Pbel City Tower K - Aquamarine
INCOR APPA TWO PROJECTS PRIVATE LIMITED · Rangareddy · RERA P02400000041
PBEL CITY TOWER K - AQUAMARINE is a residential apartment project near TSPA Junction in Peeramchruvu, Gandipet mandal, Ranga Reddy district, developed by INCOR APPA TWO PROJECTS PRIVATE LIMITED. The registered site area is 96,820 sq m, and the filing records one building with 198 homes: 78 2BHK and 120 3BHK apartments. The 2BHK saleable area is 127.08 sq m and the 3BHK saleable area is 127.42–167.23 sq m. Its TG-RERA registration number is P02400000041, and the proposed completion date is 05/01/2022.
More from Incor Appa Two Projects Pvt Ltd · 4 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | PBEL CITY TOWER K - AQUAMARINE RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Tower K (Aquamarine); the registration is for this tower, not the entire PBEL City development RERA record |
| TG-RERA registration number | P02400000041 RERA record |
| Registration validity | 29/11/2018 to 05/01/2022; the supplied certificate records no extension |
| Registered promoter | INCOR APPA TWO PROJECTS PRIVATE LIMITED, a private limited company RERA record Corporate record |
| RERA status | Recorded as On-Going Project in the project filing RERA filing |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | NEAR TSPA JUNCTION; the registration certificate also identifies Peeramchruvu RERA record |
| Revenue village | Peeramchruvu (also rendered Peerancheru / Peeramcheru in supplied approval and title records) RERA record |
| Mandal / district / PIN | Gandipet / Ranga Reddy / 500091 RERA record |
| Project survey numbers and subdivisions, as filed | 16, 17, 18, 19/1, 19/2, 19/3, 21, 22, 23, 25/1, 25/3, 26, 27/1, 27/2, 28, 29, 30, 31, 32, 33, 34, 39, 40, 41, 42, 43 RERA record Land records |
| Registered site extent | 96,820 sq m (also written as 96,820.00 sq m in the technical approval) RERA filing |
| Net / total area | Net area 96,820.00 sq m; total area 96,820 sq m RERA filing |
| Boundaries | East: PBEL CITY COMPANY LAND. West: JNNURM HOUSING COLONY AND PEERANCHERU VILLAGE. North: PBEL CITY COMPANY LAND AND PEERANCHERU VILLAGE. South: PBEL CITY COMPANY LAND AND LAND OF INCOR APPA PROJ. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA); the technical approval delegates plan sanction to Peerancheru Gram Panchayat in conformity with HMDA-approved plans Approvals record |
| Principal approval | 4339/P4/Plg./H/2009, technical approval dated 05-01-2017 Approvals record |
| Approved built-up area | 26,985.53 sq m, as recorded in the RERA filing RERA filing |
| Building count | One proposed building/unit in the RERA filing; Tower K is the registered building identified by the architect’s certificate RERA filing |
| Sanctioned configuration recorded in approval | Approval describes PBEL City blocks J, K and L as Cellar + Ground + 19 Upper Floors; four EWS/LIG blocks as Cellar + Stilt + 7 Upper Floors; and an amenities block as Ground + 1 Upper Floor. The extract does not isolate Tower K’s own floor plan from the wider approval description. |
| Parking / mortgage area | RERA filing lists mortgage area of 2,738.05 sq m. The supplied records do not give a usable sanctioned parking-space count or parking-level allocation for Tower K. RERA filing |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configurations | 2BHK: 78 units; 3BHK: 120 units (the filing records 3BHJ for one of the 3BHK rows) RERA unit table RERA unit details |
| RERA-filed saleable area | 2BHK: 127.08 sq m. 3BHK: 127.42–167.23 sq m. RERA unit table RERA unit details |
| Booked / available | 123 booked and 75 available in the portal-derived summary: 2BHK 56 / 22; 3BHK 67 / 53. The portal record has no as-of date, so these counts are indicative, not a current inventory confirmation. RERA unit table RERA unit details |
| Construction stage | The RERA status is On-Going Project. The supplied amenity-progress records contain selected declared percentages, but no current independent site inspection or overall construction-progress certification is supplied. RERA filing RERA amenities |
| Completion dates | Proposed and revised completion dates in the RERA filing are both 05/01/2022. RERA record RERA filing |
| Occupancy certificate status | An architect’s certificate records HMDA occupancy certificate 4339/P4/Plg./H/2009, dated 29.12.2020, and certifies completion of Tower K. This is a tower-specific record; it is distinct from the RERA registration validity and completion date. |
2. The project story
PBEL CITY TOWER K - AQUAMARINE is the Tower K apartment portion of the larger PBEL City development, in the Peeramchruvu / Peerancheru area of Gandipet mandal, Ranga Reddy district. The registered project covers the survey numbers listed above and a filed site extent of 96,820 sq m. RERA record Land records
The RERA filing describes one building and 198 homes: 78 two-bedroom apartments and 120 three-bedroom apartments. Its portal-derived inventory snapshot reports 123 booked and 75 available, but does not state when those counts were captured. RERA unit table RERA unit details
The RERA record labels the project ongoing and gives 05/01/2022 as both the proposed and revised completion date. Separately, the architect’s filed certificate records completion and an HMDA occupancy certificate for Tower K dated 29.12.2020. That certificate is expressly scoped to Tower K; it does not establish the completion or occupancy status of all other PBEL City blocks or common development works. The supplied record does not include a current independent site inspection to verify construction or facility condition. RERA filing RERA amenities
3. Master plan, architecture & building design
The RERA filing records 96,820 sq m total and net site area and 26,985.53 sq m approved built-up area. These are separate filed area figures; no FSI-counted area is supplied. RERA filing RERA filing
HMDA’s 05-01-2017 technical approval describes the broader PBEL City scheme, including blocks J, K and L, four EWS/LIG blocks, and an amenities block. It specifies Cellar + Ground + 19 Upper Floors for blocks J, K and L; Cellar + Stilt + 7 Upper Floors for the EWS/LIG blocks; and Ground + 1 Upper Floor for the amenities block. The approval extract does not provide Tower K-specific floor-by-floor plans, apartment-per-floor counts, lift or stair arrangements, building footprint, or open-space area.
The approval requires the delegated local authority’s sanctioned plans to conform to the HMDA technical plans, and refers to approved internal circulation and parking areas. It identifies 4.5 m and 5 m road-width figures in its parameters, but the supplied extract does not tie those figures to a particular Tower K road segment.
4. Homes, configurations & floor plans
The following counts and saleable areas are from the TG-RERA filing. Saleable area is not the same as carpet area: the supplied drawing notes explain that saleable area includes a share of common areas, while carpet area is smaller. The available floor-plan set comprises 19 drawings, all still marked as scans pending; no software-measured carpet areas or room dimensions are supplied. RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 78 | 56 | 22 | 127.08 sq m | Not measured | Not supplied |
| 3BHK | 120 | 67 | 53 | 127.42–167.23 sq m | Not measured | Not supplied |
The portal-derived booking counts are indicative because the source record provides no as-of date. The supplied drawings do not support a description of apartment room layouts, dimensions, balcony or utility areas, or orientation. RERA unit table RERA unit details Floor plans
5. Parking & vehicle circulation
The filing records a mortgage area of 2,738.05 sq m, but that is not a parking-space count. The supplied approval refers to parking areas and an approved internal circulation pattern, without a Tower K parking-space total, parking-level schedule, resident/visitor allocation, accessible spaces, ramp arrangement, EV provision, or unit-specific parking allocation. RERA filing
Accordingly, the available records do not establish how many spaces are sanctioned for Tower K or which spaces, if any, are allocated exclusively to individual apartments. A parking bay shown in a drawing would not by itself establish exclusive ownership.
6. Amenities, recreation & open spaces
The approval identifies an amenities block with Ground + 1 Upper Floor and requires open space shown on the building plan to remain open and be developed with greenery. The RERA amenity filing marks community buildings at 50% or 55% in supplied entries; other selected entries report internal roads and footpaths at 80%, water supply and sewerage at 100%, storm-water drains at 92%, green strip/park at 80%, and solid-waste management at 60%. These are portal declarations, not independently verified completion findings; the supplied records do not identify each percentage’s date or map it to a specific Tower K facility. RERA amenities
| Description / size | Sanctioned approval describes a Ground + 1 Upper Floor amenities block; no facility-by-facility schedule or area is supplied. |
|---|---|
| Declared progress / verified status | RERA entries show 50% and 55% for community buildings; independent completion verification not supplied. RERA amenities |
| Description / size | Internal circulation is referenced in the technical approval; widths and Tower K-specific circulation plan are not established by the supplied extract. |
|---|---|
| Declared progress / verified status | Selected portal entry reports 80%; no independent verification supplied. RERA amenities |
| Description / size | The approval requires designated open space to remain open and be developed with greenery. No area is supplied. |
|---|---|
| Declared progress / verified status | Selected portal entry reports 80%; no independent verification supplied. RERA amenities |
| Description / size | RERA amenity records list aggregate recreational open space, without a supplied area or facility breakdown. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Some entries report 100%; others show 0%. These portal entries do not establish current physical completion. RERA amenities |
The supplied amenity records do not provide a sufficiently specific facility list for clubhouse/indoor, sports/recreation, or convenience/community features beyond the community-building and open-space items above. RERA amenities
7. Utilities, building services & safety
HMDA’s technical approval lists STP and septic-tank provision, recycled water for gardening, sump and water-harvesting pits, rainwater-harvesting structures, storm-water drains, refuse chutes, garbage disposal, a garbage house, and a transformer. It also lists underground and terrace water-storage tank capacities as 25.000 Its and 25,000 lits, respectively, using the source’s wording; the supplied extract does not provide a separate water-source description.
The approval’s conditions refer to fire protection and fire-safety requirements, structural design conditions, and automatic sprinklers if basement area exceeds 200 sq m. The provided material does not establish Tower K’s installed fire systems, escape-stair arrangement, lift number or capacity, backup power capacity, CCTV/access-control arrangements, waste segregation method, or accessibility features. Approval conditions and portal declarations should not be read as independent confirmation that the systems are installed or functioning. RERA amenities
8. Location, access & connectivity
The registered location is NEAR TSPA JUNCTION, Peeramchruvu, Gandipet mandal, Ranga Reddy district, PIN 500091. The project’s filed boundaries identify adjoining PBEL City company land, Peerancheru village, JNNURM Housing Colony, and land of Incor Appa Projects. RERA record RERA filing RERA filing
The supplied location data lists these measured distances: Financial District (Nanakramguda) — 6.5 km; Union Bank of India — 3.0 km; Chaitanya Bharathi Institute of Engineering — 2.8 km; and Rock Garden — 1.7 km. The data does not identify the measurement method or provide approach-road, public-transport, or travel-time information. Location record
9. Developer & development status
The registered legal promoter is INCOR APPA TWO PROJECTS PRIVATE LIMITED, a company; its listed address is INCOR, KAVURI HILLS, PBEL CITY, NEAR TSPA JUNCTION, Gandipet, Ranga Reddy, 500091. The supplied promoter contact information lists the website as https://WWW.INCOR.IN and names Srinivas Metla as authorized signatory. RERA record Corporate record Parties record
The RERA filing states a proposed and revised completion date of 05/01/2022 and labels the project ongoing. The registration certificate records validity through 05/01/2022 and no extension. Separately, the architect’s certificate records Tower K completion and an HMDA occupancy certificate dated 29.12.2020. The supplied records do not establish current site conditions or the status of wider PBEL City development works. RERA record
10. Approvals, official records & documents
| Supplied evidence | Form C, registration P02400000041, issued 29/11/2018; validity to 05/01/2022. |
|---|---|
| Scope / note | Registered project: PBEL CITY TOWER K - AQUAMARINE. |
| Supplied evidence | Approval 4339/P4/Plg./H/2009, dated 05-01-2017. |
|---|---|
| Scope / note | Technical approval for extensions to blocks J, K and L, four EWS/LIG blocks and an amenities block at PBEL City. |
| Supplied evidence | Architect’s certificate identifies HMDA occupancy certificate 4339/P4/Plg./H/2009, dated 29.12.2020. |
|---|---|
| Scope / note | The certificate expressly concerns Tower K of PBEL City. |
| Supplied evidence | Form B by Soma Jagan Mohan Reddy as authorized signatory for Incor Appa Two Projects Private Limited. |
|---|---|
| Scope / note | Promoter declaration includes title/development-right statements, an encumbrance disclosure, and an undertaking to complete the phase by 30 September 2020. |
| Supplied evidence | The supplied record identifies an HMDA plan approval and 19 floor-plan drawings, but no readable Tower K floor-plan measurements are available; the public HMDA approved-layout lookup is reported unavailable. Approvals record Floor plans HMDA |
|---|---|
| Scope / note | Detailed layout/floor-plan review is therefore limited by the supplied material. |
The broader technical approval refers to conditions on local plan sanction, structural design, environmental clearance, utilities, fire safety, internal circulation and open space; this overview does not treat those conditions as proof of current implementation.
1. Project at a glance
Project identity
Registered project name: PBEL CITY TOWER K - AQUAMARINE
Project type: Residential apartment project
Phase / registered portion: Tower K (Aquamarine); the registration is for this tower, not the entire PBEL City development
TG-RERA registration number: P02400000041
Registration validity: 29/11/2018 to 05/01/2022; the supplied certificate records no extension
Registered promoter: INCOR APPA TWO PROJECTS PRIVATE LIMITED, a private limited company
RERA status: Recorded as On-Going Project in the project filing
Land and geographic identity
Locality: NEAR TSPA JUNCTION; the registration certificate also identifies Peeramchruvu
Revenue village: Peeramchruvu (also rendered Peerancheru / Peeramcheru in supplied approval and title records)
Mandal / district / PIN: Gandipet / Ranga Reddy / 500091
Project survey numbers and subdivisions, as filed: 16, 17, 18, 19/1, 19/2, 19/3, 21, 22, 23, 25/1, 25/3, 26, 27/1, 27/2, 28, 29, 30, 31, 32, 33, 34, 39, 40, 41, 42, 43
Registered site extent: 96,820 sq m (also written as 96,820.00 sq m in the technical approval)
Net / total area: Net area 96,820.00 sq m; total area 96,820 sq m
Boundaries: East: PBEL CITY COMPANY LAND. West: JNNURM HOUSING COLONY AND PEERANCHERU VILLAGE. North: PBEL CITY COMPANY LAND AND PEERANCHERU VILLAGE. South: PBEL CITY COMPANY LAND AND LAND OF INCOR APPA PROJ.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA); the technical approval delegates plan sanction to Peerancheru Gram Panchayat in conformity with HMDA-approved plans
Principal approval: 4339/P4/Plg./H/2009, technical approval dated 05-01-2017
Approved built-up area: 26,985.53 sq m, as recorded in the RERA filing
Building count: One proposed building/unit in the RERA filing; Tower K is the registered building identified by the architect’s certificate
Sanctioned configuration recorded in approval: Approval describes PBEL City blocks J, K and L as Cellar + Ground + 19 Upper Floors; four EWS/LIG blocks as Cellar + Stilt + 7 Upper Floors; and an amenities block as Ground + 1 Upper Floor. The extract does not isolate Tower K’s own floor plan from the wider approval description.
Parking / mortgage area: RERA filing lists mortgage area of 2,738.05 sq m. The supplied records do not give a usable sanctioned parking-space count or parking-level allocation for Tower K.
Offering and status
RERA-filed configurations: 2BHK: 78 units; 3BHK: 120 units (the filing records 3BHJ for one of the 3BHK rows)
RERA-filed saleable area: 2BHK: 127.08 sq m. 3BHK: 127.42–167.23 sq m.
Booked / available: 123 booked and 75 available in the portal-derived summary: 2BHK 56 / 22; 3BHK 67 / 53. The portal record has no as-of date, so these counts are indicative, not a current inventory confirmation.
Construction stage: The RERA status is On-Going Project. The supplied amenity-progress records contain selected declared percentages, but no current independent site inspection or overall construction-progress certification is supplied.
Completion dates: Proposed and revised completion dates in the RERA filing are both 05/01/2022.
Occupancy certificate status: An architect’s certificate records HMDA occupancy certificate 4339/P4/Plg./H/2009, dated 29.12.2020, and certifies completion of Tower K. This is a tower-specific record; it is distinct from the RERA registration validity and completion date.
2. The project story
PBEL CITY TOWER K - AQUAMARINE is the Tower K apartment portion of the larger PBEL City development, in the Peeramchruvu / Peerancheru area of Gandipet mandal, Ranga Reddy district. The registered project covers the survey numbers listed above and a filed site extent of 96,820 sq m.
The RERA filing describes one building and 198 homes: 78 two-bedroom apartments and 120 three-bedroom apartments. Its portal-derived inventory snapshot reports 123 booked and 75 available, but does not state when those counts were captured.
The RERA record labels the project ongoing and gives 05/01/2022 as both the proposed and revised completion date. Separately, the architect’s filed certificate records completion and an HMDA occupancy certificate for Tower K dated 29.12.2020. That certificate is expressly scoped to Tower K; it does not establish the completion or occupancy status of all other PBEL City blocks or common development works. The supplied record does not include a current independent site inspection to verify construction or facility condition.
3. Master plan, architecture & building design
The RERA filing records 96,820 sq m total and net site area and 26,985.53 sq m approved built-up area. These are separate filed area figures; no FSI-counted area is supplied.
HMDA’s 05-01-2017 technical approval describes the broader PBEL City scheme, including blocks J, K and L, four EWS/LIG blocks, and an amenities block. It specifies Cellar + Ground + 19 Upper Floors for blocks J, K and L; Cellar + Stilt + 7 Upper Floors for the EWS/LIG blocks; and Ground + 1 Upper Floor for the amenities block. The approval extract does not provide Tower K-specific floor-by-floor plans, apartment-per-floor counts, lift or stair arrangements, building footprint, or open-space area.
The approval requires the delegated local authority’s sanctioned plans to conform to the HMDA technical plans, and refers to approved internal circulation and parking areas. It identifies 4.5 m and 5 m road-width figures in its parameters, but the supplied extract does not tie those figures to a particular Tower K road segment.
4. Homes, configurations & floor plans
The following counts and saleable areas are from the TG-RERA filing. Saleable area is not the same as carpet area: the supplied drawing notes explain that saleable area includes a share of common areas, while carpet area is smaller. The available floor-plan set comprises 19 drawings, all still marked as scans pending; no software-measured carpet areas or room dimensions are supplied.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 78 | 56 | 22 | 127.08 sq m | Not measured | Not supplied |
| 3BHK | 120 | 67 | 53 | 127.42–167.23 sq m | Not measured | Not supplied |
The portal-derived booking counts are indicative because the source record provides no as-of date. The supplied drawings do not support a description of apartment room layouts, dimensions, balcony or utility areas, or orientation.
5. Parking & vehicle circulation
The filing records a mortgage area of 2,738.05 sq m, but that is not a parking-space count. The supplied approval refers to parking areas and an approved internal circulation pattern, without a Tower K parking-space total, parking-level schedule, resident/visitor allocation, accessible spaces, ramp arrangement, EV provision, or unit-specific parking allocation.
Accordingly, the available records do not establish how many spaces are sanctioned for Tower K or which spaces, if any, are allocated exclusively to individual apartments. A parking bay shown in a drawing would not by itself establish exclusive ownership.
6. Amenities, recreation & open spaces
The approval identifies an amenities block with Ground + 1 Upper Floor and requires open space shown on the building plan to remain open and be developed with greenery. The RERA amenity filing marks community buildings at 50% or 55% in supplied entries; other selected entries report internal roads and footpaths at 80%, water supply and sewerage at 100%, storm-water drains at 92%, green strip/park at 80%, and solid-waste management at 60%. These are portal declarations, not independently verified completion findings; the supplied records do not identify each percentage’s date or map it to a specific Tower K facility.
| Description / size | Sanctioned approval describes a Ground + 1 Upper Floor amenities block; no facility-by-facility schedule or area is supplied. |
|---|---|
| Declared progress / verified status | RERA entries show 50% and 55% for community buildings; independent completion verification not supplied. |
| Description / size | Internal circulation is referenced in the technical approval; widths and Tower K-specific circulation plan are not established by the supplied extract. |
|---|---|
| Declared progress / verified status | Selected portal entry reports 80%; no independent verification supplied. |
| Description / size | The approval requires designated open space to remain open and be developed with greenery. No area is supplied. |
|---|---|
| Declared progress / verified status | Selected portal entry reports 80%; no independent verification supplied. |
| Description / size | RERA amenity records list aggregate recreational open space, without a supplied area or facility breakdown. |
|---|---|
| Declared progress / verified status | Some entries report 100%; others show 0%. These portal entries do not establish current physical completion. |
The supplied amenity records do not provide a sufficiently specific facility list for clubhouse/indoor, sports/recreation, or convenience/community features beyond the community-building and open-space items above.
7. Utilities, building services & safety
HMDA’s technical approval lists STP and septic-tank provision, recycled water for gardening, sump and water-harvesting pits, rainwater-harvesting structures, storm-water drains, refuse chutes, garbage disposal, a garbage house, and a transformer. It also lists underground and terrace water-storage tank capacities as 25.000 Its and 25,000 lits, respectively, using the source’s wording; the supplied extract does not provide a separate water-source description.
The approval’s conditions refer to fire protection and fire-safety requirements, structural design conditions, and automatic sprinklers if basement area exceeds 200 sq m. The provided material does not establish Tower K’s installed fire systems, escape-stair arrangement, lift number or capacity, backup power capacity, CCTV/access-control arrangements, waste segregation method, or accessibility features. Approval conditions and portal declarations should not be read as independent confirmation that the systems are installed or functioning.
8. Location, access & connectivity
The registered location is NEAR TSPA JUNCTION, Peeramchruvu, Gandipet mandal, Ranga Reddy district, PIN 500091. The project’s filed boundaries identify adjoining PBEL City company land, Peerancheru village, JNNURM Housing Colony, and land of Incor Appa Projects.
The supplied location data lists these measured distances: Financial District (Nanakramguda) — 6.5 km; Union Bank of India — 3.0 km; Chaitanya Bharathi Institute of Engineering — 2.8 km; and Rock Garden — 1.7 km. The data does not identify the measurement method or provide approach-road, public-transport, or travel-time information.
9. Developer & development status
The registered legal promoter is INCOR APPA TWO PROJECTS PRIVATE LIMITED, a company; its listed address is INCOR, KAVURI HILLS, PBEL CITY, NEAR TSPA JUNCTION, Gandipet, Ranga Reddy, 500091. The supplied promoter contact information lists the website as https://WWW.INCOR.IN and names Srinivas Metla as authorized signatory.
The RERA filing states a proposed and revised completion date of 05/01/2022 and labels the project ongoing. The registration certificate records validity through 05/01/2022 and no extension. Separately, the architect’s certificate records Tower K completion and an HMDA occupancy certificate dated 29.12.2020. The supplied records do not establish current site conditions or the status of wider PBEL City development works.
10. Approvals, official records & documents
| Supplied evidence | Form C, registration P02400000041, issued 29/11/2018; validity to 05/01/2022. |
|---|---|
| Scope / note | Registered project: PBEL CITY TOWER K - AQUAMARINE. |
| Supplied evidence | Approval 4339/P4/Plg./H/2009, dated 05-01-2017. |
|---|---|
| Scope / note | Technical approval for extensions to blocks J, K and L, four EWS/LIG blocks and an amenities block at PBEL City. |
| Supplied evidence | Architect’s certificate identifies HMDA occupancy certificate 4339/P4/Plg./H/2009, dated 29.12.2020. |
|---|---|
| Scope / note | The certificate expressly concerns Tower K of PBEL City. |
| Supplied evidence | Form B by Soma Jagan Mohan Reddy as authorized signatory for Incor Appa Two Projects Private Limited. |
|---|---|
| Scope / note | Promoter declaration includes title/development-right statements, an encumbrance disclosure, and an undertaking to complete the phase by 30 September 2020. |
| Supplied evidence | The supplied record identifies an HMDA plan approval and 19 floor-plan drawings, but no readable Tower K floor-plan measurements are available; the public HMDA approved-layout lookup is reported unavailable. |
|---|---|
| Scope / note | Detailed layout/floor-plan review is therefore limited by the supplied material. |
The broader technical approval refers to conditions on local plan sanction, structural design, environmental clearance, utilities, fire safety, internal circulation and open space; this overview does not treat those conditions as proof of current implementation.
Frequently asked questions
Is PBEL CITY TOWER K - AQUAMARINE registered with Telangana RERA?
Yes. PBEL CITY TOWER K - AQUAMARINE is registered with the Telangana Real Estate Regulatory Authority as P02400000041; the registration status is On-Going Project.
Who is the developer of PBEL CITY TOWER K - AQUAMARINE?
The promoter named in the RERA registration is INCOR APPA TWO PROJECTS PRIVATE LIMITED.
Where is PBEL CITY TOWER K - AQUAMARINE located?
PBEL CITY TOWER K - AQUAMARINE is in NEAR TSPA JUNCTION, Peeramchruvu, Gandipet, Rangareddy, Telangana (500091).
When will PBEL CITY TOWER K - AQUAMARINE be completed?
The promoter's proposed date of completion filed with RERA is 05/01/2022. This is the promoter's declaration, not a guarantee.