Sign in

Shambhavi Residency

M/S SHAMBHAVI CONSTRUCTIONS · Jagtial · RERA P02800000346

SHAMBHAVI RESIDENCY is a residential apartment project in Jagtial ( U ), Jagtial ( U ) mandal, Jagithyal district. The registered promoter is M/S SHAMBHAVI CONSTRUCTIONS. The project covers 652.24 sq. m and comprises one building, Building - A1 (UMAPATHI), sanctioned as Stilt + 5, with 20 2BHK units. It is registered with TG-RERA as P02800000346, with a proposed completion date of 10/10/2023.

01What we found

Period endedTG-RERA registration ran to 10 Oct 2023 - check its extension on TG-RERA
11documents on file - each fact links to its page
4court cases on this project's land (survey 156, Na)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameSHAMBHAVI RESIDENCY RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately named in the supplied record; registration identifies the project and site as a whole RERA record
TG-RERA registration numberP02800000346 RERA record
Registration validity20/02/2019 to 10/10/2023; certificate states a four-year validity period. No extension is recorded in the supplied certificate
Registered promoterM/S SHAMBHAVI CONSTRUCTIONS, recorded as a partnership RERA record RERA filing
RERA statusRecorded as “On-Going Project”; the registration validity end date is separate from the stated completion date and occupancy-certificate status RERA record

Land and geographic identity

FieldProject record
Locality / address on registration certificateJagtial ( U), Jagithyal
Revenue villageNot disclosed in the RERA project fields; the building-permit record identifies Ganesh Nagar_W18 as locality, not as a revenue-village entry RERA filing
MandalJagtial ( U) RERA record
DistrictJagithyal RERA record
PIN505327 RERA record
Project survey numbers / subdivisions156 A TO E (as recorded on the RERA registration) RERA record
Registered site extent652.24 sq. m in the building-permit order
Total / net areaTotal area: 652.24 sq. m; net area: 652.24 sq. m; recorded road-affected area: 0 RERA filing
Boundaries (RERA filing)East: OPEN LAND OF VENDORS; West: HOUSE OF SADULA SATHEMMA; North: 9M WIDE EXISTING ROAD; South: LG GARDEN GP DHAROOR RERA filing

Development identity

FieldProject record
Sanctioning authorityBuilding-permit order issued by JAGITYAL Municipality I; RERA project fields list DTCP as the authority RERA filing
Principal approval number / date3009/W18/2017/0491, approved 10 October, 2017
Additional numbers shown on permitLayout / Sub Divn. Nos. 169/LRS/G1/2017 and 170/LRS/G1/2017
Approved built-up area1,756.85 sq. m RERA filing
Building count and nameOne building unit in the RERA filing; permit names Building - A1 (UMAPATHI) RERA filing
Sanctioned floor configurationStilt + 5; sanctioned height 14.25 m
Parking levelsStilt level is shown in the permit. Parking count and a separate parking-level schedule are not established by the supplied records
Unit countsApproved plan: 1 building unit; proposed units as per agreement: 1 in the land-details fields. RERA unit inventory records 20 2BHK units RERA filing RERA unit table

Offering and status

FieldProject record
RERA-filed configuration2BHK, 20 units RERA unit table RERA unit details
RERA-filed saleable area100.01 sq. m per unit RERA unit table RERA unit details
Booked / available0 booked / 20 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative RERA unit table
Construction stageProject status is recorded as “On-Going Project”; supplied records do not establish an independently verified current site stage RERA record
Original / revised completion date10/10/2023 / 10/10/2023 RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The building permit states that an Occupancy Certificate is compulsory before occupation RERA record

2. The project story

SHAMBHAVI RESIDENCY is registered as a residential apartment project in Jagtial ( U), Jagithyal, on the RERA-recorded survey range 156 A TO E. The site is recorded as 652.24 sq. m, with one permitted residential building, Building - A1 (UMAPATHI), sanctioned as Stilt + 5. The RERA inventory records 20 two-bedroom apartments. RERA record RERA filing RERA unit table

The supplied record labels the project “On-Going Project” and gives 10/10/2023 as both original and revised completion date. It does not provide a current independently verified construction update or an occupancy/completion certificate. The Form B declaration signed by the managing partner on 30 November 2018 undertakes completion within 36 months; that is a promoter declaration, not evidence of present completion. RERA record

3. Master plan, architecture & building design

The building permit describes one residential building, Building - A1 (UMAPATHI), on an extent of 652.24 sq. m, with Stilt + 5 floors and a sanctioned height of 14.25 m. The permit’s listed approved built-up area is 1,756.85 sq. m. The project fields likewise record approved built-up area as 1,756.85 sq. m. These are approved-area figures; the supplied material does not state a separate FSI-counted area, carpet area, building footprint, or floor-by-floor apartment arrangement. RERA filing

The RERA filing records one building unit in the approved plan and 20 apartments in the unit inventory. The supplied floor-plan records comprise two drawings, neither software-measured; both are marked as scans pending. Details such as flats per floor, lifts, stairs, entrances, internal circulation and apartment orientation therefore cannot be established from the available drawing data. RERA filing RERA unit table Floor plans

The permit lists a tot-lot to be fenced and maintained as greenery before issue of the occupancy certificate, and requires a rainwater-harvesting structure, transformer space and a garbage house. These are permit conditions; the supplied material does not establish their completion.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK20020100.01 sq. mNot measured from the supplied drawingsNot supplied

The configuration, unit count, booking count and saleable area are from the TG-RERA record; the booking snapshot has no recorded as-of date. The two supplied floor-plan drawings are scans pending, so no software-measured carpet area or room dimensions are available. Saleable area is the RERA-filed figure; the supplied record does not provide a separate carpet-area measurement or loading figure for these units. RERA unit table RERA unit details Floor plans

5. Parking & vehicle circulation

The project is described in the permit as a Stilt + 5 building, and the vendor record lists “parking” without a count or layout. The supplied evidence does not establish sanctioned car or two-wheeler space counts, visitor or accessible bays, parking allocation to individual units, ramps, driveways, mechanical parking, EV charging, or a separate parking level. A stilt designation alone does not establish the number or allocation of parking spaces. Promoter website

6. Amenities, recreation & open spaces

The RERA amenity record lists the following site facilities. Its progress entries are recorded as 0 where shown; these are not evidence of independently verified completion.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsNo size or specification suppliedRERA amenities0%; completion not independently verified
Water SupplyListed as available: YES; source and capacity not suppliedRERA amenities0%; completion not independently verified
Sewerage (Chamber, Lines, Septic Tank, STP)Listed as available: YES; components/capacity not specifiedRERA amenities0%; completion not independently verified
Storm Water DrainsNo specification suppliedRERA amenities0%; completion not independently verified
Green Strip / TOT LOT / ParkPermit requires a fenced tot-lot maintained as greenery before occupancy certificate; size not suppliedRERA amenities0%; completion not independently verified
Street LightingNo specification suppliedRERA amenities0%; completion not independently verified
Community BuildingsNo description or size suppliedRERA amenities0%; completion not independently verified
Treatment and Disposal of Sewage and Sullage WaterNo system or capacity specifiedRERA amenities0%; completion not independently verified
Solid Waste Management and DisposalPermit also requires a garbage house within the premisesRERA amenities0%; completion not independently verified
Water Conservation / Rainwater HarvestingPermit requires a rainwater-harvesting structure (percolation pit); the permit lists 2 RWHPsRERA amenities0%; completion not independently verified
Energy ManagementNo system specifiedRERA amenities0%; completion not independently verified
Fire Protection and Fire Safety RequirementsNo systems or details suppliedRERA amenities0%; completion not independently verified
Electrical Meter Room / Sub-Station / Receiving StationListed as available: YES; permit requires space for a transformerRERA amenities0%; completion not independently verified
Aggregate area of recreational open spaceNo area suppliedRERA amenities0%; completion not independently verified

7. Utilities, building services & safety

The project’s RERA amenity record lists water supply, sewerage, storm-water drainage, rainwater harvesting and electrical meter room/sub-station/receiving station. It does not state water sources, storage or treatment capacities, sewerage-system capacity, storm-water design, electrical supply or backup arrangements. RERA amenities

The supplied material does not specify lifts, lift capacities, fire-safety systems, escape stairs, CCTV, access control, waste-segregation arrangements, or accessible circulation.

8. Location, access & connectivity

The RERA registration identifies the project in Jagtial ( U), Jagithyal, PIN 505327; the building-permit order describes its locality as Ganesh Nagar_W18. The revenue village is not disclosed in the project fields. The registered site boundaries include a 9M WIDE EXISTING ROAD to the north. RERA record RERA filing

The supplied location data provides a geocoded cadastral-parcel centroid and one connectivity entry: Financial District (Nanakramguda), 1.2 km. This is a supplied mapped-distance record; no travel time or supporting route description is provided. Location record

9. Developer & development status

The registered promoter is M/S SHAMBHAVI CONSTRUCTIONS, recorded as a partnership. The RERA filing lists its address as SRI RAM NAGAR, GANESH NAGAR, Jagtial ( U), Jagithyal, 505327, and identifies THAKUR PAVAN SING as authorized signatory. The registration certificate gives Jagithyal, PIN 505327, as the promoter office address, without a more complete office address. RERA filing Parties record

The project is recorded as ongoing, with original and revised completion dates both 10/10/2023. The Form B affidavit, verified at Jagtial on 30th November, 2018, contains the promoter’s undertaking to complete the project within 36 MONTHS. No current construction-progress certificate or occupancy/completion certificate is available in the supplied records. RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for SHAMBHAVI RESIDENCY, registration P02800000346, issued 20/02/2019, valid through 10/10/2023; no extension is recorded in the certificate.
Principal building permit3009/W18/2017/0491, issued by JAGITYAL Municipality I on 10 October, 2017, for Building - A1 (UMAPATHI), Stilt + 5.
Layout / subdivision numbers in permit169/LRS/G1/2017 and 170/LRS/G1/2017.
Promoter declarationForm B affidavit by THAKUR PAVAN SING, managing partner, verified at Jagtial on 30th November, 2018.
Occupancy / completion certificateNot present in the supplied project documents; the permit states that an Occupancy Certificate is compulsory before occupation.
Approved floor-plan drawingsTwo drawings are recorded; both are scans pending and none has a software measurement available. Floor plans

The building-permit order states that permission does not confer ownership rights and requires compliance with its listed conditions, including adherence to the sanctioned plan and provision of specified site facilities. Detailed permit conditions and title evidence are addressed in the relevant report sections.

Frequently asked questions

Is SHAMBHAVI RESIDENCY registered with Telangana RERA?

Yes. SHAMBHAVI RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02800000346; the registration status is On-Going Project.

Who is the developer of SHAMBHAVI RESIDENCY?

The promoter named in the RERA registration is M/S SHAMBHAVI CONSTRUCTIONS.

Where is SHAMBHAVI RESIDENCY located?

SHAMBHAVI RESIDENCY is in Jagtial ( U ), Jagtial, Telangana (505327).

When will SHAMBHAVI RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 10/10/2023. This is the promoter's declaration, not a guarantee.

More projects in Jagtial