Central Park
M/S RR BUILDERS · Rangareddy · RERA P02400000111
CENTRAL PARK is a residential apartment project in Alkapoor Township, Gandipet mandal, Ranga Reddy district, developed by registered promoter M/S RR BUILDERS. The registered site extent is 3270.09 sq. m, and the RERA record describes one building with 72 apartments: 37 2BHK and 35 3BHK units. Its TG-RERA registration number is P02400000111, and the proposed completion date is 31/08/2019.
More from Rr Builders · 6 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | CENTRAL PARK |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase not separately identified; registration is for the project at Plots 197–210 |
| TG-RERA registration | P02400000111 |
| Registration validity | 31/12/2018 to 31/08/2019; certificate says subject to extension. No extension is recorded on the certificate. This is registration validity, not the completion deadline or an OC. |
| Registered promoter | M/S RR BUILDERS, a partnership according to the RERA filing RERA record RERA filing |
| RERA project status | On-Going Project in the project record RERA record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Alkapoor Township RERA record |
| Revenue village | Neknapur; documents also spell it “Neknampur” or “Neknampura” RERA record |
| Mandal / district / PIN | Gandipet / Ranga Reddy / 500089 RERA record |
| Project survey number(s) and subdivisions | Survey No. 115; no project subdivision is identified in the registration record |
| Registered site extent | 3270.09 sq. m RERA filing |
| Net / total area | Net area 3270.09 sq. m; total area 3270.09 sq. m; affected area recorded as 0 sq. m RERA filing |
| Boundaries recorded | East: Neighbours Land; West: 30 feet wide road; North: 60 feet wide road; South: 30 feet wide road RERA filing |
| Plots covered by registration | Plot Nos. 197, 198, 199, 200, 201, 202, 203, 204, 205, 206, 207, 208, 209 and 210 |
Development identity
| Item | Record |
|---|---|
| Sanctioning / technical authorities recorded | Gram Panchayat permission; building plans noted as technically approved by HMDA |
| Principal building-permit number and date | Roc. No.GP NKP BP 10/2018-2019, dated 20.04.2018 |
| HMDA technical approval | 006704/SKP/R1/U6/HMDA/02012018, dated 06-03-2018 |
| Approved built-up area | 8428.24 sq. m RERA filing |
| Building count | 1 approved building and 1 building proposed in the RERA record RERA filing |
| Floor configuration in permission document | 1 Cellar + 1 Ground + OSupper floors as extracted from the permission; the number of upper floors is not legible/established in the supplied extraction |
| Parking levels / sanctioned parking count | Not disclosed in the supplied project record and extracts. The permission refers to a cellar, but the available material does not establish a parking count or allocation. |
| Unit count | 72 total units in the RERA record; no separate sanctioned-unit count is supplied in the available approval extraction RERA unit table RERA filing |
Offering and status
| Item | Record |
|---|---|
| Unit types | 2BHK and 3BHK RERA unit table |
| Filed saleable areas | 2BHK: 37.57 sq. m; 3BHK: 70.11 sq. m RERA unit table |
| Booked / available counts | 2BHK: 34 booked / 3 available; 3BHK: 31 booked / 4 available. The portal-derived counts have no as-of date and are indicative. RERA unit table |
| Construction stage | An Architect’s Certificate dated 14-02-2024 certifies the project complete in all aspects; this is a filed architect’s certification, not an independent site inspection. |
| Original / revised completion dates | 31/08/2019 / 31/08/2019 RERA record |
| Occupancy certificate status | Form–1A records OC No. 027551/SKP /OC/U6 IHMDA/31082019, dated 5/10/2019, for CENTRAL PARK; the supplied extraction does not separately specify tower or phase scope. |
2. The project story
CENTRAL PARK is a residential apartment development registered with TG-RERA as project P02400000111. The project record places it at Plots 197–210 in Survey No. 115, revenue village Neknapur, Gandipet mandal, Ranga Reddy district, in the Alkapoor Township locality. The registered site extent is 3270.09 sq. m. RERA filing RERA record
The RERA record describes one building and 72 apartments: 37 2BHK units and 35 3BHK units. The portal counts indicate 65 booked and 7 available, but are undated and should be treated as indicative rather than a current inventory confirmation. RERA filing RERA unit table
The registration certificate records validity through 31/08/2019, and the project record gives the same date as the original and revised proposed completion date. Separately, the Architect’s Certificate dated 14-02-2024 certifies overall completion and records an occupancy certificate number and date. These are different milestones and documents; the supplied materials do not establish an independent inspection of completed works. RERA record
3. Master plan, architecture & building design
The RERA land record identifies a site of 3270.09 sq. m, with the same net and total area, and records one building. The supplied project record gives an approved built-up area of 8428.24 sq. m. No floor-plan drawing measurements, building footprint, flat-per-floor arrangement, lift or stair details, internal circulation plan, or separate residential/common-area area schedule are available in the supplied evidence. RERA filing RERA filing Floor plans
The Gram Panchayat permission dated 20.04.2018 describes a residential apartment building as “1 Cellar+ 1 Ground+ OSupper floors”; the number of upper floors is not established by the extracted text. The permission records a 4.5 m road width and states that the building plans were technically approved by HMDA. The available extract does not provide a complete sanctioned drawing set from which to describe the building’s detailed layout or floor-by-floor design.
The registered project record reports one building and one proposed building. The supplied evidence does not provide a separately labelled FSI-counted area, gross built-up area, or carpet-area schedule; the filed saleable areas are set out under Homes below. RERA filing RERA filing RERA unit table
4. Homes, configurations & floor plans
The TG-RERA unit record lists 72 apartments across two configurations. The portal’s booked and available counts are indicative because no as-of date is supplied. The available drawing review has no measured apartment plans: one drawing is pending scan processing and one has no flats. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 37 | 34 | 3 | 37.57 sq. m | Not measured from available drawings | Not supplied |
| 3BHK | 35 | 31 | 4 | 70.11 sq. m | Not measured from available drawings | Not supplied |
The areas above are RERA-filed saleable areas, not software-measured carpet areas. No measured room dimensions, balcony or utility areas, or typical floor arrangement are available in the supplied drawing review. RERA unit table Floor plans
5. Parking & vehicle circulation
The available material does not establish the number of sanctioned car or two-wheeler spaces, visitor or accessible parking, parking allocation to individual apartments, or any mechanical or surface parking provision. The permission extract identifies a cellar but does not establish how it is used or how many parking spaces it contains. It also states that no parking or construction is to be made in setback areas.
6. Amenities, recreation & open spaces
The permission document lists certain site or building provisions, while the RERA amenities record reports some facilities as available. Those portal percentages are RERA-recorded declarations; they are not independent verification of present condition. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot lot / park | Size not supplied | RERA amenities record | Reported available, 100%; independent completion verification not supplied |
| Community buildings | Not described | RERA amenities record | 0% recorded |
| Aggregate recreational open space | Area not supplied | RERA amenities record | 0% recorded |
| Garbage house | Size not supplied | Building permission | Listed as a required/provided facility in the permission extract; completion not independently verified |
| Open space | Permission requires the designated open space to remain open and be developed with greenery only | Building permission | Condition in permission; no independent site verification supplied |
7. Utilities, building services & safety
The building-permission extract lists infrastructure and safety requirements for the residential building. It states that the applicant must construct a sump, septic tank and water-harvesting pits to specifications; the extract does not provide evidence of their present operating condition or independent completion verification.
| Evidence in the record | Separate underground static water-storage tank of 25,000 Its capacity and separate terrace tank of 25,000 lits capacity for residential buildings are listed in the permission extract |
|---|---|
| Status / limitation | Permission-recorded provisions; completion and operational status not independently verified |
| Evidence in the record | RERA amenities record lists water supply and “Sewerage (Chamber, Lines, Septic Tank, STP)” as available at 100%. The permission extract specifically requires a septic tank. |
|---|---|
| Status / limitation | Portal-declared availability; the supplied evidence does not identify or independently verify an STP or its capacity RERA amenities |
| Evidence in the record | Rain-water-harvesting structures are listed in the permission; RERA amenities record reports water conservation/rainwater harvesting at 100% |
|---|---|
| Status / limitation | Declared/listed; completion and performance not independently verified RERA amenities |
| Evidence in the record | Transformer is listed in the permission; the RERA amenities record reports an electrical meter room, sub-station or receiving station at 100% |
|---|---|
| Status / limitation | Declared/listed; detailed capacity and independent operating status not supplied RERA amenities |
| Evidence in the record | Permission lists hose reel, down comer and automatic sprinkler system, and requires fire-safety compliance and fire-service clearance before applying for an occupancy certificate |
|---|---|
| Status / limitation | Requirements/provisions recorded in the permission; the supplied extract does not establish clearance or independently verified system operation |
| Evidence in the record | Garbage house is listed in the permission. RERA amenities record solid-waste management and disposal at 0% |
|---|---|
| Status / limitation | Permission-list item; the RERA progress field does not report the waste-management facility as available RERA amenities |
| Evidence in the record | RERA amenities record |
|---|---|
| Status / limitation | Each recorded at 0% RERA amenities |
| Evidence in the record | No details supplied |
|---|---|
| Status / limitation | Not established in the available evidence |
8. Location, access & connectivity
The registered location is Alkapoor Township, revenue village Neknapur, Gandipet mandal, Ranga Reddy district, PIN 500089. The project record identifies roads on the north (60 feet wide) and west and south (30 feet wide); the permission extract separately records a 4.5 m road width without specifying it as one of those boundary roads. RERA record RERA filing
The supplied location record lists the Financial District (Nanakramguda) at 3.7 km. No public-transport details, route-specific travel times, or further approach-road measurements are supplied. Location record
9. Developer & development status
The registered promoter is M/S RR BUILDERS, recorded as a partnership. Its GSTIN is 36AAUFR4179H1ZI. The promoter address in the project record is NM RESIDENCY, ROAD NO 29, Road No 16, Alkapoor Township, Gandipet, Ranga Reddy, 500089. The record identifies Adireddy Dondeti as a partner and Srinivasa Reddy Kisari as an authorized signatory. RERA filing Corporate record Parties record
A Form B declaration dated 27 November 2018 records the promoter’s stated completion deadline of 31/8/2019 and declarations concerning title, encumbrances, project funds and approvals. The Architect’s Certificate dated 14-02-2024 subsequently certifies completion and records an occupancy certificate reference. These are promoter-filed and professional-certification records; no independent site inspection is included in the supplied evidence.
10. Approvals, official records & documents
| Reference / date | P02400000111, issued 31/12/2018; validity to 31/08/2019 |
|---|---|
| Scope and evidence | Records CENTRAL PARK, promoter M/S Rr Builders, Survey No. 115, and Plots 197–210 |
| Reference / date | 006704/SKP/R1/U6/HMDA/02012018, dated 06-03-2018 |
|---|---|
| Scope and evidence | Recorded in the Gram Panchayat permission as technical approval for the building plans |
| Reference / date | Roc. No.GP NKP BP 10/2018-2019, dated 20.04.2018 |
|---|---|
| Scope and evidence | Permission for a residential apartment in Survey No. 115, Plots 197–210; includes construction, open-space, water and safety conditions |
| Reference / date | Dated 27 November 2018 |
|---|---|
| Scope and evidence | Promoter-filed declaration concerning title, encumbrances, completion undertaking, funds, approvals and allottee treatment |
| Reference / date | Dated 14-02-2024 |
|---|---|
| Scope and evidence | Certifies overall completion and records OC No. 027551/SKP /OC/U6 IHMDA/31082019, dated 5/10/2019; identifies HMDA as competent authority |
| Reference / date | No complete drawing sheets or detailed drawing extraction supplied |
|---|---|
| Scope and evidence | The permission refers to technically approved building plans, but the supplied evidence does not enable a detailed plan review Floor plans |
1. Project at a glance
Project identity
Registered project name: CENTRAL PARK
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified; registration is for the project at Plots 197–210
TG-RERA registration: P02400000111
Registration validity: 31/12/2018 to 31/08/2019; certificate says subject to extension. No extension is recorded on the certificate. This is registration validity, not the completion deadline or an OC.
Registered promoter: M/S RR BUILDERS, a partnership according to the RERA filing
RERA project status: On-Going Project in the project record
Land and geographic identity
Locality: Alkapoor Township
Revenue village: Neknapur; documents also spell it “Neknampur” or “Neknampura”
Mandal / district / PIN: Gandipet / Ranga Reddy / 500089
Project survey number(s) and subdivisions: Survey No. 115; no project subdivision is identified in the registration record
Registered site extent: 3270.09 sq. m
Net / total area: Net area 3270.09 sq. m; total area 3270.09 sq. m; affected area recorded as 0 sq. m
Boundaries recorded: East: Neighbours Land; West: 30 feet wide road; North: 60 feet wide road; South: 30 feet wide road
Plots covered by registration: Plot Nos. 197, 198, 199, 200, 201, 202, 203, 204, 205, 206, 207, 208, 209 and 210
Development identity
Sanctioning / technical authorities recorded: Gram Panchayat permission; building plans noted as technically approved by HMDA
Principal building-permit number and date: Roc. No.GP NKP BP 10/2018-2019, dated 20.04.2018
HMDA technical approval: 006704/SKP/R1/U6/HMDA/02012018, dated 06-03-2018
Approved built-up area: 8428.24 sq. m
Building count: 1 approved building and 1 building proposed in the RERA record
Floor configuration in permission document: 1 Cellar + 1 Ground + OSupper floors as extracted from the permission; the number of upper floors is not legible/established in the supplied extraction
Parking levels / sanctioned parking count: Not disclosed in the supplied project record and extracts. The permission refers to a cellar, but the available material does not establish a parking count or allocation.
Unit count: 72 total units in the RERA record; no separate sanctioned-unit count is supplied in the available approval extraction
Offering and status
Unit types: 2BHK and 3BHK
Filed saleable areas: 2BHK: 37.57 sq. m; 3BHK: 70.11 sq. m
Booked / available counts: 2BHK: 34 booked / 3 available; 3BHK: 31 booked / 4 available. The portal-derived counts have no as-of date and are indicative.
Construction stage: An Architect’s Certificate dated 14-02-2024 certifies the project complete in all aspects; this is a filed architect’s certification, not an independent site inspection.
Original / revised completion dates: 31/08/2019 / 31/08/2019
Occupancy certificate status: Form–1A records OC No. 027551/SKP /OC/U6 IHMDA/31082019, dated 5/10/2019, for CENTRAL PARK; the supplied extraction does not separately specify tower or phase scope.
2. The project story
CENTRAL PARK is a residential apartment development registered with TG-RERA as project P02400000111. The project record places it at Plots 197–210 in Survey No. 115, revenue village Neknapur, Gandipet mandal, Ranga Reddy district, in the Alkapoor Township locality. The registered site extent is 3270.09 sq. m.
The RERA record describes one building and 72 apartments: 37 2BHK units and 35 3BHK units. The portal counts indicate 65 booked and 7 available, but are undated and should be treated as indicative rather than a current inventory confirmation.
The registration certificate records validity through 31/08/2019, and the project record gives the same date as the original and revised proposed completion date. Separately, the Architect’s Certificate dated 14-02-2024 certifies overall completion and records an occupancy certificate number and date. These are different milestones and documents; the supplied materials do not establish an independent inspection of completed works.
3. Master plan, architecture & building design
The RERA land record identifies a site of 3270.09 sq. m, with the same net and total area, and records one building. The supplied project record gives an approved built-up area of 8428.24 sq. m. No floor-plan drawing measurements, building footprint, flat-per-floor arrangement, lift or stair details, internal circulation plan, or separate residential/common-area area schedule are available in the supplied evidence.
The Gram Panchayat permission dated 20.04.2018 describes a residential apartment building as “1 Cellar+ 1 Ground+ OSupper floors”; the number of upper floors is not established by the extracted text. The permission records a 4.5 m road width and states that the building plans were technically approved by HMDA. The available extract does not provide a complete sanctioned drawing set from which to describe the building’s detailed layout or floor-by-floor design.
The registered project record reports one building and one proposed building. The supplied evidence does not provide a separately labelled FSI-counted area, gross built-up area, or carpet-area schedule; the filed saleable areas are set out under Homes below.
4. Homes, configurations & floor plans
The TG-RERA unit record lists 72 apartments across two configurations. The portal’s booked and available counts are indicative because no as-of date is supplied. The available drawing review has no measured apartment plans: one drawing is pending scan processing and one has no flats.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 37 | 34 | 3 | 37.57 sq. m | Not measured from available drawings | Not supplied |
| 3BHK | 35 | 31 | 4 | 70.11 sq. m | Not measured from available drawings | Not supplied |
The areas above are RERA-filed saleable areas, not software-measured carpet areas. No measured room dimensions, balcony or utility areas, or typical floor arrangement are available in the supplied drawing review.
5. Parking & vehicle circulation
The available material does not establish the number of sanctioned car or two-wheeler spaces, visitor or accessible parking, parking allocation to individual apartments, or any mechanical or surface parking provision. The permission extract identifies a cellar but does not establish how it is used or how many parking spaces it contains. It also states that no parking or construction is to be made in setback areas.
6. Amenities, recreation & open spaces
The permission document lists certain site or building provisions, while the RERA amenities record reports some facilities as available. Those portal percentages are RERA-recorded declarations; they are not independent verification of present condition.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot lot / park | Size not supplied | RERA amenities record | Reported available, 100%; independent completion verification not supplied |
| Community buildings | Not described | RERA amenities record | 0% recorded |
| Aggregate recreational open space | Area not supplied | RERA amenities record | 0% recorded |
| Garbage house | Size not supplied | Building permission | Listed as a required/provided facility in the permission extract; completion not independently verified |
| Open space | Permission requires the designated open space to remain open and be developed with greenery only | Building permission | Condition in permission; no independent site verification supplied |
7. Utilities, building services & safety
The building-permission extract lists infrastructure and safety requirements for the residential building. It states that the applicant must construct a sump, septic tank and water-harvesting pits to specifications; the extract does not provide evidence of their present operating condition or independent completion verification.
| Evidence in the record | Separate underground static water-storage tank of 25,000 Its capacity and separate terrace tank of 25,000 lits capacity for residential buildings are listed in the permission extract |
|---|---|
| Status / limitation | Permission-recorded provisions; completion and operational status not independently verified |
| Evidence in the record | RERA amenities record lists water supply and “Sewerage (Chamber, Lines, Septic Tank, STP)” as available at 100%. The permission extract specifically requires a septic tank. |
|---|---|
| Status / limitation | Portal-declared availability; the supplied evidence does not identify or independently verify an STP or its capacity |
| Evidence in the record | Rain-water-harvesting structures are listed in the permission; RERA amenities record reports water conservation/rainwater harvesting at 100% |
|---|---|
| Status / limitation | Declared/listed; completion and performance not independently verified |
| Evidence in the record | Transformer is listed in the permission; the RERA amenities record reports an electrical meter room, sub-station or receiving station at 100% |
|---|---|
| Status / limitation | Declared/listed; detailed capacity and independent operating status not supplied |
| Evidence in the record | Permission lists hose reel, down comer and automatic sprinkler system, and requires fire-safety compliance and fire-service clearance before applying for an occupancy certificate |
|---|---|
| Status / limitation | Requirements/provisions recorded in the permission; the supplied extract does not establish clearance or independently verified system operation |
| Evidence in the record | Garbage house is listed in the permission. RERA amenities record solid-waste management and disposal at 0% |
|---|---|
| Status / limitation | Permission-list item; the RERA progress field does not report the waste-management facility as available |
| Evidence in the record | RERA amenities record |
|---|---|
| Status / limitation | Each recorded at 0% |
| Evidence in the record | No details supplied |
|---|---|
| Status / limitation | Not established in the available evidence |
8. Location, access & connectivity
The registered location is Alkapoor Township, revenue village Neknapur, Gandipet mandal, Ranga Reddy district, PIN 500089. The project record identifies roads on the north (60 feet wide) and west and south (30 feet wide); the permission extract separately records a 4.5 m road width without specifying it as one of those boundary roads.
The supplied location record lists the Financial District (Nanakramguda) at 3.7 km. No public-transport details, route-specific travel times, or further approach-road measurements are supplied.
9. Developer & development status
The registered promoter is M/S RR BUILDERS, recorded as a partnership. Its GSTIN is 36AAUFR4179H1ZI. The promoter address in the project record is NM RESIDENCY, ROAD NO 29, Road No 16, Alkapoor Township, Gandipet, Ranga Reddy, 500089. The record identifies Adireddy Dondeti as a partner and Srinivasa Reddy Kisari as an authorized signatory.
A Form B declaration dated 27 November 2018 records the promoter’s stated completion deadline of 31/8/2019 and declarations concerning title, encumbrances, project funds and approvals. The Architect’s Certificate dated 14-02-2024 subsequently certifies completion and records an occupancy certificate reference. These are promoter-filed and professional-certification records; no independent site inspection is included in the supplied evidence.
10. Approvals, official records & documents
| Reference / date | P02400000111, issued 31/12/2018; validity to 31/08/2019 |
|---|---|
| Scope and evidence | Records CENTRAL PARK, promoter M/S Rr Builders, Survey No. 115, and Plots 197–210 |
| Reference / date | 006704/SKP/R1/U6/HMDA/02012018, dated 06-03-2018 |
|---|---|
| Scope and evidence | Recorded in the Gram Panchayat permission as technical approval for the building plans |
| Reference / date | Roc. No.GP NKP BP 10/2018-2019, dated 20.04.2018 |
|---|---|
| Scope and evidence | Permission for a residential apartment in Survey No. 115, Plots 197–210; includes construction, open-space, water and safety conditions |
| Reference / date | Dated 27 November 2018 |
|---|---|
| Scope and evidence | Promoter-filed declaration concerning title, encumbrances, completion undertaking, funds, approvals and allottee treatment |
| Reference / date | Dated 14-02-2024 |
|---|---|
| Scope and evidence | Certifies overall completion and records OC No. 027551/SKP /OC/U6 IHMDA/31082019, dated 5/10/2019; identifies HMDA as competent authority |
| Reference / date | No complete drawing sheets or detailed drawing extraction supplied |
|---|---|
| Scope and evidence | The permission refers to technically approved building plans, but the supplied evidence does not enable a detailed plan review |
Frequently asked questions
Is CENTRAL PARK registered with Telangana RERA?
Yes. CENTRAL PARK is registered with the Telangana Real Estate Regulatory Authority as P02400000111; the registration status is On-Going Project.
Who is the developer of CENTRAL PARK?
The promoter named in the RERA registration is M/S RR BUILDERS.
Where is CENTRAL PARK located?
CENTRAL PARK is in Alkapoor Township, Neknapur, Gandipet, Rangareddy, Telangana (500089).
When will CENTRAL PARK be completed?
The promoter's proposed date of completion filed with RERA is 31/08/2019. This is the promoter's declaration, not a guarantee.