq. m; total area 628.75 sq. m and net area 628.75 sq. m in the project land record. [land; doc:91380 p1]
Boundaries in RERA land record: East: NEIGHBORS LAND; West: 40 FEET WIDE ROAD; North: OPEN SPACE; South: 30 FEET WIDE ROAD.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC) [approvals; doc:91380 p1]
Principal building permit: 2/C4/05542/2019, dated 03 April, 2019; file no. 2/C4/03393/2019. [approvals; doc:91380 p1]
Approved building use and configuration: One proposed residential building, “PROPO BLDG (RESIDENCE),” with 1 Stilt + 5 upper floors; sanctioned height 14.95 m.
Approved built-up area: The project record gives 1600.62 sq. m; the permit extraction separately records residential area 1,600.60 and stilt area 324.99. These are the figures as recorded, not interchangeable area measures.
Building / tower count: One building/unit in the RERA project fields; one building in the GHMC permit.
RERA-declared units: 10, all 3BHK; booked 0 and available 10 in the portal data, whose as-of date is not supplied. [units; unit_details]
Sanctioned unit count: The permit says the number of units sanctioned must not be increased without prior GHMC approval, but the extracted permit text does not state the sanctioned count.
Parking levels / number: Stilt is sanctioned; the permit says approved cellar and stilt areas for parking must be used exclusively for vehicle parking. No cellar level or parking-space count is established in the supplied material.
Offering and status
RERA-filed configuration: 3BHK; 10 units [units; unit_details]
RERA-filed saleable area: 82.17 sq. m per unit [units; unit_details]
Booked / available: 0 booked / 10 available, as last read from the TG-RERA portal; no as-of date is provided, so the counts are indicative. [units; unit_details]
Construction stage: No independently verified or dated construction-progress evidence is supplied. The amenities record gives selected progress percentages, but does not establish overall building completion.
Completion date: The project header lists 25/03/2025 as proposed completion; the Form B declaration states a completion undertaking of 16 months, but its date is OCR-rendered as “25 day of 2920” and is not reliably readable. [header; doc:103148 p1]
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied documents. The GHMC permit requires a completion notice and occupancy certificate before occupation.
2. The project story
TRIPADA RESIDENCY is recorded with TG-RERA as a residential apartment project on Survey No. 56 at Biramalguda, Hyderabad district. The registered project information describes a site of 628.75 sq. m and one building; the GHMC permit identifies a proposed residential building with stilt parking and five upper floors. [header; land; fields: Land Details; doc:91380 p1]
The RERA unit schedule lists ten 3BHK apartments. The portal counts show none booked and all ten available, but lack an as-of date. The supplied material does not establish the building’s current construction stage or independently verify completion. The proposed completion date in the project record and the registration-validity end date are separate dates; neither, by itself, establishes that the project is complete or occupied. No occupancy/completion certificate is supplied. [unit_details; units; header; doc:REGCERT-12723 p1; documents]
3. Master plan, architecture & building design
The RERA land record describes a single-building residential project on a 628.75 sq. m site, with the same figure recorded as net area. The GHMC permit describes a single building named “PROPO BLDG (RESIDENCE)” with 1 Stilt + 5 upper floors and a height of 14.95 m. [land; doc:91380 p1]
The project fields list approved built-up area as 1600.62 sq. m. The permit extraction records residential area as 1,600.60 and stilt area as 324.99; the permit’s extracted sanctioned-parameter text also contains “Proposed Covered builtup area 112,043.00,” whose label/value formatting is unclear in the extraction. These figures are reported as recorded and are not treated as equivalent area categories. No floor-plan detail sufficient to establish the building footprint, flats per floor, room arrangement, lifts, stairs, entrances, or internal circulation is available in the supplied material.
The permit refers to a tot-lot, a peripheral greenery strip, and rainwater harvesting; it also records 30 Trees and 93.36 RM of compound wall in its extracted parameters. The permit requires greenery at the tot-lot and around the site. No landscape drawing or measured open-space schedule is supplied.
4. Homes, configurations & floor plans
The TG-RERA unit schedule records ten 3BHK units, each with a saleable area of 82.17 sq. m. The portal booking counts are indicative because their as-of date is not given. [unit_details; units]
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 82.17 sq. m | Not established | Not supplied |
The supplied floor-plan review reports two drawings measured, but zero 3BHK flat designs measured; it therefore provides no software-measured carpet area or room dimensions for these units. The RERA-filed saleable area is not a carpet-area measurement. [floor_plans; unit_details]
5. Parking & vehicle circulation
The GHMC permit describes a stilt level and requires the approved cellar and stilt areas for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied extraction does not establish a cellar in this building’s floor configuration, nor does it provide the number or allocation of parking spaces, visitor or accessible parking, vehicle ramps, EV charging, or unit-specific parking rights. A parking bay or parking-level provision alone does not establish exclusive ownership or allocation.
6. Amenities, recreation & open spaces
The RERA amenities record includes selected development-progress entries; the percentages shown are reported values and do not independently verify completion. The permit also requires specified site facilities. [amenities; doc:91380 p1–2]
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Permit calls for a tot-lot, to be fenced and maintained as greenery before occupancy certificate; no area or capacity supplied. | Permit condition; delivered status not verified. RERA amenities entry: 0%. | |
| Community buildings | No size or facility description supplied. | RERA amenities entry: 0%. | |
| Indoor games | Listed in third-party vendor material only; no size supplied. | Marketing/listing claim; not established as RERA-filed or delivered. | |
| Kids’ play areas / sand pits | Listed in third-party vendor material only; no size supplied. | Marketing/listing claim; not established as RERA-filed or delivered. | |
| Normal park / central green | Listed in third-party vendor material only; no size supplied. | Marketing/listing claim; not established as RERA-filed or delivered. |
7. Utilities, building services & safety
The permit requires a rainwater-harvesting structure (percolation pit), records No. of RWHPs 6, and requires space for a transformer and a garbage house within the premises. It also records fire-protection and fire-safety requirements among the sanctioned parameters, but the supplied extraction does not describe the installed systems or confirm completion.
Water: RERA amenities record marks water supply “YES” at 50%; source, storage and treatment details are not supplied.
Sewerage / drainage: Sewerage is marked “YES” at 0% in the RERA amenities record. No STP, reuse, storm-water or capacity details are supplied.
Rainwater harvesting: Required by the GHMC permit; six RWHPs are listed in its extracted parameters. Installation is not verified.
Electrical: The RERA amenities record lists electrical meter room/sub-station/receiving station as “YES” at 10%; the permit requires transformer space. Capacity and completion status are not supplied. [amenities; doc:91380 p1]
Fire and life safety: Fire-protection/fire-safety requirements appear in the amenities record; the supplied evidence does not detail systems, escape routes, clearances or completion.
Waste: The permit requires a garbage house; the record does not establish its completion or a waste-segregation system.
Lifts, backup, security and accessibility: No project-specific lift, power-backup, CCTV/security or accessible-circulation specifications are established in the supplied RERA documents. Third-party vendor listings mention power backup and 24×7 security, but those are not verified project records.
8. Location, access & connectivity
The registered project location is Biramalguda, Hyderabad district, PIN 500079, on Survey No. 56. The RERA land record gives the site’s west and south boundaries as 40-foot and 30-foot-wide roads respectively. The GHMC permit identifies the site as Bairamalguda village (Champapet-3B). [header; fields: Address Details; land; doc:91380 p1]
A supplied cadastral-parcel centroid is 17.41528, 78.35459. The location record lists Financial District (Nanakramguda) at 1.2 km. The evidence does not provide measured distances to public transport or other landmarks.
9. Developer & development status
The TG-RERA registration certificate names Mr./Ms. Gunuganti Rameshwar Rao as promoter. The project’s promoter field is “GUNUGANTI”; the legal entity type is not disclosed, and no corporate registration identifier, official contact details or promoter website is supplied. The certificate lists promoter office as House No.: 2218/15/E.
The GHMC permit names G.RAMESWAR RAO as applicant and SAI BALAJI CONSTRUCTIONS as developer/builder. The project record identifies one building, with no phase-wise development schedule supplied. Current construction progress and completion are not independently verified; no occupancy/completion certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P02500001655; issued 18/02/2020; validity stated to 25/03/2025 |
|---|---|
| What the supplied record establishes | Form C registration for TRIPADA RESIDENCY; includes a 70% separate-account condition. |
| Identifier / date | Approval no. 2/C4/05542/2019; file no. 2/C4/03393/2019; 03 April, 2019 |
|---|---|
| What the supplied record establishes | Conditional permission for a proposed residential building on Survey No. 56, with 1 Stilt + 5 upper floors. |
| Identifier / date | LRS/2297/CR-3/EASTZONE/GHMC/2008 |
|---|---|
| What the supplied record establishes | Reference recorded in the building permit; a separate approved-layout plan is not supplied. |
| Identifier / date | Doc. 103148 |
|---|---|
| What the supplied record establishes | Promoter declaration includes title and encumbrance assertions, a 16-month completion undertaking and fund-management statements; the declaration date is OCR-rendered and not reliably readable. |
| Identifier / date | Docs 91246 and 91247 |
|---|---|
| What the supplied record establishes | Filed encumbrance-statement documents; the supplied project record notes that a fresh current EC is not included. |
| Identifier / date | Docs 103110, 103111, 103151 |
|---|---|
| What the supplied record establishes | Filed sale-deed/title-report material and an advocate’s title opinion concerning Survey No. 56. |
| Identifier / date | Doc. 103150 |
|---|---|
| What the supplied record establishes | RERA-form agreement document; the supplied extraction says allottee, unit, price, possession date and execution particulars remain unfilled. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The GHMC permit says a completion notice and occupancy certificate are required before occupation. |
Frequently asked questions
Is TRIPADA RESIDENCY registered with Telangana RERA?
Yes. TRIPADA RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02500001655; the registration status is New Project.
Who is the developer of TRIPADA RESIDENCY?
The promoter named in the RERA registration is GUNUGANTI.
Where is TRIPADA RESIDENCY located?
TRIPADA RESIDENCY is in BIRAMALGUDA, Hyderabad, Telangana (500079).
When will TRIPADA RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 25/03/2025. This is the promoter's declaration, not a guarantee.
More projects in Hyderabad