Sign in

Aishwarya Residency

SREE SIRI CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200000852

AISHWARYA RESIDENCY is a residential apartment project in Kompally-Ncl Colony, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District, developed by registered promoter SREE SIRI CONSTRUCTIONS. It covers 891.58 sq. m and comprises one proposed building, Block A, with 1 stilt + 5 upper floors and 20 2BHK homes. The project is registered under TG-RERA **P02200000852**, with a proposed completion date of **16/09/2021**.

01What we found

Period endedTG-RERA registration ran to 16 Sep 2021 - check its extension on TG-RERA
14documents on file - each fact links to its page
6court cases on this project's land (survey 155, Kompally-Ncl Colony)
10items to check - 7 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 7 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from squareyards.com

1. Project at a glance

Project identity

FieldProject record
Registered project nameAISHWARYA RESIDENCY RERA record
Project type / registered portionResidential apartment project; the supplied record does not identify a separately named phase. The filed plan describes one proposed building, Block A. RERA record RERA filing
TG-RERA registrationP02200000852; Form ‘C’ registration issued under section 5 on 12/06/2019, valid through 16/09/2021 for 2 years; certificate records no extension. Registration validity is distinct from the project’s completion deadline. Approvals record
Registered promoterSREE SIRI CONSTRUCTIONS; entity type recorded as Partnership. RERA record RERA filing
RERA statusThe project record labels it “On-Going Project.” The registration certificate’s stated validity ended on 16/09/2021; the supplied evidence does not establish a subsequent extension. RERA filing

Land and geographic identity

FieldProject record
LocalityKompally / Kompally-Ncl Colony RERA record
Revenue villageKompally-Ncl Colony in the RERA identity; the HMDA technical approval describes the site as Kompalle Village. RERA record
MandalDundigal Gandimaisamma; the technical approval prints Dundigal/Gandimaisamma Mandal. RERA record
District / PINMedchal-Malkajgiri / 500014 RERA record
Project survey number(s)Survey No. 155; no subdivision is recorded in the supplied project identity. Land records
Plot numbers682, 683, 694, 695 RERA filing
Site extent891.58 sq. m total and net area; RERA records 0 area affected by road widening/FTL of tanks/nala widening. RERA filing
Boundaries as filedEast: 30 FEET WIDE ROAD; west: 60 FEET WIDE ROAD; north: PLOT NO 681 AND 696; south: PLOT NO 684 AND 693. RERA filing

Development identity

FieldProject record
Sanctioning authority / principal approvalHyderabad Metropolitan Development Authority (HMDA), technical approval 011550/MED/R1/U6/HMDA/10052018, dated 23/07/2018. Approvals record
Approved building descriptionOne proposed residential building, Block A, 1 stilt + 5 upper floors.
Approved built-up areaHMDA document states “Built up Area 1877.05” and “Total Built up Area (In Sq.mts) 2294”; these are recorded separately as stated, without inferring a different area basis.
RERA building/unit countRERA records 1 total building unit and 1 proposed building unit as per agreement; the unit schedule records 20 2BHK homes. RERA filing RERA unit table
Parking / building heightThe approval extraction reports building height 14.95 (unit not stated in the extracted field) and a mortgage-area provision; it does not provide a clear count of resident or visitor parking spaces.

Offering and status

FieldProject record
Unit type2BHK RERA unit table
RERA-filed saleable area58.84 sq. m per unit RERA unit table
Booked / available0 booked / 20 available, as last read from the TG-RERA portal; the record has no as-of date, so counts are indicative. RERA unit table
Construction stageRERA portal’s amenity disclosures show varying reported progress percentages; no independently verified current site-stage assessment is supplied. RERA amenities
Completion datesOriginal and revised proposed completion date: 16/09/2021. The promoter’s Form B also undertakes completion by “16t September, 2021.” RERA record
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied project documents. This is not a determination that none exists; certificate status should be confirmed with the competent authority. Document index

2. The project story

AISHWARYA RESIDENCY is filed as a residential apartment project on plots 682, 683, 694 and 695, in Survey No. 155, Kompally-Ncl Colony, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District. Its filed scheme is a single proposed building, Block A, comprising stilt parking level and five upper floors, with 20 RERA-listed 2BHK units. RERA record RERA filing RERA unit table

The project registration certificate gives a validity period ending 16/09/2021, and the same date is the filed completion deadline. The available materials do not establish current construction completion or occupancy certification. Portal progress percentages are disclosures, not independent verification of work on site. RERA record RERA amenities

3. Master plan, architecture & building design

The RERA-filed land details give a total and net site area of 891.58 sq. m. The HMDA technical approval identifies Block A as a residential building of 1 stilt + 5 upper floors. It lists “Built up Area 1877.05” and “Total Built up Area (In Sq.mts) 2294”; the supplied extract does not define the measurement bases for these two figures, so they should not be treated as interchangeable. RERA filing

The approval’s listed site provisions include a transformer and garbage house, septic tank, ETP, generator and rainwater-harvesting structures. The approved technical conditions also specify one entry and one exit, each with a minimum width of 4.5 metres and 5 metres height clearance, and a joint open space with neighbouring premises for fire-vehicle manoeuvrability. These are approval conditions, not evidence that the facilities have been completed.

The supplied floor-plan record contains two drawings, neither with measured unit geometry; no reliable drawing-based room dimensions, flat-per-floor arrangement, lift or stair count, or building-footprint measurement is available from this evidence. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2002058.84 sq. mNot measured from the supplied drawingsNot supplied

The RERA filing provides the unit count, booking figures and saleable area. The floor-plan review reports 0 measured drawings and says the available drawings contain no flats, so no software-measured carpet area or room dimensions can be reported. Carpet area, if established from a suitable drawing or unit-specific document, is distinct from saleable area; the latter may include a share of common areas. RERA unit table RERA unit details Floor plans

5. Parking & vehicle circulation

The approved building has a stilt level, but the supplied approval extraction does not specify the number of parking spaces or their allocation. The project record does not establish resident-versus-visitor parking, accessible bays, mechanical parking, EV charging, or an individual allotment of any bay. The approval does require one entry and one exit, each at least 4.5 metres wide with 5 metres height clearance. A stilt level or a drawn parking space alone does not establish an exclusive parking right. RERA filing

6. Amenities, recreation & open spaces

The following are TG-RERA portal disclosures. Percentages are reported progress values, not independently verified completion status.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Water supplySize and source not statedRERA amenity recordAvailable: YES; 50% reported
Sewerage (chamber, lines, septic tank, STP)System components listed in the portal label; no capacity statedRERA amenity recordAvailable: YES; 0% reported
Storm-water drainsNo size or capacity statedRERA amenity recordAvailable: YES; 0% reported
Treatment and disposal of sewage and sullage waterNo plant capacity statedRERA amenity recordAvailable: YES; 0% reported
Solid-waste management and disposalNo system details statedRERA amenity recordAvailable: YES; 0% reported
Energy managementNo system details statedRERA amenity recordAvailable: YES; 30% reported
Electrical meter room / sub-station / receiving stationNo capacity statedRERA amenity recordAvailable: YES; 20% reported
Internal roads and footpathsNo dimensions statedRERA amenity record0% reported
Green strip / tot lot / parkNo area statedRERA amenity record0% reported
Street lightingNo extent statedRERA amenity record0% reported
Community buildingsNo size or use statedRERA amenity record0% reported
Rainwater harvesting / water conservationNo system size statedRERA amenity record; HMDA approval condition0% reported in portal; approval requires rainwater-harvesting structures
Fire protection and fire-safety requirementsNo installed-system details statedRERA amenity record; HMDA approval conditions0% reported in portal
Aggregate recreational open spaceArea not statedRERA amenity record0% reported

The supplied RERA filing does not identify project-specific clubhouse, indoor recreation, sports or community-facility details or sizes. RERA amenities

7. Utilities, building services & safety

HMDA’s technical approval lists a septic tank and ETP, and requires rainwater-harvesting structures, a transformer, a garbage house and a generator as an alternative electricity source. The RERA amenity record also lists water supply, sewerage, storm-water drainage, sewage/sullage treatment and disposal, solid-waste management, energy management and an electrical meter room/sub-station/receiving station. No storage, treatment, generator, transformer or electrical capacities are supplied, and the portal’s reported progress does not independently verify completion. RERA amenities

The approval conditions call for emergency lighting in corridors/common passages and staircases; water-type fire extinguishers at the stated floor-area provision; automatic sprinklers if basement area exceeds 200 sq. m; fire-resistant swing doors for collapsible lifts; and compliance with Fire Service department norms. The extract does not state lift count or capacity, basement provision, installed fire-system status, or accessibility features. These are recorded conditions and disclosures, not a finding of completed or statutory-compliant installation.

8. Location, access & connectivity

The registered location is Kompally-Ncl Colony, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District, PIN 500014. The filed site boundaries identify 30 FEET WIDE ROAD to the east and 60 FEET WIDE ROAD to the west. RERA record RERA filing

Location data supplied for the project lists the nearest sampled Outer Ring Road interchange at approximately 7.3 km, Bolarum railway station at 2.8 km, St Martins Engineering College at 1.8 km, a hospital at 0.5 km, a park at 0.7 km, and a school and bank each at 0.1 km. These are supplied location-record distances; no travel times are provided. Location record

9. Developer & development status

The registered promoter is SREE SIRI CONSTRUCTIONS, recorded as a partnership. The RERA record lists VISWANATHA RAJU SAGIRAJU as authorized signatory and identifies three partners: VENKATA PRUDVI RAJU CHEKURI, VENKATA RAMA RANGA RAJU RUDRARAJU and VENKATA SATYANARAYANA RAJU PENMETSA. RERA filing Parties record

The registration certificate gives the promoter’s office as Jeedimetla-Village, Qutballapur Mandal, Medchal-Malkajgiri District, PIN 500015. The project record does not supply an official promoter website or contact details. Parties record

The Form B declaration, made through the authorized signatory and verified at Hyderabad on 25 April 2019, states a completion undertaking of 16 September 2021 and includes the promoter’s declarations concerning project funds and pending approvals. These are promoter declarations. The materials supplied do not establish a current construction-stage assessment, a registration extension, or an occupancy/completion certificate. RERA amenities

10. Approvals, official records & documents

RecordWhat the supplied evidence shows
TG-RERA Form ‘C’ certificateAISHWARYA RESIDENCY, registration P02200000852, issued 12/06/2019 and stated valid through 16/09/2021; certificate includes the separate-account condition.
HMDA technical approvalApproval 011550/MED/R1/U6/HMDA/10052018, dated 23/07/2018, for a residential Block A at 1 stilt + 5 upper floors on plots 682, 683, 694 and 695 in Survey No. 155.
Commencement/approval recordThe RERA document list labels document 50198 “Commencement Certificates for each building in each phase”; the extracted content describes an HMDA technical approval and its conditions. Document index
Form B declarationPromoter declaration signed through authorized signatory VISWANATHA RAJU SAGIRAJU and verified at Hyderabad on 25 April 2019.
Title materialsRERA-filed title report and underlying deed materials include the development agreement cum GPA and title-chain documents for the project plots. Document index
Layout and occupancy/completion recordsNo approved-layout document extraction or occupancy/completion certificate is established in the supplied materials. Document index

Frequently asked questions

Is AISHWARYA RESIDENCY registered with Telangana RERA?

Yes. AISHWARYA RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02200000852; the registration status is On-Going Project.

Who is the developer of AISHWARYA RESIDENCY?

The promoter named in the RERA registration is SREE SIRI CONSTRUCTIONS.

Where is AISHWARYA RESIDENCY located?

AISHWARYA RESIDENCY is in KOMPALLY, Kompally-Ncl Colony, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500014).

When will AISHWARYA RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 16/09/2021. This is the promoter's declaration, not a guarantee.

More projects in Kompally Ncl Colony