SMR VINAY ICONIA, PHASE-II, BLOCK-2 is named as LOGAN and BLOCK-3 is named as HAMILTON
SMR BUILDERS PRIVATE LIMITED · Rangareddy · RERA P02400000195
SMR VINAY ICONIA, PHASE-II, BLOCK-2 is named as LOGAN and BLOCK-3 is named as HAMILTON is a residential apartments project in Kondapur, Serilingampally Mandal, Ranga Reddy District. It is being developed by the registered promoter, SMR BUILDERS PRIVATE LIMITED, on land with a total area of 48,419.41 m² and a net area of 42,474.38 m². The development has two residential blocks: Block 2, with 3-Basements, Ground + (26) upper floors, and Block 3, with 3-Basements, Ground + 30 upper floors; the RERA filing records 652 homes, comprising 252 2BHK and 398 3BHK homes. Its TG-RERA registration is P02400000195, and the declared project completion is 23-04-2024.
More from Smr Builders Pvt Ltd · 8 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | SMR VINAY ICONIA, PHASE-II, BLOCK-2 is named as LOGAN and BLOCK-3 is named as HAMILTON RERA record |
| Project type | Residential apartments RERA record RERA filing |
| Phase / registered portion | Phase-II, Block-2 (LOGAN) and Block-3 (HAMILTON) |
| TG-RERA registration | P02400000195 |
| Registration validity | Certificate states five years, commencing 21/01/2019 and ending 23/04/2024; the supplied certificate records no extension |
| Registered promoter | SMR BUILDERS PRIVATE LIMITED Corporate record |
| RERA status in supplied record | Registration validity ended on 23/04/2024. Current registration status or any later extension is not established by the certificate supplied |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Kondapur / Kondapur RERA record Land records |
| Mandal / district / PIN | Serilingampally / Ranga Reddy / 500084 RERA record |
| Project survey numbers and subdivisions | 113; 114/1, 114/2, 114/3; 115/1, 115/2, 115/3; 116/1, 116/2, 116/3; 117/1, 117/2; 118; 119; 126 RERA record Land records |
| Site extent | Total area 48,419.41 m²; net area 42,474.38 m² RERA filing |
| Boundaries as filed | East: land in Sy. No. 114; West: Maruti Nagar Residential Colony; North: land in Sy. No. 113; South: road RERA filing |
| Additional location / boundary detail | Not disclosed in the supplied project record RERA record Land records |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit Order 53467/HO/WZ/Cir-11/2017, approved 24 04 2018 Approvals record |
| Approval reference as filed with RERA | 53467/HO/WZ/Cir-11/2 RERA record Approvals record |
| Approved built-up area | 95,361.39 m² total: Block 2, 56,431.60 m²; Block 3, 38,929.79 m² |
| Buildings / blocks | Two residential blocks: Block 2 (LOGAN) and Block 3 (HAMILTON) RERA record |
| Sanctioned floor configuration | Block 2: 3-Basements, Ground + (26) upper floors; Block 3: 3-Basements, Ground + 30 upper floors |
| Building heights | Block 2: 79.65; Block 3: 89.90 m |
| Parking provision stated in sanction | Three basement parking floors in each block (six total); parking areas 18,651.46 m² and 12,875.86 m² |
| Unit count | RERA filing records 652 homes: 252 2BHK and 398 3BHK; it also lists two “ENTRY LOBBY FLAT” rows that are not homes on sale RERA unit table RERA unit details |
| Approved unit count | Sanctioned unit count is not stated in the supplied extract |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed home configurations | 2BHK and 3BHK RERA unit table RERA unit details |
| RERA-filed saleable area | 2BHK: 135.93 m²; 3BHK: 184.73 m² RERA unit table RERA unit details |
| RERA portal booking figures | 2BHK: 57 booked / 195 available; 3BHK: 170 booked / 228 available. The portal extract has no as-of date, so these figures are indicative RERA unit table RERA unit details |
| Declared project completion | Promoter Form B undertakes completion by 23-04-2024; the GHMC permit also states construction to be completed before 23.04.2024 |
| Original or revised completion dates | The supplied record states the above date but does not provide a separate revised date or extension order |
| Construction stage | Filed progress data lists several infrastructure and safety items with percentages; it is not an independent site inspection RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents. Certificate status is therefore not established here Document index |
2. The project story
This is a residential apartment development in Kondapur, registered as Phase-II, comprising two high-rise blocks: LOGAN (Block 2) and HAMILTON (Block 3). The GHMC building-permit extract describes three basement levels beneath each block, with ground and upper floors above; both blocks are residential in the supplied sanction record. RERA record
The RERA filing lists 252 2BHK and 398 3BHK homes. Booking and availability counts are portal figures without an as-of date, rather than a current sales confirmation. The record includes a promoter completion undertaking and permit completion date of 23 April 2024, but the supplied materials do not establish current construction completion or issuance of an occupancy certificate. Filed infrastructure progress percentages are reported in section 6 below and should not be read as independent verification of work at the site. RERA unit table RERA unit details RERA amenities
3. Master plan, architecture & building design
The project land is recorded as 48,419.41 m² total and 42,474.38 m² net. The GHMC building-permit extract specifies two blocks and a combined approved built-up area of 95,361.39 m². It separately lists Block 2 at 56,431.60 m² and Block 3 at 38,929.79 m². These are figures identified in the sanction extract as built-up area; the supplied data does not provide FSI-counted area, carpet area for the buildings as a whole, or an approved drawing-derived footprint. RERA filing
The sanctioned configuration is three basement levels, ground floor and 26 upper floors for Block 2, and three basement levels, ground floor and 30 upper floors for Block 3. The permit extract gives heights of 79.65 and 89.90 m, respectively. The approved plan is subject to GHMC conditions, including provision of 10% organized open space to be handed over to GHMC through registered gift deed before obtaining OC, and a tot-lot of 4,434.11 m². The extract also identifies land affected for a proposed 36.0 m road and a peripheral road deduction; detailed plan geometry and the overall circulation arrangement are not available in the supplied drawing-derived records.
The RERA filing describes two proposed building units, while the sanction extract identifies two blocks. The supplied materials do not establish detailed apartment distribution by floor, lift or stair count, building entrances, landscaping plan, or a phase-wide area schedule separating saleable, carpet and common areas. RERA filing
4. Homes, configurations & floor plans
The RERA filing records two home configurations. Saleable area is the filed figure; it is not a carpet-area measurement. Although floor-plan sheets are listed, none of the 21 drawing sheets has been software-measured in the supplied record, so no measured carpet area or room dimensions can be reported. RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 252 | 57 | 195 | 135.93 m² | Not measured | Not supplied |
| 3BHK | 398 | 170 | 228 | 184.73 m² | Not measured | Not supplied |
The RERA portal extract also lists two “ENTRY LOBBY FLAT” rows at 154.74 m² each. These are recorded as common-area/not-for-sale rows, not as homes available for purchase, and are excluded from the home counts above. RERA unit table RERA unit table
5. Parking & vehicle circulation
The building-permit extract provides three basement parking floors in each block and lists parking areas of 18,651.46 m² and 12,875.86 m². It does not state parking-space counts, resident or visitor allocations, accessible spaces, mechanical parking, EV charging, ramp details, or unit-specific parking allotments. The RERA filing also states a mortgage area of 14,332.77 m²; the supplied materials do not establish individual parking or home allocations. RERA filing RERA unit table
6. Amenities, recreation & open spaces
The GHMC permit extract identifies a tot-lot, water-recycling plant, rainwater-harvesting percolation pit, transformer space, garbage house and tree plantation as project provisions. The RERA amenity-progress extract supplies percentages for listed works; these are filed progress figures, not independent confirmation of completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Tot-lot area 4,434.11 m² in the permit extract; tot-lot to be fenced and maintained as greenery under the stated permit condition | RERA amenities | Green Strip/TOT LOT/Park: 90% declared; independent completion not established |
| Internal roads & footpaths | Description only; no dimensions supplied in the progress record | RERA amenities | 100% declared |
| Community buildings | No facility description or size supplied | RERA amenities | 0% declared |
| Tree plantation | Listed as a permit provision; no quantity or area supplied | Progress not separately reported | |
| Water recycling plant | Listed as a permit provision; no capacity supplied | Progress not separately reported | |
| Rainwater harvesting | Percolation pit listed in the permit; progress record also lists water conservation/rainwater harvesting | RERA amenities | 0% declared |
| Water supply | No source, storage or capacity supplied | RERA amenities | 30% declared |
| Sewerage / sewage treatment and disposal | Sewerage (chamber, lines, septic tank, STP) listed; no capacity supplied | RERA amenities | Sewerage: 100% declared; treatment and disposal of sewage and sullage water: 0% declared |
| Storm-water drains | No dimensions or discharge details supplied | RERA amenities | 90% declared |
| Street lighting | No fixture or coverage details supplied | RERA amenities | 95% declared |
| Fire protection and fire safety | Permit assigns responsibility for structural and fire-safety requirements; no system or equipment schedule supplied here | RERA amenities | 95% declared |
| Solid-waste management | No system or capacity details supplied | RERA amenities | 0% declared |
| Energy management | No system or capacity details supplied | RERA amenities | 0% declared |
| Electrical meter room / sub-station / receiving station | Permit lists space for transformer; the progress record lists electrical meter room/sub-station/receiving station | RERA amenities | 0% declared |
| Aggregate recreational open space | No area supplied in the progress record; permit separately refers to 10% organized open space | RERA amenities | 0% declared |
7. Utilities, building services & safety
The permit extract requires a water-recycling plant and rainwater-harvesting structure (percolation pit), and lists space for a transformer and a garbage house. It does not specify water sources or storage capacity, STP capacity or treated-water reuse volumes, electrical supply capacity, backup generation, lift arrangements, fire-fighting equipment schedule, or security and accessibility systems. The RERA progress record reports water supply at 30%, sewerage at 100%, fire protection and fire-safety requirements at 95%, and electrical meter room/sub-station/receiving station at 0%; these are declared progress entries and are not evidence of independent inspection or statutory clearance. RERA amenities
The permit states that occupancy is compulsory before occupying any building and that the owner/builder should not deliver possession of any part of the building by sale or lease before obtaining GHMC’s occupancy certificate. No OC is included in the supplied documents.
8. Location, access & connectivity
The registered location is Kondapur revenue village, Serilingampally Mandal, Ranga Reddy District, PIN 500084. The permit extract identifies a proposed 36.0 mtrs wide road and an 18 mt. road width, but the supplied material does not map these road references to a particular project boundary or provide an access-road plan. RERA record
The supplied location record lists Financial District (Nanakramguda), 1.2 km as a nearby anchor. No travel time, public-transport stop, route, or independently measured journey information is supplied. Location record
9. Developer & development status
The registered promoter is SMR BUILDERS PRIVATE LIMITED, a company. The RERA record gives the promoter’s address as SMR House, 5th Floor, Nagarjuna Hills, near HCU Bus Depot, Kondapur, Serilingampally, Ranga Reddy, PIN 500084; the supplied record lists https://www.smrholdings.in as its website. Corporate record Parties record
The GHMC permit identifies SMR Builders Pvt. Ltd. as GPA holder/developer/builder, while the building-permit applicant/owner field names Kondapur Towers Pvt. Ltd. and others. The Form B declaration dated 5 November 2018 is a promoter declaration, including an undertaking to complete the project by 23-04-2024. The available record does not establish a later revised completion date, current construction stage by block, or OC status.
10. Approvals, official records & documents
| Record | What the supplied document establishes |
|---|---|
| TG-RERA registration certificate, P02400000195 | Form C registration for Phase-II, Block-2 (LOGAN) and Block-3 (HAMILTON); validity stated as 21/01/2019 to 23/04/2024 |
| GHMC Building Permit Order, 53467/HO/WZ/Cir-11/2017 | Building permit approved 24 04 2018 for two residential blocks, with floor configuration, built-up areas and stated permit conditions |
| RERA approval reference | Plan approval number filed as 53467/HO/WZ/Cir-11/2 Approvals record |
| Form B promoter declaration | Promoter’s declaration dated 5 November 2018, including the stated completion undertaking and disclosure concerning a project loan secured by deposited title deeds |
| Board authorization extract | Authorizes Managing Director Ram Reddy Saireddy to execute the Form B and registration documents for the named Phase-II blocks |
| Occupancy / completion certificate | Not included in the supplied document set; certificate status is not established here Document index |
| Layout and detailed floor-plan evidence | The supplied layout-plan entry is not extracted; 21 floor-plan sheets are listed, with none software-measured Document index Floor plans |
1. Project at a glance
Project identity
Registered name: SMR VINAY ICONIA, PHASE-II, BLOCK-2 is named as LOGAN and BLOCK-3 is named as HAMILTON
Project type: Residential apartments
Phase / registered portion: Phase-II, Block-2 (LOGAN) and Block-3 (HAMILTON)
TG-RERA registration: P02400000195
Registration validity: Certificate states five years, commencing 21/01/2019 and ending 23/04/2024; the supplied certificate records no extension
Registered promoter: SMR BUILDERS PRIVATE LIMITED
RERA status in supplied record: Registration validity ended on 23/04/2024. Current registration status or any later extension is not established by the certificate supplied
Land and geographic identity
Locality / revenue village: Kondapur / Kondapur
Mandal / district / PIN: Serilingampally / Ranga Reddy / 500084
Project survey numbers and subdivisions: 113; 114/1, 114/2, 114/3; 115/1, 115/2, 115/3; 116/1, 116/2, 116/3; 117/1, 117/2; 118; 119; 126
Site extent: Total area 48,419.41 m²; net area 42,474.38 m²
Boundaries as filed: East: land in Sy. No. 114; West: Maruti Nagar Residential Colony; North: land in Sy. No. 113; South: road
Additional location / boundary detail: Not disclosed in the supplied project record
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 53467/HO/WZ/Cir-11/2017, approved 24 04 2018
Approval reference as filed with RERA: 53467/HO/WZ/Cir-11/2
Approved built-up area: 95,361.39 m² total: Block 2, 56,431.60 m²; Block 3, 38,929.79 m²
Buildings / blocks: Two residential blocks: Block 2 (LOGAN) and Block 3 (HAMILTON)
Sanctioned floor configuration: Block 2: 3-Basements, Ground + (26) upper floors; Block 3: 3-Basements, Ground + 30 upper floors
Building heights: Block 2: 79.65; Block 3: 89.90 m
Parking provision stated in sanction: Three basement parking floors in each block (six total); parking areas 18,651.46 m² and 12,875.86 m²
Unit count: RERA filing records 652 homes: 252 2BHK and 398 3BHK; it also lists two “ENTRY LOBBY FLAT” rows that are not homes on sale
Approved unit count: Sanctioned unit count is not stated in the supplied extract
Offering and status
RERA-filed home configurations: 2BHK and 3BHK
RERA-filed saleable area: 2BHK: 135.93 m²; 3BHK: 184.73 m²
RERA portal booking figures: 2BHK: 57 booked / 195 available; 3BHK: 170 booked / 228 available. The portal extract has no as-of date, so these figures are indicative
Declared project completion: Promoter Form B undertakes completion by 23-04-2024; the GHMC permit also states construction to be completed before 23.04.2024
Original or revised completion dates: The supplied record states the above date but does not provide a separate revised date or extension order
Construction stage: Filed progress data lists several infrastructure and safety items with percentages; it is not an independent site inspection
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents. Certificate status is therefore not established here
2. The project story
This is a residential apartment development in Kondapur, registered as Phase-II, comprising two high-rise blocks: LOGAN (Block 2) and HAMILTON (Block 3). The GHMC building-permit extract describes three basement levels beneath each block, with ground and upper floors above; both blocks are residential in the supplied sanction record.
The RERA filing lists 252 2BHK and 398 3BHK homes. Booking and availability counts are portal figures without an as-of date, rather than a current sales confirmation. The record includes a promoter completion undertaking and permit completion date of 23 April 2024, but the supplied materials do not establish current construction completion or issuance of an occupancy certificate. Filed infrastructure progress percentages are reported in section 6 below and should not be read as independent verification of work at the site.
3. Master plan, architecture & building design
The project land is recorded as 48,419.41 m² total and 42,474.38 m² net. The GHMC building-permit extract specifies two blocks and a combined approved built-up area of 95,361.39 m². It separately lists Block 2 at 56,431.60 m² and Block 3 at 38,929.79 m². These are figures identified in the sanction extract as built-up area; the supplied data does not provide FSI-counted area, carpet area for the buildings as a whole, or an approved drawing-derived footprint.
The sanctioned configuration is three basement levels, ground floor and 26 upper floors for Block 2, and three basement levels, ground floor and 30 upper floors for Block 3. The permit extract gives heights of 79.65 and 89.90 m, respectively. The approved plan is subject to GHMC conditions, including provision of 10% organized open space to be handed over to GHMC through registered gift deed before obtaining OC, and a tot-lot of 4,434.11 m². The extract also identifies land affected for a proposed 36.0 m road and a peripheral road deduction; detailed plan geometry and the overall circulation arrangement are not available in the supplied drawing-derived records.
The RERA filing describes two proposed building units, while the sanction extract identifies two blocks. The supplied materials do not establish detailed apartment distribution by floor, lift or stair count, building entrances, landscaping plan, or a phase-wide area schedule separating saleable, carpet and common areas.
4. Homes, configurations & floor plans
The RERA filing records two home configurations. Saleable area is the filed figure; it is not a carpet-area measurement. Although floor-plan sheets are listed, none of the 21 drawing sheets has been software-measured in the supplied record, so no measured carpet area or room dimensions can be reported.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 252 | 57 | 195 | 135.93 m² | Not measured | Not supplied |
| 3BHK | 398 | 170 | 228 | 184.73 m² | Not measured | Not supplied |
The RERA portal extract also lists two “ENTRY LOBBY FLAT” rows at 154.74 m² each. These are recorded as common-area/not-for-sale rows, not as homes available for purchase, and are excluded from the home counts above.
5. Parking & vehicle circulation
The building-permit extract provides three basement parking floors in each block and lists parking areas of 18,651.46 m² and 12,875.86 m². It does not state parking-space counts, resident or visitor allocations, accessible spaces, mechanical parking, EV charging, ramp details, or unit-specific parking allotments. The RERA filing also states a mortgage area of 14,332.77 m²; the supplied materials do not establish individual parking or home allocations.
6. Amenities, recreation & open spaces
The GHMC permit extract identifies a tot-lot, water-recycling plant, rainwater-harvesting percolation pit, transformer space, garbage house and tree plantation as project provisions. The RERA amenity-progress extract supplies percentages for listed works; these are filed progress figures, not independent confirmation of completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Tot-lot area 4,434.11 m² in the permit extract; tot-lot to be fenced and maintained as greenery under the stated permit condition | Green Strip/TOT LOT/Park: 90% declared; independent completion not established | |
| Internal roads & footpaths | Description only; no dimensions supplied in the progress record | 100% declared | |
| Community buildings | No facility description or size supplied | 0% declared | |
| Tree plantation | Listed as a permit provision; no quantity or area supplied | Progress not separately reported | |
| Water recycling plant | Listed as a permit provision; no capacity supplied | Progress not separately reported | |
| Rainwater harvesting | Percolation pit listed in the permit; progress record also lists water conservation/rainwater harvesting | 0% declared | |
| Water supply | No source, storage or capacity supplied | 30% declared | |
| Sewerage / sewage treatment and disposal | Sewerage (chamber, lines, septic tank, STP) listed; no capacity supplied | Sewerage: 100% declared; treatment and disposal of sewage and sullage water: 0% declared | |
| Storm-water drains | No dimensions or discharge details supplied | 90% declared | |
| Street lighting | No fixture or coverage details supplied | 95% declared | |
| Fire protection and fire safety | Permit assigns responsibility for structural and fire-safety requirements; no system or equipment schedule supplied here | 95% declared | |
| Solid-waste management | No system or capacity details supplied | 0% declared | |
| Energy management | No system or capacity details supplied | 0% declared | |
| Electrical meter room / sub-station / receiving station | Permit lists space for transformer; the progress record lists electrical meter room/sub-station/receiving station | 0% declared | |
| Aggregate recreational open space | No area supplied in the progress record; permit separately refers to 10% organized open space | 0% declared |
7. Utilities, building services & safety
The permit extract requires a water-recycling plant and rainwater-harvesting structure (percolation pit), and lists space for a transformer and a garbage house. It does not specify water sources or storage capacity, STP capacity or treated-water reuse volumes, electrical supply capacity, backup generation, lift arrangements, fire-fighting equipment schedule, or security and accessibility systems. The RERA progress record reports water supply at 30%, sewerage at 100%, fire protection and fire-safety requirements at 95%, and electrical meter room/sub-station/receiving station at 0%; these are declared progress entries and are not evidence of independent inspection or statutory clearance.
The permit states that occupancy is compulsory before occupying any building and that the owner/builder should not deliver possession of any part of the building by sale or lease before obtaining GHMC’s occupancy certificate. No OC is included in the supplied documents.
8. Location, access & connectivity
The registered location is Kondapur revenue village, Serilingampally Mandal, Ranga Reddy District, PIN 500084. The permit extract identifies a proposed 36.0 mtrs wide road and an 18 mt. road width, but the supplied material does not map these road references to a particular project boundary or provide an access-road plan.
The supplied location record lists Financial District (Nanakramguda), 1.2 km as a nearby anchor. No travel time, public-transport stop, route, or independently measured journey information is supplied.
9. Developer & development status
The registered promoter is SMR BUILDERS PRIVATE LIMITED, a company. The RERA record gives the promoter’s address as SMR House, 5th Floor, Nagarjuna Hills, near HCU Bus Depot, Kondapur, Serilingampally, Ranga Reddy, PIN 500084; the supplied record lists https://www.smrholdings.in as its website.
The GHMC permit identifies SMR Builders Pvt. Ltd. as GPA holder/developer/builder, while the building-permit applicant/owner field names Kondapur Towers Pvt. Ltd. and others. The Form B declaration dated 5 November 2018 is a promoter declaration, including an undertaking to complete the project by 23-04-2024. The available record does not establish a later revised completion date, current construction stage by block, or OC status.
10. Approvals, official records & documents
TG-RERA registration certificate, P02400000195: Form C registration for Phase-II, Block-2 (LOGAN) and Block-3 (HAMILTON); validity stated as 21/01/2019 to 23/04/2024
GHMC Building Permit Order, 53467/HO/WZ/Cir-11/2017: Building permit approved 24 04 2018 for two residential blocks, with floor configuration, built-up areas and stated permit conditions
RERA approval reference: Plan approval number filed as 53467/HO/WZ/Cir-11/2
Form B promoter declaration: Promoter’s declaration dated 5 November 2018, including the stated completion undertaking and disclosure concerning a project loan secured by deposited title deeds
Board authorization extract: Authorizes Managing Director Ram Reddy Saireddy to execute the Form B and registration documents for the named Phase-II blocks
Occupancy / completion certificate: Not included in the supplied document set; certificate status is not established here
Layout and detailed floor-plan evidence: The supplied layout-plan entry is not extracted; 21 floor-plan sheets are listed, with none software-measured
Frequently asked questions
Is SMR VINAY ICONIA, PHASE-II, BLOCK-2 is named as LOGAN and BLOCK-3 is named as HAMILTON registered with Telangana RERA?
Yes. SMR VINAY ICONIA, PHASE-II, BLOCK-2 is named as LOGAN and BLOCK-3 is named as HAMILTON is registered with the Telangana Real Estate Regulatory Authority as P02400000195; the registration status is New Project.
Who is the developer of SMR VINAY ICONIA, PHASE-II, BLOCK-2 is named as LOGAN and BLOCK-3 is named as HAMILTON?
The promoter named in the RERA registration is SMR BUILDERS PRIVATE LIMITED.
Where is SMR VINAY ICONIA, PHASE-II, BLOCK-2 is named as LOGAN and BLOCK-3 is named as HAMILTON located?
SMR VINAY ICONIA, PHASE-II, BLOCK-2 is named as LOGAN and BLOCK-3 is named as HAMILTON is in Kondapur, Serilingampally, Rangareddy, Telangana (500084).
When will SMR VINAY ICONIA, PHASE-II, BLOCK-2 is named as LOGAN and BLOCK-3 is named as HAMILTON be completed?
The promoter's proposed date of completion filed with RERA is 23/04/2024. This is the promoter's declaration, not a guarantee.
More projects in Kondapur





