Horizon C

RIZE DEVELOPERS AND BUILDERS PRIVATE LIMITED · Medchal-Malkajgiri · RERA P02200007356

HORIZON C is a residential apartment project in UNDER NIZAMPET MUNCIPAL CORPORATION, Bachupally mandal, Medchal-Malkajgiri district, developed by RIZE DEVELOPERS AND BUILDERS PRIVATE LIMITED. The project has a registered site extent of 3,737.80 Sq.Mt. and one residential building with 1 Cellar + 1 Ground + 5 upper floors. It lists 41 2BHK homes and 52 3BHK homes. Its TG-RERA registration is P02200007356, and the header records a proposed completion date of 11/01/2027.

01What we found

Period endedTG-RERA registration ran to 11 Sep 2026 - check its extension on TG-RERA
15documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameHORIZON C
Project type / statusResidential apartment project; filed as a new project
Registered phase or portionNot separately identified in the supplied record
TG-RERA registrationP02200007356
Registration validity8 December 2023 to 11 September 2026, unless extended by the Authority
Registered promoterRIZE DEVELOPERS AND BUILDERS PRIVATE LIMITED
RERA status in supplied evidenceRegistration certificate on file; no extension is recorded in the supplied certificate

Land and geographic identity

ItemRecord
Registered localityUNDER NIZAMPET MUNCIPAL CORPORATION
Revenue villageBachupally
MandalBachupally
DistrictMedchal-Malkajgiri
PIN500090 in the project header; the registration certificate separately records 500050 RERA record
Project survey number(s) and subdivision(s)Survey No. 406/PART; building-permit documents describe it as Survey No. 406 part RERA record
Registered site extent3,737.80 Sq.Mt. RERA filing
Total / net areaTotal area 3,737.80 sq m; net area 3,737.80 sq m RERA filing
Boundaries filedEast: NEIGHBOURS LAND; West: SURVEY NO 485; North: SURVEY NO 406PART AND 407; South: 30 FEET WIDE ROAD RERA filing

Development identity

ItemRecord
Sanctioning authority / building-permit authorityHMDA technical approval; building permit order issued by Nizampet Municipal Corporation
Principal approval008220/BP/HMDA/1800/MED/2023, dated 11 September 2023 Approvals record
Approved built-up area11,448.78 sq m is recorded as “Built-up Area”; the approval extraction separately records “Total Built up Area” of 14,582.57 sq m
Building countOne residential building is recorded in the project filing RERA filing
Sanctioned floor configuration1 Cellar + 1 Ground + 5 upper floors
Height17.87, as recorded in the sanctioned-parameters extraction; unit is not stated in that extracted field
Parking levels / provisionCellar is part of the sanctioned floor configuration. The available extraction does not give a sanctioned parking-space count or parking allocation
Units96 total units in the project record, including 93 homes (41 2BHK and 52 3BHK) and three rows identified as common areas/non-home items RERA unit table RERA unit table

Offering and status

ItemRecord
Home configurations2BHK and 3BHK RERA unit table
RERA-filed saleable area2BHK: 111.95 sq m; 3BHK: 131.8 sq m RERA unit table
Booked / available2BHK: 24 booked, 17 available; 3BHK: 47 booked, 5 available. Counts are from the TG-RERA portal reading; no as-of date is supplied, so they are indicative RERA unit table RERA unit details
Construction stageTG-RERA progress record reports sewerage at 50% and green strip/TOT LOT/park at 10%; other listed infrastructure items are at 0% or have no percentage stated. These are filed progress figures, not independent site verification RERA amenities
Promoter-declared completion11 September 2026 in Form B
Header proposed completion11/01/2027 RERA record
Occupancy / completion certificateNo occupancy or completion certificate is recorded in the supplied project evidence. The building-permit order requires an Occupancy Certificate before occupation

Registration validity, the promoter’s Form B completion undertaking and the header’s proposed completion date are separate record items; none establishes that an Occupancy Certificate has been issued.

2. The project story

HORIZON C is registered as a residential apartment project on Survey No. 406/PART, at Bachupally, within the locality entered in the RERA record as UNDER NIZAMPET MUNCIPAL CORPORATION. The registered site extent is 3,737.80 sq m. The approval documents describe one residential building, with a sanctioned configuration of 1 Cellar + 1 Ground + 5 upper floors. RERA record RERA filing

The project filing lists 41 2BHK homes and 52 3BHK homes. The portal-read booking figures are 24 and 47 respectively, but the record does not provide an as-of date for those counts. The remaining three entries in the unit table—Lobby, Ramp To Cellar and Visitors Parking—are not homes for sale. RERA unit table RERA unit table

The available RERA progress data indicates 50% for sewerage and 10% for the green strip/TOT LOT/park; several other listed infrastructure and amenity items are recorded at 0%. These are reported portal figures, not an independent inspection of construction. The supplied evidence does not establish an overall construction-completion percentage. No occupancy or completion certificate is included. RERA amenities

3. Master plan, architecture & building design

The supplied building-permit record covers a single residential building on Survey No. 406 part. Its sanctioned floor configuration is 1 Cellar + 1 Ground + 5 upper floors. The project filing records one building unit. No evidence in the supplied material specifies the building footprint, flats per floor, lift or stair count, tower arrangement, internal circulation plan, or phase-wise organization. RERA filing

Design / area itemEvidence
Site extent3,737.80 Sq.Mt.
“Built-up Area”11,448.78 sq m
“Total Built up Area”14,582.57 sq m
Sanctioned configuration1 Cellar + 1 Ground + 5 upper floors
Height17.87; extracted field does not state a unit
FSI-counted areaNot disclosed in the supplied evidence
Building footprint / flats per floor / lifts / stairsNot disclosed in the supplied evidence
Parking configuration beyond cellar levelNot established by the supplied drawing extraction

The approved-layout document row is present in the RERA document list, but its plan image was not extracted in the supplied evidence. The descriptions above therefore rely on the extracted approval details, not a complete drawing review. Document index

4. Homes, configurations & floor plans

The following unit counts and saleable areas are from the TG-RERA filing. Carpet areas are software measurements from the filed floor-plan drawings, not RERA-filed carpet-area disclosures; the drawing-derived measurements are identified as needing review. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK412417111.95 sq mMedian 75.4 sq m; range 55.3–77.8 sq m33%
3BHK52475131.8 sq mMedian 88.6 sq m; range 87.5–101.1 sq m33%

Software measured 12 2BHK and 14 3BHK flat designs. For one illustrated 2BHK plan, the listed rooms include two bedrooms, living/dining, kitchen, two toilets and two utility areas; for one illustrated 3BHK plan, the listed rooms include three bedrooms, living/kitchen, two toilets and two utility areas. These are drawing-based measurements and room labels, not a guarantee that every unit has the same arrangement. RERA unit details

Carpet area represents the software-measured internal area from drawing geometry. The RERA-filed saleable area is a separate figure and, according to the supplied drawing-measurement note, also accounts for the home’s share of common areas. Utility areas are separately identified in the measured plans and are excluded from the supplied carpet calculation. The portal-read booking counts have no stated as-of date. Floor plans RERA unit details

5. Parking & vehicle circulation

The sanctioned building configuration includes a cellar, and the unit table contains a “RAMP TO CELLAR” row identified as a non-home entry. The approval document also refers to parking and prohibits parking or construction in setback areas. The supplied evidence does not establish the number of sanctioned car or two-wheeler spaces, visitor-space count, accessible spaces, parking allocation to individual apartments, or whether parking is resident, visitor, surface, stilt, mechanical or otherwise configured. RERA unit table

A RERA unit-table row named “VISITORS PARKING” is not a verified count of parking bays or evidence of an individual allotment. No spaces-per-home ratio can be established from the supplied records. RERA unit table

6. Amenities, recreation & open spaces

The following table reports the amenities/infrastructure items and progress as recorded in the supplied RERA progress data. Percentages are filed progress figures and are not independently verified. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Green Strip/TOT LOT/ParkSize not statedRERA progress data RERA amenities10%; not independently verified
Community BuildingsSize or quantity not statedRERA progress data RERA amenities0%
Aggregate area of recreational Open SpaceArea not statedRERA progress data RERA amenities0%

The supplied project-specific RERA progress extract does not list clubhouse, indoor recreation, sports or convenience facilities with sizes or completion status. Promoter/vendor material lists additional amenity claims, but those claims are not treated here as sanctioned or delivered facilities. Promoter website

7. Utilities, building services & safety

The building-permit extraction lists a transformer, garbage house, STP, rainwater-harvesting structures and electric-vehicle charging infrastructure as amenities/utilities. The permit also requires an STP and rainwater-harvesting structures. These are approval-document provisions, not evidence that the facilities are complete or operational.

Water supply
Evidence in supplied recordMarked “YES” in the RERA progress data RERA amenities
Status / limitationReported progress is 0%; source, storage and treatment capacity are not stated
Sewerage / STP
Evidence in supplied recordSewerage (chambers, lines, septic tank, STP) marked “YES”; STP also listed in the building-approval extraction RERA amenities
Status / limitationRERA progress data reports 50%; completion and capacity are not independently verified
Storm-water drainage
Evidence in supplied recordListed in RERA progress data RERA amenities
Status / limitation0%; detailed design and capacity not supplied
Rainwater harvesting
Evidence in supplied recordMarked “YES” in RERA progress data and listed in the approval extraction RERA amenities
Status / limitationRERA progress data reports 0%; completion not independently verified
Electrical
Evidence in supplied recordTransformer listed in the approval extraction; electrical meter room/sub-station/receiving station marked “YES” in RERA progress data RERA amenities
Status / limitationProgress reported as 0%; capacity and backup provision are not established by project-specific RERA evidence
EV charging
Evidence in supplied recordListed in the building-approval extraction
Status / limitationNumber, location and installation status not stated
Fire and life safety
Evidence in supplied recordFire-protection and fire-safety requirements listed in RERA progress data RERA amenities
Status / limitationProgress reported as 0%; no project-specific fire-system details or clearance are established here
Waste
Evidence in supplied recordGarbage house listed in the building-approval extraction; solid-waste management/disposal listed in RERA progress data RERA amenities
Status / limitationRERA progress data reports 0% for solid-waste management/disposal
Lifts, access and security
Evidence in supplied recordNo project-specific RERA evidence supplied for lift count/capacity, accessible circulation, CCTV or access-control systems
Status / limitationNot established

The approval documents state that an Occupancy Certificate is compulsory before occupation and that occupation is subject to the stated approval conditions. No such certificate is included in the supplied evidence.

8. Location, access & connectivity

The registered project location is in the locality recorded as UNDER NIZAMPET MUNCIPAL CORPORATION, revenue village Bachupally, Bachupally mandal, Medchal-Malkajgiri district, PIN 500090. The project boundary record identifies a 30 FEET WIDE ROAD to the south. The building-permit extraction refers to a minimum approach-road width of 4.5mts. RERA record RERA filing

A cadastral parcel-centroid coordinate is supplied as 17.41528, 78.35459. The location data provides one measured connectivity distance: Financial District (Nanakramguda), 1.2 km. No other project-verified road, public-transport or landmark distances are supplied in the location record. Location record

9. Developer & development status

The registered promoter is RIZE DEVELOPERS AND BUILDERS PRIVATE LIMITED, a company, GSTIN 36AANCR0362A1ZO. The project record names VENKANA ARAVIND REDDY as authorized signatory and VENKANNAGARI SUCHARITHA as director. The filed promoter address is DATTA SAI ENCLAVE, CHANDANAGAR, BACHUPALLY VILLAGE AND MANDAL, UNDER NIZAMPET MUNCIPAL CORPORATION, Medchal-Malkajgiri, 500090. Corporate record Parties record

The promoter’s Form B, signed by SRI. V. ARAVIND REDDY for the company on 20 October 2023, declares completion by 11 September 2026 and includes the promoter’s stated fund-management and audit commitments. The project header separately records a proposed completion date of 11/01/2027. RERA record No project-wide construction-completion percentage or occupancy certificate is established by the supplied evidence.

The project record identifies VENKANNAGARI DIGAMBER REDDY as the landowner/promoter participant under an AreaShare agreement. Parties record The supplied evidence does not provide an official promoter contact number or a verified project-specific website address.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200007356; issued 8 December 2023
What the supplied evidence establishesRegistration of HORIZON C; validity stated to 11 September 2026
HMDA technical building approval
Identifier / date008220/BP/HMDA/1800/MED/2023; 11 September 2023
What the supplied evidence establishesTechnical approval for a residential building on Survey No. 406 part; records floor configuration and approval conditions
Nizampet Municipal Corporation Building Permit Order
Identifier / date008220/BP/HMDA/1800/MED/2023; 11 September 2023
What the supplied evidence establishesBuilding permit order for Survey No. 406 part, with an extent of 3,737.80 Sq.Mt.; no completion certificate is recorded in the extraction
Registered mortgage for HMDA
Identifier / dateDocument No. 24295/2023; 8 September 2023
What the supplied evidence establishesApproval record describes a mortgage of built-up area in favour of HMDA; the extracted approval identifies 1,166.26 sq m in the Ground floor
Form B promoter declaration
Identifier / date20 October 2023
What the supplied evidence establishesPromoter’s declared land, encumbrance and completion particulars
Project encumbrance statement
Identifier / dateStatement No. 147520685; searched 1 January 1983 to 19 October 2023
What the supplied evidence establishesFiled encumbrance-statement extract; a fresh current search is not included
Advocate’s title search report
Identifier / dateDocument 365572; dated 20 October 2023 in the document summary
What the supplied evidence establishesTitle opinion and underlying instrument references; full title analysis is addressed in the Land & Title section
Approved layout / plan document
Identifier / dateDocument 365413
What the supplied evidence establishesListed in the RERA document register; plan image was not extracted in the supplied evidence Document index
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied evidence establishesNo project occupancy or completion certificate is established in the supplied evidence

Frequently asked questions

Is HORIZON C registered with Telangana RERA?

Yes. HORIZON C is registered with the Telangana Real Estate Regulatory Authority as P02200007356; the registration status is New Project.

Who is the developer of HORIZON C?

The promoter named in the RERA registration is RIZE DEVELOPERS AND BUILDERS PRIVATE LIMITED.

Where is HORIZON C located?

HORIZON C is in UNDER NIZAMPET MUNCIPAL CORPORATION, Medchal-Malkajgiri, Telangana (500090).

When will HORIZON C be completed?

The promoter's proposed date of completion filed with RERA is 11/01/2027. This is the promoter's declaration, not a guarantee.