Mareechi Homes Prr
M/s MAREECHI HOMES · Siddipet · RERA P01300009549
MAREECHI HOMES PRR is a plotted development in PONNALA, SIDDIPET (URBAN) Mandal, Siddipet district, developed by registered promoter M/s MAREECHI HOMES. The project covers a total RERA land area of 35,988.75 sq.mt and a net area of 35,421.98 sq.mt, with 124 plots; the drawing-derived plot sizes are 96.75–408.3 sq.m. It is registered under TG-RERA number P01300009549, and the RERA header states proposed completion of 15/03/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | MAREECHI HOMES PRR RERA record Approvals record |
| Project type | Plotted development / plotted layout RERA record RERA filing |
| Phase or registered portion | Phase not disclosed; registration is for the project identified as MAREECHI HOMES PRR Approvals record |
| TG-RERA registration number | P01300009549 Approvals record |
| Registration validity | 15/11/2024 to 15/11/2026, unless extended by the Authority Approvals record |
| Registered promoter | M/s MAREECHI HOMES; partnership RERA record RERA filing |
| RERA status | Registered; the supplied certificate states a two-year validity period Approvals record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | PONNALA; the layout approval also calls it Ponnal Revenue Village RERA record RERA filing |
| Mandal | SIDDIPET (URBAN) RERA record RERA filing |
| District | Siddipet RERA record RERA filing |
| PIN | 502277 RERA record RERA filing |
| Project survey numbers | 205 and 206 RERA record Land records |
| Subdivisions | The registration and layout records identify the land at survey-number level only; project-specific subdivisions are not disclosed in those records RERA record Land records |
| Registered layout area | 36,555.49 sq.mt stated in the layout-plan extraction; its area statement separately records total net layout as 35,988.75 sq.mt |
| RERA land figures | Total area 35,988.75 sq.mt; area affected by road widening/FTL of tanks/nala widening 566.77 sq.mt; net area 35,421.98 sq.mt RERA filing Land records |
| Boundaries | East: OTHER LAND; West: OTHERS LAND; North: OTHERS LAND; South: OTHERS LAND RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | SIUDA Urban Development Authority is identified on the tentative layout approval; the RERA filing also records DTCP as the authority Approvals record |
| Principal approval | Tentative Layout Plan No. 423187/LP/GP/206957/0032/2024, dated 15-11-2024 |
| Layout plan / file reference | File No. TS/041788/2024 appears in the filed layout-plan extraction |
| Plot count | 124 plots in the layout records |
| Approved built-up area | 0.00 proposed built-up area, with and without parking, in the layout-plan extraction; this is a plotted layout, not a building scheme in that record |
| Building count and floor configuration | Not disclosed in the supplied RERA project records; no building floors or building configuration are established Document index |
| Parking | The layout-plan extraction records 0.00 common parking area; individual plot or dwelling parking provision is not disclosed |
Offering and status
| Item | Record |
|---|---|
| Offering | Plots; the layout schedule is reported as containing 124 plots RERA record Layout record |
| Plot sizes | Software-measured from the approved layout drawing: 96.75–408.3 sq.m (smallest to largest); median 158.78 sq.m. These are drawing-derived measurements, not a RERA-filed unit schedule Layout record |
| Booked / available plots | Counts not supplied RERA unit table Document index |
| Construction / development stage | The supplied record identifies a tentative layout approval and lists infrastructure works to be carried out; no independently verified site-progress figure is supplied RERA amenities |
| Completion timing | The RERA header states proposed completion 15/03/2027 RERA record. A Form B declaration in the supplied documents states 22.05.2026. The available evidence does not explain the relationship between these dates. |
| Registration validity vs completion | Registration validity is stated separately above; it is not a statement that development is complete |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied records. For this plotted layout, the available approval is a Tentative Layout Plan |
2. The project story
MAREECHI HOMES PRR is registered as a plotted development in PONNALA village, Siddipet (Urban) Mandal, Siddipet district. The layout approval covers survey numbers 205 and 206 and provides for 124 plots, alongside internal roads, open space/park, utility land and social infrastructure. The approval is expressly a tentative layout approval; the supplied project records do not establish a completed final layout or independently verified completion of the infrastructure works. RERA record Land records
The approval conditions contemplate infrastructure development—including roads, drains, avenue planting, street lighting, sewerage disposal and protected water supply—and require a work completion certificate from a Licensed Technical Person for approval of the Final Layout Plan. The documents supplied do not provide a verified percentage of work completed or confirm that a final layout or occupancy/completion certificate has been issued.
3. Master plan, architecture & building design
This is a plotted layout rather than a disclosed apartment or multi-storey building scheme. The approved-plan extraction gives a total net layout area of 35,988.75 sq.mt and allocates it as follows: 20,816.36 sq.mt plotted area (57.84%), 10,635.91 sq.mt roads (29.55%), 3,267.76 sq.mt organized open space/park (9.08%), 904.44 sq.mt social infrastructure (2.51%), and 364.28 sq.mt utility area (1.01%). The plan extraction also records 566.77 sq.mt as road-affected area.
The tentative layout approval separately states a layout area of Ac. 8.893 cents; 43042.509 Sq.Yds, with plotted area Ac5.144 cents 24896.367 Sq.Yds, roads Ac2.628 cents 12720.548 Sq.Yds, open space Ac0.807 cents 3908.241 Sq.Yds, utilities Ac 0.09cents 435.679 Sq.Yds, and social infrastructure Ac 0.223 cents 1081.71 Sq.Yds.
The plan labels internal roads 9.14MT WIDE INTERNAL ROAD and 12.00MT WIDE INTERNAL ROAD, and also identifies existing/proposed roads and a road-widening strip. The approval requires roads to remain accessible to neighbouring sites and calls for open-space, social-infrastructure, utility and road areas to be handed over by registered gift deed before release of the final layout. No building footprints, floor plans, building heights, or residential/commercial built-up areas are disclosed.
The drawing-derived layout schedule reports 124 plots, with sizes read by software from the drawing. It groups the plots into these measured size bands: 13 plots in 100–150 sq.yd, 55 in 150–200 sq.yd, 51 in 200–250 sq.yd, 1 in 250–300 sq.yd, 2 in 300–400 sq.yd, and 2 in 400–500 sq.yd. The source notes that plot count and sizes should be verified against the drawing. Layout record
4. Homes, configurations & floor plans
The offering shown by the project records is plotted land, not apartments. The supplied RERA material does not provide booked or available inventory by plot number, nor a RERA-filed plot-size schedule. The drawing-derived schedule covers 124 plots and gives the following size distribution; these are software-measured from the approved layout drawing, not RERA-filed saleable-area figures. Layout record
| Plot-size band (sq.yd, drawing-derived) | Plots |
|---|---|
| 100–150 | 13 |
| 150–200 | 55 |
| 200–250 | 51 |
| 250–300 | 1 |
| 300–400 | 2 |
| 400–500 | 2 |
The software-measured smallest, median and largest plot areas are 96.75 sq.m, 158.78 sq.m and 408.3 sq.m, respectively. These measurements should be checked against the approved drawing and are not apartment carpet-area measurements. The supplied records do not give plot-wise booking status or a unit-level saleable-area schedule. Layout record RERA unit table
5. Parking & vehicle circulation
The layout-plan extraction records 0.00 common parking area. The supplied documents do not establish a count of individual parking spaces, visitor or accessible spaces, a parking-allotment arrangement, or designated vehicle-entry and exit points. Internal road widths shown in the plan extraction include 9.14MT and 12.00MT internal roads; the tentative approval also requires roads to be opened for access to neighbouring sites.
6. Amenities, recreation & open spaces
The approved-plan extraction identifies open space/park, social infrastructure and utility land. The tentative approval lists proposed infrastructure and amenities, while the RERA amenity-status data records several items as available but reports 0% progress for every listed item. “Available” in that status field is not independent confirmation of completed delivery. RERA amenities
| Facility | Organized open space / park |
|---|---|
| Description / size | 3,267.76 sq.mt; 9.08% of total net layout in the layout-plan extraction |
| Declared progress / verified status | Listed as available; reported progress 0%; completion not independently verified RERA amenities |
| Facility | Green strip / tot lot / park |
|---|---|
| Description / size | Area not separately stated in amenity-status data |
| Evidence source | RERA amenities |
| Declared progress / verified status | Listed as available; reported progress 0%; completion not independently verified |
| Facility | Social infrastructure land |
|---|---|
| Description / size | 904.44 sq.mt; 2.51% of total net layout in the layout-plan extraction |
| Declared progress / verified status | Land allocation shown; delivery or handover not verified |
| Facility | Social infrastructure and possible community uses |
|---|---|
| Description / size | Tentative approval lists pharmacy, clinic, school, play school, crèche, dispensary and convenient shops; no individual facility size is stated |
| Declared progress / verified status | Approval-condition list; no evidence that these facilities are built or operational |
| Facility | Utility area |
|---|---|
| Description / size | 364.28 sq.mt; 1.01% of total net layout in the layout-plan extraction |
| Declared progress / verified status | Land allocation shown; delivery or handover not verified |
The tentative approval requires the applicant to develop and hand over open space, social infrastructure, utilities and roads as specified in its conditions. It also lists works such as avenue planting and fencing of open spaces; the supplied evidence does not independently verify completion.
7. Utilities, building services & safety
The tentative layout approval identifies utility land and calls for water supply, sewerage disposal, storm-water/drain works, rainwater-harvesting pits, street lighting and electricity facilities. It also requires an overhead tank or sump and septic tank, as applicable, and refers to utility uses such as a water reservoir, septic tank/sewerage treatment plant, electric transformer and solid-waste management. These are approval conditions or listed proposed works; the supplied record does not confirm capacities, commissioning, or completed operation. RERA amenities
| Supplied evidence | Approval conditions refer to protected water supply and an overhead tank or sump; utility descriptions include a water reservoir. A third-party vendor record lists borewell water supply, but this is not a TG-RERA filing Promoter website |
|---|---|
| Status limitation | Source, capacity, storage and operational status are not established by the supplied RERA records |
| Supplied evidence | Approval conditions refer to drains, nala channelization, sewerage disposal and a septic tank, as applicable; utility descriptions also mention a septic tank/STP |
|---|---|
| Status limitation | No verified system capacity, commissioning or reuse information supplied |
| Supplied evidence | The amenity record lists storm-water drains and water conservation/rainwater harvesting; approval conditions call for rainwater-harvesting pits RERA amenities |
|---|---|
| Status limitation | Listed requirements/features; no completion verification supplied |
| Supplied evidence | Approval conditions call for electricity facilities and list an electric transformer; the amenity record includes an electrical meter room/sub-station/receiving station RERA amenities |
|---|---|
| Status limitation | Supply capacity and completion status not disclosed |
| Supplied evidence | Utility descriptions and amenity records refer to solid-waste management and disposal RERA amenities |
|---|---|
| Status limitation | No process, capacity or completed-status evidence supplied |
| Supplied evidence | The amenity record includes fire-protection and fire-safety requirements; the supplied material does not describe a specific fire system, accessible circulation or completed clearances RERA amenities |
|---|---|
| Status limitation | No project-specific system details or compliance verification supplied |
8. Location, access & connectivity
The registered project location is PONNALA, SIDDIPET (URBAN), Siddipet, 502277, in survey numbers 205 and 206. The layout approval refers to Ponnal/Ponnala Revenue Village and identifies internal roads, existing and proposed roads, and a road-widening area. It requires roads to be opened for access to neighbouring sites. RERA record
A supplied location record measures the nearest sampled Outer Ring Road interchange at approximately 63.6 km from the cadastral parcel centroid. This is a measured distance in the supplied location data; no travel time is provided. Location record
9. Developer & development status
The registered promoter is M/s MAREECHI HOMES, identified in the RERA filing as a partnership. The filing names KOMATIREDDY ADI REDDY as a partner and GANGAM INDRA SENA REDDY as authorized signatory. The supplied corporate identifier is GSTIN 36ACCFM1782B1ZI. RERA record RERA filing Corporate record Parties record
A Form B declaration filed for the project states a completion undertaking of 22.05.2026. The RERA project header separately gives a proposed completion date of 15/03/2027; both are reproduced as recorded, without treating either date as proof of construction progress. The registration certificate states validity through 15/11/2026, unless extended. No independently verified construction progress or completion certificate is supplied. RERA record RERA amenities
10. Approvals, official records & documents
| Record | Details |
|---|---|
| TG-RERA registration | Form C certificate for MAREECHI HOMES PRR, registration P01300009549, valid 15/11/2024–15/11/2026 unless extended |
| Tentative layout approval | SIUDA Urban Development Authority; approval No. 423187/LP/GP/206957/0032/2024, dated 15-11-2024; covers survey numbers 205 and 206 |
| Filed layout plan | Layout-plan details identify File No. TS/041788/2024, 124 individual sub-plots and road/open-space/social-infrastructure/utility allocations |
| Layout drawing | Two layout sheets are recorded; plot count and size readings are drawing-derived and should be checked against the drawing Layout record |
| Form B declaration | Project declaration by M/s MAREECHI HOMES, dated 24 March 2025 in the extraction; includes a completion undertaking of 22.05.2026 |
| Occupancy / completion records | No occupancy or completion certificate is identified in the supplied project documents Document index |
1. Project at a glance
Project identity
Registered project name: MAREECHI HOMES PRR
Project type: Plotted development / plotted layout
Phase or registered portion: Phase not disclosed; registration is for the project identified as MAREECHI HOMES PRR
TG-RERA registration number: P01300009549
Registration validity: 15/11/2024 to 15/11/2026, unless extended by the Authority
Registered promoter: M/s MAREECHI HOMES; partnership
RERA status: Registered; the supplied certificate states a two-year validity period
Land and geographic identity
Locality / revenue village: PONNALA; the layout approval also calls it Ponnal Revenue Village
Mandal: SIDDIPET (URBAN)
District: Siddipet
PIN: 502277
Project survey numbers: 205 and 206
Subdivisions: The registration and layout records identify the land at survey-number level only; project-specific subdivisions are not disclosed in those records
Registered layout area: 36,555.49 sq.mt stated in the layout-plan extraction; its area statement separately records total net layout as 35,988.75 sq.mt
RERA land figures: Total area 35,988.75 sq.mt; area affected by road widening/FTL of tanks/nala widening 566.77 sq.mt; net area 35,421.98 sq.mt
Boundaries: East: OTHER LAND; West: OTHERS LAND; North: OTHERS LAND; South: OTHERS LAND
Development identity
Sanctioning authority: SIUDA Urban Development Authority is identified on the tentative layout approval; the RERA filing also records DTCP as the authority
Principal approval: Tentative Layout Plan No. 423187/LP/GP/206957/0032/2024, dated 15-11-2024
Layout plan / file reference: File No. TS/041788/2024 appears in the filed layout-plan extraction
Plot count: 124 plots in the layout records
Approved built-up area: 0.00 proposed built-up area, with and without parking, in the layout-plan extraction; this is a plotted layout, not a building scheme in that record
Building count and floor configuration: Not disclosed in the supplied RERA project records; no building floors or building configuration are established
Parking: The layout-plan extraction records 0.00 common parking area; individual plot or dwelling parking provision is not disclosed
Offering and status
Offering: Plots; the layout schedule is reported as containing 124 plots
Plot sizes: Software-measured from the approved layout drawing: 96.75–408.3 sq.m (smallest to largest); median 158.78 sq.m. These are drawing-derived measurements, not a RERA-filed unit schedule
Booked / available plots: Counts not supplied
Construction / development stage: The supplied record identifies a tentative layout approval and lists infrastructure works to be carried out; no independently verified site-progress figure is supplied
Completion timing: The RERA header states proposed completion 15/03/2027. A Form B declaration in the supplied documents states 22.05.2026. The available evidence does not explain the relationship between these dates.
Registration validity vs completion: Registration validity is stated separately above; it is not a statement that development is complete
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied records. For this plotted layout, the available approval is a Tentative Layout Plan
2. The project story
MAREECHI HOMES PRR is registered as a plotted development in PONNALA village, Siddipet (Urban) Mandal, Siddipet district. The layout approval covers survey numbers 205 and 206 and provides for 124 plots, alongside internal roads, open space/park, utility land and social infrastructure. The approval is expressly a tentative layout approval; the supplied project records do not establish a completed final layout or independently verified completion of the infrastructure works.
The approval conditions contemplate infrastructure development—including roads, drains, avenue planting, street lighting, sewerage disposal and protected water supply—and require a work completion certificate from a Licensed Technical Person for approval of the Final Layout Plan. The documents supplied do not provide a verified percentage of work completed or confirm that a final layout or occupancy/completion certificate has been issued.
3. Master plan, architecture & building design
This is a plotted layout rather than a disclosed apartment or multi-storey building scheme. The approved-plan extraction gives a total net layout area of 35,988.75 sq.mt and allocates it as follows: 20,816.36 sq.mt plotted area (57.84%), 10,635.91 sq.mt roads (29.55%), 3,267.76 sq.mt organized open space/park (9.08%), 904.44 sq.mt social infrastructure (2.51%), and 364.28 sq.mt utility area (1.01%). The plan extraction also records 566.77 sq.mt as road-affected area.
The tentative layout approval separately states a layout area of Ac. 8.893 cents; 43042.509 Sq.Yds, with plotted area Ac5.144 cents 24896.367 Sq.Yds, roads Ac2.628 cents 12720.548 Sq.Yds, open space Ac0.807 cents 3908.241 Sq.Yds, utilities Ac 0.09cents 435.679 Sq.Yds, and social infrastructure Ac 0.223 cents 1081.71 Sq.Yds.
The plan labels internal roads 9.14MT WIDE INTERNAL ROAD and 12.00MT WIDE INTERNAL ROAD, and also identifies existing/proposed roads and a road-widening strip. The approval requires roads to remain accessible to neighbouring sites and calls for open-space, social-infrastructure, utility and road areas to be handed over by registered gift deed before release of the final layout. No building footprints, floor plans, building heights, or residential/commercial built-up areas are disclosed.
The drawing-derived layout schedule reports 124 plots, with sizes read by software from the drawing. It groups the plots into these measured size bands: 13 plots in 100–150 sq.yd, 55 in 150–200 sq.yd, 51 in 200–250 sq.yd, 1 in 250–300 sq.yd, 2 in 300–400 sq.yd, and 2 in 400–500 sq.yd. The source notes that plot count and sizes should be verified against the drawing.
4. Homes, configurations & floor plans
The offering shown by the project records is plotted land, not apartments. The supplied RERA material does not provide booked or available inventory by plot number, nor a RERA-filed plot-size schedule. The drawing-derived schedule covers 124 plots and gives the following size distribution; these are software-measured from the approved layout drawing, not RERA-filed saleable-area figures.
100–150: 13
150–200: 55
200–250: 51
250–300: 1
300–400: 2
400–500: 2
The software-measured smallest, median and largest plot areas are 96.75 sq.m, 158.78 sq.m and 408.3 sq.m, respectively. These measurements should be checked against the approved drawing and are not apartment carpet-area measurements. The supplied records do not give plot-wise booking status or a unit-level saleable-area schedule.
5. Parking & vehicle circulation
The layout-plan extraction records 0.00 common parking area. The supplied documents do not establish a count of individual parking spaces, visitor or accessible spaces, a parking-allotment arrangement, or designated vehicle-entry and exit points. Internal road widths shown in the plan extraction include 9.14MT and 12.00MT internal roads; the tentative approval also requires roads to be opened for access to neighbouring sites.
6. Amenities, recreation & open spaces
The approved-plan extraction identifies open space/park, social infrastructure and utility land. The tentative approval lists proposed infrastructure and amenities, while the RERA amenity-status data records several items as available but reports 0% progress for every listed item. “Available” in that status field is not independent confirmation of completed delivery.
| Facility | Organized open space / park |
|---|---|
| Description / size | 3,267.76 sq.mt; 9.08% of total net layout in the layout-plan extraction |
| Declared progress / verified status | Listed as available; reported progress 0%; completion not independently verified |
| Facility | Green strip / tot lot / park |
|---|---|
| Description / size | Area not separately stated in amenity-status data |
| Declared progress / verified status | Listed as available; reported progress 0%; completion not independently verified |
| Facility | Social infrastructure land |
|---|---|
| Description / size | 904.44 sq.mt; 2.51% of total net layout in the layout-plan extraction |
| Declared progress / verified status | Land allocation shown; delivery or handover not verified |
| Facility | Social infrastructure and possible community uses |
|---|---|
| Description / size | Tentative approval lists pharmacy, clinic, school, play school, crèche, dispensary and convenient shops; no individual facility size is stated |
| Declared progress / verified status | Approval-condition list; no evidence that these facilities are built or operational |
| Facility | Utility area |
|---|---|
| Description / size | 364.28 sq.mt; 1.01% of total net layout in the layout-plan extraction |
| Declared progress / verified status | Land allocation shown; delivery or handover not verified |
The tentative approval requires the applicant to develop and hand over open space, social infrastructure, utilities and roads as specified in its conditions. It also lists works such as avenue planting and fencing of open spaces; the supplied evidence does not independently verify completion.
7. Utilities, building services & safety
The tentative layout approval identifies utility land and calls for water supply, sewerage disposal, storm-water/drain works, rainwater-harvesting pits, street lighting and electricity facilities. It also requires an overhead tank or sump and septic tank, as applicable, and refers to utility uses such as a water reservoir, septic tank/sewerage treatment plant, electric transformer and solid-waste management. These are approval conditions or listed proposed works; the supplied record does not confirm capacities, commissioning, or completed operation.
| Supplied evidence | Approval conditions refer to protected water supply and an overhead tank or sump; utility descriptions include a water reservoir. A third-party vendor record lists borewell water supply, but this is not a TG-RERA filing |
|---|---|
| Status limitation | Source, capacity, storage and operational status are not established by the supplied RERA records |
| Supplied evidence | Approval conditions refer to drains, nala channelization, sewerage disposal and a septic tank, as applicable; utility descriptions also mention a septic tank/STP |
|---|---|
| Status limitation | No verified system capacity, commissioning or reuse information supplied |
| Supplied evidence | The amenity record lists storm-water drains and water conservation/rainwater harvesting; approval conditions call for rainwater-harvesting pits |
|---|---|
| Status limitation | Listed requirements/features; no completion verification supplied |
| Supplied evidence | Approval conditions call for electricity facilities and list an electric transformer; the amenity record includes an electrical meter room/sub-station/receiving station |
|---|---|
| Status limitation | Supply capacity and completion status not disclosed |
| Supplied evidence | Utility descriptions and amenity records refer to solid-waste management and disposal |
|---|---|
| Status limitation | No process, capacity or completed-status evidence supplied |
| Supplied evidence | The amenity record includes fire-protection and fire-safety requirements; the supplied material does not describe a specific fire system, accessible circulation or completed clearances |
|---|---|
| Status limitation | No project-specific system details or compliance verification supplied |
8. Location, access & connectivity
The registered project location is PONNALA, SIDDIPET (URBAN), Siddipet, 502277, in survey numbers 205 and 206. The layout approval refers to Ponnal/Ponnala Revenue Village and identifies internal roads, existing and proposed roads, and a road-widening area. It requires roads to be opened for access to neighbouring sites.
A supplied location record measures the nearest sampled Outer Ring Road interchange at approximately 63.6 km from the cadastral parcel centroid. This is a measured distance in the supplied location data; no travel time is provided.
9. Developer & development status
The registered promoter is M/s MAREECHI HOMES, identified in the RERA filing as a partnership. The filing names KOMATIREDDY ADI REDDY as a partner and GANGAM INDRA SENA REDDY as authorized signatory. The supplied corporate identifier is GSTIN 36ACCFM1782B1ZI.
A Form B declaration filed for the project states a completion undertaking of 22.05.2026. The RERA project header separately gives a proposed completion date of 15/03/2027; both are reproduced as recorded, without treating either date as proof of construction progress. The registration certificate states validity through 15/11/2026, unless extended. No independently verified construction progress or completion certificate is supplied.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for MAREECHI HOMES PRR, registration P01300009549, valid 15/11/2024–15/11/2026 unless extended
Tentative layout approval: SIUDA Urban Development Authority; approval No. 423187/LP/GP/206957/0032/2024, dated 15-11-2024; covers survey numbers 205 and 206
Filed layout plan: Layout-plan details identify File No. TS/041788/2024, 124 individual sub-plots and road/open-space/social-infrastructure/utility allocations
Layout drawing: Two layout sheets are recorded; plot count and size readings are drawing-derived and should be checked against the drawing
Form B declaration: Project declaration by M/s MAREECHI HOMES, dated 24 March 2025 in the extraction; includes a completion undertaking of 22.05.2026
Occupancy / completion records: No occupancy or completion certificate is identified in the supplied project documents
Frequently asked questions
Is MAREECHI HOMES PRR registered with Telangana RERA?
Yes. MAREECHI HOMES PRR is registered with the Telangana Real Estate Regulatory Authority as P01300009549; the registration status is New Project.
Who is the developer of MAREECHI HOMES PRR?
The promoter named in the RERA registration is M/s MAREECHI HOMES.
Where is MAREECHI HOMES PRR located?
MAREECHI HOMES PRR is in SIDDIPET, PONNALA, SIDDIPET (URBAN), Telangana (502277).
When will MAREECHI HOMES PRR be completed?
The promoter's proposed date of completion filed with RERA is 15/03/2027. This is the promoter's declaration, not a guarantee.
More projects in Ponnala