Lacasa 1
GKH BUILDERS · Medchal-Malkajgiri · RERA P02200009480
LACASA 1 is a residential apartment project in R K Puram / Officers Colony, Ramakrishna Puram, Malkajgiri mandal, Medchal-Malkajgiri district. The registered promoter is GKH BUILDERS. The project has a net plot area of 443.85 sq. m and one building, Building A, with 1 Stilt + 5 upper floors and 10 3BHK units. Its TG-RERA registration number is P02200009480, and the project header records proposed completion as 19/03/2028.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | LACASA 1 RERA record |
| Project type / phase | Residential apartment project; the supplied record identifies one registered project and one building. A separate phase name or phase number is not disclosed. RERA record |
| TG-RERA registration | P02200009480; registration recorded as valid from 19 November 2024 to 19 November 2027. This is registration validity, not the project completion deadline. RERA record |
| Registered promoter | GKH BUILDERS (also styled G.K.H. BUILDERS / Gkh Builders in filed documents); partnership. RERA record Corporate record |
| RERA status | Registration certificate supplied; the registration record gives the validity above. No extension is shown in the supplied evidence. Approvals record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / site description | R K Puram / Officers Colony, Ramakrishna Puram, Secunderabad; the registered location is recorded as Rk Puram. RERA record |
| Revenue village | MALKAJGIRI is stated in the revised building permit extraction; the project registration records Rk Puram. The supplied records do not establish a single reconciled revenue-village name. |
| Mandal / district / PIN | Malkajgiri / Medchal-Malkajgiri / 500056. RERA record |
| Survey numbers and subdivisions | 195/1 and 196/1. RERA record Land records |
| Site area | Sanction extraction: plot area 445.93 sq. m, splay area 2.08 sq. m, net plot area 443.85 sq. m. |
| Boundaries filed with RERA | East: 30 WIDE ROAD; West: PLOT NO 60; North: PORTION OF H NO 33-66; South: PLOT NO 62. Land records |
| Roads stated in plan extraction | 9.00M; 30'0" WIDE SOUTH SIDE ROAD; 30'0" WIDE EAST SIDE ROAD; and an 18 mt. road width referenced in plan conditions. |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building approval | Revised Building Permit Order 3557/GHMC/SEC/2024-BP, approved 19 November 2024; file no. 002632/GHMC/1264/SEC2/2024-BP. Approvals record |
| Approved building use and count | Residential; 1 building, identified as Building A. |
| Sanctioned configuration | 1 Stilt + 5 upper floors; building height 14.9 (the permit extraction states this figure without a unit in the corresponding sanctioned-parameters entry). The extracted plan also describes NO OF FLOORS: 6. |
| Approved built-up area | Permit extraction: residential area 1,254.65 Sq.Mt., stilt area 238.55 Sq.Mt., and total parking area 140.9 (unit not stated in that extracted parameter). The layout-plan extraction separately reports total proposed built-up area excluding parking 1254.65, including parking 1505.55, total BUA 1517.13, deductions 11.58, and net BUA 1254.65. These are distinct extracted plan entries. |
| Units | 10 units in the GHMC plan extraction; the RERA unit record also lists 10 units. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 3BHK, 10 units; filed saleable area 150.04 sq. m per unit. RERA unit table RERA unit details |
| Booked / available | 0 booked / 10 available, as last read from the TG-RERA portal; no portal as-of date is supplied, so these counts are indicative. RERA unit table RERA unit details |
| Construction stage | Construction progress is not established by the supplied records. The TG-RERA amenities progress entries show 0% for listed items; these entries are not an independently verified site inspection. RERA amenities |
| Completion dates | GHMC permit extraction states construction to be commenced before 19 May, 2025 and completed before 19 November, 2027. The RERA Form B declaration gives a completion undertaking of 19.11.2027. The project header separately records proposed completion 19/03/2028. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project evidence. The permit conditions require an Occupancy Certificate before occupation. |
2. The project story
LACASA 1 is a single-building residential apartment project on Survey Nos. 195/1 and 196/1, in the R K Puram / Officers Colony, Ramakrishna Puram locality of Malkajgiri. The registered project record lists one building and ten 3BHK units; the GHMC permit extraction describes Building A as 1 Stilt + 5 upper floors. RERA record Land records RERA unit table
The filing describes a compact site with a net plot area of 443.85 sq. m and a 2.08 sq. m splay area. The permit records 1,254.65 Sq.Mt. of residential area, alongside separate stilt and parking-area figures. The supplied evidence does not establish construction progress through an independent site inspection; the RERA progress entries provided for listed amenities are recorded at 0%. RERA amenities
The registration is valid through 19 November 2027, while the supplied records contain completion-date entries of 19 November 2027 and 19/03/2028. No occupancy or completion certificate is provided. The GHMC permit conditions state that an Occupancy Certificate is required before occupation. RERA record
3. Master plan, architecture & building design
The GHMC-filed plan extraction identifies one residential building, Building A, with 1 Stilt + 5 upper floors. It records a building height of 14.9, residential area of 1,254.65 Sq.Mt., and stilt area of 238.55 Sq.Mt. The permit extraction lists a net plot area of 443.85 sq. m; the accompanying layout-plan extraction lists the plot area as 445.93 and splay area as 2.08.
The layout-plan extraction reports total proposed built-up area excluding parking as 1254.65, including parking as 1505.55, total BUA as 1517.13, deductions as 11.58, and net BUA as 1254.65. The supplied fields do not define these separate area labels further, so they should not be treated as interchangeable.
The extracted sanctioned-plan data also lists a vacant plot area of 192.92, TDR 80M, and TDR area 189.8 Sq. Yds. It does not provide a drawing-derived schedule of flat positions per floor, building footprint, lifts or stairs, landscaped-area dimensions, or a detailed residential/common-area breakdown.
4. Homes, configurations & floor plans
The TG-RERA record lists 10 3BHK units, with 0 booked and 10 available at the last portal read; the portal record supplies no as-of date. The RERA-filed saleable area is 150.04 sq. m per unit. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 150.04 sq. m | Software-measured: median 91.5 sq. m; range 87.5–92.4 sq. m | 39% |
Carpet-area figures are software measurements from the approved floor-plan drawing geometry, not RERA-filed disclosures, and the source notes that they need review. Four flat designs were measured. For one depicted flat, the drawing extraction identifies three bedrooms, living/dining, kitchen, toilet, a 1.25 M. WIDE BALC, and utility; the balcony and utility are excluded from the measured carpet area. The supplied material does not provide a complete room schedule for every unit design. Floor plans RERA unit details
The filed saleable area and measured carpet area are different area measures: the former is the RERA record, while the latter is a drawing-based software measurement. The supplied evidence does not provide a separately verified balcony area or a unit-specific common-area loading calculation. RERA unit table Floor plans
5. Parking & vehicle circulation
The GHMC plan extraction records 1 Stilt + 5 upper floors, a stilt area of 238.55 Sq.Mt., and a total parking area of 140.9 (the unit is not stated in that extracted entry). A separate plan extraction lists parking area as 250.90. The plan conditions state that cellar and stilt areas approved for parking are to be used exclusively for parking and not converted to other uses.
The layout-plan extraction specifies one entry and one exit, each with a minimum width of 4.5mts. and height clearance of 5mts. The supplied documents do not establish the number of car or two-wheeler spaces, visitor or accessible spaces, a parking allocation for individual units, or the precise parking level arrangement beyond the stilt reference.
The plan conditions also require parking places to have Electric Vehicle Charging Infrastructure as described in the cited plan condition; the supplied evidence does not confirm installation or completion.
6. Amenities, recreation & open spaces
| Description / size | Listed; no dimensions supplied |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded in the supplied RERA amenities data; not independently verified |
| Description / size | Listed as YES; plan extraction also lists municipal water line and a separate underground static water storage tank of 25, 000 lits. and a separate terrace tank of 25,000lits for residential buildings |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Water supply is marked available in the filing; progress is recorded as 0% in the amenities data |
| Description / size | Sewerage (chamber, lines, septic tank, STP) and treatment/disposal listed; plan extraction lists STP and drainage line |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded; completion not independently verified |
| Description / size | Listed; plan extraction also lists storm water |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded; completion not independently verified |
| Description / size | Listed; plan conditions require tree planting and maintenance of a fenced tot-lot as greenery |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded; completion not independently verified |
| Description / size | Listed as YES; plan extraction specifies 3 rainwater-harvesting pits and a percolation-pit structure |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded in the amenities data; installation not independently verified |
| Description / size | Listed; plan extraction requires a garbage house within the premises |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded; completion not independently verified |
| Description / size | Listed; no facility details supplied |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded; no completed facility verified |
| Description / size | Listed; no quantity or specification supplied |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded; completion not independently verified |
| Description / size | Listed; plan extraction requires space for a transformer and lists a distribution transformer |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded; installation not independently verified |
| Description / size | Listed; no system or specification supplied |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded; completion not independently verified |
| Description / size | Listed; permit conditions assign fire-safety provision responsibility to the project parties and require a Fire NOC before Occupancy Certificate |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded; no Fire NOC or completed system supplied |
| Description / size | Listed as aggregate area of recreational open space; no area supplied |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded; completion not independently verified |
7. Utilities, building services & safety
The project records list municipal water supply, a 25, 000 lits. underground static-water storage tank, a 25,000lits terrace tank, rainwater harvesting, storm water, drainage, and an STP. The RERA amenities data marks water supply and water conservation/rainwater harvesting as YES, but records 0% progress for the listed facilities; no independent completion evidence is supplied. RERA amenities
Electrical provisions in the plan extraction include space for a transformer and a distribution transformer. The plan condition calls for EV-charging infrastructure in parking places. No project-specific supply capacity, backup-power capacity, or installed EV equipment is established in the supplied RERA evidence.
The plan lists a lift, but the supplied project-specific sanction extraction does not state its capacity or number. The permit conditions require services including sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical supervision. They also state that an Occupancy Certificate and an occupancy Fire NOC are required before occupation/issuance of the OC, respectively. No such certificates are supplied.
The permit conditions refer to structural safety and means-of-escape/fire-safety responsibilities. The available material does not establish completed fire systems, escape routes, accessibility features, CCTV, access control, or waste segregation arrangements. RERA amenities
8. Location, access & connectivity
The project is registered at Rk Puram, Malkajgiri, Medchal-Malkajgiri, 500 056, with the building-permit extraction describing the site as R K PURAM (OFFICERS COLONY). The supplied land record identifies the site as Rk Puram and the plan extraction refers to Officers Colony, Ramakrishna Puram, Secunderabad. RERA record
The filed boundary description identifies a 30 WIDE ROAD on the east. The plan extraction also refers to a 30'0" WIDE SOUTH SIDE ROAD, a 30'0" WIDE EAST SIDE ROAD, and 9.00M and 18 mt. road width entries. These are the road descriptions recorded in the supplied plan data. Land records
A location record gives the nearest sampled Outer Ring Road interchange at 7.6 km; it is labelled approximate. No public-transport or landmark distance has been established in the supplied project-location record. Location record
9. Developer & development status
The registered promoter is GKH BUILDERS, recorded as a partnership, with GSTIN 36AARFG6869J1ZI. The supplied promoter address is GK COLONY, RAMAKRISHNAPURAM, MALKAJGIRI, Malkajgiri, Medchal-Malkajgiri, 500056. No official website or project contact details are supplied. Corporate record Parties record
The Form B declaration filed for G.K.H. BUILDERS, verified on 04.02.2025, states a completion undertaking of 19.11.2027 and includes declarations concerning encumbrances, project funds, approvals and audit obligations. This is a promoter declaration, not independent confirmation of project progress or completion.
The supplied records identify one building and ten units. No project-specific, independently verified construction-progress update or occupancy/completion certificate is included. The registration certificate records validity through 19 November 2027; completion-date entries are separately recorded in the project header and filed plan/declaration materials. RERA record RERA unit table
10. Approvals, official records & documents
| Reference / scope | LACASA 1; P02200009480; validity 19/11/2024–19/11/2027 |
|---|---|
| Evidence supplied | Form C registration certificate |
| Reference / scope | 3557/GHMC/SEC/2024-BP; approved 19 November, 2024; file no. 002632/GHMC/1264/SEC2/2024-BP; surveys 195/1 and 196/1 |
|---|---|
| Evidence supplied | Revised Building Permit Order extraction |
| Reference / scope | Proposed residential apartment, Stilt + 4 floors + 1 floor T.D.R.; plot nos. 62 & 63, surveys 195/1, 196/1 |
|---|---|
| Evidence supplied | Plan/layout extraction filed with RERA |
| Reference / scope | Form B; completion undertaking 19.11.2027; verified 04.02.2025 |
|---|
| Reference / scope | Advocate’s report concerning Plot Nos. 62 and 63, Survey Nos. 195/1 & 196/1 |
|---|---|
| Evidence supplied | Filed title report; cited here as an available project document |
The supplied evidence does not include an Occupancy Certificate or completion certificate. The GHMC plan conditions state that an Occupancy Certificate is compulsory before occupation.
1. Project at a glance
Project identity
Registered name: LACASA 1
Project type / phase: Residential apartment project; the supplied record identifies one registered project and one building. A separate phase name or phase number is not disclosed.
TG-RERA registration: P02200009480; registration recorded as valid from 19 November 2024 to 19 November 2027. This is registration validity, not the project completion deadline.
Registered promoter: GKH BUILDERS (also styled G.K.H. BUILDERS / Gkh Builders in filed documents); partnership.
RERA status: Registration certificate supplied; the registration record gives the validity above. No extension is shown in the supplied evidence.
Land and geographic identity
Locality / site description: R K Puram / Officers Colony, Ramakrishna Puram, Secunderabad; the registered location is recorded as Rk Puram.
Revenue village: MALKAJGIRI is stated in the revised building permit extraction; the project registration records Rk Puram. The supplied records do not establish a single reconciled revenue-village name.
Mandal / district / PIN: Malkajgiri / Medchal-Malkajgiri / 500056.
Survey numbers and subdivisions: 195/1 and 196/1.
Site area: Sanction extraction: plot area 445.93 sq. m, splay area 2.08 sq. m, net plot area 443.85 sq. m.
Boundaries filed with RERA: East: 30 WIDE ROAD; West: PLOT NO 60; North: PORTION OF H NO 33-66; South: PLOT NO 62.
Roads stated in plan extraction: 9.00M; 30'0" WIDE SOUTH SIDE ROAD; 30'0" WIDE EAST SIDE ROAD; and an 18 mt. road width referenced in plan conditions.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: Revised Building Permit Order 3557/GHMC/SEC/2024-BP, approved 19 November 2024; file no. 002632/GHMC/1264/SEC2/2024-BP.
Approved building use and count: Residential; 1 building, identified as Building A.
Sanctioned configuration: 1 Stilt + 5 upper floors; building height 14.9 (the permit extraction states this figure without a unit in the corresponding sanctioned-parameters entry). The extracted plan also describes NO OF FLOORS: 6.
Approved built-up area: Permit extraction: residential area 1,254.65 Sq.Mt., stilt area 238.55 Sq.Mt., and total parking area 140.9 (unit not stated in that extracted parameter). The layout-plan extraction separately reports total proposed built-up area excluding parking 1254.65, including parking 1505.55, total BUA 1517.13, deductions 11.58, and net BUA 1254.65. These are distinct extracted plan entries.
Units: 10 units in the GHMC plan extraction; the RERA unit record also lists 10 units.
Offering and status
RERA-filed configuration: 3BHK, 10 units; filed saleable area 150.04 sq. m per unit.
Booked / available: 0 booked / 10 available, as last read from the TG-RERA portal; no portal as-of date is supplied, so these counts are indicative.
Construction stage: Construction progress is not established by the supplied records. The TG-RERA amenities progress entries show 0% for listed items; these entries are not an independently verified site inspection.
Completion dates: GHMC permit extraction states construction to be commenced before 19 May, 2025 and completed before 19 November, 2027. The RERA Form B declaration gives a completion undertaking of 19.11.2027. The project header separately records proposed completion 19/03/2028.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project evidence. The permit conditions require an Occupancy Certificate before occupation.
2. The project story
LACASA 1 is a single-building residential apartment project on Survey Nos. 195/1 and 196/1, in the R K Puram / Officers Colony, Ramakrishna Puram locality of Malkajgiri. The registered project record lists one building and ten 3BHK units; the GHMC permit extraction describes Building A as 1 Stilt + 5 upper floors.
The filing describes a compact site with a net plot area of 443.85 sq. m and a 2.08 sq. m splay area. The permit records 1,254.65 Sq.Mt. of residential area, alongside separate stilt and parking-area figures. The supplied evidence does not establish construction progress through an independent site inspection; the RERA progress entries provided for listed amenities are recorded at 0%.
The registration is valid through 19 November 2027, while the supplied records contain completion-date entries of 19 November 2027 and 19/03/2028. No occupancy or completion certificate is provided. The GHMC permit conditions state that an Occupancy Certificate is required before occupation.
3. Master plan, architecture & building design
The GHMC-filed plan extraction identifies one residential building, Building A, with 1 Stilt + 5 upper floors. It records a building height of 14.9, residential area of 1,254.65 Sq.Mt., and stilt area of 238.55 Sq.Mt. The permit extraction lists a net plot area of 443.85 sq. m; the accompanying layout-plan extraction lists the plot area as 445.93 and splay area as 2.08.
The layout-plan extraction reports total proposed built-up area excluding parking as 1254.65, including parking as 1505.55, total BUA as 1517.13, deductions as 11.58, and net BUA as 1254.65. The supplied fields do not define these separate area labels further, so they should not be treated as interchangeable.
The extracted sanctioned-plan data also lists a vacant plot area of 192.92, TDR 80M, and TDR area 189.8 Sq. Yds. It does not provide a drawing-derived schedule of flat positions per floor, building footprint, lifts or stairs, landscaped-area dimensions, or a detailed residential/common-area breakdown.
4. Homes, configurations & floor plans
The TG-RERA record lists 10 3BHK units, with 0 booked and 10 available at the last portal read; the portal record supplies no as-of date. The RERA-filed saleable area is 150.04 sq. m per unit.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 150.04 sq. m | Software-measured: median 91.5 sq. m; range 87.5–92.4 sq. m | 39% |
Carpet-area figures are software measurements from the approved floor-plan drawing geometry, not RERA-filed disclosures, and the source notes that they need review. Four flat designs were measured. For one depicted flat, the drawing extraction identifies three bedrooms, living/dining, kitchen, toilet, a 1.25 M. WIDE BALC, and utility; the balcony and utility are excluded from the measured carpet area. The supplied material does not provide a complete room schedule for every unit design.
The filed saleable area and measured carpet area are different area measures: the former is the RERA record, while the latter is a drawing-based software measurement. The supplied evidence does not provide a separately verified balcony area or a unit-specific common-area loading calculation.
5. Parking & vehicle circulation
The GHMC plan extraction records 1 Stilt + 5 upper floors, a stilt area of 238.55 Sq.Mt., and a total parking area of 140.9 (the unit is not stated in that extracted entry). A separate plan extraction lists parking area as 250.90. The plan conditions state that cellar and stilt areas approved for parking are to be used exclusively for parking and not converted to other uses.
The layout-plan extraction specifies one entry and one exit, each with a minimum width of 4.5mts. and height clearance of 5mts. The supplied documents do not establish the number of car or two-wheeler spaces, visitor or accessible spaces, a parking allocation for individual units, or the precise parking level arrangement beyond the stilt reference.
The plan conditions also require parking places to have Electric Vehicle Charging Infrastructure as described in the cited plan condition; the supplied evidence does not confirm installation or completion.
6. Amenities, recreation & open spaces
| Description / size | Listed; no dimensions supplied |
|---|---|
| Declared progress / verified status | 0% recorded in the supplied RERA amenities data; not independently verified |
| Description / size | Listed as YES; plan extraction also lists municipal water line and a separate underground static water storage tank of 25, 000 lits. and a separate terrace tank of 25,000lits for residential buildings |
|---|---|
| Declared progress / verified status | Water supply is marked available in the filing; progress is recorded as 0% in the amenities data |
| Description / size | Sewerage (chamber, lines, septic tank, STP) and treatment/disposal listed; plan extraction lists STP and drainage line |
|---|---|
| Declared progress / verified status | 0% recorded; completion not independently verified |
| Description / size | Listed; plan extraction also lists storm water |
|---|---|
| Declared progress / verified status | 0% recorded; completion not independently verified |
| Description / size | Listed; plan conditions require tree planting and maintenance of a fenced tot-lot as greenery |
|---|---|
| Declared progress / verified status | 0% recorded; completion not independently verified |
| Description / size | Listed as YES; plan extraction specifies 3 rainwater-harvesting pits and a percolation-pit structure |
|---|---|
| Declared progress / verified status | 0% recorded in the amenities data; installation not independently verified |
| Description / size | Listed; plan extraction requires a garbage house within the premises |
|---|---|
| Declared progress / verified status | 0% recorded; completion not independently verified |
| Description / size | Listed; no facility details supplied |
|---|---|
| Declared progress / verified status | 0% recorded; no completed facility verified |
| Description / size | Listed; no quantity or specification supplied |
|---|---|
| Declared progress / verified status | 0% recorded; completion not independently verified |
| Description / size | Listed; plan extraction requires space for a transformer and lists a distribution transformer |
|---|---|
| Declared progress / verified status | 0% recorded; installation not independently verified |
| Description / size | Listed; no system or specification supplied |
|---|---|
| Declared progress / verified status | 0% recorded; completion not independently verified |
| Description / size | Listed; permit conditions assign fire-safety provision responsibility to the project parties and require a Fire NOC before Occupancy Certificate |
|---|---|
| Declared progress / verified status | 0% recorded; no Fire NOC or completed system supplied |
| Description / size | Listed as aggregate area of recreational open space; no area supplied |
|---|---|
| Declared progress / verified status | 0% recorded; completion not independently verified |
7. Utilities, building services & safety
The project records list municipal water supply, a 25, 000 lits. underground static-water storage tank, a 25,000lits terrace tank, rainwater harvesting, storm water, drainage, and an STP. The RERA amenities data marks water supply and water conservation/rainwater harvesting as YES, but records 0% progress for the listed facilities; no independent completion evidence is supplied.
Electrical provisions in the plan extraction include space for a transformer and a distribution transformer. The plan condition calls for EV-charging infrastructure in parking places. No project-specific supply capacity, backup-power capacity, or installed EV equipment is established in the supplied RERA evidence.
The plan lists a lift, but the supplied project-specific sanction extraction does not state its capacity or number. The permit conditions require services including sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical supervision. They also state that an Occupancy Certificate and an occupancy Fire NOC are required before occupation/issuance of the OC, respectively. No such certificates are supplied.
The permit conditions refer to structural safety and means-of-escape/fire-safety responsibilities. The available material does not establish completed fire systems, escape routes, accessibility features, CCTV, access control, or waste segregation arrangements.
8. Location, access & connectivity
The project is registered at Rk Puram, Malkajgiri, Medchal-Malkajgiri, 500 056, with the building-permit extraction describing the site as R K PURAM (OFFICERS COLONY). The supplied land record identifies the site as Rk Puram and the plan extraction refers to Officers Colony, Ramakrishna Puram, Secunderabad.
The filed boundary description identifies a 30 WIDE ROAD on the east. The plan extraction also refers to a 30'0" WIDE SOUTH SIDE ROAD, a 30'0" WIDE EAST SIDE ROAD, and 9.00M and 18 mt. road width entries. These are the road descriptions recorded in the supplied plan data.
A location record gives the nearest sampled Outer Ring Road interchange at 7.6 km; it is labelled approximate. No public-transport or landmark distance has been established in the supplied project-location record.
9. Developer & development status
The registered promoter is GKH BUILDERS, recorded as a partnership, with GSTIN 36AARFG6869J1ZI. The supplied promoter address is GK COLONY, RAMAKRISHNAPURAM, MALKAJGIRI, Malkajgiri, Medchal-Malkajgiri, 500056. No official website or project contact details are supplied.
The Form B declaration filed for G.K.H. BUILDERS, verified on 04.02.2025, states a completion undertaking of 19.11.2027 and includes declarations concerning encumbrances, project funds, approvals and audit obligations. This is a promoter declaration, not independent confirmation of project progress or completion.
The supplied records identify one building and ten units. No project-specific, independently verified construction-progress update or occupancy/completion certificate is included. The registration certificate records validity through 19 November 2027; completion-date entries are separately recorded in the project header and filed plan/declaration materials.
10. Approvals, official records & documents
| Reference / scope | LACASA 1; P02200009480; validity 19/11/2024–19/11/2027 |
|---|---|
| Evidence supplied | Form C registration certificate |
| Reference / scope | 3557/GHMC/SEC/2024-BP; approved 19 November, 2024; file no. 002632/GHMC/1264/SEC2/2024-BP; surveys 195/1 and 196/1 |
|---|---|
| Evidence supplied | Revised Building Permit Order extraction |
| Reference / scope | Proposed residential apartment, Stilt + 4 floors + 1 floor T.D.R.; plot nos. 62 & 63, surveys 195/1, 196/1 |
|---|---|
| Evidence supplied | Plan/layout extraction filed with RERA |
| Reference / scope | Form B; completion undertaking 19.11.2027; verified 04.02.2025 |
|---|
| Reference / scope | Advocate’s report concerning Plot Nos. 62 and 63, Survey Nos. 195/1 & 196/1 |
|---|---|
| Evidence supplied | Filed title report; cited here as an available project document |
The supplied evidence does not include an Occupancy Certificate or completion certificate. The GHMC plan conditions state that an Occupancy Certificate is compulsory before occupation.
Frequently asked questions
Is LACASA 1 registered with Telangana RERA?
Yes. LACASA 1 is registered with the Telangana Real Estate Regulatory Authority as P02200009480; the registration status is New Project.
Who is the developer of LACASA 1?
The promoter named in the RERA registration is GKH BUILDERS.
Where is LACASA 1 located?
LACASA 1 is in MALKAJGIRI, Rk Puram, Medchal-Malkajgiri, Telangana (500056).
When will LACASA 1 be completed?
The promoter's proposed date of completion filed with RERA is 19/03/2028. This is the promoter's declaration, not a guarantee.
More projects in Rk Puram