ARMONIA EXTENSION is a residential layout with housing / gated-community villa project in BUDVEL VILLAGE, Rajendranagar, Ranga Reddy. The registered promoter is OORJITA PROJECTS PVT LTD. The GHMC permit records a total site area of 114282.23 Sqmt and lists 132 dwelling units; villa types include Ground Floor + 2 Upper Floors and Proposed Ground Floor + 3 Upper Floors. The TG-RERA registration is P02400011122, and the proposed completion date is 06/05/2031.

More from Oorjita Projects Pvt Ltd · 2 projects →

01What we found

RegisteredTG-RERA - valid till 6 May 2031
49documents on file - each fact links to its page
2court cases on this project's land (survey 310, 311, 312, Budwel)
12items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from nobroker.inPhoto from nobroker.in
▦ View all 2 photos
Budwel, Rajendranagar, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameARMONIA EXTENSION RERA record
Project typeResidential; GHMC permit describes a layout with housing / gated-community villa project. RERA record RERA filing
Phase / registered portionRegistered portion is identified as parts of Survey Nos. 310/PART, 311/PART and 312/PART in Budwel. The filing identifies 39 proposed building units; the permit and drawings describe the wider villa scheme. RERA record
TG-RERA registrationP02400011122 Approvals record
Registration validity06/05/2026–06/05/2031; this is the registration period, not an occupancy certificate or evidence of completion. Approvals record
Registered promoterOORJITA PROJECTS PVT LTD RERA record
RERA statusRecorded as New Project; the registration certificate is issued. RERA record

Land and geographic identity

ItemRecord
Locality / revenue villageBUDVEL VILLAGE; the registration certificate spells the village Budwel. RERA record
Mandal / district / PINRajendranagar, Ranga Reddy, 500030. RERA record
Project survey numbers and subdivisions310/PART, 311/PART AND 312/PART (also written on the GHMC permit/drawings as 310/P, 311/P and 312/P). RERA record
Site areaGHMC permit: 114282.23 Sqmt total site area; 2377.15 Sq. Mtrs road-affected area; 111905.08 Sq. Mtrs net area.
Boundaries recorded in the project filingEast: PROPOSED 40 FEET ROAD; west: 100 FEET WIDE ROAD; north: ARMONIA PROJECT VILLAS; south: LAND IN SY NO 233 AND 232. RERA filing
Additional boundary description in a declarationA July 2026 declaration for “OORJITA ARMONIA X” describes its scheduled land as Acres 08-16.75 Gts out of total land measuring Acres 28-14 Gts in the same survey parts and village; its stated boundaries include land in Sy. Nos. 233, 232 and 313.

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal permit3697/GHMC/SWDL/RJN1/2026, dated 06/05/2026; described as a LAYOUT WITH HOUSING - REVISED PERMIT ORDER. Approvals record
Approved built-up areaTotal Sanctioned Built Up Area 95793.68 (as recorded in the permit; unit shown in the permit’s site-area context as Sq. Mtrs).
Building / unit scaleThe RERA filing records 39 proposed building units and 39 total building units as per approved plan. The GHMC permit extract separately states 132 dwelling units and lists villa types, as well as a clubhouse. RERA filing
Sanctioned floor configurationThe permit extract lists many villas as Ground Floor + 2 Upper Floors; some entries are Proposed Ground Floor + 3 Upper Floors. It also records CLUB HOUSE -01 as Revised Ground Floor + 2 Upper Floors.
Parking levels / provisionThe permit’s extracted parameters state Parking floor: Cellar 0 0; Stilt 0 0; U.Floors 0 0. A revised drawing lists Parking Area proposed 50.56 sq.m and the Type 10-A Villa 97 entry also records Existing Parking Area 50.56 sq.m.
Layout land-use statementThe drawing’s area statement assigns 66146.53 sq.m to plotted area, 4161.73 sq.m to amenities, 28013.49 sq.m to roads, 12319.70 sq.m to organized open space and 1263.69 sq.m to utility area, totalling 111905.08 sq.m.

Offering and status

ItemRecord
RERA-filed offeringsThe filing includes 2-bedroom entries, a 3 BEDROOMS BALCONY entry, and additional unit rows filed as LIVING AND KITCHEN, GARAGE SERVANT ROOM and GARAGE AND SERVANT. The latter labels are reproduced as filed; the supplied data does not classify them further. RERA unit table
RERA-filed count and availabilityThe normalized RERA record lists 150 total units, all shown as available and none booked in the portal extract. Its booking data has no recorded as-of date and should be treated as indicative. RERA unit table
RERA-filed saleable areaFor normalized 2-bedroom units: 206.92–242.3 sq.m; 3-bedroom: 255.83 sq.m. The remaining filed home rows span 214.27–249.22 sq.m. These are saleable-area figures, not carpet-area measurements. RERA unit table RERA unit table
Construction stageRERA header describes the project as New Project. No independently verified site-progress measurement is supplied. RERA record
Completion dateGHMC permit says construction is to be completed before 06/05/2031; the Form B declaration also undertakes completion on or before 06/05/2031.
Occupancy / completion certificateNo project occupancy or completion certificate is supplied in this evidence. The permit requires a completion notice and occupancy certificate before occupation.

2. The project story

ARMONIA EXTENSION is registered as a residential project on parts of Survey Nos. 310, 311 and 312 at Budwel/Budvel Village, Rajendranagar Mandal, Ranga Reddy District. Its GHMC permit describes a gated-community housing development of villas, with a clubhouse and organized open space; the RERA-filed identity records 39 proposed building units, while the permit extract lists 132 dwelling units. These figures refer to different recorded fields and are not interchangeable. RERA record

The drawings show a mix of villa types and orientations, including east-facing, west-facing and a north-facing type, with entries for ground plus two upper floors and proposed entries for ground plus three upper floors. The wider layout drawing also depicts internal roads, tot-lots, utility areas and a clubhouse. These are plan/document features, not confirmation that construction or amenities have been completed.

The RERA record labels this a new project, and the supplied materials do not provide a verified construction-progress assessment or an occupancy certificate. The GHMC permit and promoter’s Form B declaration state a completion deadline of 06/05/2031. Registration remains valid through 06/05/2031; registration validity should not be read as proof of completion or permission to occupy. RERA record

3. Master plan, architecture & building design

The GHMC permit records a total site area of 114282.23 Sqmt, a road-affected area of 2377.15 Sq. Mtrs, and net area of 111905.08 Sq. Mtrs. It records total sanctioned built-up area of 95793.68. The layout drawing’s own net-area statement distributes 66146.53 sq.m to plotted area, 4161.73 sq.m to amenities, 28013.49 sq.m to roads, 12319.70 sq.m to organized open space and 1263.69 sq.m to utility area.

The permit and revised drawings depict individually numbered villas in multiple types, generally with ground and two upper floors, and some proposed types with ground and three upper floors. The extracted permit lists a CLUB HOUSE -01 with ground plus two upper floors. The supplied material does not establish a uniform tower arrangement, apartment-floor count, lifts or stairs count, or a building-footprint schedule.

The site plan records internal road widths including 18m, 30m, 12m, 11.96m, 12.05m, 11.98m, 9m and 20m; it also identifies existing and proposed roads. These are drawing labels and should be read with the relevant plan sheets.

The area figures in the plan materials have distinct meanings: the permit’s Total Sanctioned Built Up Area 95793.68 is the sanctioned project built-up figure; the layout’s land-use figures describe site allocation; and villa-specific gross/net BUA entries in revised drawings are individual-plan measurements. None of these is the same as RERA saleable area or carpet area.

4. Homes, configurations & floor plans

The RERA filing lists 2-bedroom and 3-bedroom entries, alongside rows whose filed labels are LIVING AND KITCHEN, GARAGE SERVANT ROOM and GARAGE AND SERVANT. The evidence does not provide a RERA classification for those three labels, so they are shown separately as filed rather than interpreted as conventional bedroom configurations. Counts and bookings below are portal-derived; no as-of date is supplied. RERA unit table RERA unit table

Configuration / filed labelUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading
2-bedroom entries (four filed variants)72072206.92–242.3 sq.mDrawing-based 2BHK measurement: 206.4 sq.m for one measured designNot supplied
3 BEDROOMS BALCONY202255.83 sq.mNot suppliedNot supplied
LIVING AND KITCHEN38038214.27 sq.mNot suppliedNot supplied
GARAGE SERVANT ROOM34034236.8 sq.mNot suppliedNot supplied
GARAGE AND SERVANT404249.22 sq.mNot suppliedNot supplied

The measured 2BHK carpet figure comes from software measurement of one drawing design in document 724915 and is not a RERA disclosure. The drawing measurement identifies living room, bedroom, kitchen, dressing and toilet spaces; it separately marks a sit-out, open-to-air balcony and utility area as excluded from carpet area. RERA saleable area includes more than the measured carpet footprint, including a share of common areas; no loading figure is supplied. Measurements are software-derived and require checking against the drawings. RERA unit details Floor plans

A separate drawing-only measurement identifies 1BHK plans in the submitted drawings, with measured carpet areas of 114.8–188.9 sq.m (median 137.4 sq.m) across nine designs. The supplied RERA normalized configuration record does not list 1BHK as a filed configuration, and no RERA unit count or saleable-area figure for 1BHK is established here. RERA unit details Floor plans

5. Parking & vehicle circulation

The permit extract records Cellar 0 0; Stilt 0 0; U.Floors 0 0 under parking-floor parameters. A revised plan lists Parking Area proposed 50.56 sq.m; it also identifies a surface-parking area at the clubhouse in the drawing text, but the supplied material does not establish a complete sanctioned parking-space count, visitor/accessible allocation, or unit-by-unit parking entitlement.

The GHMC conditions state that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not partitioned or converted; however, the permit’s extracted parking-level values are zero. The permit also refers to site entry and exit provision with minimum width 4.5mts. and height clearance 5mts. A drawn parking bay or parking-area label does not, by itself, establish exclusive ownership or allocation to a particular villa.

6. Amenities, recreation & open spaces

The GHMC permit records Amenities 3128.94 and Tot Lot (m2) 12319.7. The layout drawing separately records 4161.73 sq.m as amenities plot area and 12319.70 sq.m as organized open space. These are plan-recorded land/building categories; no independent completion verification is supplied.

Clubhouse / indoor
FacilityClubhouse
Description / sizePermit lists CLUB HOUSE -01; revised plan lists clubhouse area 1191.68 sq.m and an altered clubhouse gross BUA of 3149.66 sq.m.
Evidence sourcePermit and revised plan
Declared progress / verified statusShown in plan records; completion not independently verified.
Clubhouse / indoor
FacilityMultipurpose hall, cafeteria, fitness centre, indoor games, grocery store/pharmacy, community bar, PHC toilet
Description / sizeNamed in the clubhouse plan extract; no separate verified delivery status supplied.
Evidence sourceRevised drawing
Declared progress / verified statusPlan-listed; completion not independently verified.
Clubhouse / indoor
FacilityCovered swimming pool
Description / sizeNamed in the revised drawing’s amenity list.
Evidence sourceRevised drawing
Declared progress / verified statusPlan-listed; completion not independently verified.
Sports / recreation
FacilityIndoor badminton courts and squash court
Description / sizeNamed in the drawing’s amenity list; no size or count supplied.
Evidence sourceDrawing
Declared progress / verified statusPlan-listed; completion not independently verified.
Landscape / open space
FacilityOrganized open space / tot-lots
Description / sizeLayout statement records 12319.70 sq.m organized open space; drawing text also identifies tot-lot areas including 740.70 sq.m, 1592.60 sq.m, 5313.10 sq.m and 336.20 sq.m.
Evidence sourceLayout and drawing extracts
Declared progress / verified statusPlan-recorded; completion not independently verified.
Convenience / community
FacilityCommunity buildings
Description / sizeRERA amenity record marks community buildings as available, with recorded progress 0. RERA amenities
Evidence sourceTG-RERA amenity record
Declared progress / verified statusPortal indicates provision; progress shown as 0, not verified complete.

The GHMC permit condition states that the tot-lot is to be fenced and maintained as greenery before issue of the occupancy certificate.

7. Utilities, building services & safety

The revised layout drawing labels STP-215KLD, treated-water and raw-water sumps of 180 KLD, a rain-water sump of 400 KLD, a pump room, storm-water drains, transformer yard, main electrical room, garbage collection, and 810KVA ACOUSTIC DG SET-1 and 810KVA ACOUSTIC DG SET-2. These are drawing labels; the supplied evidence does not establish installation or operational status.

The RERA amenity record marks water supply, sewerage, water conservation/rainwater harvesting, street lighting and electrical meter room/sub-station/receiving station as available, while recorded progress values are 0. The GHMC permit requires a rainwater-harvesting structure (percolation pit), transformer space, garbage house and generator as an alternate electricity source. RERA amenities

The permit also specifies fire/life-safety conditions including emergency lighting in common passages and staircases, fire extinguishers, a manual alarm system, hose reel/downcomer, and water-storage tanks stated as 25,000 lts. underground and 25,000 lts. terrace storage for residential buildings. These are permit conditions, not confirmation that systems have been installed or tested. The evidence does not establish lift quantities/capacities, accessibility provisions, CCTV installation, or independently verified safety clearances.

8. Location, access & connectivity

The registered location is Budwel, Rajendranagar, Ranga Reddy, 500030, on parts of Survey Nos. 310/PART, 311/PART AND 312/PART. RERA record

The project filing records east and west road boundaries as PROPOSED 40 FEET ROAD and 100 FEET WIDE ROAD. The GHMC drawings show road labels including 18m, 30m, 12m, 11.96m, 12.05m, 11.98m, 9m and 20m. The supplied location data gives the Rajiv Gandhi Intl Airport at 9.7 km from the project location point. RERA filing Location record

9. Developer & development status

The registered legal promoter is OORJITA PROJECTS PVT LTD, a company. The corporate record gives CIN: U45201TG2001PTC036533 and GSTIN: 36AAACO4555H1ZF. The project record identifies VEER PRAKASH as managing director/authorized signatory. The supplied registration certificate lists the promoter address as KHAIRTABAD, District: Hyderabad, Pin: 500034; the promoter information record separately gives an address at Sri Krishna Apartments, Road No. 6, Budvel Village, Rajendranagar, Ranga Reddy, 500030. No official website or project contact details are supplied. Corporate record Parties record

The project is recorded as a new registration, with a completion deadline of 06/05/2031. A Form B affidavit dated 29-05-2026 declares completion on or before that date and states that 70% of amounts realized from allottees will be deposited in a separate scheduled-bank account for construction and land cost, with withdrawals certified by an engineer, architect and chartered accountant. These are promoter undertakings, not independently verified performance. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02400011122; valid 06/05/2026–06/05/2031
What it establishes in this overviewRegistration of ARMONIA EXTENSION and the registered land identifiers.
GHMC revised permit order
Identifier / date3697/GHMC/SWDL/RJN1/2026; 06/05/2026
What it establishes in this overviewConditional GHMC sanction for a layout-with-housing residential gated-community project on Survey Nos. 310/P, 311/P and 312/P.
GHMC application/file reference
Identifier / date011217/GHMC/05036/SWDL/CHR1/2025-REV
What it establishes in this overviewFile/application reference reproduced in the permit and plan extracts.
Revised layout/site drawings
Identifier / dateDocuments 724914, 724915, 724916, 724917
What it establishes in this overviewVilla types, road and land-use information, clubhouse and utility labels; drawing extracts should be read as plan evidence and not as proof of completed works.
GHMC proceedings references in drawings
Identifier / date1/C11/07396/2021 (ARMONIA) and 3697/GHMC/SWDL/RJN1/2026 (ARMONIA EXTENSION)
What it establishes in this overviewReferences printed on layout drawing extracts.
Form B declaration
Identifier / dateDated 29-05-2026
What it establishes in this overviewPromoter’s declarations on title, encumbrance, project-fund account and completion deadline.
Title / development documents
Identifier / dateTitle report 725189; development agreement-cum-GPA 13561/2016; supplementary agreement records 724908 and 724937
What it establishes in this overviewFiled land-title and development-rights material; detailed title analysis belongs in the Land & Title section.
Occupancy / completion certificate
Identifier / dateNot supplied in the reviewed evidence
What it establishes in this overviewNo OC or completion certificate is established here; the GHMC permit requires one before occupation.

Frequently asked questions

Is ARMONIA EXTENSION registered with Telangana RERA?

Yes. ARMONIA EXTENSION is registered with the Telangana Real Estate Regulatory Authority as P02400011122; the registration status is New Project.

Who is the developer of ARMONIA EXTENSION?

The promoter named in the RERA registration is OORJITA PROJECTS PVT LTD.

Where is ARMONIA EXTENSION located?

ARMONIA EXTENSION is in BUDVEL VILLAGE, Budwel, Rajendranagar, Rangareddy, Telangana (500030).

When will ARMONIA EXTENSION be completed?

The promoter's proposed date of completion filed with RERA is 06/09/2031. This is the promoter's declaration, not a guarantee.