Sign in

Ark Homes Hi Blocks

ARK BUILDERS · Medchal-Malkajgiri · RERA P02200000448

ARK HOMES HI BLOCKS is a residential apartments project in Malkajgiri Mandal, Medchal-Malkajgiri District, developed by registered promoter ARK BUILDERS. The project has a site area of 30,355.50 m² and comprises two residential blocks, H and I, each with five upper floors; H-Block also has a cellar, and both blocks have stilt parking. The TG-RERA inventory records 187 apartments in 2BHK and 3BHK configurations. It is registered under TG-RERA number P02200000448, with proposed completion on 31/07/2023.

01What we found

Period endedTG-RERA registration ran to 31 Jul 2022 - check its extension on TG-RERA
12documents on file - each fact links to its page
43court cases on this project's land (survey 53, 54, 55, 56, Malkajgiri Mandal)
10items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameARK HOMES HI BLOCKS RERA record
Project typeResidential apartments RERA record RERA filing
Phase / registered portionRERA record describes the project as ARK HOMES HI BLOCKS; no separate phase name is disclosed.
TG-RERA registration numberP02200000448 RERA record
Registration validity12 March 2019 to 31 July 2022; the certificate states three years, unless extended. The certificate record says extended: false. Registration validity is distinct from the completion date and occupancy certificate. RERA record
Registered promoterARK BUILDERS (also styled M/s. ARK BUILDERS / Ark Builders in the supplied records) RERA record Corporate record
RERA status in supplied recordProject status is recorded as “New Project”; the supplied registration certificate’s validity ended 31 July 2022 and is marked not extended. RERA filing

Land and geographic identity

FieldProject record
LocalityMalkajgiri Mandal is the RERA-filed locality; the building-permit and title records identify Turkapally Village. RERA record RERA filing
Revenue villageTurkapally Village in the title and GHMC building-permit records. The RERA land-details fields do not disclose a village.
MandalMalkajgiri Mandal in the building-permit and RERA project identity; one supplied occupancy-certificate extraction labels the mandal Alwal. RERA record
DistrictMedchal-Malkajgiri in the RERA project identity; the building-permit extraction labels Ranga Reddy District, and the occupancy-certificate extraction labels MEDCHAL. RERA record
PIN500047 in the RERA project identity and registration certificate. RERA record
Project survey numbers and subdivisionsSy. Nos. 53, 54P, 55 and 56P (also written in the title records as 53, 54/P, 55 and 56/P). The GHMC permit and OC use the broader wording “Sy. No. 53 to 57.” RERA record
Registered site area30,355.50 m² total site area; 1,745.30 m² road-affected area; 28,610.20 m² net area, as recorded in the project/authority records. RERA filing
RERA-filed boundariesEast: 6 mtr wide road; West: 15 mtr wide road; North: 6 mtr wide road; South: 12 mtr wide road. RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building approvalBuilding Permit Order 53524/HO/NZ/Cir-16/2016, dated 07 01 2019; File No. 205804/04/01/2019/HO; Application No. E-343186/TPS/HO/GHMC/2018. Approvals record
Approved built-up area15,260.00 m² in the permit record. RERA filing
Building count / arrangementTwo residential blocks, H and I, in the building permit.
Sanctioned floor configurationH-Block: Cellar, stilt for parking and 5 upper floors. I-Block: stilt for parking and 5 upper floors.
Parking provision in the permitCellar and stilt parking are shown; the permit extraction records ground area of 3,539.30 m². A total parking-space count is not supplied.
Unit countsTG-RERA unit record: 187 total units. GHMC permit extraction: 70 + 70 = 140 units. RERA unit table

Offering and status

FieldProject record
RERA-filed configurations2BHK and 3BHK; the record also files 2BHK units under “DOUBLE BEDROOM.” RERA unit table RERA unit details
RERA-filed saleable area2BHK: 38.42–218.0 m²; 3BHK: 69.82 m². These are filed saleable-area figures, not carpet-area measurements. RERA unit table RERA unit details
Booked / available68 booked and 119 available as last read from the TG-RERA portal; no as-of date is supplied, so these counts are indicative. RERA unit table
Construction stageThe project record gives overall completeness as 90%; the source and measurement date for that figure are not specified. TG-RERA amenity/infrastructure fields separately report item-level percentages. These are recorded figures, not an independent site inspection. RERA record RERA amenities
Completion datesThe RERA header records proposed completion 31/07/2023 and completion date at registration 31/07/2022; the Form B declaration states a 36-month period plus a six-month grace period. RERA record
Occupancy certificateGHMC OC No. 4787/GHMC/KPL/2023-OC, Application No. 013184/GHMC/6488/KPL1/2023-OC, dated 27 November 2023. The supplied extraction identifies Block-I (TULIP), Cellar + Stilt; Ground + 5 upper floors. This does not establish OC coverage for every block or phase. Approvals record

2. The project story

ARK HOMES HI BLOCKS is registered as a residential apartment project under TG-RERA number P02200000448. The project identity identifies survey numbers 53, 54P, 55 and 56P; the title and GHMC permit records place the land at Turkapally Village, with the permit describing a two-block development. RERA record

The GHMC building permit describes H-Block and I-Block, each with five upper floors; H-Block additionally has a cellar, and both blocks have stilt parking. The RERA unit inventory records 187 apartments across two blocks, with 2BHK and 3BHK configurations. RERA unit table

The supplied project record reports 90% completeness, but does not provide an as-of date or identify an independent site-verification method. A GHMC occupancy certificate dated 27 November 2023 is supplied for Block-I (TULIP), described as Cellar + Stilt; Ground + 5 upper floors. The supplied OC extraction does not establish certification for all project blocks. RERA record

3. Master plan, architecture & building design

The GHMC building-permit record sanctions a residential building development with two blocks, H and I, and identifies 15,260.00 m² as the approved built-up area. It records a ground area of 3,539.30 m² and height of 14.95 m. These are permit-record figures; no separate FSI-counted area, gross built-up area or carpet-area total is supplied.

The recorded floor arrangement is H-Block: Cellar, stilt for parking and five upper floors; I-Block: stilt for parking and five upper floors. The OC extraction names Block-I (TULIP) and records Cellar + Stilt; Ground + 5 upper floors. The available information does not describe flats per floor, building footprints by block, tower orientation, lifts, stairs, entrances, internal circulation or landscape design.

The permit lists a tot-lot of 3,886.55 m², space for a transformer, a garbage house and a sewage treatment plant. The RERA amenity record reports aggregate recreational open space at 100%; the supplied data does not provide a drawing-level breakdown of open-space location or configuration. RERA amenities

4. Homes, configurations & floor plans

The TG-RERA inventory records 187 apartments: 134 as 2BHK (including the filed label “DOUBLE BEDROOM”) and 53 as 3BHK. The portal-derived booked and available counts have no stated as-of date and should be treated as indicative. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK (filed as “2BHK” and “DOUBLE BEDROOM”)134617338.42–218.0 m²Not availableNot supplied
3BHK5374669.82 m²Not availableNot supplied

The four drawing records are scans pending measurement; no software-measured carpet areas or room dimensions are available. Accordingly, the table reports TG-RERA saleable areas only. Saleable area is not the same as carpet area; the supplied data does not quantify any balcony or utility area or the common-area component included in saleable area. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC permit identifies a cellar for H-Block and stilt parking in both H-Block and I-Block. It requires the cellar and stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The permit extraction does not state the number of parking spaces or provide a visitor, accessible, two-wheeler or EV-space count.

No unit-specific parking allocation or exclusive parking title is established by the supplied records. The permit’s parking designation describes approved use of the relevant areas; it does not by itself establish allocation of an individual bay to a buyer.

6. Amenities, recreation & open spaces

The table below summarizes facilities identified in the GHMC permit and the RERA amenity record. RERA percentages are reported as filed; the supplied material does not independently verify completion.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot3,886.55 m²GHMC building permit; OC extractionPermit-listed; OC extraction also records the tot-lot area. No independent site verification supplied.
Green strip / tot-lot / parkArea not separately stated in RERA amenity recordRERA amenities RERA amenitiesRERA-listed at 100%; independent verification not supplied.
Aggregate recreational open spaceArea not separately stated in RERA amenity recordRERA amenities RERA amenitiesRERA-listed at 100%; independent verification not supplied.
Community buildingsNo size or facility details suppliedRERA amenities RERA amenitiesRERA-listed at 80%; independent verification not supplied.

The vendor record lists a clubhouse, gymnasium, swimming pool, jogging track, children’s play area, yoga, indoor games, conference room, multi-purpose hall and retail space. These are vendor-attributed details; the supplied GHMC/RERA project evidence does not establish their sanctioned scope, dimensions or delivery status. Promoter website

7. Utilities, building services & safety

ServiceEvidence in the project record
WaterRERA amenity record lists water supply at 100%. No source, storage capacity or treatment-system capacity is stated. RERA amenities
Sewerage and drainageThe RERA record lists sewerage (chambers, lines, septic tank, STP) at 100% and storm-water drains at 100%. Treatment and disposal of sewage and sullage water is recorded at 0%. The GHMC permit lists an STP but does not provide capacity or operating details. RERA amenities
Rainwater harvestingRERA lists water conservation/rainwater harvesting at 100%; the OC extraction lists RWH. No capacity is supplied. RERA amenities
ElectricalRERA lists an electrical meter room, sub-station and receiving station at 100%; the GHMC permit lists space for a transformer. No transformer or backup capacity is supplied. RERA amenities
Fire and life safetyRERA records fire protection and fire-safety requirements at 60%. The GHMC permit requires automatic sprinklers in the cellar and fire-safety measures as per NBC norms before OC. No fire-system design details or independent compliance verification are supplied. RERA amenities
WasteThe GHMC permit lists a garbage house. RERA records solid-waste management and disposal at 0%. RERA amenities
Circulation and lightingRERA records internal roads and footpaths at 90% and street lighting at 90%. No accessible-route details are supplied. RERA amenities
Lifts / accessibility / securityThe vendor record mentions a lift and security, but the supplied RERA/permit evidence does not provide lift quantities or capacities, or accessibility and security-system specifications. Promoter website

8. Location, access & connectivity

The official project identity gives Malkajgiri Mandal, Medchal-Malkajgiri District and PIN 500047; the title and GHMC permit records identify Turkapally Village. The RERA land record gives the project boundaries as roads of 6 mtr to the east, 15 mtr to the west, 6 mtr to the north and 12 mtr to the south. RERA record RERA filing

The supplied location dataset provides software-listed nearby points and distances: Financial District (Nanakramguda), 1.2 km; IndusInd Bank, 0.4 km; unnamed bus station, 2.2 km; Manuu Polytechnic Hyderabad, 1.6 km; Sankaraya Eye Hospital, 1.6 km; ADP, 0.0 km; South India Shopping Mall, 2.6 km; unnamed park, 1.2 km; and Nanakramguda Government Primary School, 0.5 km. These are supplied location-data measurements, not statements of travel time. Location record

9. Developer & development status

The registered promoter is ARK BUILDERS, recorded as a partnership. The supplied RERA data names Gummi Ram Reddy and Gummi Sarala as partners and Gummi Ram Reddy as authorized signatory. The registration certificate gives a promoter-office address in Serilingampally, Ranga Reddy District, PIN 500032; the project identity separately records an address at SLN Terminus, Gachibowli, Turkappally, Malkajgiri Mandal, Medchal-Malkajgiri, PIN 500047. Corporate record Parties record

In Form B, Sri G Ram Reddy, on behalf of M/s. ARK BUILDERS, declared a 36-month completion period with a six-month grace period, that the land was free from encumbrances, and that pending approvals would be obtained on time. These are promoter declarations in the filed affidavit.

The RERA header records 90% completeness, without a stated measurement date; the RERA amenity record gives separate item-level percentages. The supplied GHMC OC extraction is for Block-I (TULIP) only. RERA record RERA amenities

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200000448; issued 12 March 2019; valid through 31 July 2022
Supplied scopeForm C for ARK HOMES HI BLOCKS; certificate states the separate-account condition.
GHMC building permit
Identifier / date53524/HO/NZ/Cir-16/2016, dated 07 01 2019; File No. 205804/04/01/2019/HO; Application No. E-343186/TPS/HO/GHMC/2018
Supplied scopeConditional permit for two blocks, H and I; survey wording “Sy. No. 53 to 57.”
GHMC occupancy certificate
Identifier / dateProceedings No. 4787/GHMC/KPL/2023-OC; Application No. 013184/GHMC/6488/KPL1/2023-OC; dated 27 November 2023
Supplied scopeSupplied extraction identifies Block-I (TULIP), Cellar + Stilt; Ground + 5 upper floors.
Title report and title instrument records
Identifier / dateTitle report dated 16-01-2019; Development Agreement-cum-GPA 1238/2009 and 1276/09 are cited in the supplied title records
Supplied scopeTitle material concerns Ac 7.20 guntas in Sy. Nos. 53, 54/P, 55 and 56/P, Turkapally Village.
Form B declaration
Identifier / dateDeclaration in January 2019
Supplied scopePromoter affidavit by Sri G Ram Reddy on behalf of M/s. ARK BUILDERS.
RERA-filed allotment letter and agreement for sale
Identifier / dateDocuments 35835 and 35821
Supplied scopePartially filled template records; fields include an unspecified apartment/allottee.
Layout / floor-plan material
Identifier / dateLayout-plan record 35820; drawing records: four scans pending measurement
Supplied scopeNo layout drawing extraction or software-measured floor-plan areas are supplied. Document index Floor plans

The public HMDA layout lookup is recorded as unavailable in the supplied evidence, and no LP number is present in the RERA record. This indicates a source-access limitation, not a determination about layout approval. HMDA

Frequently asked questions

Is ARK HOMES HI BLOCKS registered with Telangana RERA?

Yes. ARK HOMES HI BLOCKS is registered with the Telangana Real Estate Regulatory Authority as P02200000448; the registration status is New Project.

Who is the developer of ARK HOMES HI BLOCKS?

The promoter named in the RERA registration is ARK BUILDERS.

Where is ARK HOMES HI BLOCKS located?

ARK HOMES HI BLOCKS is in MALKAJGIRI MANDAL, Medchal-Malkajgiri, Telangana (500047).

When will ARK HOMES HI BLOCKS be completed?

The promoter's proposed date of completion filed with RERA is 31/07/2023. This is the promoter's declaration, not a guarantee.

More projects in Medchal-Malkajgiri