Sign in

True Emerald Block-I

SREERAMANENI · Rangareddy · RERA P02400009396

TRUE EMERALD BLOCK-I is a residential plotted development in Kadyalakunta Thanda, Farooqnagar Mandal, Ranga Reddy District, developed by registered promoter Sreeramaneni Madhuri. The RERA land record reports a net area of 14265.17 sqmts, and the draft layout approval describes Ac 3-21 Gts; 17061.00 Sq. Yds. with 58 residential plots; plot dimensions and size configurations are not supplied. The project is registered under TG-RERA number P02400009396, and the promoter’s Form B undertaking states completion by 05-09-2025.

01What we found

Period endedTG-RERA registration ran to 5 Sep 2025 - check its extension on TG-RERA
14documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Burgula, Farooqnagar, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameTRUE EMERALD BLOCK-I RERA record
Project typePlotted development / residential draft layout RERA record
Phase / registered portion“BLOCK-I”; the evidence identifies the project by this name but does not describe the extent of any other phase. RERA record
TG-RERA registrationP02400009396; certificate issued under section 5. RERA record
Registration validityCertificate states 05/09/2023 to 05/09/2025, unless extended by the Authority. The supplied certificate record says no extension. This is the registration period, distinct from the completion undertaking below.
Registered promoterSreeramaneni Madhuri (certificate); the RERA filing also identifies SREERAMANENI MADHURI as promoter.
RERA status in supplied recordThe project is registered. The supplied certificate does not record an extension; current registration status after 05/09/2025 is not established by the material provided.

Land and geographic identity

ItemRecord
LocalityKadyalakunta Thanda RERA record
Revenue villageBurgula Revenue Village (also rendered “Burgula” in the project record). RERA record
Mandal / district / PINFarooqnagar / Ranga Reddy / 509202 (certificate prints “509 202”). RERA record
Project survey number(s)21/P. The supplied approval and RERA certificate identify this survey number; no separate project subdivision is specified. RERA record
Registered site extentThe layout approval describes Ac 3-21 Gts; 17061.00 Sq. Yds.
RERA land areaTotal area 14265.169 sqmts; net area 14265.17 sqmts; affected area reported as 00 sqmts. RERA filing
BoundariesNot stated in the supplied project land record. Land records

Development identity

ItemRecord
Sanctioning authorityDT&CP / Regional Deputy Director of Town and Country Planning; the approval record says the layout is delegated to Kadyalakunta Thanda Gram Panchayat. Approvals record
Principal layout approvalDraft Technical Layout Pattern, approval 76/2023/HRO/H1, dated 05.09.2023; file no. 747/2023/HRO/H1; application no. 20040/2065. Approvals record
Plot count and land-use splitApproval describes 58 plots over Ac 3-21 Gts: plotted area Ac. 1-38.66 Gts; 9517.86 Sq Yds (55.79%); park open space Ac. 0-14.10 Gts; 1706.10 Sq. Yds. (10.00%); road area Ac. 1-08.24 Gts; 5838.35 Sq. Yds. (34.21%).
Approved built-up area / buildings / floorsNot applicable as a building configuration for the evidenced plotted layout; no approved built-up area, building count or floor schedule is supplied for this project. RERA filing
ParkingNo project-wide parking count or parking arrangement is established in the supplied evidence.

Offering and status

ItemRecord
Unit typeResidential plots; the layout approval specifies detached dwelling houses designed for single-family occupation and says shops, business premises and industrial units are not allowed except at sites specially reserved in the draft layout.
Plot count58 plots in the draft layout approval. Plot-by-plot dimensions and a size range are not supplied in the evidence provided.
Booked / available countsNot established by the supplied records.
Construction / development stageThe project is described in the header as “New Project”; no independently verified site progress is supplied. The approval requires layout works and later final-layout release after development and compliance. RERA record
Completion deadlinePromoter’s Form B undertaking states completion by 05-09-2025. This is separate from the registration validity date.
Occupancy / completion certificateNo project occupancy or completion certificate is supplied. This is a plotted-layout project; the evidence provided does not establish completion certification for the layout or any individual dwelling.

2. The project story

TRUE EMERALD BLOCK-I is a registered plotted-development project associated with Survey No. 21/P in Burgula Revenue Village, at Kadyalakunta Thanda, Farooqnagar Mandal, Ranga Reddy District. Its RERA-filed land record reports a net area of 14265.17 sqmts; the layout approval describes the layout area as Ac 3-21 Gts; 17061.00 Sq. Yds. RERA record RERA filing

The filed layout approval is for a residential draft layout of 58 plots. It allocates land to plots, a park open space and roads, and sets conditions for layout development and eventual release of the final layout. The record describes the project as new, but it does not provide independently verified construction progress or establish that the required development works are complete. RERA record

The promoter’s Form B undertakes completion by 05-09-2025. The TG-RERA certificate separately records registration validity through 05/09/2025, unless extended. The supplied material does not establish a registration extension or a completion/occupancy certificate.

3. Master plan, architecture & building design

The supplied approval concerns a draft residential plot layout, not a set of apartment-building drawings. It records 58 plots and this land-use distribution: 55.79% plotted area, 10.00% park open space and 34.21% roads.

The approval records road-width text as “60:00 wide road”, “330* wide road” and “350° wide road”; the supplied text does not make those notations unambiguous measurements. No approved plot-by-plot schedule, building footprints, dwelling designs, floor plans, building heights or phase-wise building arrangement is provided.

The approval requires the owner/developer to form roads and drains, channelize nalas, provide greenery, rainwater-harvesting pits, street lighting, electricity facilities, a sewerage-disposal system and protected water supply. These are approval conditions, not evidence that the facilities have been completed.

4. Homes, configurations & floor plans

This is a plotted project; the evidence identifies 58 residential plots in the draft layout approval. It does not provide plot-wise dimensions, plot-size bands, booked/available counts or a RERA-filed saleable-area schedule.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plots58 in draft layoutNot establishedNot establishedNot suppliedNot applicableNot supplied

The file includes an allotment letter and a partially filled agreement-for-sale form, but these records do not supply a complete project-wide plot schedule or establish completed conveyance to buyers.

5. Parking & vehicle circulation

No project-wide parking count, visitor or accessible parking provision, vehicle entry/exit arrangement, or parking allocation to individual plots is established in the supplied records. The layout approval requires roads to be opened for accessibility to neighbouring sites and prohibits a compound wall or fencing around the site; it does not establish completed circulation works.

The approval separately requires Plot Nos. 05 to 13, measuring 1479.79 Sq. Yards, to be mortgaged to the Gram Panchayat for development obligations and says those plots are not for sale while mortgaged. This is a development-condition area, not a stated parking allocation.

6. Amenities, recreation & open spaces

The filed layout approval reserves park open space and specifies infrastructure and development works. The supplied progress fields show no reported completion percentage for the listed amenities; no independent completion verification is provided. RERA amenities

Park open space
Description / sizeAc. 0-14.10 Gts; 1706.10 Sq. Yds. (10.00%)
Evidence sourceDraft layout approval
Declared progress / verified statusReserved in the approval; completion not established.
Internal roads
Description / sizeRoad area Ac. 1-08.24 Gts; 5838.35 Sq. Yds. (34.21%)
Evidence sourceDraft layout approval
Declared progress / verified statusLand allocation and road-development conditions recorded; completion not established.
Greenery
Description / sizeRequired as part of layout development; no size or quantity specified.
Evidence sourceApproval conditions
Declared progress / verified statusRequired; completion not established.
Community buildings
Description / sizeListed in the RERA amenity data; no size or description supplied.
Evidence sourceRERA amenity record RERA amenities
Declared progress / verified statusProgress recorded as 0%; completion not established.
Landscape garden and tree planting
Description / sizeListed in third-party vendor information.
Evidence sourceVendor description Promoter website
Declared progress / verified statusVendor-attributed claim only; not established as sanctioned or delivered in the supplied project records.

7. Utilities, building services & safety

The draft layout approval requires the developer to undertake drains and nala channelization, rainwater-harvesting pits, street lighting, electricity facilities, sewerage disposal and protected water supply. These are stated requirements for development; the supplied record does not establish their completion, capacity or operating status.

RERA amenity data also lists water supply, sewerage and sewage/sullage treatment and disposal, storm-water drains, water conservation/rainwater harvesting, energy management, fire protection and fire safety, and an electrical meter room/sub-station/receiving station. Progress is recorded as 0% for these entries; no capacities, technical drawings, clearances or independent completion evidence are supplied. RERA amenities

The vendor information lists 24X7 water supply, energy management and street lighting, but these are third-party descriptions and do not establish sanctioned or completed provision. Promoter website

8. Location, access & connectivity

The registered location is Kadyalakunta Thanda, Burgula Revenue Village, Farooqnagar Mandal, Ranga Reddy District, Telangana, PIN 509202. The project record identifies Survey No. 21/P. RERA record RERA filing

The location data supplies a cadastral parcel centroid at 16.986321600356177, 78.22400860197095. It lists the nearest sampled Outer Ring Road interchange at approximately 34.8 km; this is a supplied distance estimate, not a travel-time claim. No approach-road names, public-transport routes or further landmark distances are provided. Location record

9. Developer & development status

The TG-RERA certificate names Sreeramaneni Madhuri as promoter and gives the promoter office as VILLA NO 26, Village: Kondapur, Mandal: Serilingampally, District: Ranga Reddy, Pin: 500049 State of Telangana. The supplied evidence does not establish a company or other legal-entity type, corporate registration number, official website or contact details. Corporate record

The Form B declaration is the promoter’s undertaking to complete the project by 05-09-2025. The project record labels it a new project, but no independent site-progress evidence or current completion certification is supplied. RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for TRUE EMERALD BLOCK-I, registration P02400009396, granted under section 5; valid from 05/09/2023 to 05/09/2025 unless extended. The supplied certificate record states no extension.
Principal layout approvalDT&CP Draft Technical Layout Pattern for residential plots in Survey No. 21/P, approval 76/2023/HRO/H1, dated 05.09.2023; file no. 747/2023/HRO/H1; application no. 20040/2065.
Title-related filingAdvocate’s land title search report, document 514928; supporting sale-deed records 525106 and 525107; mortgage deed and gift settlement records 514926 and 514927.
Encumbrance filingEncumbrance statement, document 514943.
Promoter declarationForm B affidavit-cum-declaration, document 514934.
Sale documents filedAllotment letter, document 514932; partially filled agreement-for-sale form, document 514931.
Completion / occupancy certificateNone supplied. The available approval is for a draft layout; no certificate establishing completed layout works or an occupancy-certified dwelling is in the evidence provided.

Frequently asked questions

Is TRUE EMERALD BLOCK-I registered with Telangana RERA?

Yes. TRUE EMERALD BLOCK-I is registered with the Telangana Real Estate Regulatory Authority as P02400009396; the registration status is New Project.

Who is the developer of TRUE EMERALD BLOCK-I?

The promoter named in the RERA registration is SREERAMANENI.

Where is TRUE EMERALD BLOCK-I located?

TRUE EMERALD BLOCK-I is in KADYALAKUNTA THANDA, Burgula, Farooqnagar, Rangareddy, Telangana (509202).

When will TRUE EMERALD BLOCK-I be completed?

The promoter's proposed date of completion filed with RERA is 05/09/2025. This is the promoter's declaration, not a guarantee.

More projects in Burgula