Villa Verde By Cybercity Phase2
CYBERCITY BLUE EDGE LLP · Medchal-Malkajgiri · RERA P02200010343
VILLA VERDE BY CYBERCITY PHASE2 is a residential villa project in IDL, Kukatpally mandal, Medchal-Malkajgiri district. It is being developed by registered promoter CYBERCITY BLUE EDGE LLP on a RERA-filed site extent of 54,138.93 sq m; the GHMC permit records 90 buildings and 2168 dwellings, while the Phase 2 RERA filing lists 3 4BHK units and 0 5BHK units. The project is registered under TG-RERA number P02200010343, and the project header gives proposed completion as 09/02/2028.
More from Cybercity Blue Edge LLP · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | VILLA VERDE BY CYBERCITY PHASE2 RERA record |
| Project type and registered portion | Residential villa project; registered portion is identified as Phase 2. RERA record |
| TG-RERA registration | P02200010343 RERA record |
| Registration validity | 09/10/2024 to 09/10/2027. This is the registration period, not a completion certificate or proof of completion. RERA record |
| Registered promoter | CYBERCITY BLUE EDGE LLP, an LLP. RERA record Corporate record |
| RERA status | Recorded as New Project; registration certificate is in the supplied record. RERA record Approvals record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Locality: IDL; the RERA header records village Idl. The GHMC permit and filed drawings identify Baghameer and Kukatpally (V), respectively. RERA record RERA filing |
| Mandal / district / PIN | Kukatpally mandal; Medchal-Malkajgiri district; 500072. RERA record RERA filing |
| Project survey numbers | 1011/1, 1011/2 and 1011/12. The GHMC permit prints the corresponding parcel descriptions as 1011/P, 1011/2P and 1011/12P. RERA record Land records |
| RERA-filed site extent | 54,138.93 sq m; total and net area are recorded as the same in the RERA land details. RERA filing Land records |
| Drawing-stated boundary | East: 100 FEET ROAD; west, north and south: NEIGHBOURS LAND. RERA filing |
| Plan approval identifier | 3079/GHMC/KPL/2024-LO. RERA record Approvals record |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal layout-with-housing-permit order | 3079/GHMC/KPL/2024-LO, dated 09 October, 2024. Approvals record |
| Approved site area | 54,138.93 m2. |
| Approved built-up area | The permit records Total Sanctioned Built Up Area: 54821.38. The filed drawings separately state total proposed built-up area excluding parking 51825.38 and including parking 54176.76. These are distinct drawing figures and should not be treated as interchangeable measures. |
| Building / dwelling counts | GHMC permit extraction records 90 buildings and 2168 dwellings. This permit-level count is not the same as the unit count in the Phase 2 RERA filing. |
| Typical sanctioned configuration | The permit/drawings show individual residential buildings with ground and upper floors; drawing labels include ground, first, second and terrace floors. The clubhouse is shown with a cellar/basement, ground and three upper floors; building heights shown include 10, 12 and 14.85 MT. |
| Parking levels / count | Parking is shown in sanctioned-plan figures, including proposed built-up area “including parking”; a reliable total number of parking spaces or allocation schedule is not provided in the supplied record. |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configurations | 4BHK: 3 units; 5BHK: 0 units. RERA unit table RERA unit details |
| RERA-filed saleable area | For the 4BHK units: 911.7 sq m each as recorded. No saleable area is supplied for the 5BHK row. RERA unit table RERA unit table |
| Booked / available | 4BHK: 0 booked, 3 available; 5BHK: 0 booked, 0 available. Portal counts have no supplied as-of date and are indicative only. RERA unit table RERA unit table |
| Construction stage | No independently verified site-progress measurement is supplied. The GHMC permit and drawings describe proposed development; the approval extraction records completion as not certified. |
| Completion dates | Promoter’s Form B declaration states completion by 9th October, 2027; the project header gives proposed completion as 09/02/2028. These are recorded separately here, without a source comparison or a conclusion about which governs. RERA record |
| Occupancy certificate (OC) | No OC or completion certificate is supplied; the approval extraction records completion as not certified. The GHMC permit states an OC is compulsory before occupation. |
2. The project story
Villa Verde by Cybercity Phase 2 is registered as a residential villa project on land identified in the RERA record as Survey Nos. 1011/1, 1011/2 and 1011/12, at IDL, Kukatpally, Medchal-Malkajgiri. The filed GHMC permit describes a gated-community layout with housing, and the drawings show a planned arrangement of villa plots, internal roads, open space, utility land and a clubhouse. RERA record Land records
For the registered Phase 2 offering, the RERA unit record lists three 4BHK units, all shown as available, and no 5BHK units. This is the portal’s last-read inventory information; it carries no as-of date. The broader GHMC permit extraction contains a separate layout-level count of 90 buildings and 2168 dwellings. The supplied record does not establish that these are Phase 2 sale units. RERA unit table RERA unit table
The drawings and permit describe proposed works, but the supplied evidence does not give independently verified construction progress. No occupancy or completion certificate is included; therefore, the record supports describing the development as proposed/uncertified, not as completed or occupancy-certified.
3. Master plan, architecture & building design
The GHMC-filed layout plan identifies a site area of 54,138.93 m2 and a net layout area of 54,138.93 m2. Its land-use statement allocates 29,227.45 m2 (53.99%) to plots, 17,523.89 m2 (32.37%) to roads, 5,486.23 m2 (10.13%) to organized open space/park, 1,339.23 m2 (2.47%) to amenity area and 562.20 m2 (1.04%) to utility area. These are figures printed in the submitted drawing, not independently surveyed measurements.
The drawings state 90 individual sub-plots. The project-level layout extraction reports 90 plots, but only 88 plot sizes were read by software; the extracted size range is 248.29–487.92 sq m, with a median of 296.35 sq m. These drawing-derived plot measurements and count should be checked against the approved drawing. Layout record
The permit and drawings depict detached residential buildings on villa plots, generally with ground, first and second floors and a terrace; the clubhouse drawing shows a cellar/basement, ground and three upper floors. The supplied permit extraction gives building heights of 10, 12 and 14.85 MT. It also records total proposed built-up area excluding parking as 51825.38, including parking as 54176.76, and a total sanctioned built-up-area figure of 54821.38. The record does not identify these as carpet area or saleable area; they are presented as labelled in their respective permit/drawing extracts.
The layout drawing shows internal roads labelled 12.00 mt. and 18.00 mt. wide, and the site plan labels a 30.00MT WIDE MAINROAD. The sanction also lists a 4.5m driveway and requires one entry and one exit with a minimum width of 4.5mts. and height clearance of 5mts.
4. Homes, configurations & floor plans
The RERA filing records three 4BHK units and zero 5BHK units. RERA saleable area is supplied for the 4BHK configuration only. No reliable RERA-filed carpet area, room schedule or loading figure is available for these registered units. RERA unit table RERA unit details RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 4BHK | 3 | 0 | 3 | 911.7 sq m | Not supplied for this RERA configuration | Not supplied |
| 5BHK | 0 | 0 | 0 | Not supplied | Not supplied | Not supplied |
Floor-plan software extraction reports a 1BHK design measurement from drawing 616694: median carpet area 491.2 sq m (5287 sq ft), from one measured design. This is a software measurement from drawing geometry, not a RERA-filed configuration or RERA area disclosure; the extraction flags it for review. The supplied material does not establish it as part of the Phase 2 RERA offering. Floor plans RERA unit details
Carpet area and saleable area are different measures: the supplied floor-plan note describes saleable area as including the home’s share of common areas, while the drawing-based carpet measurement is a software extraction requiring review. Do not infer a loading percentage or use the measured drawing figure as the RERA area. Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC drawing includes parking within its built-up-area accounting and states that cellar/stilt areas approved for parking must be used exclusively for vehicle parking. The drawing extraction does not establish a dependable total number of parking spaces, visitor or accessible spaces, or unit-wise parking allocations. A drawn parking bay does not by itself establish an allottee’s exclusive entitlement.
The plan also identifies a vehicular ramp measuring 20.00 mt. long, 2.40 mt. high and 5.40 mt. wide. The sanction calls for one entry and one exit, each with a minimum width of 4.5mts. and height clearance of 5mts. No EV-charging provision or legally documented unit parking allocation is established by the supplied project record.
6. Amenities, recreation & open spaces
The filed GHMC layout drawings and permit identify the following facilities. Their appearance in the plans records proposed or sanctioned provision; it does not establish that they are complete or independently verified. The RERA amenity list marks entries as available but records 0% progress for each listed item. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse | Shown as a proposed amenity building; drawings label cellar/basement, ground and three upper floors. | Planned in drawings; completion not certified. | |
| Swimming pool | Listed in the filed drawing extraction; no size or capacity supplied. | No completion verification supplied. | |
| Indoor games / association uses | Drawing extraction lists indoor games, billiards, yoga/meditation hall and association room; no areas supplied. | No completion verification supplied. | |
| Badminton and squash courts | Listed in the filed drawing extraction; no dimensions supplied. | No completion verification supplied. | |
| Tot-lot / organized open space | 5,486.23 m2 in the permit/layout record. | Planned provision; not independently verified complete. | |
| Green strip | Listed on the layout drawing. | No completion verification supplied. | |
| Community buildings | Marked “YES” in the RERA amenity record; no further description or size supplied. | RERA amenities | RERA record shows 0% progress. |
| Internal roads and footpaths | Marked “YES” in the RERA amenity record; road widths are also shown in the drawings. | RERA amenities | RERA record shows 0% progress. |
The project documents also list site utilities—water, sewerage, drainage, electrical and waste provisions—which are addressed in the next section rather than counted as recreational amenities. RERA amenities
7. Utilities, building services & safety
- Water and sewerage: A Hyderabad Metropolitan Water Supply & Sewerage Board feasibility certificate records willingness to provide water and sewerage connections for the proposed development, subject to later connection requirements and charges. It is a feasibility certificate, not evidence that connections have been installed. The filed drawings also list an STP/sewage treatment plant and pump house/motor room, without supplied capacity or completion evidence.
- Rainwater and drainage: GHMC permit conditions require a rainwater-harvesting structure/percolation pit. The layout permit extraction records No. of RWHPs: 0, while the drawings and permit conditions refer to rainwater harvesting. The supplied record does not establish installed systems or storage/harvesting capacity.
- Electrical supply and backup: The drawing extraction lists 500 KVA x 3 NOS DG AREA and 1000 KVA x 2 NOS TRANSFORMER - 120 SQM, and the permit requires transformer space. These are plan-recorded provisions, not evidence of installed or operational equipment.
- Fire and life safety: The drawings/permit conditions refer to fire-fighting installations, manually operated alarm systems, hose reels/down-comers, emergency lighting and automatic sprinklers in specified circumstances. The permit specifically requires an automatic sprinkler system in the cellar floor of the amenities block and an Occupancy Fire NOC before that block receives an OC. These are stated requirements; compliance and completion are not established here.
- Water storage: The drawing conditions specify a separate underground static water storage tank of 25,000 litres and a separate residential terrace tank of 25,000 litres. The record does not confirm installation.
- Waste and access: The drawings/permit list a garbage house and require construction-and-demolition waste to be transferred to a designated collection point. A gated-community layout is described in the permit; no project-specific CCTV, access-control equipment or operational security system is documented in the supplied record.
- Accessibility and lifts: No reliable project-specific accessible circulation or lift schedule, including lift number or capacity, is supplied. The permit’s general condition concerning facilities for physically handicapped persons applies to public and semi-public buildings above 300Sq.mts.; the record does not establish completed accessibility works.
8. Location, access & connectivity
The RERA project location is recorded as IDL, Kukatpally mandal, Medchal-Malkajgiri district, PIN 500072; the project survey identifiers are 1011/1, 1011/2 and 1011/12. The GHMC permit and filed layout drawings describe the site in relation to Baghameer/Kukatpally. RERA record RERA filing
The layout drawing identifies a 30.00MT WIDE MAINROAD and internal roads labelled 12.00 mt. and 18.00 mt. wide. The RERA-recorded location data supplies a distance of 1.2 km to Financial District (Nanakramguda). No verified travel time is supplied. Location record
9. Developer & development status
The registered promoter is CYBERCITY BLUE EDGE LLP, an LLP, with GSTIN 36AASFC8858J1ZK. The supplied promoter address is CYBERCITY, GREEN HILLS ROAS, IDL ROAD, IDL, Kukatpally, Medchal-Malkajgiri, 500072. The RERA certificate names Kiran Kumar Reddy Kesireddy as the promoter’s representative. Corporate record Parties record
The Form B affidavit is a promoter declaration signed by K. Kiran Kumar Reddy as authorised signatory on 30th day of September 2025. It declares completion by 9th October, 2027 and discloses a memorandum of deposit of title deeds in favour of M/s Piramal Trusteeship Services Private Limited.
The available materials do not provide independently verified construction progress or a completion certificate. The project header’s proposed completion date is 09/02/2028; the RERA registration remains separately recorded as valid through 09/10/2027. RERA record
10. Approvals, official records & documents
| Identifier / date | P02200010343; valid 09/10/2024–09/10/2027 |
|---|---|
| What the supplied record shows | Form C certificate for VILLA VERDE BY CYBERCITY PHASE2, naming CYBERCITY BLUE EDGE LLP as promoter and recording the project location and survey numbers. |
| Identifier / date | 3079/GHMC/KPL/2024-LO; 09 October, 2024 |
|---|---|
| What the supplied record shows | Permit extraction records site extent 54,138.93 m2, 90 buildings and 2168 dwellings, with conditions including OC before occupation. |
| Identifier / date | File TS/039154/2024; drawing approval date recorded as 24-07-2024 |
|---|---|
| What the supplied record shows | Filed layout/building-plan drawings show the 90-plot arrangement, area statement, roads, clubhouse and site provisions. |
| Identifier / date | File 2024-10-538; approval date extracted as 05:10.2024 |
|---|---|
| What the supplied record shows | Records willingness to provide water and sewerage connections subject to stated requirements; expressly does not confer title to land or structures. |
| Identifier / date | 30th day of September 2025 |
|---|---|
| What the supplied record shows | Promoter’s completion undertaking and disclosure of the memorandum of deposit of title deeds. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record shows | The available approval extraction records completion as not certified; no OC or completion certificate is included. |
1. Project at a glance
Project identity
Registered name: VILLA VERDE BY CYBERCITY PHASE2
Project type and registered portion: Residential villa project; registered portion is identified as Phase 2.
TG-RERA registration: P02200010343
Registration validity: 09/10/2024 to 09/10/2027. This is the registration period, not a completion certificate or proof of completion.
Registered promoter: CYBERCITY BLUE EDGE LLP, an LLP.
RERA status: Recorded as New Project; registration certificate is in the supplied record.
Land and geographic identity
Locality / revenue village: Locality: IDL; the RERA header records village Idl. The GHMC permit and filed drawings identify Baghameer and Kukatpally (V), respectively.
Mandal / district / PIN: Kukatpally mandal; Medchal-Malkajgiri district; 500072.
Project survey numbers: 1011/1, 1011/2 and 1011/12. The GHMC permit prints the corresponding parcel descriptions as 1011/P, 1011/2P and 1011/12P.
RERA-filed site extent: 54,138.93 sq m; total and net area are recorded as the same in the RERA land details.
Drawing-stated boundary: East: 100 FEET ROAD; west, north and south: NEIGHBOURS LAND.
Plan approval identifier: 3079/GHMC/KPL/2024-LO.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal layout-with-housing-permit order: 3079/GHMC/KPL/2024-LO, dated 09 October, 2024.
Approved site area: 54,138.93 m2.
Approved built-up area: The permit records Total Sanctioned Built Up Area: 54821.38. The filed drawings separately state total proposed built-up area excluding parking 51825.38 and including parking 54176.76. These are distinct drawing figures and should not be treated as interchangeable measures.
Building / dwelling counts: GHMC permit extraction records 90 buildings and 2168 dwellings. This permit-level count is not the same as the unit count in the Phase 2 RERA filing.
Typical sanctioned configuration: The permit/drawings show individual residential buildings with ground and upper floors; drawing labels include ground, first, second and terrace floors. The clubhouse is shown with a cellar/basement, ground and three upper floors; building heights shown include 10, 12 and 14.85 MT.
Parking levels / count: Parking is shown in sanctioned-plan figures, including proposed built-up area “including parking”; a reliable total number of parking spaces or allocation schedule is not provided in the supplied record.
Offering and status
RERA-filed configurations: 4BHK: 3 units; 5BHK: 0 units.
RERA-filed saleable area: For the 4BHK units: 911.7 sq m each as recorded. No saleable area is supplied for the 5BHK row.
Booked / available: 4BHK: 0 booked, 3 available; 5BHK: 0 booked, 0 available. Portal counts have no supplied as-of date and are indicative only.
Construction stage: No independently verified site-progress measurement is supplied. The GHMC permit and drawings describe proposed development; the approval extraction records completion as not certified.
Completion dates: Promoter’s Form B declaration states completion by 9th October, 2027; the project header gives proposed completion as 09/02/2028. These are recorded separately here, without a source comparison or a conclusion about which governs.
Occupancy certificate (OC): No OC or completion certificate is supplied; the approval extraction records completion as not certified. The GHMC permit states an OC is compulsory before occupation.
2. The project story
Villa Verde by Cybercity Phase 2 is registered as a residential villa project on land identified in the RERA record as Survey Nos. 1011/1, 1011/2 and 1011/12, at IDL, Kukatpally, Medchal-Malkajgiri. The filed GHMC permit describes a gated-community layout with housing, and the drawings show a planned arrangement of villa plots, internal roads, open space, utility land and a clubhouse.
For the registered Phase 2 offering, the RERA unit record lists three 4BHK units, all shown as available, and no 5BHK units. This is the portal’s last-read inventory information; it carries no as-of date. The broader GHMC permit extraction contains a separate layout-level count of 90 buildings and 2168 dwellings. The supplied record does not establish that these are Phase 2 sale units.
The drawings and permit describe proposed works, but the supplied evidence does not give independently verified construction progress. No occupancy or completion certificate is included; therefore, the record supports describing the development as proposed/uncertified, not as completed or occupancy-certified.
3. Master plan, architecture & building design
The GHMC-filed layout plan identifies a site area of 54,138.93 m2 and a net layout area of 54,138.93 m2. Its land-use statement allocates 29,227.45 m2 (53.99%) to plots, 17,523.89 m2 (32.37%) to roads, 5,486.23 m2 (10.13%) to organized open space/park, 1,339.23 m2 (2.47%) to amenity area and 562.20 m2 (1.04%) to utility area. These are figures printed in the submitted drawing, not independently surveyed measurements.
The drawings state 90 individual sub-plots. The project-level layout extraction reports 90 plots, but only 88 plot sizes were read by software; the extracted size range is 248.29–487.92 sq m, with a median of 296.35 sq m. These drawing-derived plot measurements and count should be checked against the approved drawing.
The permit and drawings depict detached residential buildings on villa plots, generally with ground, first and second floors and a terrace; the clubhouse drawing shows a cellar/basement, ground and three upper floors. The supplied permit extraction gives building heights of 10, 12 and 14.85 MT. It also records total proposed built-up area excluding parking as 51825.38, including parking as 54176.76, and a total sanctioned built-up-area figure of 54821.38. The record does not identify these as carpet area or saleable area; they are presented as labelled in their respective permit/drawing extracts.
The layout drawing shows internal roads labelled 12.00 mt. and 18.00 mt. wide, and the site plan labels a 30.00MT WIDE MAINROAD. The sanction also lists a 4.5m driveway and requires one entry and one exit with a minimum width of 4.5mts. and height clearance of 5mts.
4. Homes, configurations & floor plans
The RERA filing records three 4BHK units and zero 5BHK units. RERA saleable area is supplied for the 4BHK configuration only. No reliable RERA-filed carpet area, room schedule or loading figure is available for these registered units.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 4BHK | 3 | 0 | 3 | 911.7 sq m | Not supplied for this RERA configuration | Not supplied |
| 5BHK | 0 | 0 | 0 | Not supplied | Not supplied | Not supplied |
Floor-plan software extraction reports a 1BHK design measurement from drawing 616694: median carpet area 491.2 sq m (5287 sq ft), from one measured design. This is a software measurement from drawing geometry, not a RERA-filed configuration or RERA area disclosure; the extraction flags it for review. The supplied material does not establish it as part of the Phase 2 RERA offering.
Carpet area and saleable area are different measures: the supplied floor-plan note describes saleable area as including the home’s share of common areas, while the drawing-based carpet measurement is a software extraction requiring review. Do not infer a loading percentage or use the measured drawing figure as the RERA area.
5. Parking & vehicle circulation
The GHMC drawing includes parking within its built-up-area accounting and states that cellar/stilt areas approved for parking must be used exclusively for vehicle parking. The drawing extraction does not establish a dependable total number of parking spaces, visitor or accessible spaces, or unit-wise parking allocations. A drawn parking bay does not by itself establish an allottee’s exclusive entitlement.
The plan also identifies a vehicular ramp measuring 20.00 mt. long, 2.40 mt. high and 5.40 mt. wide. The sanction calls for one entry and one exit, each with a minimum width of 4.5mts. and height clearance of 5mts. No EV-charging provision or legally documented unit parking allocation is established by the supplied project record.
6. Amenities, recreation & open spaces
The filed GHMC layout drawings and permit identify the following facilities. Their appearance in the plans records proposed or sanctioned provision; it does not establish that they are complete or independently verified. The RERA amenity list marks entries as available but records 0% progress for each listed item.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Clubhouse | Shown as a proposed amenity building; drawings label cellar/basement, ground and three upper floors. | Planned in drawings; completion not certified. | |
| Swimming pool | Listed in the filed drawing extraction; no size or capacity supplied. | No completion verification supplied. | |
| Indoor games / association uses | Drawing extraction lists indoor games, billiards, yoga/meditation hall and association room; no areas supplied. | No completion verification supplied. | |
| Badminton and squash courts | Listed in the filed drawing extraction; no dimensions supplied. | No completion verification supplied. | |
| Tot-lot / organized open space | 5,486.23 m2 in the permit/layout record. | Planned provision; not independently verified complete. | |
| Green strip | Listed on the layout drawing. | No completion verification supplied. | |
| Community buildings | Marked “YES” in the RERA amenity record; no further description or size supplied. | RERA record shows 0% progress. | |
| Internal roads and footpaths | Marked “YES” in the RERA amenity record; road widths are also shown in the drawings. | RERA record shows 0% progress. |
The project documents also list site utilities—water, sewerage, drainage, electrical and waste provisions—which are addressed in the next section rather than counted as recreational amenities.
7. Utilities, building services & safety
- Water and sewerage: A Hyderabad Metropolitan Water Supply & Sewerage Board feasibility certificate records willingness to provide water and sewerage connections for the proposed development, subject to later connection requirements and charges. It is a feasibility certificate, not evidence that connections have been installed. The filed drawings also list an STP/sewage treatment plant and pump house/motor room, without supplied capacity or completion evidence.
- Rainwater and drainage: GHMC permit conditions require a rainwater-harvesting structure/percolation pit. The layout permit extraction records No. of RWHPs: 0, while the drawings and permit conditions refer to rainwater harvesting. The supplied record does not establish installed systems or storage/harvesting capacity.
- Electrical supply and backup: The drawing extraction lists 500 KVA x 3 NOS DG AREA and 1000 KVA x 2 NOS TRANSFORMER - 120 SQM, and the permit requires transformer space. These are plan-recorded provisions, not evidence of installed or operational equipment.
- Fire and life safety: The drawings/permit conditions refer to fire-fighting installations, manually operated alarm systems, hose reels/down-comers, emergency lighting and automatic sprinklers in specified circumstances. The permit specifically requires an automatic sprinkler system in the cellar floor of the amenities block and an Occupancy Fire NOC before that block receives an OC. These are stated requirements; compliance and completion are not established here.
- Water storage: The drawing conditions specify a separate underground static water storage tank of 25,000 litres and a separate residential terrace tank of 25,000 litres. The record does not confirm installation.
- Waste and access: The drawings/permit list a garbage house and require construction-and-demolition waste to be transferred to a designated collection point. A gated-community layout is described in the permit; no project-specific CCTV, access-control equipment or operational security system is documented in the supplied record.
- Accessibility and lifts: No reliable project-specific accessible circulation or lift schedule, including lift number or capacity, is supplied. The permit’s general condition concerning facilities for physically handicapped persons applies to public and semi-public buildings above 300Sq.mts.; the record does not establish completed accessibility works.
8. Location, access & connectivity
The RERA project location is recorded as IDL, Kukatpally mandal, Medchal-Malkajgiri district, PIN 500072; the project survey identifiers are 1011/1, 1011/2 and 1011/12. The GHMC permit and filed layout drawings describe the site in relation to Baghameer/Kukatpally.
The layout drawing identifies a 30.00MT WIDE MAINROAD and internal roads labelled 12.00 mt. and 18.00 mt. wide. The RERA-recorded location data supplies a distance of 1.2 km to Financial District (Nanakramguda). No verified travel time is supplied.
9. Developer & development status
The registered promoter is CYBERCITY BLUE EDGE LLP, an LLP, with GSTIN 36AASFC8858J1ZK. The supplied promoter address is CYBERCITY, GREEN HILLS ROAS, IDL ROAD, IDL, Kukatpally, Medchal-Malkajgiri, 500072. The RERA certificate names Kiran Kumar Reddy Kesireddy as the promoter’s representative.
The Form B affidavit is a promoter declaration signed by K. Kiran Kumar Reddy as authorised signatory on 30th day of September 2025. It declares completion by 9th October, 2027 and discloses a memorandum of deposit of title deeds in favour of M/s Piramal Trusteeship Services Private Limited.
The available materials do not provide independently verified construction progress or a completion certificate. The project header’s proposed completion date is 09/02/2028; the RERA registration remains separately recorded as valid through 09/10/2027.
10. Approvals, official records & documents
| Identifier / date | P02200010343; valid 09/10/2024–09/10/2027 |
|---|---|
| What the supplied record shows | Form C certificate for VILLA VERDE BY CYBERCITY PHASE2, naming CYBERCITY BLUE EDGE LLP as promoter and recording the project location and survey numbers. |
| Identifier / date | 3079/GHMC/KPL/2024-LO; 09 October, 2024 |
|---|---|
| What the supplied record shows | Permit extraction records site extent 54,138.93 m2, 90 buildings and 2168 dwellings, with conditions including OC before occupation. |
| Identifier / date | File TS/039154/2024; drawing approval date recorded as 24-07-2024 |
|---|---|
| What the supplied record shows | Filed layout/building-plan drawings show the 90-plot arrangement, area statement, roads, clubhouse and site provisions. |
| Identifier / date | File 2024-10-538; approval date extracted as 05:10.2024 |
|---|---|
| What the supplied record shows | Records willingness to provide water and sewerage connections subject to stated requirements; expressly does not confer title to land or structures. |
| Identifier / date | 30th day of September 2025 |
|---|---|
| What the supplied record shows | Promoter’s completion undertaking and disclosure of the memorandum of deposit of title deeds. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record shows | The available approval extraction records completion as not certified; no OC or completion certificate is included. |
Frequently asked questions
Is VILLA VERDE BY CYBERCITY PHASE2 registered with Telangana RERA?
Yes. VILLA VERDE BY CYBERCITY PHASE2 is registered with the Telangana Real Estate Regulatory Authority as P02200010343; the registration status is New Project.
Who is the developer of VILLA VERDE BY CYBERCITY PHASE2?
The promoter named in the RERA registration is CYBERCITY BLUE EDGE LLP.
Where is VILLA VERDE BY CYBERCITY PHASE2 located?
VILLA VERDE BY CYBERCITY PHASE2 is in IDL, Kukatpally, Medchal-Malkajgiri, Telangana (500072).
When will VILLA VERDE BY CYBERCITY PHASE2 be completed?
The promoter's proposed date of completion filed with RERA is 09/02/2028. This is the promoter's declaration, not a guarantee.