Gsn Rise
GSN INFRA · Medchal-Malkajgiri · RERA P02200008827
GSN RISE is a residential apartment building in Ramakrishnapuram, Malkajgiri, Medchal-Malkajgiri. The registered promoter is GSN INFRA, identified in the RERA record as a partnership. The project is on 557.48 sq.m of land and comprises one residential block with 1 Stilt + 5 upper floors and 10 3BHK units. Its TG-RERA registration number is P02200008827, and the promoter’s Form B undertaking states completion by 06 August, 2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | GSN RISE RERA record |
| Project type / phase | Residential apartment building; New Project. No separate phase name or number is disclosed. RERA record RERA filing |
| TG-RERA registration | P02200008827; registered from 06/08/2024 to 06/08/2027. This is the registration-validity period, not the project completion deadline. RERA record Approvals record |
| Registered promoter | GSN INFRA, identified in the RERA record as a partnership. RERA record RERA filing |
| RERA record status | The supplied record identifies the project as registered; no registration extension is supplied. RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Ramakrishnapuram; revenue-village field: Rk Puram. RERA record RERA filing |
| Mandal / district / PIN | Malkajgiri / Medchal-Malkajgiri / 500056. RERA record RERA filing |
| Project survey identity | PART OF SURVEY NO 219/1; the filed building-plan description identifies part of Sy.No.219/1. RERA record Land records |
| Plot reference | Plot No. 21-B. RERA filing |
| Site extent | RERA land record: total area 557.48 sq.m, net area 557.48 sq.m, and affected area 0. The filed layout-plan extract states a minimum plot area of 557.48 sq.m, a splay area of 1.93, and net plot area of 555.55; the building-permit extract also records net plot area 555.55 sq.m. RERA filing |
| Boundaries recorded by RERA | East: PLOT NO 22-B; west: 30 FEET WIDE ROAD; north: 30 FEET WIDE ROAD; south: HOUSE IN PLOT NO 29-B. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building approval | Building Permit Order 2452/GHMC/SEC/2024-BP, approved 06 August, 2024; file no. 007196/GHMC/3404/SEC2/2024-BP. Approvals record |
| Building / floors | One residential block, A (GSN INFRA); sanctioned as 1 Stilt + 5 upper floors. The filed permit records NO OF FLOORS: 6, building height 14.75 MT., and stair headroom +17.70 mt. / total height 20.70mt. |
| Built-up area | Approved-plan extract: TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING 1384.15; TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING 1644.25; parking area 260.10. The RERA project record lists approved built-up area 1384.15 sq.m. RERA record |
| Units | 10 sanctioned units in the layout-plan extract; 10 RERA-filed units. RERA unit table |
| Parking | Parking area is recorded as 260.10 in the permit extract. The plan conditions say the approved stilt/parking area is for vehicle parking; a count of parking spaces is not supplied. |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 3BHK; 10 units. RERA unit table RERA unit details |
| RERA-filed saleable area | 167.0 sq.m per unit in the supplied configuration record. RERA unit table RERA unit details |
| Bookings / availability | Portal-derived record: 0 booked; 10 available. No as-of date is attached to these counts; treat them as indicative, not a live inventory confirmation. RERA unit table RERA unit details |
| Completion deadline | Promoter’s Form B undertaking states completion by 06 August, 2027. This is distinct from the RERA registration validity end date. |
| Construction stage | No independently verified site-progress measurement is supplied. The RERA amenities record shows 0% for its listed items; this does not establish the overall construction stage. RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents. The GHMC permit requires an occupancy certificate before occupation. |
2. The project story
GSN RISE is registered as a residential apartment project on Plot No. 21-B, in part of Survey No. 219/1, at Ramakrishnapuram (RERA revenue-village field: Rk Puram), Malkajgiri, Medchal-Malkajgiri district. The supplied RERA record describes a single-block development rather than a multi-tower scheme: one residential building, identified in the filed plan as A (GSN INFRA), with one stilt level and five upper floors. RERA record RERA filing
The RERA-filed offering is ten 3BHK units. The registration certificate is valid through 06/08/2027, while the promoter’s Form B declares a project completion date of 06 August, 2027. The documents supplied do not establish construction progress by independent site inspection, nor do they include an occupancy certificate; the permit expressly makes that certificate a prerequisite to occupation. RERA unit table
3. Master plan, architecture & building design
The filed GHMC building permit describes a single residential block with 1 Stilt + 5 upper floors. It records a plot area of 557.48, net plot area of 555.55, proposed built-up area excluding parking of 1384.15, built-up area including parking of 1644.25, and parking area of 260.10. The RERA project record separately identifies approved built-up area as 1384.15 sq.m. These are filed plan figures; no FSI-counted area is supplied. RERA record
The filed plan describes the building as residential, with a total of six floors and a stated building height of 14.75 MT.; it also lists stair headroom at +17.70 mt. and total height 20.70mt. The supplied extracts do not specify flats per floor, lift count in the sanctioned drawings, stair configuration, or a complete building-circulation description.
The permit lists a lift, watchman room, septic tank, STP, WTP, electrical transformer, percolation pit and rainwater harvesting. Its conditions also refer to a garbage house, a tot-lot to be maintained as greenery, perimeter greenery/tree planting, and vehicle parking in the approved stilt/parking area. These are approval-filed provisions or conditions; the supplied evidence does not confirm their completion.
The layout-plan extract identifies the site as a single block and gives setbacks as 3.00, 1.50, 2.00, 1.00, 2.39, and 1.89; it does not label the corresponding sides in the supplied extraction. The permit records road widths of 9.00 MT WIDE EXISTING ROAD, 9.00 MT WIDE PROPOSED ROAD, and 18 mt. road width. No separate phase-wise development arrangement is disclosed.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 167.0 sq.m | Software-measured median 100.6 sq.m; range 96.4–104.8 sq.m | 40% |
The RERA-filed unit count, booking/availability figures and saleable area are from the supplied TG-RERA-derived records; booking counts have no recorded as-of date. Carpet-area figures are software measurements from the filed floor-plan drawing, not RERA-filed carpet-area disclosures, and the measurement record says they need review. The measurement set covers six flat designs. RERA unit table RERA unit details Floor plans
The drawing extract for one second-floor flat labels a kitchen, hall, three bedrooms, two toilets and two balconies. It records the balcony labels as 1.21 M. WIDE BALC and measures those spaces separately from the carpet area. For example, the extracted room dimensions include a kitchen of 3.22 × 3.07 m, a hall of 5.11 × 4.96 m, and a master bedroom of 3.5 × 3.35 m. These are drawing-based software measurements, not independent on-site measurements. RERA unit details
Saleable area and carpet area are different measures: the RERA-filed saleable figure is not a substitute for the software-measured internal carpet area; the supplied drawing-measurement note says the saleable figure also counts the home’s share of common areas. No RERA-filed carpet area or unit-specific balcony entitlement is established by the supplied records. RERA unit details Floor plans
5. Parking & vehicle circulation
The GHMC permit records 260.10 as the total parking area and states that the stilt/parking area shown in the plan is to be used exclusively for parking vehicles, without partition walls or rolling shutters. The permit extract does not provide a count of car or two-wheeler spaces, a separate visitor or accessible-space count, or details of parking allocation to individual units. A drawn or sanctioned parking provision does not by itself establish exclusive ownership or a specific buyer’s allocation.
The GHMC permit also requires parking places in buildings to be provided with electric-vehicle charging infrastructure. The supplied evidence does not confirm installation or give a charger count. No ramp arrangement, internal driveway layout, pedestrian-vehicle separation, or parking-level count beyond the stilt/parking references is established in the extracted record.
6. Amenities, recreation & open spaces
| Description / size | Tot-lot to be fenced and maintained as greenery; no size supplied |
|---|---|
| Evidence source | GHMC permit conditions |
| Declared progress / verified status | Required before issue of occupancy certificate; completion not verified. |
| Description / size | Tree planting along the periphery and in front; strip of greenery to be maintained |
|---|---|
| Evidence source | GHMC permit conditions |
| Declared progress / verified status | Required by permit; completion not verified. |
| Description / size | Listed as available in the RERA amenities record; no source, capacity or storage details supplied |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0% progress recorded. RERA amenities |
| Description / size | RERA record lists sewerage and treatment/disposal; permit extract lists septic tank and STP |
|---|---|
| Evidence source | RERA amenities record; filed plan |
| Declared progress / verified status | 0% progress recorded for the RERA-listed items; installation not independently verified. RERA amenities |
| Description / size | Percolation pit / rainwater harvesting; permit states one rainwater-harvesting pit |
|---|---|
| Evidence source | Filed plan and permit |
| Declared progress / verified status | Required/listed; completion not verified. |
| Description / size | Listed in RERA amenities record; no dimensions or capacity supplied |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0% progress recorded. RERA amenities |
| Description / size | Garbage house required within premises; waste management and disposal listed in RERA record |
|---|---|
| Evidence source | Filed plan and RERA amenities record |
| Declared progress / verified status | Permit condition; RERA record shows 0% for the listed item; completion not verified. RERA amenities |
| Description / size | Electrical meter-room/substation/receiving-station item listed; transformer space required in permit |
|---|---|
| Evidence source | RERA amenities record; filed plan |
| Declared progress / verified status | RERA record shows the item available as “YES” and 0% progress; installed status not independently verified. RERA amenities |
| Description / size | Listed in the RERA amenities record; no quantities or sizes supplied |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Each is recorded at 0%; completion not verified. RERA amenities |
The supplied project record does not establish a clubhouse, swimming pool, gym, sports facility or other indoor recreation facility as a sanctioned or delivered project amenity. RERA amenities
7. Utilities, building services & safety
The filed plan lists a lift, septic tank, STP, WTP, electrical transformer and percolation pit/rainwater harvesting. The RERA amenities record lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, water conservation/rainwater harvesting, energy management, and electrical meter-room/substation/receiving-station facilities. No capacities, water source, storage volume, reuse arrangement, lift capacity or backup-power specification are supplied in the RERA project records reviewed here. RERA amenities
The GHMC permit requires fire-protection and fire-safety measures, and the building permit conditions state that an Occupancy FIRE NOC is to be obtained from the Director (EV&DM) before issue of the occupancy certificate. The permit also requires a working fire extinguisher on each floor, CCTV installation, twin bins for each tenement, and compliance with construction-safety and waste-control conditions. These are permit requirements, not evidence that the systems have been installed or certified.
The permit requires a zero ramp within the plot that does not extend onto the road or footpath. The supplied extracts do not describe accessible internal routes, lift accessibility, or other accessibility provisions.
8. Location, access & connectivity
The registered project location is Ramakrishnapuram, Rk Puram revenue-village field, Malkajgiri mandal, Medchal-Malkajgiri district, PIN 500056. The filed site boundaries identify 30 FEET WIDE ROAD on the west and north; the building-plan extract also refers to 9.00 MT existing and proposed roads and an 18 mt. road width. RERA record RERA filing RERA filing
The supplied location record gives the nearest sampled Outer Ring Road interchange at 7.6 km (approx.). No public-transport route, measured distance to other landmarks, or independently verified travel time is supplied. Location record
9. Developer & development status
The registered promoter is GSN INFRA, recorded as a partnership. The RERA record gives GSTIN 36ABAFG9652P1ZQ. Its listed partners are NIRANJAN BABU TELLAM, MANJU DEVI, and GANESH BABU GANDLA; NIRANJAN BABU TELLAM is listed as authorized signatory. The RERA certificate gives the promoter’s registered office as Village: Saipuri, Mandal: Malkajgiri, District: Medchal-Malkajgiri, PIN 501401. RERA filing Corporate record Parties record
The promoter’s Form B declares completion by 06 August, 2027. This is a promoter declaration; no independent progress inspection or completion certification is supplied. The registration certificate remains valid to 06/08/2027, a separate regulatory validity date. No occupancy certificate is included in the supplied documents.
10. Approvals, official records & documents
| Supplied evidence | Form C certificate, registration P02200008827, valid 06/08/2024–06/08/2027 |
|---|---|
| Scope / note | Project registration for GSN RISE. |
| Supplied evidence | Building Permit Order 2452/GHMC/SEC/2024-BP, dated 06 August, 2024; file no. 007196/GHMC/3404/SEC2/2024-BP |
|---|---|
| Scope / note | Conditional permission for one residential building, 1 stilt + 5 upper floors, on part of Survey No. 219/1. |
| Supplied evidence | Plan/layout extract 487339 |
|---|---|
| Scope / note | Shows one residential block, identified as A (GSN INFRA), unit count 10, site/built-up figures and listed utilities/permit conditions. |
| Supplied evidence | Form B, dated 12t* September, 2024 in the supplied extraction |
|---|---|
| Scope / note | Promoter declaration of title basis, encumbrance position, project-fund obligations and completion undertaking. |
| Supplied evidence | Not supplied |
|---|---|
| Scope / note | GHMC permit requires an occupancy certificate before occupation; no issued certificate is evidenced in the reviewed documents. |
The supplied plan and permit records include conditions concerning commencement and completion notices, road-affected land surrender, parking use, fire-safety requirements, and the occupancy-certificate prerequisite. This overview identifies the filed records; the detailed approval conditions are addressed in the approvals review.
1. Project at a glance
Project identity
Registered project name: GSN RISE
Project type / phase: Residential apartment building; New Project. No separate phase name or number is disclosed.
TG-RERA registration: P02200008827; registered from 06/08/2024 to 06/08/2027. This is the registration-validity period, not the project completion deadline.
Registered promoter: GSN INFRA, identified in the RERA record as a partnership.
RERA record status: The supplied record identifies the project as registered; no registration extension is supplied.
Land and geographic identity
Locality / revenue village: Ramakrishnapuram; revenue-village field: Rk Puram.
Mandal / district / PIN: Malkajgiri / Medchal-Malkajgiri / 500056.
Project survey identity: PART OF SURVEY NO 219/1; the filed building-plan description identifies part of Sy.No.219/1.
Plot reference: Plot No. 21-B.
Site extent: RERA land record: total area 557.48 sq.m, net area 557.48 sq.m, and affected area 0. The filed layout-plan extract states a minimum plot area of 557.48 sq.m, a splay area of 1.93, and net plot area of 555.55; the building-permit extract also records net plot area 555.55 sq.m.
Boundaries recorded by RERA: East: PLOT NO 22-B; west: 30 FEET WIDE ROAD; north: 30 FEET WIDE ROAD; south: HOUSE IN PLOT NO 29-B.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: Building Permit Order 2452/GHMC/SEC/2024-BP, approved 06 August, 2024; file no. 007196/GHMC/3404/SEC2/2024-BP.
Building / floors: One residential block, A (GSN INFRA); sanctioned as 1 Stilt + 5 upper floors. The filed permit records NO OF FLOORS: 6, building height 14.75 MT., and stair headroom +17.70 mt. / total height 20.70mt.
Built-up area: Approved-plan extract: TOTAL PROPOSED BUILT UP AREA EXCLUDING PARKING 1384.15; TOTAL PROPOSED BUILT UP AREA INCLUDING PARKING 1644.25; parking area 260.10. The RERA project record lists approved built-up area 1384.15 sq.m.
Units: 10 sanctioned units in the layout-plan extract; 10 RERA-filed units.
Parking: Parking area is recorded as 260.10 in the permit extract. The plan conditions say the approved stilt/parking area is for vehicle parking; a count of parking spaces is not supplied.
Offering and status
RERA-filed configuration: 3BHK; 10 units.
RERA-filed saleable area: 167.0 sq.m per unit in the supplied configuration record.
Bookings / availability: Portal-derived record: 0 booked; 10 available. No as-of date is attached to these counts; treat them as indicative, not a live inventory confirmation.
Completion deadline: Promoter’s Form B undertaking states completion by 06 August, 2027. This is distinct from the RERA registration validity end date.
Construction stage: No independently verified site-progress measurement is supplied. The RERA amenities record shows 0% for its listed items; this does not establish the overall construction stage.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents. The GHMC permit requires an occupancy certificate before occupation.
2. The project story
GSN RISE is registered as a residential apartment project on Plot No. 21-B, in part of Survey No. 219/1, at Ramakrishnapuram (RERA revenue-village field: Rk Puram), Malkajgiri, Medchal-Malkajgiri district. The supplied RERA record describes a single-block development rather than a multi-tower scheme: one residential building, identified in the filed plan as A (GSN INFRA), with one stilt level and five upper floors.
The RERA-filed offering is ten 3BHK units. The registration certificate is valid through 06/08/2027, while the promoter’s Form B declares a project completion date of 06 August, 2027. The documents supplied do not establish construction progress by independent site inspection, nor do they include an occupancy certificate; the permit expressly makes that certificate a prerequisite to occupation.
3. Master plan, architecture & building design
The filed GHMC building permit describes a single residential block with 1 Stilt + 5 upper floors. It records a plot area of 557.48, net plot area of 555.55, proposed built-up area excluding parking of 1384.15, built-up area including parking of 1644.25, and parking area of 260.10. The RERA project record separately identifies approved built-up area as 1384.15 sq.m. These are filed plan figures; no FSI-counted area is supplied.
The filed plan describes the building as residential, with a total of six floors and a stated building height of 14.75 MT.; it also lists stair headroom at +17.70 mt. and total height 20.70mt. The supplied extracts do not specify flats per floor, lift count in the sanctioned drawings, stair configuration, or a complete building-circulation description.
The permit lists a lift, watchman room, septic tank, STP, WTP, electrical transformer, percolation pit and rainwater harvesting. Its conditions also refer to a garbage house, a tot-lot to be maintained as greenery, perimeter greenery/tree planting, and vehicle parking in the approved stilt/parking area. These are approval-filed provisions or conditions; the supplied evidence does not confirm their completion.
The layout-plan extract identifies the site as a single block and gives setbacks as 3.00, 1.50, 2.00, 1.00, 2.39, and 1.89; it does not label the corresponding sides in the supplied extraction. The permit records road widths of 9.00 MT WIDE EXISTING ROAD, 9.00 MT WIDE PROPOSED ROAD, and 18 mt. road width. No separate phase-wise development arrangement is disclosed.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 167.0 sq.m | Software-measured median 100.6 sq.m; range 96.4–104.8 sq.m | 40% |
The RERA-filed unit count, booking/availability figures and saleable area are from the supplied TG-RERA-derived records; booking counts have no recorded as-of date. Carpet-area figures are software measurements from the filed floor-plan drawing, not RERA-filed carpet-area disclosures, and the measurement record says they need review. The measurement set covers six flat designs.
The drawing extract for one second-floor flat labels a kitchen, hall, three bedrooms, two toilets and two balconies. It records the balcony labels as 1.21 M. WIDE BALC and measures those spaces separately from the carpet area. For example, the extracted room dimensions include a kitchen of 3.22 × 3.07 m, a hall of 5.11 × 4.96 m, and a master bedroom of 3.5 × 3.35 m. These are drawing-based software measurements, not independent on-site measurements.
Saleable area and carpet area are different measures: the RERA-filed saleable figure is not a substitute for the software-measured internal carpet area; the supplied drawing-measurement note says the saleable figure also counts the home’s share of common areas. No RERA-filed carpet area or unit-specific balcony entitlement is established by the supplied records.
5. Parking & vehicle circulation
The GHMC permit records 260.10 as the total parking area and states that the stilt/parking area shown in the plan is to be used exclusively for parking vehicles, without partition walls or rolling shutters. The permit extract does not provide a count of car or two-wheeler spaces, a separate visitor or accessible-space count, or details of parking allocation to individual units. A drawn or sanctioned parking provision does not by itself establish exclusive ownership or a specific buyer’s allocation.
The GHMC permit also requires parking places in buildings to be provided with electric-vehicle charging infrastructure. The supplied evidence does not confirm installation or give a charger count. No ramp arrangement, internal driveway layout, pedestrian-vehicle separation, or parking-level count beyond the stilt/parking references is established in the extracted record.
6. Amenities, recreation & open spaces
| Description / size | Tot-lot to be fenced and maintained as greenery; no size supplied |
|---|---|
| Evidence source | GHMC permit conditions |
| Declared progress / verified status | Required before issue of occupancy certificate; completion not verified. |
| Description / size | Tree planting along the periphery and in front; strip of greenery to be maintained |
|---|---|
| Evidence source | GHMC permit conditions |
| Declared progress / verified status | Required by permit; completion not verified. |
| Description / size | Listed as available in the RERA amenities record; no source, capacity or storage details supplied |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0% progress recorded. |
| Description / size | RERA record lists sewerage and treatment/disposal; permit extract lists septic tank and STP |
|---|---|
| Evidence source | RERA amenities record; filed plan |
| Declared progress / verified status | 0% progress recorded for the RERA-listed items; installation not independently verified. |
| Description / size | Percolation pit / rainwater harvesting; permit states one rainwater-harvesting pit |
|---|---|
| Evidence source | Filed plan and permit |
| Declared progress / verified status | Required/listed; completion not verified. |
| Description / size | Listed in RERA amenities record; no dimensions or capacity supplied |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | 0% progress recorded. |
| Description / size | Garbage house required within premises; waste management and disposal listed in RERA record |
|---|---|
| Evidence source | Filed plan and RERA amenities record |
| Declared progress / verified status | Permit condition; RERA record shows 0% for the listed item; completion not verified. |
| Description / size | Electrical meter-room/substation/receiving-station item listed; transformer space required in permit |
|---|---|
| Evidence source | RERA amenities record; filed plan |
| Declared progress / verified status | RERA record shows the item available as “YES” and 0% progress; installed status not independently verified. |
| Description / size | Listed in the RERA amenities record; no quantities or sizes supplied |
|---|---|
| Evidence source | RERA amenities record |
| Declared progress / verified status | Each is recorded at 0%; completion not verified. |
The supplied project record does not establish a clubhouse, swimming pool, gym, sports facility or other indoor recreation facility as a sanctioned or delivered project amenity.
7. Utilities, building services & safety
The filed plan lists a lift, septic tank, STP, WTP, electrical transformer and percolation pit/rainwater harvesting. The RERA amenities record lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, water conservation/rainwater harvesting, energy management, and electrical meter-room/substation/receiving-station facilities. No capacities, water source, storage volume, reuse arrangement, lift capacity or backup-power specification are supplied in the RERA project records reviewed here.
The GHMC permit requires fire-protection and fire-safety measures, and the building permit conditions state that an Occupancy FIRE NOC is to be obtained from the Director (EV&DM) before issue of the occupancy certificate. The permit also requires a working fire extinguisher on each floor, CCTV installation, twin bins for each tenement, and compliance with construction-safety and waste-control conditions. These are permit requirements, not evidence that the systems have been installed or certified.
The permit requires a zero ramp within the plot that does not extend onto the road or footpath. The supplied extracts do not describe accessible internal routes, lift accessibility, or other accessibility provisions.
8. Location, access & connectivity
The registered project location is Ramakrishnapuram, Rk Puram revenue-village field, Malkajgiri mandal, Medchal-Malkajgiri district, PIN 500056. The filed site boundaries identify 30 FEET WIDE ROAD on the west and north; the building-plan extract also refers to 9.00 MT existing and proposed roads and an 18 mt. road width.
The supplied location record gives the nearest sampled Outer Ring Road interchange at 7.6 km (approx.). No public-transport route, measured distance to other landmarks, or independently verified travel time is supplied.
9. Developer & development status
The registered promoter is GSN INFRA, recorded as a partnership. The RERA record gives GSTIN 36ABAFG9652P1ZQ. Its listed partners are NIRANJAN BABU TELLAM, MANJU DEVI, and GANESH BABU GANDLA; NIRANJAN BABU TELLAM is listed as authorized signatory. The RERA certificate gives the promoter’s registered office as Village: Saipuri, Mandal: Malkajgiri, District: Medchal-Malkajgiri, PIN 501401.
The promoter’s Form B declares completion by 06 August, 2027. This is a promoter declaration; no independent progress inspection or completion certification is supplied. The registration certificate remains valid to 06/08/2027, a separate regulatory validity date. No occupancy certificate is included in the supplied documents.
10. Approvals, official records & documents
| Supplied evidence | Form C certificate, registration P02200008827, valid 06/08/2024–06/08/2027 |
|---|---|
| Scope / note | Project registration for GSN RISE. |
| Supplied evidence | Building Permit Order 2452/GHMC/SEC/2024-BP, dated 06 August, 2024; file no. 007196/GHMC/3404/SEC2/2024-BP |
|---|---|
| Scope / note | Conditional permission for one residential building, 1 stilt + 5 upper floors, on part of Survey No. 219/1. |
| Supplied evidence | Plan/layout extract 487339 |
|---|---|
| Scope / note | Shows one residential block, identified as A (GSN INFRA), unit count 10, site/built-up figures and listed utilities/permit conditions. |
| Supplied evidence | Form B, dated 12t* September, 2024 in the supplied extraction |
|---|---|
| Scope / note | Promoter declaration of title basis, encumbrance position, project-fund obligations and completion undertaking. |
| Supplied evidence | Not supplied |
|---|---|
| Scope / note | GHMC permit requires an occupancy certificate before occupation; no issued certificate is evidenced in the reviewed documents. |
The supplied plan and permit records include conditions concerning commencement and completion notices, road-affected land surrender, parking use, fire-safety requirements, and the occupancy-certificate prerequisite. This overview identifies the filed records; the detailed approval conditions are addressed in the approvals review.
Frequently asked questions
Is GSN RISE registered with Telangana RERA?
Yes. GSN RISE is registered with the Telangana Real Estate Regulatory Authority as P02200008827; the registration status is New Project.
Who is the developer of GSN RISE?
The promoter named in the RERA registration is GSN INFRA.
Where is GSN RISE located?
GSN RISE is in Ramakrishnapuram, Rk Puram, Malkajgiri, Medchal-Malkajgiri, Telangana (500056).
When will GSN RISE be completed?
The promoter's proposed date of completion filed with RERA is 06/12/2027. This is the promoter's declaration, not a guarantee.
More projects in Rk Puram