HARI HARA RESIDENCY is a residential apartment project in GOVINDPALLY, Jagtial ( U ) mandal, Jagithyal district, developed by M/S HARIHARA CONSTRUCTIONS & DEVELOPERS. The project is on 882.05 sq m of land and comprises one building with stilt parking and G+4 upper floors. The TG-RERA schedule lists 15 2BHK apartments, each with a saleable area of 103.46 sq m. Its TG-RERA registration number is P02800000403, and its proposed completion date is 03/07/2020.

More from Harihara Constructions & Developers · 2 projects →

01What we found

Period endedTG-RERA registration ran to 3 Jul 2020 - check its extension on TG-RERA
10documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from hari-hara-residency.mumbaihotel.netPhoto from hari-hara-residency.mumbaihotel.net
▦ View all 2 photos
Mothe, Jagtial, Jagithyal · geocoded — approximate.

Project at a glance

Project identity

FieldProject record
Registered project nameHARI HARA RESIDENCY RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase designation not disclosed; the registration identifies Survey No. 384 RERA record
TG-RERA registrationP02800000403 RERA record
Registration validity8 March 2019 to 3 July 2020; the supplied certificate records no extension RERA record
Registered promoterM/S HARIHARA CONSTRUCTIONS & DEVELOPERS RERA record
RERA statusListed as “On-Going Project” in the supplied record RERA filing

Land and geographic identity

FieldProject record
LocalityGOVINDPALLY RERA record RERA filing
Revenue villageMOTHE(R) RERA record
MandalJagtial ( U) RERA record
DistrictJagithyal RERA record
PIN505325 RERA record
Project survey number(s)Survey No. 384; no subdivision is disclosed RERA record Land records
Registered site extent882.05 sq m total and net area in the RERA land record RERA filing
Boundaries as recordedEast: HOUSE OF T SATYANARAYANA; West: LAND OF VENDOR OTHERS; North: 9M WIDE ROAD LAND OF VENDOR; South: HOUSE OF PURANAM KAMALA RERA filing

Development identity

FieldProject record
Sanctioning authority shown in project recordDTCP; the RERA record also lists a plan approval identified as ZONE/GHMC/2012 RERA record RERA filing
Principal project-specific technical-clearance identifiersDTCP-WGLM/BLDG/22/2018-WNGL-DTCP; Proceedings No. 2054/2018/W; Building Permission No. B.P.No.55/2018/W. The technical clearance is dated 2018 06.07 Approvals record
Building description in technical-clearance documentResidential Apartment Building, stilt floor for parking and G+4 upper floors
Approved built-up area1335.10 sq m in the RERA project record RERA filing
Building countOne building/unit in the RERA land details RERA filing
ParkingStilt parking is described in the technical-clearance document; a parking-space count is not disclosed
Units1 building unit is recorded in land details; 15 apartments are recorded in the RERA unit schedule RERA filing RERA unit table

Offering and status

FieldProject record
RERA-filed configuration2BHK RERA unit table
RERA-filed saleable area103.46 sq m RERA unit table
Booked / available0 booked / 15 available, as last read from the TG-RERA portal; no as-of date is supplied, so counts are indicative RERA unit table
Declared construction progress80% in the project header; this is a recorded progress figure, not an independent site verification RERA record
Completion datesOriginal and revised proposed completion dates: 03/07/2020 RERA record
Occupancy certificate statusNo occupancy certificate for this Survey No. 384 project is identified in the supplied evidence; status is therefore not established by the supplied documents Document index

The project story

HARI HARA RESIDENCY is recorded with TG-RERA as a residential apartment project on Survey No. 384 at Govindpally, in the revenue village of Mothe, Jagtial mandal, Jagithyal district. The filed land area is 882.05 sq m. The project’s technical-clearance document describes a residential apartment building with stilt parking and G+4 upper floors. RERA record Land records

The RERA schedule lists fifteen 2BHK apartments, all shown as available and none booked in the portal data supplied. The project header records 80% completion and a proposed completion date of 3 July 2020, but the progress figure is not independently verified here. The supplied evidence does not establish an occupancy certificate for this project. RERA unit table RERA record Document index

Master plan, architecture & building design

The project record describes one residential building on a site recorded as 882.05 sq m, with an approved built-up area of 1335.10 sq m. The technical-clearance document describes stilt parking and G+4 upper floors and refers to the site as 882.88 sq m. RERA filing RERA filing

The submitted technical-clearance conditions refer to open parking, water supply, storm-water drainage, drainage, sewerage, a transformer, a garbage chute, rainwater-harvesting structures, greenery and a continuous 1.0 m-wide green plantation strip around the periphery. The document also describes a mortgage area as 10% of the total built-up area, to be handed over to the sanctioning authority by notarised affidavit. These are document conditions or plan references; the supplied evidence does not establish their completion.

Detailed floor plans, building footprint, flats per floor, stair and lift arrangements, internal circulation and phase organization are not established by the supplied project-specific drawing data. The project record gives approved built-up area; no separately labelled FSI-counted area or gross built-up area is supplied. The RERA saleable area and software-measured carpet-area data are kept distinct in the homes section. RERA filing Floor plans RERA unit table

Homes, configurations & floor plans

The RERA unit schedule identifies 15 apartments as 2BHK, with saleable area of 103.46 sq m each; the schedule shows none booked and all 15 available, with no as-of date stated. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK15015103.46 sq mNot supplied for this RERA-filed configurationNot supplied

A separate software measurement of the supplied drawing identifies 3BHK plans, not a matching RERA-filed configuration: four flat designs were measured, with software-measured carpet area ranging from 53.4 to 91.4 sq m (median 75.5 sq m). This is a drawing-based measurement, not a RERA disclosure, and the measurement record says it needs review. The supplied room schedule for one first-floor plan labels bedrooms, living/dining, kitchen, toilets and a utility; the utility is identified as excluded from carpet area. Floor plans

Carpet area is the usable area within a home as measured from the drawing; RERA saleable area is a separately filed figure and may include a share of common areas. The supplied evidence does not provide a verified loading figure for the RERA-filed 2BHK units. Floor plans RERA unit table

Parking & vehicle circulation

The technical-clearance document describes a stilt floor for parking and states that the open parking area shown in the plan is to be used only for parking. It does not provide a count of car or two-wheeler spaces, nor does the supplied evidence establish visitor, accessible or EV-charging spaces, ramps, driveway arrangements, or unit-specific parking allocations. A drawn or referenced bay does not by itself establish exclusive ownership.

Amenities, recreation & open spaces

The RERA amenities record lists 14 infrastructure and facility categories. The supplied progress percentages are 0 where shown; a percentage of 0 is not evidence that a facility has been completed. The technical-clearance document also sets out certain plan conditions. RERA amenities

Landscape / open space
FacilityGreen strip / tot lot / park
Description / sizeNo size supplied
Evidence sourceRERA amenities
Declared progress / verified status0% recorded; completion not independently verified
Landscape / open space
FacilityAggregate recreational open space
Description / sizeNo area supplied
Evidence sourceRERA amenities
Declared progress / verified status0% recorded; completion not independently verified
Landscape / open space
FacilityGreenery and 1.0 m-wide continuous peripheral plantation strip
Description / sizeRequired by the technical-clearance document; no area or completion evidence supplied
Declared progress / verified statusPlan condition; completion not independently verified
Sports / recreation
FacilityNo separate sports facility identified
Description / size—
Evidence sourceRERA amenities
Declared progress / verified statusNot disclosed
Clubhouse / indoor
FacilityCommunity buildings
Description / sizeNo size or use details supplied
Evidence sourceRERA amenities
Declared progress / verified status0% recorded; completion not independently verified
Convenience / community
FacilityStreet lighting
Description / sizeNo quantity or specification supplied
Evidence sourceRERA amenities
Declared progress / verified status0% recorded; completion not independently verified
Convenience / community
FacilityInternal roads and footpaths
Description / sizeNo dimensions or layout details supplied
Evidence sourceRERA amenities
Declared progress / verified status0% recorded; completion not independently verified

Utilities, building services & safety

The RERA amenities schedule records “YES” for water supply, sewerage and storm-water drains, and rainwater harvesting/water conservation; it also records “YES” for an electrical meter room, sub-station or receiving station. It gives no capacities, technical designs or evidence of completed operation. RERA amenities

The RERA amenities record also lists treatment and disposal of sewage and sullage water, solid-waste management and disposal, energy management, and fire protection and fire-safety requirements, but shows 0% for these items and provides no supporting system details or capacities. Lift provision, backup power, CCTV/security systems, accessibility features and fire-clearance status are not established in the supplied project-specific evidence. RERA amenities

See Master plan, architecture & building design above for technical-clearance conditions concerning water supply, storm-water drainage, drainage, sewerage, a transformer, garbage chute, rainwater-harvesting structures and greenery, and their completion status.

Location, access & connectivity

The registered project location is Govindpally locality, Mothe revenue village, Jagtial ( U) mandal, Jagithyal district, PIN 505325. The land-details record identifies a 9M-wide road along the northern boundary. No verified public-transport details, landmark distances, measured travel distances or travel times are supplied. RERA record RERA filing RERA filing

Developer & development status

The registered promoter is M/S HARIHARA CONSTRUCTIONS & DEVELOPERS, identified in the project record as a partnership. The supplied promoter record names Ananthula Srinath and Aduvala Laxman as partners, and Pellerla Rajaiah and Kotagiri Aravind as authorized signatories. A separate RERA-filed Form B declaration is attributed to P. Rajaiah and Karavind and states a 30-month completion undertaking; it is a promoter declaration. RERA record RERA filing Parties record

The project header records 80% completion and 3 July 2020 as both the original and revised proposed completion date. The supplied evidence does not independently verify the reported progress or establish an occupancy certificate for this Survey No. 384 project. RERA record Document index

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02800000403; issued 8 March 2019; validity to 3 July 2020
What the supplied record establishesRegistration of HARI HARA RESIDENCY; Survey No. 384 and the registered promoter are identified.
DTCP technical clearance
Identifier / dateFile No. DTCP-WGLM/BLDG/22/2018-WNGL-DTCP; Proceedings No. 2054/2018/W; dated 2018 06.07
What the supplied record establishesTechnical clearance for a residential apartment building with stilt parking and G+4 upper floors on Survey No. 384; the document delegates building-permission action to Mothe Gram Panchayat.
Building permission reference in technical-clearance document
Identifier / dateB.P.No.55/2018/W
What the supplied record establishesListed in the technical-clearance document; the supplied evidence does not include a separate project-specific final building-permission instrument.
Form B declaration
Identifier / dateDeclaration dated 26/Lday of Nov 2018
What the supplied record establishesPromoter declaration concerning title basis, encumbrances, project funds, audits, approvals and a 30-month completion undertaking.
TG-RERA unit and land records
Identifier / dateCaptured in shared project data; portal booking data has no stated as-of date
What the supplied record establishesRecord 882.05 sq m total/net area, 15 RERA-filed 2BHK units and their indicative booked/available counts. RERA filing RERA unit table

No occupancy certificate for HARI HARA RESIDENCY on Survey No. 384 is identified in the supplied evidence. The other building-permit and occupancy-certificate records in the document set identify different projects, promoters and survey numbers, so they are not presented as approvals or completion evidence for this project. Document index

Frequently asked questions

Is HARI HARA RESIDENCY registered with Telangana RERA?

Yes. HARI HARA RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02800000403; the registration status is On-Going Project.

Who is the developer of HARI HARA RESIDENCY?

The promoter named in the RERA registration is M/S HARIHARA CONSTRUCTIONS & DEVELOPERS.

Where is HARI HARA RESIDENCY located?

HARI HARA RESIDENCY is in GOVINDPALLY, MOTHE(R), Jagtial ( U ), Jagtial, Telangana (505325).

When will HARI HARA RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 03/07/2020. This is the promoter's declaration, not a guarantee.