Cnr Quality Signatures
QUALITY BUILDERS · Medchal-Malkajgiri · RERA P02200000570
CNR QUALITY SIGNATURES is a residential apartment project in ALWAL, Alwal, Medchal-Malkajgiri district. The registered promoter is QUALITY BUILDERS. The RERA record gives a total land area of 9433.95 sqmts, two building units and 150 apartments: 110 2BHK units with a saleable area of 40.26 sqm each and 40 3BHK units with a saleable area of 53.07 sqm each. It is registered with TG-RERA as P02200000570, with a promoter-declared proposed completion date of 31/12/2021.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | CNR QUALITY SIGNATURES RERA record |
| Project type | Residential; TG-RERA lists it as an apartment project. The GHMC permit extraction also describes residential blocks and a commercial block. RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record. TG-RERA registration number: P02200000570. |
| Registered promoter | QUALITY BUILDERS; the RERA record identifies the entity type as a partnership. RERA filing Corporate record |
| TG-RERA status and validity | Registration certificate states validity from 09/04/2019 to 31/12/2021; the certificate extraction says it was not extended. Registration validity is separate from the completion deadline and from occupancy certification. RERA record |
| RERA completion date | Promoter-declared proposed completion date: 31/12/2021. RERA record RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied project documents; status is not established by the available record. Document index |
Land and geographic identity
| Item | Project record |
|---|---|
| Registered locality / village | Locality: ALWAL; registered revenue village: Alwal. The building-permit extraction separately identifies Dammaiguda as its village/locality. RERA record RERA filing |
| Mandal | Not disclosed in the RERA identity fields. The GHMC permit extraction says MALKAJGIRI. Land records |
| District | Medchal-Malkajgiri in the RERA project identity; the permit extraction states MEDCHAL. RERA record RERA filing |
| PIN | 500010. RERA record |
| Project survey numbers | RERA registration certificate: 1/A PART and 2/PART. The permit extraction gives 1/1 & 2/part and 1/2/part. |
| Registered site extent | RERA land record: total area 9433.95 sqmts, affected area 1453.34 sqmts, and net area 7980.61 sqmts. Land records |
| Boundaries in RERA record | North: ROAD WIDTH 9 MTRS AND NEIGHBOURS LAND; south: ROAD WIDTH 18 MTRS; east: PART OF LAND AND RAILWAY TRACK; west: NEIGHBOURS LAND AND 9 MTRS APPROACH ROAD. Land records |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building permit | Approval No. 1/Cl/08148/2018; the RERA approval summary gives approved date 22 October, 2018. The permit extraction also lists File No. 1/Cl/12778/2017. Approvals record |
| Approved built-up area | RERA project fields state 19430.12 sqmts approved built-up area. The permit extraction contains a separate, garbled covered-built-up figure (“1,294%300”); no corrected value can be established from the supplied extraction. RERA filing |
| Buildings / blocks | RERA record: 2 total building units. The permit extraction describes residential Block A (VEERENDRA DAS), G+4 and Block B (VEERENDRA DAS), Ground+2, plus commercial Block C (VEERENDRA DAS), Ground+2. RERA filing |
| Floors and height | Permit extraction lists G+4 and Ground+2, and a height of 14.9m; it does not clearly tie the height to a particular block. Basement, stilt, podium, and parking-floor configuration are not established in the supplied record. |
| Approved versus RERA-declared units | GHMC permit extraction states 5 units; RERA filing lists 150 apartments: 110 2BHK and 40 3BHK. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations | 2BHK: 110 units, saleable area 40.26 sqm each; 3BHK: 40 units, saleable area 53.07 sqm each. RERA unit table |
| Booked / available | Portal-read figures show 0 booked and 110 available 2BHK units; 0 booked and 40 available 3BHK units. The portal record supplies no as-of date, so these counts are indicative rather than a current inventory confirmation. RERA unit table |
| Construction stage | RERA record labels the project New Project. No independently verified site-progress report or completed-work status is supplied. RERA filing RERA record |
| Completion deadline | Promoter-declared proposed completion: 31/12/2021. The GHMC permit extraction separately states construction to be completed before 22 December 2019. RERA record |
| OC status / scope | No OC or completion certificate is present in the supplied evidence for the project or for an individual block. Document index |
2. The project story
CNR QUALITY SIGNATURES is registered with TG-RERA as a residential apartment project at Alwal, with the registration identifying survey subdivisions 1/A PART and 2/PART. The registered land record gives a total area of 9433.95 sqmts, of which 1453.34 sqmts is shown as affected and 7980.61 sqmts as net area. RERA record Land records
The RERA filing describes two building units and 150 apartments: 110 two-bedroom and 40 three-bedroom homes. The GHMC permit extraction describes two residential blocks and a Ground+2 commercial block. The supplied evidence does not establish the commercial block’s relationship to the RERA apartment inventory or provide a phase-by-phase account. RERA filing RERA unit table
The RERA project status is “New Project”; that is a filing status, not an independently verified construction inspection. The promoter’s proposed completion date was 31/12/2021, while the supplied record does not establish actual construction progress, completion, or occupancy certification for any block. RERA filing RERA record Document index
3. Master plan, architecture & building design
The RERA record states total land area 9433.95 sqmts, affected area 1453.34 sqmts, net area 7980.61 sqmts, and approved built-up area 19430.12 sqmts. These are distinct filed figures; the supplied evidence does not provide a reliable breakdown of FSI-counted area, gross built-up area, or building footprint. Land records RERA filing
The GHMC building-permit extraction identifies residential Block A as G+4, residential Block B as Ground+2, and commercial Block C as Ground+2. It lists a height of 14.9m without clearly tying it to a block. The RERA land record lists two total building units, but a detailed approved drawing set establishing block arrangement, floor plates, entries, lifts, stairs, internal circulation, open-space areas, or commercial/common-area distribution is not included in the supplied material. RERA filing
The permit extraction names a Tot lot and includes conditions for periphery/front tree planting and a fenced tot-lot to be maintained as open area before an occupancy certificate. No measured site plan or drawing-derived area for these features is supplied.
4. Homes, configurations & floor plans
The RERA filing lists the following configurations and areas. No carpet-area measurement was produced from the supplied floor-plan drawings: the drawing record reports two drawings measured, but 0 flat designs measured for either configuration. Accordingly, no drawing-based carpet area or room dimensions can be reported. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 110 | 0 | 110 | 40.26 sqm | Not measured | Not supplied |
| 3BHK | 40 | 0 | 40 | 53.07 sqm | Not measured | Not supplied |
Saleable area is the RERA-filed area; it is not a software-measured carpet area. The supplied evidence does not provide a carpet-area figure, balcony or utility-area schedule, or loading calculation. The portal-read booking figures have no recorded as-of date and should be confirmed for a specific unit before purchase. RERA unit table RERA unit details Floor plans
5. Parking & vehicle circulation
The supplied permit and project records do not establish a sanctioned parking count, parking levels, visitor or accessible spaces, ramps, driveways, pedestrian separation, or unit-specific parking allocations. The project fields report a mortgage area of 1661.31 sqmts, but do not identify this as a parking area. RERA filing
A third-party vendor listing mentions “Covered Car Parking,” but this is not a RERA-filed or independently verified parking schedule and is not evidence of an allocation to a particular apartment. Promoter website
6. Amenities, recreation & open spaces
The RERA amenity schedule marks the following facilities as available (“YES”) and reports 0% progress for each listed item. These are filed availability/progress entries, not independent confirmation that facilities are built or operational. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Size not supplied | RERA amenity schedule RERA amenities | Available: YES; 0%; not independently verified |
| Water supply | Capacity/source not supplied | RERA amenity schedule RERA amenities | Available: YES; 100%; not independently verified |
| Sewerage (chamber, lines, septic tank, STP) | Components are grouped in the filing; individual provision is not specified | RERA amenity schedule RERA amenities | Available: YES; 0%; not independently verified |
| Storm-water drains | Size not supplied | RERA amenity schedule RERA amenities | Available: YES; 0%; not independently verified |
| Green strip / tot lot / park | Area and quantity not supplied; GHMC permit also names a tot lot | RERA amenity schedule RERA amenities; GHMC permit | Available: YES; 0%; not independently verified |
| Street lighting | Details not supplied | RERA amenity schedule RERA amenities | Available: YES; 0%; not independently verified |
| Community buildings | Description and size not supplied | RERA amenity schedule RERA amenities | Available: YES; 0%; not independently verified |
| Treatment and disposal of sewage and sullage water | System/capacity not supplied | RERA amenity schedule RERA amenities | Available: YES; 0%; not independently verified |
| Solid-waste management and disposal | Details not supplied | RERA amenity schedule RERA amenities | Progress: 0%; availability not stated; not independently verified |
| Water conservation / rainwater harvesting | System/capacity not supplied; GHMC permit requires a rainwater-harvesting structure (percolation pit) | RERA amenity schedule RERA amenities; GHMC permit | Available: YES; 0%; not independently verified |
| Energy management | Details not supplied | RERA amenity schedule RERA amenities | Progress: 0%; availability not stated; not independently verified |
| Fire protection and fire-safety requirements | System details not supplied | RERA amenity schedule RERA amenities | Available: YES; 0%; not independently verified |
| Electrical meter room / sub-station / receiving station | Details not supplied; GHMC permit requires space for a transformer | RERA amenity schedule RERA amenities; GHMC permit | Available: YES; 0%; not independently verified |
| Recreational open space | Aggregate area not supplied | RERA amenity schedule RERA amenities | Progress: 0%; availability not stated; not independently verified |
| Swimming pool | Size/capacity not supplied | RERA amenity schedule RERA amenities | Available: YES; 0%; not independently verified |
| Club house | Size/capacity not supplied | RERA amenity schedule RERA amenities | Available: YES; 0%; not independently verified |
| Indoor games | Details not supplied | RERA amenity schedule RERA amenities | Available: YES; 0%; not independently verified |
| AC gym | Size/equipment not supplied | RERA amenity schedule RERA amenities | Available: YES; 0%; not independently verified |
| Children’s play area | Size/equipment not supplied | RERA amenity schedule RERA amenities | Available: YES; 0%; not independently verified |
| Vaastu compliant | No supporting design detail supplied | RERA amenity schedule RERA amenities | Available: YES; 0%; not independently verified |
| 24 by 7 security | System/staffing details not supplied | RERA amenity schedule RERA amenities | Available: YES; 0%; not independently verified |
| 24 by 7 water supply | Source/storage details not supplied | RERA amenity schedule RERA amenities | Available: YES; 0%; not independently verified |
| 24 by 7 power backup | Capacity/coverage not supplied | RERA amenity schedule RERA amenities | Available: YES; 0%; not independently verified |
| Jogging track | Size not supplied | RERA amenity schedule RERA amenities | Available: YES; 0%; not independently verified |
| CCTV | Coverage/system details not supplied | RERA amenity schedule RERA amenities | Available: YES; 0%; not independently verified |
| Solar fencing | Details not supplied | RERA amenity schedule RERA amenities | Available: YES; 0%; not independently verified |
| Intercom | Details not supplied | RERA amenity schedule RERA amenities | Available: YES; 0%; not independently verified |
The GHMC permit also requires public amenities such as water and electricity connections, garbage-house provision, and tree planting; the supplied permit extraction does not establish their completion.
7. Utilities, building services & safety
The RERA schedule marks water supply and 24-by-7 water supply as available, but gives no source, storage, treatment, or capacity details. Sewerage, storm-water drainage, treatment/disposal, and rainwater harvesting are listed, with 0% progress recorded for those entries. The GHMC permit requires a rainwater-harvesting percolation pit and public-amenity connections for water and electricity. RERA amenities
The filing lists an electrical meter room/sub-station/receiving station and 24-by-7 power backup, but provides no equipment capacity or backup coverage. GHMC’s permit extraction requires transformer space. No lift count or capacity, fire-system specification, escape-stair arrangement, accessibility provisions, waste-segregation method, or security-system design is established in the supplied project documents. RERA amenities
The permit states that an occupancy certificate must be obtained before a building is occupied and that a completion notice is to be submitted after completion. These are permit conditions; the supplied evidence does not establish that an OC has been issued.
8. Location, access & connectivity
The registered project location is ALWAL, village Alwal, district Medchal-Malkajgiri, PIN 500010. The RERA land record gives approach-road boundaries to the west and road-width boundaries to the north and south; it also identifies a railway track along the eastern boundary. RERA record RERA filing Land records
A separate GHMC permit extraction places the permitted development in Dammaiguda, mandal MALKAJGIRI, district MEDCHAL. The supplied material does not provide a verified road-network plan or public-transport route schedule for the registered project.
The location dataset supplies these measured distances from the cadastral parcel centroid: ADP 0.0 km; IndusInd Bank 0.4 km; Nanakramguda Govt primary school 0.5 km; Financial District (Nanakramguda) 1.2 km; unnamed park 1.2 km; Manuu Polytechnic Hyderabad 1.6 km; Sankaraya Eye Hospital 1.6 km; unnamed bus station 2.2 km; and South india shopping mall 2.6 km. These are dataset measurements, not stated travel times. Location record
9. Developer & development status
The registered promoter is QUALITY BUILDERS, recorded as a partnership. The RERA party record names GUNDA DAYAKAR as authorized signatory and partner, and VEERANDRA DAS GUNDA as partner. The project record does not provide a verified official website or contact details for the promoter. RERA filing Corporate record Parties record
TG-RERA records the project as “New Project,” with proposed completion 31/12/2021. The supplied records do not give independently verified construction progress, a revised completion date, or an OC for either building. The RERA portal inventory read shows 110 2BHK and 40 3BHK units available, but carries no as-of date. RERA filing RERA record RERA unit table Document index
10. Approvals, official records & documents
| Record | Supplied evidence and scope |
|---|---|
| TG-RERA registration | Form C certificate for CNR QUALITY SIGNATURES, registration P02200000570, granted under section 5; certificate states validity from 09/04/2019 to 31/12/2021. |
| GHMC building permit | Building Permit Order, Approval No. 1/Cl/08148/2018, approved 22 October, 2018; File No. 1/Cl/12778/2017. The extraction describes residential Blocks A and B and commercial Block C, and records permit conditions. |
| Other numbers in permit extraction | Co-ordination layout proceedings 1433/02/44/2019/131 (24 April 2018); NOC proceedings 12129/2013 (04/11/2018); Fire NOC 2329/2018 (18 April 2018); LTP licence CA/201275'529. |
| Commencement / occupancy evidence | Document title refers to commencement certificates for each building in each phase, but the supplied extraction is a building permit order. It requires commencement notice and an OC before occupation; no issued OC is identified in the supplied evidence. Document index |
| RERA Form B declaration | Filed declaration attributed to an authorized signatory for QUALITY BUILDERS; the extraction contains declarations regarding land, project funds, accounts, pending approvals, and non-discrimination. |
| Plan drawings | The supplied floor-plan summary reports two drawings, but no flat designs were successfully measured for the listed 2BHK and 3BHK configurations. Detailed plan features therefore cannot be described from this evidence. Floor plans |
The RERA registration certificate lists a separate-account deposit condition for 70% of amounts realised; this is a certificate condition, not evidence in itself of account operation or project progress.
1. Project at a glance
Project identity
Registered project name: CNR QUALITY SIGNATURES
Project type: Residential; TG-RERA lists it as an apartment project. The GHMC permit extraction also describes residential blocks and a commercial block.
Phase / registered portion: Phase not separately identified in the supplied record. TG-RERA registration number: P02200000570.
Registered promoter: QUALITY BUILDERS; the RERA record identifies the entity type as a partnership.
TG-RERA status and validity: Registration certificate states validity from 09/04/2019 to 31/12/2021; the certificate extraction says it was not extended. Registration validity is separate from the completion deadline and from occupancy certification.
RERA completion date: Promoter-declared proposed completion date: 31/12/2021.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied project documents; status is not established by the available record.
Land and geographic identity
Registered locality / village: Locality: ALWAL; registered revenue village: Alwal. The building-permit extraction separately identifies Dammaiguda as its village/locality.
Mandal: Not disclosed in the RERA identity fields. The GHMC permit extraction says MALKAJGIRI.
District: Medchal-Malkajgiri in the RERA project identity; the permit extraction states MEDCHAL.
PIN: 500010.
Project survey numbers: RERA registration certificate: 1/A PART and 2/PART. The permit extraction gives 1/1 & 2/part and 1/2/part.
Registered site extent: RERA land record: total area 9433.95 sqmts, affected area 1453.34 sqmts, and net area 7980.61 sqmts.
Boundaries in RERA record: North: ROAD WIDTH 9 MTRS AND NEIGHBOURS LAND; south: ROAD WIDTH 18 MTRS; east: PART OF LAND AND RAILWAY TRACK; west: NEIGHBOURS LAND AND 9 MTRS APPROACH ROAD.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building permit: Approval No. 1/Cl/08148/2018; the RERA approval summary gives approved date 22 October, 2018. The permit extraction also lists File No. 1/Cl/12778/2017.
Approved built-up area: RERA project fields state 19430.12 sqmts approved built-up area. The permit extraction contains a separate, garbled covered-built-up figure (“1,294%300”); no corrected value can be established from the supplied extraction.
Buildings / blocks: RERA record: 2 total building units. The permit extraction describes residential Block A (VEERENDRA DAS), G+4 and Block B (VEERENDRA DAS), Ground+2, plus commercial Block C (VEERENDRA DAS), Ground+2.
Floors and height: Permit extraction lists G+4 and Ground+2, and a height of 14.9m; it does not clearly tie the height to a particular block. Basement, stilt, podium, and parking-floor configuration are not established in the supplied record.
Approved versus RERA-declared units: GHMC permit extraction states 5 units; RERA filing lists 150 apartments: 110 2BHK and 40 3BHK.
Offering and status
RERA-filed configurations: 2BHK: 110 units, saleable area 40.26 sqm each; 3BHK: 40 units, saleable area 53.07 sqm each.
Booked / available: Portal-read figures show 0 booked and 110 available 2BHK units; 0 booked and 40 available 3BHK units. The portal record supplies no as-of date, so these counts are indicative rather than a current inventory confirmation.
Construction stage: RERA record labels the project New Project. No independently verified site-progress report or completed-work status is supplied.
Completion deadline: Promoter-declared proposed completion: 31/12/2021. The GHMC permit extraction separately states construction to be completed before 22 December 2019.
OC status / scope: No OC or completion certificate is present in the supplied evidence for the project or for an individual block.
2. The project story
CNR QUALITY SIGNATURES is registered with TG-RERA as a residential apartment project at Alwal, with the registration identifying survey subdivisions 1/A PART and 2/PART. The registered land record gives a total area of 9433.95 sqmts, of which 1453.34 sqmts is shown as affected and 7980.61 sqmts as net area.
The RERA filing describes two building units and 150 apartments: 110 two-bedroom and 40 three-bedroom homes. The GHMC permit extraction describes two residential blocks and a Ground+2 commercial block. The supplied evidence does not establish the commercial block’s relationship to the RERA apartment inventory or provide a phase-by-phase account.
The RERA project status is “New Project”; that is a filing status, not an independently verified construction inspection. The promoter’s proposed completion date was 31/12/2021, while the supplied record does not establish actual construction progress, completion, or occupancy certification for any block.
3. Master plan, architecture & building design
The RERA record states total land area 9433.95 sqmts, affected area 1453.34 sqmts, net area 7980.61 sqmts, and approved built-up area 19430.12 sqmts. These are distinct filed figures; the supplied evidence does not provide a reliable breakdown of FSI-counted area, gross built-up area, or building footprint.
The GHMC building-permit extraction identifies residential Block A as G+4, residential Block B as Ground+2, and commercial Block C as Ground+2. It lists a height of 14.9m without clearly tying it to a block. The RERA land record lists two total building units, but a detailed approved drawing set establishing block arrangement, floor plates, entries, lifts, stairs, internal circulation, open-space areas, or commercial/common-area distribution is not included in the supplied material.
The permit extraction names a Tot lot and includes conditions for periphery/front tree planting and a fenced tot-lot to be maintained as open area before an occupancy certificate. No measured site plan or drawing-derived area for these features is supplied.
4. Homes, configurations & floor plans
The RERA filing lists the following configurations and areas. No carpet-area measurement was produced from the supplied floor-plan drawings: the drawing record reports two drawings measured, but 0 flat designs measured for either configuration. Accordingly, no drawing-based carpet area or room dimensions can be reported.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 110 | 0 | 110 | 40.26 sqm | Not measured | Not supplied |
| 3BHK | 40 | 0 | 40 | 53.07 sqm | Not measured | Not supplied |
Saleable area is the RERA-filed area; it is not a software-measured carpet area. The supplied evidence does not provide a carpet-area figure, balcony or utility-area schedule, or loading calculation. The portal-read booking figures have no recorded as-of date and should be confirmed for a specific unit before purchase.
5. Parking & vehicle circulation
The supplied permit and project records do not establish a sanctioned parking count, parking levels, visitor or accessible spaces, ramps, driveways, pedestrian separation, or unit-specific parking allocations. The project fields report a mortgage area of 1661.31 sqmts, but do not identify this as a parking area.
A third-party vendor listing mentions “Covered Car Parking,” but this is not a RERA-filed or independently verified parking schedule and is not evidence of an allocation to a particular apartment.
6. Amenities, recreation & open spaces
The RERA amenity schedule marks the following facilities as available (“YES”) and reports 0% progress for each listed item. These are filed availability/progress entries, not independent confirmation that facilities are built or operational.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Size not supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| Water supply | Capacity/source not supplied | RERA amenity schedule | Available: YES; 100%; not independently verified |
| Sewerage (chamber, lines, septic tank, STP) | Components are grouped in the filing; individual provision is not specified | RERA amenity schedule | Available: YES; 0%; not independently verified |
| Storm-water drains | Size not supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| Green strip / tot lot / park | Area and quantity not supplied; GHMC permit also names a tot lot | RERA amenity schedule; GHMC permit | Available: YES; 0%; not independently verified |
| Street lighting | Details not supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| Community buildings | Description and size not supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| Treatment and disposal of sewage and sullage water | System/capacity not supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| Solid-waste management and disposal | Details not supplied | RERA amenity schedule | Progress: 0%; availability not stated; not independently verified |
| Water conservation / rainwater harvesting | System/capacity not supplied; GHMC permit requires a rainwater-harvesting structure (percolation pit) | RERA amenity schedule; GHMC permit | Available: YES; 0%; not independently verified |
| Energy management | Details not supplied | RERA amenity schedule | Progress: 0%; availability not stated; not independently verified |
| Fire protection and fire-safety requirements | System details not supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| Electrical meter room / sub-station / receiving station | Details not supplied; GHMC permit requires space for a transformer | RERA amenity schedule; GHMC permit | Available: YES; 0%; not independently verified |
| Recreational open space | Aggregate area not supplied | RERA amenity schedule | Progress: 0%; availability not stated; not independently verified |
| Swimming pool | Size/capacity not supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| Club house | Size/capacity not supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| Indoor games | Details not supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| AC gym | Size/equipment not supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| Children’s play area | Size/equipment not supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| Vaastu compliant | No supporting design detail supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| 24 by 7 security | System/staffing details not supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| 24 by 7 water supply | Source/storage details not supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| 24 by 7 power backup | Capacity/coverage not supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| Jogging track | Size not supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| CCTV | Coverage/system details not supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| Solar fencing | Details not supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
| Intercom | Details not supplied | RERA amenity schedule | Available: YES; 0%; not independently verified |
The GHMC permit also requires public amenities such as water and electricity connections, garbage-house provision, and tree planting; the supplied permit extraction does not establish their completion.
7. Utilities, building services & safety
The RERA schedule marks water supply and 24-by-7 water supply as available, but gives no source, storage, treatment, or capacity details. Sewerage, storm-water drainage, treatment/disposal, and rainwater harvesting are listed, with 0% progress recorded for those entries. The GHMC permit requires a rainwater-harvesting percolation pit and public-amenity connections for water and electricity.
The filing lists an electrical meter room/sub-station/receiving station and 24-by-7 power backup, but provides no equipment capacity or backup coverage. GHMC’s permit extraction requires transformer space. No lift count or capacity, fire-system specification, escape-stair arrangement, accessibility provisions, waste-segregation method, or security-system design is established in the supplied project documents.
The permit states that an occupancy certificate must be obtained before a building is occupied and that a completion notice is to be submitted after completion. These are permit conditions; the supplied evidence does not establish that an OC has been issued.
8. Location, access & connectivity
The registered project location is ALWAL, village Alwal, district Medchal-Malkajgiri, PIN 500010. The RERA land record gives approach-road boundaries to the west and road-width boundaries to the north and south; it also identifies a railway track along the eastern boundary.
A separate GHMC permit extraction places the permitted development in Dammaiguda, mandal MALKAJGIRI, district MEDCHAL. The supplied material does not provide a verified road-network plan or public-transport route schedule for the registered project.
The location dataset supplies these measured distances from the cadastral parcel centroid: ADP 0.0 km; IndusInd Bank 0.4 km; Nanakramguda Govt primary school 0.5 km; Financial District (Nanakramguda) 1.2 km; unnamed park 1.2 km; Manuu Polytechnic Hyderabad 1.6 km; Sankaraya Eye Hospital 1.6 km; unnamed bus station 2.2 km; and South india shopping mall 2.6 km. These are dataset measurements, not stated travel times.
9. Developer & development status
The registered promoter is QUALITY BUILDERS, recorded as a partnership. The RERA party record names GUNDA DAYAKAR as authorized signatory and partner, and VEERANDRA DAS GUNDA as partner. The project record does not provide a verified official website or contact details for the promoter.
TG-RERA records the project as “New Project,” with proposed completion 31/12/2021. The supplied records do not give independently verified construction progress, a revised completion date, or an OC for either building. The RERA portal inventory read shows 110 2BHK and 40 3BHK units available, but carries no as-of date.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for CNR QUALITY SIGNATURES, registration P02200000570, granted under section 5; certificate states validity from 09/04/2019 to 31/12/2021.
GHMC building permit: Building Permit Order, Approval No. 1/Cl/08148/2018, approved 22 October, 2018; File No. 1/Cl/12778/2017. The extraction describes residential Blocks A and B and commercial Block C, and records permit conditions.
Other numbers in permit extraction: Co-ordination layout proceedings 1433/02/44/2019/131 (24 April 2018); NOC proceedings 12129/2013 (04/11/2018); Fire NOC 2329/2018 (18 April 2018); LTP licence CA/201275'529.
Commencement / occupancy evidence: Document title refers to commencement certificates for each building in each phase, but the supplied extraction is a building permit order. It requires commencement notice and an OC before occupation; no issued OC is identified in the supplied evidence.
RERA Form B declaration: Filed declaration attributed to an authorized signatory for QUALITY BUILDERS; the extraction contains declarations regarding land, project funds, accounts, pending approvals, and non-discrimination.
Plan drawings: The supplied floor-plan summary reports two drawings, but no flat designs were successfully measured for the listed 2BHK and 3BHK configurations. Detailed plan features therefore cannot be described from this evidence.
The RERA registration certificate lists a separate-account deposit condition for 70% of amounts realised; this is a certificate condition, not evidence in itself of account operation or project progress.
Frequently asked questions
Is CNR QUALITY SIGNATURES registered with Telangana RERA?
Yes. CNR QUALITY SIGNATURES is registered with the Telangana Real Estate Regulatory Authority as P02200000570; the registration status is New Project.
Who is the developer of CNR QUALITY SIGNATURES?
The promoter named in the RERA registration is QUALITY BUILDERS.
Where is CNR QUALITY SIGNATURES located?
CNR QUALITY SIGNATURES is in ALWAL, Medchal-Malkajgiri, Telangana (500010).
When will CNR QUALITY SIGNATURES be completed?
The promoter's proposed date of completion filed with RERA is 31/12/2021. This is the promoter's declaration, not a guarantee.