Pbel City Tower M - Sapphire

INCOR APPA TWO PROJECTS PRIVATE LIMITED · Rangareddy · RERA P02400001909

PBEL CITY TOWER M - SAPPHIRE is a residential apartment project in Peeramchruvu, Gandipet Mandal, Ranga Reddy District, developed by INCOR APPA TWO PROJECTS PRIVATE LIMITED. The registered site area is 96,820 sq. m, and the RERA project fields identify one building unit: Tower M, with Cellar + Ground + 19 upper floors. The project has 197 units: 77 2BHK, 119 3BHK and one unit filed as “3HK.” It is registered under TG-RERA number P02400001909, with proposed completion of 01/03/2023.

More from Incor Appa Two Projects Pvt Ltd · 4 projects →

01What we found

Period endedTG-RERA registration ran to 1 Mar 2023 - check its extension on TG-RERA
44documents on file - each fact links to its page
3court cases on this project's land (survey 17, 18, 22, 23, Peeramchruvu)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project namePBEL CITY TOWER M - SAPPHIRE RERA record
Project typeResidential apartment project RERA record RERA filing
Registered portion / phaseTower M – Sapphire, within PBEL City; TG-RERA registration is for the registered project named above.
TG-RERA registrationP02400001909; certificate issued 21/03/2020; stated validity 21/03/2020 to 01/03/2023. The supplied certificate records no extension.
Registered promoterINCOR APPA TWO PROJECTS PRIVATE LIMITED RERA record Corporate record
RERA statusRegistration certificate is supplied; its stated validity ended 01/03/2023. This is separate from the completion date and the Tower M occupancy certificate noted below.

Land and geographic identity

ItemProject record
Locality / address descriptionNear TSPA Junction; the RERA record also gives PBEL CITY, Plot No. 69 & 70, opposite D Mart. RERA record RERA filing
Revenue villagePeeramchruvu (also rendered in project documents as Peeramcheru / Peerancheruvu). RERA record
Mandal / district / PINGandipet / Ranga Reddy / 500091 RERA record
Project survey numbers16, 17, 18, 19/1, 19/2, 19/3, 21, 22, 23, 25/1, 25/3, 26, 27/1, 27/2, 28, 29, 30, 31, 32, 33, 34, 39, 40, 41, 42, 43.
Registered site areaTotal area 96,820 sq. m; net area 96,820.00 sq. m; area recorded as affected by road widening/FTL/nala widening: 0 sq. m. RERA filing
BoundariesEast: PBEL CITY COMPANY LAND; West: JNNURM HOUSING COLONY AND PEERANCHERU VILLAGE; North: PBEL CITY COMPANY LAND AND PEERANCHERU VILLAGE; South: PBEL CITY COMPANY LAND AND LAND OF INCOR APPA PROJ. RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) RERA filing
Principal approvalHMDA technical approval 4339/P4/Plg./H/2009, dated 28-05-2018, for four additional blocks M, N, P and Q.
Approval identifier as filed in project fields4339/P4/PLG/H/2019 RERA filing
Approved built-up area27,599.09 sq. m as stated in the RERA project fields. RERA filing
Tower/block scopeOne building unit is stated in the Tower M RERA project fields. The supplied HMDA technical approval covers four additional blocks—M, N, P and Q—across the broader development. RERA filing
Tower M configurationCellar + Ground + 19 upper floors, per the HMDA approval description for Block M.
Other blocks in the same HMDA approvalBlock N: 2 Cellars + Ground + 19 Upper floors; Block P: 2 Cellars + Ground + 22 upper floors; Block Q: 2 Cellars + Ground + 24 upper floors.
Parking levels / approved parking countNot established by the supplied Tower M records. The approval identifies cellar levels for the blocks, but the material supplied does not give a Tower M parking-space count or unit-allocation schedule.
Unit countThe RERA filing records 197 total units: 77 2BHK, 119 3BHK and one row filed as “3HK.” RERA unit table RERA unit details

Offering and status

ItemProject record
RERA-filed configurations and saleable areas2BHK: 77 units, 127.17 sq. m each; 3BHK: 119 units, 127.43 sq. m each; filing label “3HK”: 1 unit, 166.76 sq. m. RERA unit table RERA unit details
Booked / availablePortal figures supplied show 0 booked and 77 available 2BHK; 0 booked and 119 available 3BHK; 0 booked and 1 available in the “3HK” row. Counts are indicative: the portal extract has no as-of date. RERA unit table RERA unit details
Original completion dateThe project record states proposed completion 01/03/2023. RERA record RERA filing
Completion / OC evidenceAn architect’s certificate dated 16.04.24 certifies Tower M completion and identifies HMDA occupancy certificate 4339/P4/Plg./H/2009, dated 27.05.2023. This evidence is specifically for Tower M.
Construction stageTower M is certified complete in the architect’s certificate; no independent site inspection or current construction-progress verification is supplied.

2. The project story

PBEL CITY TOWER M - SAPPHIRE is the RERA-registered residential apartment portion associated with Tower M of the larger PBEL City development at Peeramchruvu, Gandipet Mandal, Ranga Reddy District. The registered land identity spans 26 survey numbers, and the RERA project fields identify one building unit for this registered portion. RERA record RERA filing

The HMDA approval material describes a broader proposal for four additional multistorey residential blocks—M, N, P and Q. For Tower M, it records a cellar, ground floor and 19 upper floors. The supplied completion certificate addresses Tower M specifically and certifies completion in all aspects; it does not establish completion or occupancy certification for the other blocks.

The RERA filing lists 197 units in Tower M: 77 2BHK, 119 3BHK and one unit under the filed label “3HK.” Portal booking/availability figures are undated and should be treated as indicative rather than a current inventory confirmation. RERA unit table RERA unit details

3. Master plan, architecture & building design

The RERA record gives a site area of 96,820 sq. m and approved built-up area of 27,599.09 sq. m for this registered portion. These are distinct filed measures; no carpet-area total, FSI-counted area or independently measured building footprint is supplied. RERA filing RERA filing

The HMDA technical approval describes Block M as Cellar + Ground +19 upper floors. It also describes three other blocks in the broader approval: Block N with 2 cellars, ground and 19 upper floors; Block P with 2 cellars, ground and 22 upper floors; and Block Q with 2 cellars, ground and 24 upper floors. Those block descriptions do not establish that all four blocks form part of the Tower M RERA registration.

The supplied records do not give Tower M’s flats-per-floor arrangement, building footprint, lift or stair count, internal circulation drawing details, landscaping area, residential/common-area split, or phase-wise site plan sufficient to describe those features. The RERA filing states that the project has one building unit and one proposed building unit. RERA filing

4. Homes, configurations & floor plans

The areas below are the RERA-filed saleable areas, not carpet-area measurements. All 17 supplied floor-plan drawings are scans pending measurement; no software-measured carpet areas or room dimensions are available. The supplied measurement guidance notes that drawing-based carpet area would be a software measurement rather than a RERA disclosure, and would need review against the drawings. RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK77077127.17 sq. mNot measured; drawings pendingNot supplied
3BHK1190119127.43 sq. mNot measured; drawings pendingNot supplied
Filing label “3HK”101166.76 sq. mNot measured; drawings pendingNot supplied

The “3HK” entry is retained as filed; the supplied data does not establish its intended configuration beyond that label. RERA unit table RERA unit details

5. Parking & vehicle circulation

The supplied Tower M material does not establish the number of sanctioned parking spaces, visitor or accessible parking, two-wheeler provision, mechanical parking, or any unit-specific parking allocation. The HMDA approval describes cellar levels in the broader blocks and requires a minimum-width entry and exit, but does not provide a Tower M parking count in the supplied extract. A cellar level or drawn parking bay alone would not establish an allottee’s exclusive parking right.

The approval requires one entry and one exit to the premises, each with a minimum width of 4.5 mtrs and height clearance of 5 mtrs. The supplied material does not establish pedestrian separation, ramp arrangement, EV charging or internal driveway dimensions.

6. Amenities, recreation & open spaces

The RERA amenity entries state “YES” for the listed facilities. Their percentages are reproduced as recorded and are not independent confirmation of delivery. The supplied evidence does not provide facility sizes or a site-inspection status. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Treatment and disposal of sewage and sullage waterSize not suppliedRERA amenitiesRERA amenity entry: YES, 100%; independently verified status not supplied
Solid waste management and disposalSize not suppliedRERA amenitiesRERA amenity entry: YES, 100%; independently verified status not supplied
Water conservation / rainwater harvestingSize not suppliedRERA amenitiesRERA amenity entry: YES, 100%; approval requires rainwater-harvesting structures; completion not independently verified
Energy managementDetails not suppliedRERA amenitiesRERA amenity entry: YES, 100%; independently verified status not supplied
Fire protection and fire-safety requirementsSystems and capacities not suppliedRERA amenitiesRERA amenity entry: YES, 100%; approval includes fire-safety conditions; compliance verification not supplied
Electrical meter room / sub-station / receiving stationDetails not suppliedRERA amenitiesRERA amenity entry: YES, 100%; independently verified status not supplied
Recreational open spaceArea not suppliedRERA amenitiesRERA amenity entry: YES, 100%; independently verified status not supplied
Internal roads and footpathsDimensions not suppliedRERA amenitiesRERA amenity entry: YES, 100%; approval requires approved internal circulation; completion not independently verified
Water supplySource and capacity not suppliedRERA amenitiesRERA amenity entry: YES, 100%; independently verified status not supplied
Sewerage (chambers, lines, septic tank, STP)Capacities not suppliedRERA amenitiesRERA amenity entry: YES, 100%; independently verified status not supplied
Storm-water drainsDetails not suppliedRERA amenitiesRERA amenity entry: YES, 100%; independently verified status not supplied
Green strip / TOT LOT / parkSize and components not suppliedRERA amenitiesRERA amenity entry: YES, 30%; independently verified status not supplied
Street lightingDetails not suppliedRERA amenitiesRERA amenity entry: YES, 20%; independently verified status not supplied
Community buildingsType and size not suppliedRERA amenitiesRERA amenity entry: YES, 100%; independently verified status not supplied

No clubhouse, indoor recreation or sports facility is specifically identified in the supplied amenity records. The HMDA approval also requires open space shown in the building plan to remain open and be maintained with greenery; the supplied material does not provide the relevant plan area or current site verification.

7. Utilities, building services & safety

The RERA amenity entries declare water supply, sewerage/STP, storm-water drainage, solid-waste management, energy management and fire-safety requirements as available. The supplied records do not state water source, treatment or storage capacities; STP capacity; reuse volumes; electrical backup capacity; or waste-segregation arrangements. RERA amenities

The HMDA approval calls for rainwater-harvesting structures, a transformer and garbage house within the premises, and an STP and septic tank, with recycled water to be used for gardening. It also specifies a separate underground static water-storage tank of 25.000 lts Capacity and conditions relating to water disinfection and fire safety. These are approval requirements; the supplied material does not independently verify their installation or operation.

The supplied documents do not state lift numbers or capacities, service-lift provision, escape-stair details, CCTV/security arrangements, access-control systems, or accessibility features. The architect’s certificate records Tower M completion and identifies an occupancy certificate, but the supplied extract does not provide fire-clearance details or an independent compliance inspection.

8. Location, access & connectivity

The registered location is Peeramchruvu, Gandipet Mandal, Ranga Reddy District, PIN 500091, near TSPA Junction; the RERA address fields also give PBEL CITY, Plot No. 69 & 70, Kavuri Hills, opposite D Mart. RERA record RERA filing

The supplied location data lists the Financial District (Nanakramguda) at 6.5 km. No approach-road route, public-transport detail, or additional measured landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is INCOR APPA TWO PROJECTS PRIVATE LIMITED, a private company. The supplied corporate identifier is CIN: U70100TG2017PTC115634. The registered-office field in the RERA certificate gives “Village: Mandal: District: Hyderabad, Pin: 500033”; the promoter-information address in the project record is INCOR, KAVURI HILLS, PBEL CITY, NEAR TSPA JUNCTION, Gandipet, Ranga Reddy, 500091. Corporate record Parties record

The architect’s certificate names Indis Appa Two Projects Private Limited as the Tower M developer/applicant and certifies completion in all aspects of Tower M on 16.04.24; it identifies HMDA occupancy certificate 4339/P4/Plg./H/2009, dated 27.05.2023. The supplied certificate concerns Tower M, not the other blocks described in the broader HMDA approval.

The RERA registration certificate stated a validity end date of 01/03/2023; the supplied certificate records no extension. Separately, the RERA project fields stated proposed completion of 01/03/2023. RERA filing

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationFORM ‘C’ registration for PBEL CITY TOWER M - SAPPHIRE, registration P02400001909, issued 21/03/2020; stated validity to 01/03/2023.
HMDA building approvalTechnical approval 4339/P4/Plg./H/2009, dated 28-05-2018, for four additional blocks M, N, P and Q; the document describes technical approval and conditions for local-authority sanction.
Tower M completion / OC evidenceArchitect’s certificate dated 16.04.24 certifies Tower M completion and identifies HMDA occupancy certificate 4339/P4/Plg./H/2009, dated 27.05.2023.
RERA completion undertakingForm B affidavit dated 9 MAY 2019 records the promoter’s undertaking to complete the phase by “315 July 2022” and discloses a memorandum of deposit of title deeds in favour of Vistra ITCL (India) Limited.
Site plan for broader developmentA supplied site-plan document describes four towers M, N, P and Q and lists survey identifiers, but its extracted text does not show a permit or sanctioning authority.
Environmental and safety-related conditionsThe HMDA approval refers to environmental-clearance conditions, fire-safety requirements, STP/septic provision, rainwater harvesting, transformer and garbage house. The supplied approval extract states these conditions; it does not itself establish their completion or provide the underlying clearance documents.

The RERA filing identifies plan approval as 4339/P4/PLG/H/2019; no separate public HMDA layout-lookup result is supplied. RERA filing HMDA

Frequently asked questions

Is PBEL CITY TOWER M - SAPPHIRE registered with Telangana RERA?

Yes. PBEL CITY TOWER M - SAPPHIRE is registered with the Telangana Real Estate Regulatory Authority as P02400001909; the registration status is New Project.

Who is the developer of PBEL CITY TOWER M - SAPPHIRE?

The promoter named in the RERA registration is INCOR APPA TWO PROJECTS PRIVATE LIMITED.

Where is PBEL CITY TOWER M - SAPPHIRE located?

PBEL CITY TOWER M - SAPPHIRE is in NEAR TSPA JUNCTION, Peeramchruvu, Gandipet, Rangareddy, Telangana (500091).

When will PBEL CITY TOWER M - SAPPHIRE be completed?

The promoter's proposed date of completion filed with RERA is 01/03/2023. This is the promoter's declaration, not a guarantee.