Abhi Avenue
ABHI CONSTRUCTIONS AND DEVELOPERS · Kamareddy · RERA P00200002096
ABHI AVENUE is a residential apartment project in Pakabanda / Pakabanda Bazaar, Khammam; the mandal is not disclosed, and the records state the district as Kamareddy. It is being developed by the registered promoter ABHI CONSTRUCTIONS AND DEVELOPERS on a site of 748.04 sq m, with one block of 1 Stilt + 5 upper floors and 20 dwelling units recorded as 2BHK and 2BHL, each with a filed saleable area of 97.5 sq m. Its TG-RERA registration is P00200002096, and the promoter’s Form-B declaration undertakes completion by 08/03/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | ABHI AVENUE RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | No separate phase name is disclosed. TG-RERA registration is for ABHI AVENUE; the filed land identity is Survey No. 35/E. Land records |
| TG-RERA registration | P00200002096 RERA record |
| Registration validity | Certificate states validity from 24/08/2020 to 08/03/2025, unless extended by the Authority. The supplied certificate records no extension. |
| Registered promoter | ABHI CONSTRUCTIONS AND DEVELOPERS RERA record Corporate record |
| RERA status | The supplied certificate establishes registration for the stated period. Current registration status is not established by the supplied record. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Pakabanda / Pakabanda Bazaar; locality is also recorded as Khammam. |
| Revenue village | Khammam is recorded in the project and land records; the plan identifies the site at Pakabanda. RERA record Land records |
| Mandal | Not disclosed in the supplied project land identity. Land records |
| District | Kamareddy is recorded in the project header and canonical identity; the filed building-plan documents identify Khammam District. RERA record Land records |
| PIN | 507019 RERA record |
| Project survey number and subdivision | 35/E RERA record Land records |
| Site extent | 748.04 sq m (also recorded as 748.04 m2); net area 748.04 m2. Road-affected area is recorded as 0. Land records |
| Boundaries in RERA filing | East: PLOT NO 1; West: ROAD WIDTH 12; North: PLOT NO F; South: PLOT NO C. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Khammam Municipal Corporation |
| Principal building-permit number / date | 3018/W11/2018/6229, dated 08 March, 2019 Approvals record |
| Drawing description | RCC-roof building with 1 Stilt + 5 upper floors, for residential use; shown on the filed plan for Survey No. 35/E. |
| Building count | One block / single block |
| Sanctioned floors and height | The plan records 6 floors, 1 Stilt + 5 upper floors, and building height 14.25 MT. It also separately prints “20.15 mt. Total Ht.”; its basis is not specified in the supplied extraction. |
| Approved built-up area | 2,367.83 sq m; the plan separately records Residential Net BUA 1,951.73 and Total Net Built up Area 1,984.86 Sq.mt. These are distinct figures as stated in the filed plan. RERA filing |
| Parking provision in plan | 6 proposed parkings; parking arrangement is described as stilt parking. |
| Unit count | 20 dwelling units in the building plan; TG-RERA unit records also show 20 units. RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configurations | 2BHK and 2BHL records, normalized in the project unit data as 2BHK; 20 units total. RERA unit table RERA unit details |
| RERA-filed saleable area | 97.5 sq m for each filed unit record. RERA unit table RERA unit details |
| Booked / available | Portal-derived unit record shows 0 booked and 20 available; the portal record has no as-of date, so these counts are indicative rather than a dated current inventory. RERA unit table |
| Construction stage | Current construction stage is not established by the supplied records. Document index |
| Completion deadline | Promoter’s Form-B declaration undertakes completion by 08/03/2025. The TG-RERA certificate records the same end date for registration validity; these are separate dates serving separate purposes. |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents. The building-permit order requires an application for an occupancy certificate after completion and before occupation. |
2. The project story
ABHI AVENUE is registered as a residential apartment project on the filed Survey No. 35/E land at Pakabanda, Khammam, with a stated site extent of 748.04 sq m. The municipal permission and accompanying building-plan records describe one RCC-roof residential block comprising stilt parking and five upper floors, with 20 dwelling units. RERA record Land records
The RERA unit record identifies 2BHK homes and shows 0 booked and 20 available, but does not provide an as-of date for those counts. The supplied project documents do not establish the present construction stage or that any portion has been completed or occupancy-certified. The promoter’s Form-B filing undertakes completion by 08/03/2025; this is a promoter declaration, not independent confirmation of construction or completion. RERA unit table
3. Master plan, architecture & building design
The filed building plan shows a single residential block on a site recorded as 748.04 sq m, with 1 Stilt + 5 upper floors and a stated building height of 14.25 MT. It records proposed coverage of 55.62% (416.07) and an approved built-up area of 2,367.83 sq m. The plan also gives separate values for residential net BUA (1,951.73), total net built-up area (1,984.86 Sq.mt.) and “TOTAL 6 FLOORS” (2,496.36 Sq mtr and 2,497.62 Sq mtr); the supplied extraction does not explain the bases of those additional area figures, so they should not be treated as interchangeable.
The plan describes the use as residential and depicts plot portions D, E and F in Survey No. 35/E. It also records a 6.00m LONG DRIVE WAY and road-width references of 12.00 and 12.00m. The supplied records do not establish a tower arrangement beyond the single block, a floor-by-floor unit schedule, lift or stair count, or a detailed common-area distribution.
4. Homes, configurations & floor plans
The TG-RERA unit data records 20 homes under 2BHK/2BHL entries, with filed saleable area of 97.5 sq m. Drawing-based measurements below are software-measured from the filed plan, not RERA-filed carpet-area disclosures; the measurement source identifies four measured 2BHK designs and says the drawing geometry needs review. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK (filed as 2BHK and 2BHL) | 20 | 0 | 20 | 97.5 sq m | 79.5–82.3 sq m; median 79.6 sq m | 18% |
The measured sample drawing shows a living/dining area, kitchen, wash area, two bedrooms, two toilets and two balconies. For the measured flat 05 on the second-floor plan, the balconies are 2.82 sq m and 3.00 sq m. These are drawing-derived measurements, not independently verified as-built dimensions. RERA unit details
Carpet area, balcony area and RERA saleable area are different measures: the drawing measurement excludes the balconies from carpet area, while the floor-plan data notes that RERA saleable area also includes a share of common areas. The supplied evidence does not provide a RERA-filed carpet-area figure. RERA unit details Floor plans
5. Parking & vehicle circulation
The building plan records 6 proposed parkings and identifies stilt parking. It also lists visitor parking among the plan’s facilities, but does not give a separate visitor-space count. The plan’s driveway is recorded as 6.00m LONG DRIVE WAY.
The project documents do not establish the number of two-wheeler or accessible spaces, the exact parking-bay allocation for individual homes, or whether any drawn bay is exclusively allocated to a buyer. No basement, podium or mechanical parking provision is evidenced in the supplied records.
6. Amenities, recreation & open spaces
The filed building-plan extraction lists the following proposed facilities. The supplied amenity progress record reports 0% for each of its listed categories; it does not establish a separately verified completed facility. RERA amenities
Clubhouse / indoor
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Watchman room | Size not stated | No completed status established | |
| Lift | Quantity and capacity not stated | No completed status established |
Sports / recreation
| Description / size | Size not stated in the plan; plan conditions require it to be fenced and maintained as greenery before occupancy-certificate issue |
|---|---|
| Declared progress / verified status | No completed status established |
Landscape / open space
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip | Size not stated | No completed status established | |
| Perimeter planting / greenery | Plan condition refers to planting along the periphery and in front of the premises | No completed status established |
Convenience / community
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Visitors parking | Count not stated separately | No completed status established | |
| Garbage bin and garbage pit | Size/capacity not stated | No completed status established |
7. Utilities, building services & safety
The building-plan records list a septic tank, sump, overhead water tank, wastewater recycling, percolating well, rainwater harvesting, distribution transformer and garbage facilities. The building-permit order also requires a rainwater-harvesting structure, space for a transformer and a garbage house. These are plan-listed or permit-condition items; the supplied evidence does not establish installation or operation, or give storage, treatment or electrical capacities.
The plan lists a lift but gives no count or capacity. The supplied records do not specify a sewerage treatment plant, backup power, EV charging, CCTV, access-control arrangements, fire-protection equipment, escape-stair details or accessible circulation. The permit requires an occupancy certificate after completion and before occupation; no such certificate is included in the supplied evidence.
8. Location, access & connectivity
The registered project identity places ABHI AVENUE at Khammam, with the filed plan locating it at Pakabanda / Pakabanda Bazaar and identifying Survey No. 35/E. The project records give PIN 507019. RERA record Land records
The filed plan records road-width references of 12.00m and a 6.00m driveway. The supplied location record provides a cadastral parcel centroid and lists Financial District (Nanakramguda) at 1.2 km, but does not establish a project-specific approach route or public-transport details. Location record
9. Developer & development status
The registered promoter is ABHI CONSTRUCTIONS AND DEVELOPERS, identified in the RERA filing as a partnership. The project record names SREERAMANENI RAJANI as a partner and SRIRAMANENI SRINIVAS RAO as authorized signatory. The supplied records do not provide a corporate identification number, verified registered-office details, official project contact information or a verified promoter website. Parties record Corporate record RERA filing
In the RERA-filed Form-B declaration, the authorized signatory undertakes completion by 08/03/2025. This is the promoter’s declared timeline; the supplied records do not establish present construction progress, a revised completion date, or an occupancy certificate.
10. Approvals, official records & documents
| What the supplied document establishes | Form C registration for ABHI AVENUE, registration P00200002096, issued 24/08/2020, with stated validity through 08/03/2025 unless extended by the Authority |
|---|
| What the supplied document establishes | Khammam Municipal Corporation permission dated 08 March, 2019, proceeding/file number 3018/W11/2018/6229, for a residential building on a site area of 748.04 m2 |
|---|
| What the supplied document establishes | Residential plan for Survey No. 35/E, showing one block with stilt parking and five upper floors, and 20 dwelling units |
|---|
| What the supplied document establishes | Declaration by SRIRAMANENI SRINIVAS RAO on behalf of ABHI CONSTRUCTIONS AND DEVELOPERS, including the stated completion undertaking |
|---|
| What the supplied document establishes | Not included in the supplied project documents |
|---|---|
| Reference | Document index |
The building-permit order states that permission does not confer ownership rights, requires commencement notice, and requires completion notice and an occupancy certificate before occupation. The supplied records do not include evidence of an issued occupancy or completion certificate.
1. Project at a glance
Project identity
Registered project name: ABHI AVENUE
Project type: Residential apartment project
Phase / registered portion: No separate phase name is disclosed. TG-RERA registration is for ABHI AVENUE; the filed land identity is Survey No. 35/E.
TG-RERA registration: P00200002096
Registration validity: Certificate states validity from 24/08/2020 to 08/03/2025, unless extended by the Authority. The supplied certificate records no extension.
Registered promoter: ABHI CONSTRUCTIONS AND DEVELOPERS
RERA status: The supplied certificate establishes registration for the stated period. Current registration status is not established by the supplied record.
Land and geographic identity
Locality: Pakabanda / Pakabanda Bazaar; locality is also recorded as Khammam.
Revenue village: Khammam is recorded in the project and land records; the plan identifies the site at Pakabanda.
Mandal: Not disclosed in the supplied project land identity.
District: Kamareddy is recorded in the project header and canonical identity; the filed building-plan documents identify Khammam District.
PIN: 507019
Project survey number and subdivision: 35/E
Site extent: 748.04 sq m (also recorded as 748.04 m2); net area 748.04 m2. Road-affected area is recorded as 0.
Boundaries in RERA filing: East: PLOT NO 1; West: ROAD WIDTH 12; North: PLOT NO F; South: PLOT NO C.
Development identity
Sanctioning authority: Khammam Municipal Corporation
Principal building-permit number / date: 3018/W11/2018/6229, dated 08 March, 2019
Drawing description: RCC-roof building with 1 Stilt + 5 upper floors, for residential use; shown on the filed plan for Survey No. 35/E.
Building count: One block / single block
Sanctioned floors and height: The plan records 6 floors, 1 Stilt + 5 upper floors, and building height 14.25 MT. It also separately prints “20.15 mt. Total Ht.”; its basis is not specified in the supplied extraction.
Approved built-up area: 2,367.83 sq m; the plan separately records Residential Net BUA 1,951.73 and Total Net Built up Area 1,984.86 Sq.mt. These are distinct figures as stated in the filed plan.
Parking provision in plan: 6 proposed parkings; parking arrangement is described as stilt parking.
Unit count: 20 dwelling units in the building plan; TG-RERA unit records also show 20 units.
Offering and status
RERA-filed configurations: 2BHK and 2BHL records, normalized in the project unit data as 2BHK; 20 units total.
RERA-filed saleable area: 97.5 sq m for each filed unit record.
Booked / available: Portal-derived unit record shows 0 booked and 20 available; the portal record has no as-of date, so these counts are indicative rather than a dated current inventory.
Construction stage: Current construction stage is not established by the supplied records.
Completion deadline: Promoter’s Form-B declaration undertakes completion by 08/03/2025. The TG-RERA certificate records the same end date for registration validity; these are separate dates serving separate purposes.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents. The building-permit order requires an application for an occupancy certificate after completion and before occupation.
2. The project story
ABHI AVENUE is registered as a residential apartment project on the filed Survey No. 35/E land at Pakabanda, Khammam, with a stated site extent of 748.04 sq m. The municipal permission and accompanying building-plan records describe one RCC-roof residential block comprising stilt parking and five upper floors, with 20 dwelling units.
The RERA unit record identifies 2BHK homes and shows 0 booked and 20 available, but does not provide an as-of date for those counts. The supplied project documents do not establish the present construction stage or that any portion has been completed or occupancy-certified. The promoter’s Form-B filing undertakes completion by 08/03/2025; this is a promoter declaration, not independent confirmation of construction or completion.
3. Master plan, architecture & building design
The filed building plan shows a single residential block on a site recorded as 748.04 sq m, with 1 Stilt + 5 upper floors and a stated building height of 14.25 MT. It records proposed coverage of 55.62% (416.07) and an approved built-up area of 2,367.83 sq m. The plan also gives separate values for residential net BUA (1,951.73), total net built-up area (1,984.86 Sq.mt.) and “TOTAL 6 FLOORS” (2,496.36 Sq mtr and 2,497.62 Sq mtr); the supplied extraction does not explain the bases of those additional area figures, so they should not be treated as interchangeable.
The plan describes the use as residential and depicts plot portions D, E and F in Survey No. 35/E. It also records a 6.00m LONG DRIVE WAY and road-width references of 12.00 and 12.00m. The supplied records do not establish a tower arrangement beyond the single block, a floor-by-floor unit schedule, lift or stair count, or a detailed common-area distribution.
4. Homes, configurations & floor plans
The TG-RERA unit data records 20 homes under 2BHK/2BHL entries, with filed saleable area of 97.5 sq m. Drawing-based measurements below are software-measured from the filed plan, not RERA-filed carpet-area disclosures; the measurement source identifies four measured 2BHK designs and says the drawing geometry needs review.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK (filed as 2BHK and 2BHL) | 20 | 0 | 20 | 97.5 sq m | 79.5–82.3 sq m; median 79.6 sq m | 18% |
The measured sample drawing shows a living/dining area, kitchen, wash area, two bedrooms, two toilets and two balconies. For the measured flat 05 on the second-floor plan, the balconies are 2.82 sq m and 3.00 sq m. These are drawing-derived measurements, not independently verified as-built dimensions.
Carpet area, balcony area and RERA saleable area are different measures: the drawing measurement excludes the balconies from carpet area, while the floor-plan data notes that RERA saleable area also includes a share of common areas. The supplied evidence does not provide a RERA-filed carpet-area figure.
5. Parking & vehicle circulation
The building plan records 6 proposed parkings and identifies stilt parking. It also lists visitor parking among the plan’s facilities, but does not give a separate visitor-space count. The plan’s driveway is recorded as 6.00m LONG DRIVE WAY.
The project documents do not establish the number of two-wheeler or accessible spaces, the exact parking-bay allocation for individual homes, or whether any drawn bay is exclusively allocated to a buyer. No basement, podium or mechanical parking provision is evidenced in the supplied records.
6. Amenities, recreation & open spaces
The filed building-plan extraction lists the following proposed facilities. The supplied amenity progress record reports 0% for each of its listed categories; it does not establish a separately verified completed facility.
Clubhouse / indoor
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Watchman room | Size not stated | No completed status established | |
| Lift | Quantity and capacity not stated | No completed status established |
Sports / recreation
| Description / size | Size not stated in the plan; plan conditions require it to be fenced and maintained as greenery before occupancy-certificate issue |
|---|---|
| Declared progress / verified status | No completed status established |
Landscape / open space
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip | Size not stated | No completed status established | |
| Perimeter planting / greenery | Plan condition refers to planting along the periphery and in front of the premises | No completed status established |
Convenience / community
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Visitors parking | Count not stated separately | No completed status established | |
| Garbage bin and garbage pit | Size/capacity not stated | No completed status established |
7. Utilities, building services & safety
The building-plan records list a septic tank, sump, overhead water tank, wastewater recycling, percolating well, rainwater harvesting, distribution transformer and garbage facilities. The building-permit order also requires a rainwater-harvesting structure, space for a transformer and a garbage house. These are plan-listed or permit-condition items; the supplied evidence does not establish installation or operation, or give storage, treatment or electrical capacities.
The plan lists a lift but gives no count or capacity. The supplied records do not specify a sewerage treatment plant, backup power, EV charging, CCTV, access-control arrangements, fire-protection equipment, escape-stair details or accessible circulation. The permit requires an occupancy certificate after completion and before occupation; no such certificate is included in the supplied evidence.
8. Location, access & connectivity
The registered project identity places ABHI AVENUE at Khammam, with the filed plan locating it at Pakabanda / Pakabanda Bazaar and identifying Survey No. 35/E. The project records give PIN 507019.
The filed plan records road-width references of 12.00m and a 6.00m driveway. The supplied location record provides a cadastral parcel centroid and lists Financial District (Nanakramguda) at 1.2 km, but does not establish a project-specific approach route or public-transport details.
9. Developer & development status
The registered promoter is ABHI CONSTRUCTIONS AND DEVELOPERS, identified in the RERA filing as a partnership. The project record names SREERAMANENI RAJANI as a partner and SRIRAMANENI SRINIVAS RAO as authorized signatory. The supplied records do not provide a corporate identification number, verified registered-office details, official project contact information or a verified promoter website.
In the RERA-filed Form-B declaration, the authorized signatory undertakes completion by 08/03/2025. This is the promoter’s declared timeline; the supplied records do not establish present construction progress, a revised completion date, or an occupancy certificate.
10. Approvals, official records & documents
| What the supplied document establishes | Form C registration for ABHI AVENUE, registration P00200002096, issued 24/08/2020, with stated validity through 08/03/2025 unless extended by the Authority |
|---|
| What the supplied document establishes | Khammam Municipal Corporation permission dated 08 March, 2019, proceeding/file number 3018/W11/2018/6229, for a residential building on a site area of 748.04 m2 |
|---|
| What the supplied document establishes | Residential plan for Survey No. 35/E, showing one block with stilt parking and five upper floors, and 20 dwelling units |
|---|
| What the supplied document establishes | Declaration by SRIRAMANENI SRINIVAS RAO on behalf of ABHI CONSTRUCTIONS AND DEVELOPERS, including the stated completion undertaking |
|---|
| What the supplied document establishes | Not included in the supplied project documents |
|---|
The building-permit order states that permission does not confer ownership rights, requires commencement notice, and requires completion notice and an occupancy certificate before occupation. The supplied records do not include evidence of an issued occupancy or completion certificate.
Frequently asked questions
Is ABHI AVENUE registered with Telangana RERA?
Yes. ABHI AVENUE is registered with the Telangana Real Estate Regulatory Authority as P00200002096; the registration status is New Project.
Who is the developer of ABHI AVENUE?
The promoter named in the RERA registration is ABHI CONSTRUCTIONS AND DEVELOPERS.
Where is ABHI AVENUE located?
ABHI AVENUE is in KHAMMAM, Kamareddy, Telangana (507019).
When will ABHI AVENUE be completed?
The promoter's proposed date of completion filed with RERA is 08/03/2025. This is the promoter's declaration, not a guarantee.