Harmony Avenues Iris Block
SRI MAHAVISHNU INFRA LLP · Rangareddy · RERA P02400004517
HARMONY AVENUES IRIS BLOCK is a residential apartment project in Kondapur, Serilingampally mandal, Ranga Reddy district. The registered promoter is SRI MAHAVISHNU INFRA LLP. The project has a registered site extent of 393.75 sq. m and one residential building with 1 Stilt + 5 upper floors, comprising 10 apartments: five 2BHK and five 3BHK. Its TG-RERA registration number is P02400004517, and the permit completion deadline is 03 November 2024.
More from Sri Mahavishnu Infra LLP · 5 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | HARMONY AVENUES IRIS BLOCK RERA record |
| Project type and registered portion | Residential apartment project; one building, identified in the permit as Building - A (PROP). No separate phase name is disclosed. RERA record |
| TG-RERA registration | P02400004517; registration certificate states registration under section 5, valid 14/05/2022 to 03/11/2024. RERA record |
| RERA status in supplied record | The stated registration validity ended on 03/11/2024; the certificate records no extension. This is separate from the building’s occupancy certificate status below. |
| Registered promoter | SRI MAHAVISHNU INFRA LLP (LLP). RERA record Corporate record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Kondapur; revenue village recorded as Kondapur. RERA record RERA filing |
| Mandal / district / PIN | Serilingampally / Ranga Reddy / 500084. RERA record RERA filing |
| Project survey numbers and subdivisions | Sy. Nos. 56 (Part)/57 (Part); the RERA certificate lists 56(PART) and 57(PART). RERA record Land records |
| Registered site extent | 393.75 sq. m; total and net area are each recorded as 393.75 sq. m, with road-affected and nala-affected area recorded as 0.0 in the building permit. Land records |
| Boundaries as filed | East: Western Exotica Apartments; west: 40 ft wide road; north: land belonging to Sri R. Srinivasula Reddy and others; south: land belonging to Sri R. Madhu. Land records |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building permit | 0895/GHMC/SLP/2021-BP, approved 03 November 2021; file no. 001992/GHMC/1153/SLP2/2021-BP. Approvals record |
| Approved built-up area | Permit records residential upper-floor area of 1,095.35 sq. m and stilt area of 205.93 sq. m. |
| Building and floors | One residential building; sanctioned configuration 1 Stilt + 5 upper floors, height 14.9 m. |
| Parking provision in permit | Stilt parking is identified; total parking area is recorded as 205.9. The supplied permit extract does not state a count of parking spaces. |
| Unit counts | RERA-filed inventory: 10 units. The project record also states one total building unit as per approved plan; the supplied material does not explain this field’s meaning in relation to the 10 filed apartment units. RERA unit table RERA filing |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations | 2BHK: 5 units; 3BHK: 5 units. RERA unit table RERA unit details |
| Filed saleable area | 2BHK: 112.41 sq. m; 3BHK: 138.89 sq. m. RERA unit table RERA unit details |
| Booked / available | Portal snapshot records 0 booked and 5 available for each configuration (10 available total). The portal record supplied has no as-of date, so counts are indicative. RERA unit table RERA unit details |
| Construction deadline and RERA validity | The permit sets a completion deadline of 03 November 2024; the RERA certificate validity also ended 03/11/2024. These are distinct recorded dates. |
| Promoter-declared completion date | Form B, dated 25 January 2022, undertakes completion by 31/03/2023. |
| Occupancy certificate | GHMC occupancy certificate 1231/GHMC/SLP/2023-OC, dated 07 May 2023, is filed for the residential building A (PROP). An architect’s Form 1A also certifies overall completion of the registered project. |
2. The project story
HARMONY AVENUES IRIS BLOCK is a single-building residential apartment project in Kondapur, Serilingampally, on the registered project land in Sy. Nos. 56 (Part)/57 (Part). The GHMC permit describes Building - A (PROP) as a building with one stilt level and five upper floors. The RERA-filed offering comprises five 2BHK and five 3BHK apartments. RERA record Land records RERA unit table
The file includes a GHMC occupancy certificate for Building A (PROP), recording that it was inspected and declared fit for occupation, and a Form 1A architect’s completion certificate for the registered project. These are documentary records of completion/occupancy certification, not an independent assessment of present physical condition or services.
The supplied record does not give a separately verified current construction-progress assessment. The portal’s booked and available counts lack an as-of date. RERA unit table
3. Master plan, architecture & building design
The GHMC permit records a 393.75 sq. m plot, 1,095.35 sq. m of residential upper-floor area, 205.93 sq. m of stilt area and a building height of 14.9 m. It sanctions one residential building, 1 Stilt + 5 upper floors. These are permit figures; the supplied material does not identify an FSI-counted area.
The permit extract lists front, rear and side setbacks of 3 m, 2 m, 2 m and 2 m, respectively. It also records a 131 sq. yd. TDR area and DRC no. 00637/TDR/2021.
A layout-approval document is listed in the RERA file, but the supplied record does not provide an extracted drawing or detailed site layout. Accordingly, building footprint, floor-by-floor apartment arrangement, lifts, stairs, entries, internal circulation, landscaping dimensions and common-area distribution cannot be described from the available drawings. Document index
The occupancy-certificate record contains a site-plan deviations entry and compares sanctioned-plan and site-building-plan measurements; this overview does not interpret those entries. The filed certificate identifies the same building and confirms an occupancy certificate.
4. Homes, configurations & floor plans
The RERA filing records 10 apartments across two configurations. For 2BHK, software measurement from the supplied floor-plan drawing identifies a carpet-area range; this is a drawing-derived estimate, not a RERA-filed carpet-area figure. No usable 3BHK drawing measurement is supplied. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 112.41 sq. m | 77.1–79.7 sq. m (software-measured; drawing review noted) | 31% |
| 3BHK | 5 | 0 | 5 | 138.89 sq. m | Not measured in the supplied record | Not supplied |
The measured 2BHK drawing includes a living/dining area, kitchen, two bedrooms, toilet, balcony and utility spaces. The supplied room schedule gives a 1.30 m wide balcony and two utility areas; it does not provide a measured carpet-area figure for the balcony. RERA unit details
Carpet area is distinct from RERA-filed saleable area. Saleable area is the filed figure; the supplied software note says its drawing-derived carpet measure is smaller and that saleable area also counts the home’s share of common areas. The stated loading is supplied for 2BHK only. RERA unit details Floor plans
5. Parking & vehicle circulation
The building permit records stilt parking and a total parking area of 205.9; it requires the approved cellar and stilt areas to be used exclusively for parking and not partitioned or otherwise converted. The permit extract does not specify a parking-space count, visitor or accessible provision, or a unit-by-unit allocation.
The RERA record marks the 2BHK and 3BHK inventory as mortgaged. That inventory marker does not establish an individual buyer’s parking allocation. RERA unit table
No supplied project drawing or record establishes the number or location of vehicle entries, ramps, visitor spaces, two-wheeler spaces, EV charging or pedestrian separation. Document index
6. Amenities, recreation & open spaces
The permit includes requirements for rainwater harvesting, a transformer space, a garbage house, perimeter greenery and a fenced tot-lot. The RERA amenity record marks several infrastructure categories as available, but does not supply facility dimensions or independent verification. RERA amenities
| Description / size | Size not stated; permit requires tot-lot fencing and greenery maintenance. |
|---|---|
| Evidence source | GHMC permit; RERA amenity record |
| Declared progress / verified status | Permit condition; RERA record marks Green Strip/TOT LOT/Park at 100%. No independent verification supplied. RERA amenities |
| Description / size | Area not stated. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Aggregate recreational open-space field is recorded at 0%; no detailed layout evidence supplied. RERA amenities |
| Description / size | No project-filed sizes or capacities supplied. |
|---|---|
| Evidence source | Third-party vendor listing |
| Declared progress / verified status | Listed by vendor; not established as sanctioned or delivered by the supplied project documents. Promoter website |
The vendor also lists CCTV, lift, power backup and covered parking. Those are vendor claims, not evidence of project-filed facility specifications or completion. Promoter website
7. Utilities, building services & safety
| Service | Evidence in the project record |
|---|---|
| Water and rainwater | RERA amenity record marks water supply at 100% and water conservation/rainwater harvesting at 100%; the permit requires a rainwater-harvesting structure and the occupancy record lists one RWH provision. Water source, storage and treatment capacity are not stated. RERA amenities |
| Sewerage and drainage | RERA amenity record marks sewerage (including chamber, lines, septic tank and STP) and storm-water drains at 100%. The documents supplied do not identify STP capacity, treatment method or reuse arrangements. RERA amenities |
| Electrical | The permit requires space for a transformer; RERA amenity record marks the electrical meter room/sub-station/receiving-station category at 100%. Supply capacity and backup arrangements are not established by the project-filed records here. RERA amenities |
| Fire and life safety | The permit places responsibility for fire-fighting installations and means-of-escape safety on the owner/developer and identifies an occupancy Fire NOC as a permit condition. The supplied extracts do not establish the installed systems or provide the Fire NOC. |
| Waste | The permit requires a garbage house; the RERA solid-waste-management field is recorded at 0%. No capacity or operating details are supplied. RERA amenities |
| Lifts, accessibility and security | The permit refers to lifts and services under qualified technical supervision, but no lift count/capacity, accessibility layout, CCTV specification or access-control details are supplied in project-filed evidence. |
These records describe filed declarations and permit conditions; they do not independently verify current operation or statutory compliance of services. RERA amenities
8. Location, access & connectivity
The registered location is Kondapur, Serilingampally, Ranga Reddy district, Telangana 500084. The project land is identified in Kondapur revenue village, Sy. Nos. 56 (Part)/57 (Part). RERA record Land records
The project boundary record identifies a 40 ft wide road on the west. The location data gives HITEC City at 2.9 km from the cadastral parcel centroid. No measured public-transport distance or verified travel time is supplied. Land records Location record
9. Developer & development status
The registered promoter is SRI MAHAVISHNU INFRA LLP, an LLP, with GSTIN 36AEJFS6979P1ZR. The project record lists the promoter address as GSK Towers, Ammeri Bagh, Kondapur, Hyderabad, Serilingampally, Ranga Reddy, 500084. The supplied records do not provide an official contact number, email or promoter website. Corporate record Parties record
The RERA certificate records registration from 14/05/2022 to 03/11/2024, without an extension in the supplied certificate. The GHMC occupancy certificate is for Building A (PROP), and the architect’s Form 1A certifies completion of the registered project.
The Form B declaration dated 25 January 2022 records the promoter’s undertaking to complete by 31/03/2023. The GHMC permit records a completion deadline of 03 November 2024. These dates are reproduced as separate filed statements; they do not replace the occupancy-certificate record.
10. Approvals, official records & documents
| Identifier / date | P02400004517; issued 14/05/2022; valid through 03/11/2024 |
|---|---|
| What the supplied record establishes | Form C registration for HARMONY AVENUES IRIS BLOCK. |
| Identifier / date | 0895/GHMC/SLP/2021-BP; 03 November 2021; file no. 001992/GHMC/1153/SLP2/2021-BP |
|---|---|
| What the supplied record establishes | Residential Building - A (PROP), Sy. Nos. 56 (Part)/57 (Part), with sanctioned configuration and conditions. |
| Identifier / date | 1231/GHMC/SLP/2023-OC; 07 May 2023 |
|---|---|
| What the supplied record establishes | Occupancy certificate for Building A (PROP) in the project survey parcels. |
| Identifier / date | Form 1A; 07/05/2023 |
|---|---|
| What the supplied record establishes | Architect certifies completion of construction work for the registered project. |
| Identifier / date | 25 January 2022 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title, encumbrances, funds, approvals and completion undertaking. |
| Identifier / date | C/GHMC/039522/2020 |
|---|---|
| What the supplied record establishes | Identifier appears in the building permit; detailed layout drawing is not extracted in the supplied material. |
1. Project at a glance
Project identity
Registered project name: HARMONY AVENUES IRIS BLOCK
Project type and registered portion: Residential apartment project; one building, identified in the permit as Building - A (PROP). No separate phase name is disclosed.
TG-RERA registration: P02400004517; registration certificate states registration under section 5, valid 14/05/2022 to 03/11/2024.
RERA status in supplied record: The stated registration validity ended on 03/11/2024; the certificate records no extension. This is separate from the building’s occupancy certificate status below.
Registered promoter: SRI MAHAVISHNU INFRA LLP (LLP).
Land and geographic identity
Locality / revenue village: Kondapur; revenue village recorded as Kondapur.
Mandal / district / PIN: Serilingampally / Ranga Reddy / 500084.
Project survey numbers and subdivisions: Sy. Nos. 56 (Part)/57 (Part); the RERA certificate lists 56(PART) and 57(PART).
Registered site extent: 393.75 sq. m; total and net area are each recorded as 393.75 sq. m, with road-affected and nala-affected area recorded as 0.0 in the building permit.
Boundaries as filed: East: Western Exotica Apartments; west: 40 ft wide road; north: land belonging to Sri R. Srinivasula Reddy and others; south: land belonging to Sri R. Madhu.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building permit: 0895/GHMC/SLP/2021-BP, approved 03 November 2021; file no. 001992/GHMC/1153/SLP2/2021-BP.
Approved built-up area: Permit records residential upper-floor area of 1,095.35 sq. m and stilt area of 205.93 sq. m.
Building and floors: One residential building; sanctioned configuration 1 Stilt + 5 upper floors, height 14.9 m.
Parking provision in permit: Stilt parking is identified; total parking area is recorded as 205.9. The supplied permit extract does not state a count of parking spaces.
Unit counts: RERA-filed inventory: 10 units. The project record also states one total building unit as per approved plan; the supplied material does not explain this field’s meaning in relation to the 10 filed apartment units.
Offering and status
RERA-filed configurations: 2BHK: 5 units; 3BHK: 5 units.
Filed saleable area: 2BHK: 112.41 sq. m; 3BHK: 138.89 sq. m.
Booked / available: Portal snapshot records 0 booked and 5 available for each configuration (10 available total). The portal record supplied has no as-of date, so counts are indicative.
Construction deadline and RERA validity: The permit sets a completion deadline of 03 November 2024; the RERA certificate validity also ended 03/11/2024. These are distinct recorded dates.
Promoter-declared completion date: Form B, dated 25 January 2022, undertakes completion by 31/03/2023.
Occupancy certificate: GHMC occupancy certificate 1231/GHMC/SLP/2023-OC, dated 07 May 2023, is filed for the residential building A (PROP). An architect’s Form 1A also certifies overall completion of the registered project.
2. The project story
HARMONY AVENUES IRIS BLOCK is a single-building residential apartment project in Kondapur, Serilingampally, on the registered project land in Sy. Nos. 56 (Part)/57 (Part). The GHMC permit describes Building - A (PROP) as a building with one stilt level and five upper floors. The RERA-filed offering comprises five 2BHK and five 3BHK apartments.
The file includes a GHMC occupancy certificate for Building A (PROP), recording that it was inspected and declared fit for occupation, and a Form 1A architect’s completion certificate for the registered project. These are documentary records of completion/occupancy certification, not an independent assessment of present physical condition or services.
The supplied record does not give a separately verified current construction-progress assessment. The portal’s booked and available counts lack an as-of date.
3. Master plan, architecture & building design
The GHMC permit records a 393.75 sq. m plot, 1,095.35 sq. m of residential upper-floor area, 205.93 sq. m of stilt area and a building height of 14.9 m. It sanctions one residential building, 1 Stilt + 5 upper floors. These are permit figures; the supplied material does not identify an FSI-counted area.
The permit extract lists front, rear and side setbacks of 3 m, 2 m, 2 m and 2 m, respectively. It also records a 131 sq. yd. TDR area and DRC no. 00637/TDR/2021.
A layout-approval document is listed in the RERA file, but the supplied record does not provide an extracted drawing or detailed site layout. Accordingly, building footprint, floor-by-floor apartment arrangement, lifts, stairs, entries, internal circulation, landscaping dimensions and common-area distribution cannot be described from the available drawings.
The occupancy-certificate record contains a site-plan deviations entry and compares sanctioned-plan and site-building-plan measurements; this overview does not interpret those entries. The filed certificate identifies the same building and confirms an occupancy certificate.
4. Homes, configurations & floor plans
The RERA filing records 10 apartments across two configurations. For 2BHK, software measurement from the supplied floor-plan drawing identifies a carpet-area range; this is a drawing-derived estimate, not a RERA-filed carpet-area figure. No usable 3BHK drawing measurement is supplied.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 112.41 sq. m | 77.1–79.7 sq. m (software-measured; drawing review noted) | 31% |
| 3BHK | 5 | 0 | 5 | 138.89 sq. m | Not measured in the supplied record | Not supplied |
The measured 2BHK drawing includes a living/dining area, kitchen, two bedrooms, toilet, balcony and utility spaces. The supplied room schedule gives a 1.30 m wide balcony and two utility areas; it does not provide a measured carpet-area figure for the balcony.
Carpet area is distinct from RERA-filed saleable area. Saleable area is the filed figure; the supplied software note says its drawing-derived carpet measure is smaller and that saleable area also counts the home’s share of common areas. The stated loading is supplied for 2BHK only.
5. Parking & vehicle circulation
The building permit records stilt parking and a total parking area of 205.9; it requires the approved cellar and stilt areas to be used exclusively for parking and not partitioned or otherwise converted. The permit extract does not specify a parking-space count, visitor or accessible provision, or a unit-by-unit allocation.
The RERA record marks the 2BHK and 3BHK inventory as mortgaged. That inventory marker does not establish an individual buyer’s parking allocation.
No supplied project drawing or record establishes the number or location of vehicle entries, ramps, visitor spaces, two-wheeler spaces, EV charging or pedestrian separation.
6. Amenities, recreation & open spaces
The permit includes requirements for rainwater harvesting, a transformer space, a garbage house, perimeter greenery and a fenced tot-lot. The RERA amenity record marks several infrastructure categories as available, but does not supply facility dimensions or independent verification.
| Description / size | Size not stated; permit requires tot-lot fencing and greenery maintenance. |
|---|---|
| Evidence source | GHMC permit; RERA amenity record |
| Declared progress / verified status | Permit condition; RERA record marks Green Strip/TOT LOT/Park at 100%. No independent verification supplied. |
| Description / size | Area not stated. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | Aggregate recreational open-space field is recorded at 0%; no detailed layout evidence supplied. |
| Description / size | No project-filed sizes or capacities supplied. |
|---|---|
| Evidence source | Third-party vendor listing |
| Declared progress / verified status | Listed by vendor; not established as sanctioned or delivered by the supplied project documents. |
The vendor also lists CCTV, lift, power backup and covered parking. Those are vendor claims, not evidence of project-filed facility specifications or completion.
7. Utilities, building services & safety
Water and rainwater: RERA amenity record marks water supply at 100% and water conservation/rainwater harvesting at 100%; the permit requires a rainwater-harvesting structure and the occupancy record lists one RWH provision. Water source, storage and treatment capacity are not stated.
Sewerage and drainage: RERA amenity record marks sewerage (including chamber, lines, septic tank and STP) and storm-water drains at 100%. The documents supplied do not identify STP capacity, treatment method or reuse arrangements.
Electrical: The permit requires space for a transformer; RERA amenity record marks the electrical meter room/sub-station/receiving-station category at 100%. Supply capacity and backup arrangements are not established by the project-filed records here.
Fire and life safety: The permit places responsibility for fire-fighting installations and means-of-escape safety on the owner/developer and identifies an occupancy Fire NOC as a permit condition. The supplied extracts do not establish the installed systems or provide the Fire NOC.
Waste: The permit requires a garbage house; the RERA solid-waste-management field is recorded at 0%. No capacity or operating details are supplied.
Lifts, accessibility and security: The permit refers to lifts and services under qualified technical supervision, but no lift count/capacity, accessibility layout, CCTV specification or access-control details are supplied in project-filed evidence.
These records describe filed declarations and permit conditions; they do not independently verify current operation or statutory compliance of services.
8. Location, access & connectivity
The registered location is Kondapur, Serilingampally, Ranga Reddy district, Telangana 500084. The project land is identified in Kondapur revenue village, Sy. Nos. 56 (Part)/57 (Part).
The project boundary record identifies a 40 ft wide road on the west. The location data gives HITEC City at 2.9 km from the cadastral parcel centroid. No measured public-transport distance or verified travel time is supplied.
9. Developer & development status
The registered promoter is SRI MAHAVISHNU INFRA LLP, an LLP, with GSTIN 36AEJFS6979P1ZR. The project record lists the promoter address as GSK Towers, Ammeri Bagh, Kondapur, Hyderabad, Serilingampally, Ranga Reddy, 500084. The supplied records do not provide an official contact number, email or promoter website.
The RERA certificate records registration from 14/05/2022 to 03/11/2024, without an extension in the supplied certificate. The GHMC occupancy certificate is for Building A (PROP), and the architect’s Form 1A certifies completion of the registered project.
The Form B declaration dated 25 January 2022 records the promoter’s undertaking to complete by 31/03/2023. The GHMC permit records a completion deadline of 03 November 2024. These dates are reproduced as separate filed statements; they do not replace the occupancy-certificate record.
10. Approvals, official records & documents
| Identifier / date | P02400004517; issued 14/05/2022; valid through 03/11/2024 |
|---|---|
| What the supplied record establishes | Form C registration for HARMONY AVENUES IRIS BLOCK. |
| Identifier / date | 0895/GHMC/SLP/2021-BP; 03 November 2021; file no. 001992/GHMC/1153/SLP2/2021-BP |
|---|---|
| What the supplied record establishes | Residential Building - A (PROP), Sy. Nos. 56 (Part)/57 (Part), with sanctioned configuration and conditions. |
| Identifier / date | 1231/GHMC/SLP/2023-OC; 07 May 2023 |
|---|---|
| What the supplied record establishes | Occupancy certificate for Building A (PROP) in the project survey parcels. |
| Identifier / date | Form 1A; 07/05/2023 |
|---|---|
| What the supplied record establishes | Architect certifies completion of construction work for the registered project. |
| Identifier / date | 25 January 2022 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title, encumbrances, funds, approvals and completion undertaking. |
| Identifier / date | C/GHMC/039522/2020 |
|---|---|
| What the supplied record establishes | Identifier appears in the building permit; detailed layout drawing is not extracted in the supplied material. |
Frequently asked questions
Is HARMONY AVENUES IRIS BLOCK registered with Telangana RERA?
Yes. HARMONY AVENUES IRIS BLOCK is registered with the Telangana Real Estate Regulatory Authority as P02400004517; the registration status is New Project.
Who is the developer of HARMONY AVENUES IRIS BLOCK?
The promoter named in the RERA registration is SRI MAHAVISHNU INFRA LLP.
Where is HARMONY AVENUES IRIS BLOCK located?
HARMONY AVENUES IRIS BLOCK is in HYDERABAD, Kondapur, Serilingampally, Rangareddy, Telangana (500084).
When will HARMONY AVENUES IRIS BLOCK be completed?
The promoter's proposed date of completion filed with RERA is 03/11/2024. This is the promoter's declaration, not a guarantee.