Shambhavi Residency
M/S SHAMBHAVI CONSTRUCTIONS · Jagtial · RERA P02800000346
SHAMBHAVI RESIDENCY is a residential apartment project in Jagtial ( U ), Jagtial ( U ) mandal, Jagithyal district. The registered promoter is M/S SHAMBHAVI CONSTRUCTIONS. The project covers 652.24 sq. m and comprises one building, Building - A1 (UMAPATHI), sanctioned as Stilt + 5, with 20 2BHK units. It is registered with TG-RERA as P02800000346, with a proposed completion date of 10/10/2023.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | SHAMBHAVI RESIDENCY RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not separately named in the supplied record; registration identifies the project and site as a whole RERA record |
| TG-RERA registration number | P02800000346 RERA record |
| Registration validity | 20/02/2019 to 10/10/2023; certificate states a four-year validity period. No extension is recorded in the supplied certificate |
| Registered promoter | M/S SHAMBHAVI CONSTRUCTIONS, recorded as a partnership RERA record RERA filing |
| RERA status | Recorded as “On-Going Project”; the registration validity end date is separate from the stated completion date and occupancy-certificate status RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / address on registration certificate | Jagtial ( U), Jagithyal |
| Revenue village | Not disclosed in the RERA project fields; the building-permit record identifies Ganesh Nagar_W18 as locality, not as a revenue-village entry RERA filing |
| Mandal | Jagtial ( U) RERA record |
| District | Jagithyal RERA record |
| PIN | 505327 RERA record |
| Project survey numbers / subdivisions | 156 A TO E (as recorded on the RERA registration) RERA record |
| Registered site extent | 652.24 sq. m in the building-permit order |
| Total / net area | Total area: 652.24 sq. m; net area: 652.24 sq. m; recorded road-affected area: 0 RERA filing |
| Boundaries (RERA filing) | East: OPEN LAND OF VENDORS; West: HOUSE OF SADULA SATHEMMA; North: 9M WIDE EXISTING ROAD; South: LG GARDEN GP DHAROOR RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Building-permit order issued by JAGITYAL Municipality I; RERA project fields list DTCP as the authority RERA filing |
| Principal approval number / date | 3009/W18/2017/0491, approved 10 October, 2017 |
| Additional numbers shown on permit | Layout / Sub Divn. Nos. 169/LRS/G1/2017 and 170/LRS/G1/2017 |
| Approved built-up area | 1,756.85 sq. m RERA filing |
| Building count and name | One building unit in the RERA filing; permit names Building - A1 (UMAPATHI) RERA filing |
| Sanctioned floor configuration | Stilt + 5; sanctioned height 14.25 m |
| Parking levels | Stilt level is shown in the permit. Parking count and a separate parking-level schedule are not established by the supplied records |
| Unit counts | Approved plan: 1 building unit; proposed units as per agreement: 1 in the land-details fields. RERA unit inventory records 20 2BHK units RERA filing RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configuration | 2BHK, 20 units RERA unit table RERA unit details |
| RERA-filed saleable area | 100.01 sq. m per unit RERA unit table RERA unit details |
| Booked / available | 0 booked / 20 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative RERA unit table |
| Construction stage | Project status is recorded as “On-Going Project”; supplied records do not establish an independently verified current site stage RERA record |
| Original / revised completion date | 10/10/2023 / 10/10/2023 RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents. The building permit states that an Occupancy Certificate is compulsory before occupation RERA record |
2. The project story
SHAMBHAVI RESIDENCY is registered as a residential apartment project in Jagtial ( U), Jagithyal, on the RERA-recorded survey range 156 A TO E. The site is recorded as 652.24 sq. m, with one permitted residential building, Building - A1 (UMAPATHI), sanctioned as Stilt + 5. The RERA inventory records 20 two-bedroom apartments. RERA record RERA filing RERA unit table
The supplied record labels the project “On-Going Project” and gives 10/10/2023 as both original and revised completion date. It does not provide a current independently verified construction update or an occupancy/completion certificate. The Form B declaration signed by the managing partner on 30 November 2018 undertakes completion within 36 months; that is a promoter declaration, not evidence of present completion. RERA record
3. Master plan, architecture & building design
The building permit describes one residential building, Building - A1 (UMAPATHI), on an extent of 652.24 sq. m, with Stilt + 5 floors and a sanctioned height of 14.25 m. The permit’s listed approved built-up area is 1,756.85 sq. m. The project fields likewise record approved built-up area as 1,756.85 sq. m. These are approved-area figures; the supplied material does not state a separate FSI-counted area, carpet area, building footprint, or floor-by-floor apartment arrangement. RERA filing
The RERA filing records one building unit in the approved plan and 20 apartments in the unit inventory. The supplied floor-plan records comprise two drawings, neither software-measured; both are marked as scans pending. Details such as flats per floor, lifts, stairs, entrances, internal circulation and apartment orientation therefore cannot be established from the available drawing data. RERA filing RERA unit table Floor plans
The permit lists a tot-lot to be fenced and maintained as greenery before issue of the occupancy certificate, and requires a rainwater-harvesting structure, transformer space and a garbage house. These are permit conditions; the supplied material does not establish their completion.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 100.01 sq. m | Not measured from the supplied drawings | Not supplied |
The configuration, unit count, booking count and saleable area are from the TG-RERA record; the booking snapshot has no recorded as-of date. The two supplied floor-plan drawings are scans pending, so no software-measured carpet area or room dimensions are available. Saleable area is the RERA-filed figure; the supplied record does not provide a separate carpet-area measurement or loading figure for these units. RERA unit table RERA unit details Floor plans
5. Parking & vehicle circulation
The project is described in the permit as a Stilt + 5 building, and the vendor record lists “parking” without a count or layout. The supplied evidence does not establish sanctioned car or two-wheeler space counts, visitor or accessible bays, parking allocation to individual units, ramps, driveways, mechanical parking, EV charging, or a separate parking level. A stilt designation alone does not establish the number or allocation of parking spaces. Promoter website
6. Amenities, recreation & open spaces
The RERA amenity record lists the following site facilities. Its progress entries are recorded as 0 where shown; these are not evidence of independently verified completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | No size or specification supplied | RERA amenities | 0%; completion not independently verified |
| Water Supply | Listed as available: YES; source and capacity not supplied | RERA amenities | 0%; completion not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | Listed as available: YES; components/capacity not specified | RERA amenities | 0%; completion not independently verified |
| Storm Water Drains | No specification supplied | RERA amenities | 0%; completion not independently verified |
| Green Strip / TOT LOT / Park | Permit requires a fenced tot-lot maintained as greenery before occupancy certificate; size not supplied | RERA amenities | 0%; completion not independently verified |
| Street Lighting | No specification supplied | RERA amenities | 0%; completion not independently verified |
| Community Buildings | No description or size supplied | RERA amenities | 0%; completion not independently verified |
| Treatment and Disposal of Sewage and Sullage Water | No system or capacity specified | RERA amenities | 0%; completion not independently verified |
| Solid Waste Management and Disposal | Permit also requires a garbage house within the premises | RERA amenities | 0%; completion not independently verified |
| Water Conservation / Rainwater Harvesting | Permit requires a rainwater-harvesting structure (percolation pit); the permit lists 2 RWHPs | RERA amenities | 0%; completion not independently verified |
| Energy Management | No system specified | RERA amenities | 0%; completion not independently verified |
| Fire Protection and Fire Safety Requirements | No systems or details supplied | RERA amenities | 0%; completion not independently verified |
| Electrical Meter Room / Sub-Station / Receiving Station | Listed as available: YES; permit requires space for a transformer | RERA amenities | 0%; completion not independently verified |
| Aggregate area of recreational open space | No area supplied | RERA amenities | 0%; completion not independently verified |
7. Utilities, building services & safety
The project’s RERA amenity record lists water supply, sewerage, storm-water drainage, rainwater harvesting and electrical meter room/sub-station/receiving station. It does not state water sources, storage or treatment capacities, sewerage-system capacity, storm-water design, electrical supply or backup arrangements. RERA amenities
The supplied material does not specify lifts, lift capacities, fire-safety systems, escape stairs, CCTV, access control, waste-segregation arrangements, or accessible circulation.
8. Location, access & connectivity
The RERA registration identifies the project in Jagtial ( U), Jagithyal, PIN 505327; the building-permit order describes its locality as Ganesh Nagar_W18. The revenue village is not disclosed in the project fields. The registered site boundaries include a 9M WIDE EXISTING ROAD to the north. RERA record RERA filing
The supplied location data provides a geocoded cadastral-parcel centroid and one connectivity entry: Financial District (Nanakramguda), 1.2 km. This is a supplied mapped-distance record; no travel time or supporting route description is provided. Location record
9. Developer & development status
The registered promoter is M/S SHAMBHAVI CONSTRUCTIONS, recorded as a partnership. The RERA filing lists its address as SRI RAM NAGAR, GANESH NAGAR, Jagtial ( U), Jagithyal, 505327, and identifies THAKUR PAVAN SING as authorized signatory. The registration certificate gives Jagithyal, PIN 505327, as the promoter office address, without a more complete office address. RERA filing Parties record
The project is recorded as ongoing, with original and revised completion dates both 10/10/2023. The Form B affidavit, verified at Jagtial on 30th November, 2018, contains the promoter’s undertaking to complete the project within 36 MONTHS. No current construction-progress certificate or occupancy/completion certificate is available in the supplied records. RERA record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for SHAMBHAVI RESIDENCY, registration P02800000346, issued 20/02/2019, valid through 10/10/2023; no extension is recorded in the certificate. |
| Principal building permit | 3009/W18/2017/0491, issued by JAGITYAL Municipality I on 10 October, 2017, for Building - A1 (UMAPATHI), Stilt + 5. |
| Layout / subdivision numbers in permit | 169/LRS/G1/2017 and 170/LRS/G1/2017. |
| Promoter declaration | Form B affidavit by THAKUR PAVAN SING, managing partner, verified at Jagtial on 30th November, 2018. |
| Occupancy / completion certificate | Not present in the supplied project documents; the permit states that an Occupancy Certificate is compulsory before occupation. |
| Approved floor-plan drawings | Two drawings are recorded; both are scans pending and none has a software measurement available. Floor plans |
The building-permit order states that permission does not confer ownership rights and requires compliance with its listed conditions, including adherence to the sanctioned plan and provision of specified site facilities. Detailed permit conditions and title evidence are addressed in the relevant report sections.
1. Project at a glance
Project identity
Registered project name: SHAMBHAVI RESIDENCY
Project type: Residential apartment project
Phase / registered portion: Phase not separately named in the supplied record; registration identifies the project and site as a whole
TG-RERA registration number: P02800000346
Registration validity: 20/02/2019 to 10/10/2023; certificate states a four-year validity period. No extension is recorded in the supplied certificate
Registered promoter: M/S SHAMBHAVI CONSTRUCTIONS, recorded as a partnership
RERA status: Recorded as “On-Going Project”; the registration validity end date is separate from the stated completion date and occupancy-certificate status
Land and geographic identity
Locality / address on registration certificate: Jagtial ( U), Jagithyal
Revenue village: Not disclosed in the RERA project fields; the building-permit record identifies Ganesh Nagar_W18 as locality, not as a revenue-village entry
Mandal: Jagtial ( U)
District: Jagithyal
PIN: 505327
Project survey numbers / subdivisions: 156 A TO E (as recorded on the RERA registration)
Registered site extent: 652.24 sq. m in the building-permit order
Total / net area: Total area: 652.24 sq. m; net area: 652.24 sq. m; recorded road-affected area: 0
Boundaries (RERA filing): East: OPEN LAND OF VENDORS; West: HOUSE OF SADULA SATHEMMA; North: 9M WIDE EXISTING ROAD; South: LG GARDEN GP DHAROOR
Development identity
Sanctioning authority: Building-permit order issued by JAGITYAL Municipality I; RERA project fields list DTCP as the authority
Principal approval number / date: 3009/W18/2017/0491, approved 10 October, 2017
Additional numbers shown on permit: Layout / Sub Divn. Nos. 169/LRS/G1/2017 and 170/LRS/G1/2017
Approved built-up area: 1,756.85 sq. m
Building count and name: One building unit in the RERA filing; permit names Building - A1 (UMAPATHI)
Sanctioned floor configuration: Stilt + 5; sanctioned height 14.25 m
Parking levels: Stilt level is shown in the permit. Parking count and a separate parking-level schedule are not established by the supplied records
Unit counts: Approved plan: 1 building unit; proposed units as per agreement: 1 in the land-details fields. RERA unit inventory records 20 2BHK units
Offering and status
RERA-filed configuration: 2BHK, 20 units
RERA-filed saleable area: 100.01 sq. m per unit
Booked / available: 0 booked / 20 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative
Construction stage: Project status is recorded as “On-Going Project”; supplied records do not establish an independently verified current site stage
Original / revised completion date: 10/10/2023 / 10/10/2023
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents. The building permit states that an Occupancy Certificate is compulsory before occupation
2. The project story
SHAMBHAVI RESIDENCY is registered as a residential apartment project in Jagtial ( U), Jagithyal, on the RERA-recorded survey range 156 A TO E. The site is recorded as 652.24 sq. m, with one permitted residential building, Building - A1 (UMAPATHI), sanctioned as Stilt + 5. The RERA inventory records 20 two-bedroom apartments.
The supplied record labels the project “On-Going Project” and gives 10/10/2023 as both original and revised completion date. It does not provide a current independently verified construction update or an occupancy/completion certificate. The Form B declaration signed by the managing partner on 30 November 2018 undertakes completion within 36 months; that is a promoter declaration, not evidence of present completion.
3. Master plan, architecture & building design
The building permit describes one residential building, Building - A1 (UMAPATHI), on an extent of 652.24 sq. m, with Stilt + 5 floors and a sanctioned height of 14.25 m. The permit’s listed approved built-up area is 1,756.85 sq. m. The project fields likewise record approved built-up area as 1,756.85 sq. m. These are approved-area figures; the supplied material does not state a separate FSI-counted area, carpet area, building footprint, or floor-by-floor apartment arrangement.
The RERA filing records one building unit in the approved plan and 20 apartments in the unit inventory. The supplied floor-plan records comprise two drawings, neither software-measured; both are marked as scans pending. Details such as flats per floor, lifts, stairs, entrances, internal circulation and apartment orientation therefore cannot be established from the available drawing data.
The permit lists a tot-lot to be fenced and maintained as greenery before issue of the occupancy certificate, and requires a rainwater-harvesting structure, transformer space and a garbage house. These are permit conditions; the supplied material does not establish their completion.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 0 | 20 | 100.01 sq. m | Not measured from the supplied drawings | Not supplied |
The configuration, unit count, booking count and saleable area are from the TG-RERA record; the booking snapshot has no recorded as-of date. The two supplied floor-plan drawings are scans pending, so no software-measured carpet area or room dimensions are available. Saleable area is the RERA-filed figure; the supplied record does not provide a separate carpet-area measurement or loading figure for these units.
5. Parking & vehicle circulation
The project is described in the permit as a Stilt + 5 building, and the vendor record lists “parking” without a count or layout. The supplied evidence does not establish sanctioned car or two-wheeler space counts, visitor or accessible bays, parking allocation to individual units, ramps, driveways, mechanical parking, EV charging, or a separate parking level. A stilt designation alone does not establish the number or allocation of parking spaces.
6. Amenities, recreation & open spaces
The RERA amenity record lists the following site facilities. Its progress entries are recorded as 0 where shown; these are not evidence of independently verified completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | No size or specification supplied | 0%; completion not independently verified | |
| Water Supply | Listed as available: YES; source and capacity not supplied | 0%; completion not independently verified | |
| Sewerage (Chamber, Lines, Septic Tank, STP) | Listed as available: YES; components/capacity not specified | 0%; completion not independently verified | |
| Storm Water Drains | No specification supplied | 0%; completion not independently verified | |
| Green Strip / TOT LOT / Park | Permit requires a fenced tot-lot maintained as greenery before occupancy certificate; size not supplied | 0%; completion not independently verified | |
| Street Lighting | No specification supplied | 0%; completion not independently verified | |
| Community Buildings | No description or size supplied | 0%; completion not independently verified | |
| Treatment and Disposal of Sewage and Sullage Water | No system or capacity specified | 0%; completion not independently verified | |
| Solid Waste Management and Disposal | Permit also requires a garbage house within the premises | 0%; completion not independently verified | |
| Water Conservation / Rainwater Harvesting | Permit requires a rainwater-harvesting structure (percolation pit); the permit lists 2 RWHPs | 0%; completion not independently verified | |
| Energy Management | No system specified | 0%; completion not independently verified | |
| Fire Protection and Fire Safety Requirements | No systems or details supplied | 0%; completion not independently verified | |
| Electrical Meter Room / Sub-Station / Receiving Station | Listed as available: YES; permit requires space for a transformer | 0%; completion not independently verified | |
| Aggregate area of recreational open space | No area supplied | 0%; completion not independently verified |
7. Utilities, building services & safety
The project’s RERA amenity record lists water supply, sewerage, storm-water drainage, rainwater harvesting and electrical meter room/sub-station/receiving station. It does not state water sources, storage or treatment capacities, sewerage-system capacity, storm-water design, electrical supply or backup arrangements.
The supplied material does not specify lifts, lift capacities, fire-safety systems, escape stairs, CCTV, access control, waste-segregation arrangements, or accessible circulation.
8. Location, access & connectivity
The RERA registration identifies the project in Jagtial ( U), Jagithyal, PIN 505327; the building-permit order describes its locality as Ganesh Nagar_W18. The revenue village is not disclosed in the project fields. The registered site boundaries include a 9M WIDE EXISTING ROAD to the north.
The supplied location data provides a geocoded cadastral-parcel centroid and one connectivity entry: Financial District (Nanakramguda), 1.2 km. This is a supplied mapped-distance record; no travel time or supporting route description is provided.
9. Developer & development status
The registered promoter is M/S SHAMBHAVI CONSTRUCTIONS, recorded as a partnership. The RERA filing lists its address as SRI RAM NAGAR, GANESH NAGAR, Jagtial ( U), Jagithyal, 505327, and identifies THAKUR PAVAN SING as authorized signatory. The registration certificate gives Jagithyal, PIN 505327, as the promoter office address, without a more complete office address.
The project is recorded as ongoing, with original and revised completion dates both 10/10/2023. The Form B affidavit, verified at Jagtial on 30th November, 2018, contains the promoter’s undertaking to complete the project within 36 MONTHS. No current construction-progress certificate or occupancy/completion certificate is available in the supplied records.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for SHAMBHAVI RESIDENCY, registration P02800000346, issued 20/02/2019, valid through 10/10/2023; no extension is recorded in the certificate.
Principal building permit: 3009/W18/2017/0491, issued by JAGITYAL Municipality I on 10 October, 2017, for Building - A1 (UMAPATHI), Stilt + 5.
Layout / subdivision numbers in permit: 169/LRS/G1/2017 and 170/LRS/G1/2017.
Promoter declaration: Form B affidavit by THAKUR PAVAN SING, managing partner, verified at Jagtial on 30th November, 2018.
Occupancy / completion certificate: Not present in the supplied project documents; the permit states that an Occupancy Certificate is compulsory before occupation.
Approved floor-plan drawings: Two drawings are recorded; both are scans pending and none has a software measurement available.
The building-permit order states that permission does not confer ownership rights and requires compliance with its listed conditions, including adherence to the sanctioned plan and provision of specified site facilities. Detailed permit conditions and title evidence are addressed in the relevant report sections.
Frequently asked questions
Is SHAMBHAVI RESIDENCY registered with Telangana RERA?
Yes. SHAMBHAVI RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02800000346; the registration status is On-Going Project.
Who is the developer of SHAMBHAVI RESIDENCY?
The promoter named in the RERA registration is M/S SHAMBHAVI CONSTRUCTIONS.
Where is SHAMBHAVI RESIDENCY located?
SHAMBHAVI RESIDENCY is in Jagtial ( U ), Jagtial, Telangana (505327).
When will SHAMBHAVI RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 10/10/2023. This is the promoter's declaration, not a guarantee.
More projects in Jagtial







