GOKULA NANDANA BLOCK-A KESHAVA BLOCK-B MADHAV BLOCK-C RADHAKRISHNA BLOCK-D GOPALA BLOCK-E SHIVAM is a residential apartment project in RAJA RAJESHWARA NAGAR JAGTIAL, Jagtial ( U ), Jagithyal. The registered promoter is M/S SHIVA BALAJI BUILDERS AND DEVELOPERS. The project occupies 5,260.57 m² and comprises five blocks: Blocks A–D each have 1 Stilt + 5 upper floors, and Block E has 1 Ground + 2 upper floors; the 102 homes comprise 88 2BHK/2BHL units and 14 3BHK units. Its TG-RERA registration is P02800002330, and its proposed completion date is 30/11/2025.

01What we found

Period endedTG-RERA registration ran to 30 Nov 2025 - check its extension on TG-RERA
18documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameGOKULA NANDANA BLOCK-A KESHAVA BLOCK-B MADHAV BLOCK-C RADHAKRISHNA BLOCK-D GOPALA BLOCK-E SHIVAM RERA record
Project type / registered portionResidential apartment project; the registration identifies five blocks. No separate phase name or separately registered portion is disclosed. RERA record
TG-RERA registrationP02800002330, granted 10/11/2020; registration certificate states validity through 30/11/2025, unless extended by the Authority. The supplied record shows no extension.
Registered promoterM/S SHIVA BALAJI BUILDERS AND DEVELOPERS; partnership. RERA record RERA filing
RERA status in supplied record“On-Going Project.” This is the recorded project status; it should not be read as evidence of current construction activity. RERA filing

Land and geographic identity

FieldRecord
LocalityRAJA RAJESHWARA NAGAR JAGTIAL; the permit describes Raja Rajeshwara Nagar_W29. RERA record
Revenue villageRERA filing identifies Raja Rajeshwara Nagar Jagtial. Title materials also use “Jagtial Village,” “Jagtial Village sivar” and “Sivaram, Jagtial”; the supplied record does not establish these as separate registered project parcels. RERA record Land records
Mandal / district / PINJagtial ( U) / Jagithyal / 505327. RERA record
Project survey numbers1365 and 1563; no project subdivision numbers are supplied. Land records
Registered site extent5,260.57 m² total site area; 422.53 m² road-affected area; 4,838.04 m² net area. The building permit also records a 511.59 m² tot-lot.
BoundariesEast: 12M WIDE ROAD; South: 12M WIDE ROAD; West: LAND OF GOKUL NANDAN APARTMENTS AND OTHERS; North: LAND OF SHAFIUDDIN AND OTHERS. RERA filing

Development identity

FieldRecord
Sanctioning authorityJAGITYAL Municipality; the registration file also contains a DTCP-related filing record.
Principal building permit3009/W29/2019/1090, approved 30 November 2019.
Approved built-up area7,921.86 m² as recorded in the RERA filing. RERA filing
Buildings and sanctioned floorsFive residential blocks: A, B, C and D are each recorded in the building permit as 1 Stilt + 5 upper floors; Block E as 1 Ground + 2 upper floors.
Heights recorded in permitBlocks A–D: 14.9 m each; Block E: 9.01 m.
Parking levels / approved provisionThe permit requires approved cellar/stilt parking areas to be used exclusively for vehicle parking. The OC record states parking area of 1,885.71 m²; a parking-space count and allocation schedule are not supplied.
Unit countsThe RERA filing records 102 residential units: 86 2BHK and 2BHL units, and 14 3BHK units. The permit requires that the sanctioned unit count not be increased without prior approval; a separate unit-count figure in the supplied permit extraction is not available. RERA unit table RERA unit details

Offering and status

FieldRecord
RERA-filed configurations2BHK/2BHL: 88 units in total; 3BHK: 14 units. RERA unit table RERA unit details
RERA-filed saleable area2BHK: 83.61–84.78 m²; 3BHK: 125.74 m². RERA unit table RERA unit details
Booked / availablePortal snapshot: 0 booked and 86 available 2BHK units, 0 booked and 14 available 3BHK units. Counts are indicative: the record gives no as-of date. RERA unit table RERA unit details
Completion datesProposed and revised proposed completion: 30/11/2025. RERA record RERA filing
Occupancy certificateOccupancy Certificate 0051/OC/3009/2024, dated 29 May 2024; it records completion date 01 April 2024 and covers the residential building identified across Blocks A–E.
Registration validity versus completionThe registration certificate’s recorded validity ends 30/11/2025 unless extended. That date is distinct from the proposed completion date and from the OC record. RERA filing

2. The project story

This is a five-block residential apartment development registered under TG-RERA as P02800002330, on the site identified by survey numbers 1365 and 1563 at Raja Rajeshwara Nagar, Jagtial. The municipal building permit describes four five-upper-floor blocks with stilt levels and one smaller block with a ground floor and two upper floors. Land records

The RERA filing lists 102 homes: 88 two-bedroom units (filed as 2BHK/2BHL) and 14 three-bedroom units. A municipal Occupancy Certificate dated 29 May 2024 records the building as fit for occupation and identifies Blocks A–E. This establishes the certificate’s stated scope, not the present physical condition or independent verification of each facility. RERA unit table RERA unit details

The promoter’s Form B declaration undertakes a project completion period of 84 months, while the RERA filing lists 30/11/2025 as both proposed and revised proposed completion. The supplied evidence does not provide a dated, independently verified construction-progress assessment; portal amenity progress entries shown are 0%. RERA filing RERA amenities

3. Master plan, architecture & building design

The building permit records a 5,260.57 m² site, 422.53 m² road-affected portion and 4,838.04 m² net area. It separately records a 511.59 m² tot-lot. The RERA filing records approved built-up area as 7,921.86 m²; this is not a carpet-area or saleable-area figure. RERA filing

The approved scheme comprises residential Blocks A–E. The permit describes Blocks A–D as 1 Stilt + 5 upper floors and Block E as 1 Ground + 2 upper floors, with recorded heights of 14.9 m for A–D and 9.01 m for E. The permit lists block-wise residential and stilt areas: A, 2,145.50 m² residential and 495.99 m² stilt; B, 1,547.60 m² and 372.80 m²; C, 1,742.50 m² and 401.65 m²; D, 2,145.50 m² and 495.99 m²; E, 170.38 m² on the ground floor, 340.76 m² on two upper floors, and 119.27 m² recorded as “U.Floors area.”

The permit requires surrender of the 422.53 m² road-affected area to the local authority without compensation, maintenance of a fenced tot-lot as greenery, peripheral tree planting and greenery, and a rainwater-harvesting percolation pit. It also requires one entry and one exit, each subject to a minimum 4.5 m width and 5 m height clearance, and directs that setbacks remain clear for fire-vehicle manoeuvring. These are approval conditions; the evidence does not independently verify implementation.

The approved floor-plan drawing is identified as document 128057, but its supplied record is not an extracted architectural schedule. No reliable evidence here establishes the full building footprint, flats per floor, lift or stair count, or internal road and landscape layout beyond the tot-lot and conditions noted above.

4. Homes, configurations & floor plans

RERA-filed saleable areas and unit counts are shown separately from software measurements taken from the approved floor-plan drawings. The drawing measurements are not RERA disclosures, are marked as needing review, and should be checked against the original drawing. The supplied RERA record does not establish that its filed saleable-area figures are carpet areas. RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK / 2BHL8808883.61–84.78 m²53.5–60.2 m²; median 57.6 m² (software-measured)32% (software-derived from drawings)
3BHK14014125.74 m²87.1 m² (software-measured)31% (software-derived from drawings)

Drawing-based room details are available for one representative flat of each type. The measured 2BHK plan shows two bedrooms, a hall, kitchen, toilet and a 3.0 m² utility area excluded from measured carpet area. The measured 3BHK plan shows three bedrooms, a hall, kitchen, three toilets and a 2.37 m² utility area excluded from measured carpet area. Room dimensions and individual areas are drawing-derived measurements, not RERA-filed specifications. RERA unit details

The 2BHK carpet-area range is based on nine measured designs; the 3BHK figure is based on one. The drawing review records four 2BHK measurements and one 3BHK measurement as needing review. The project record reports no booked units in the supplied portal snapshot, which carries no as-of date. Floor plans RERA unit table

5. Parking & vehicle circulation

The building permit requires cellar and stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted or misused. The Occupancy Certificate records a parking area of 1,885.71 m², but the supplied documents do not establish a number of spaces, visitor or accessible-space provision, or unit-by-unit parking allocations. A drawn or recorded parking area does not by itself establish an exclusive right to a particular bay.

The permit specifies one entry and one exit, with a minimum width of 4.5 m and height clearance of 5 m, and requires setbacks to remain clear for fire-vehicle manoeuvring. The record does not specify ramps, pedestrian separation, mechanical parking or EV charging.

6. Amenities, recreation & open spaces

The project’s RERA amenity record lists the facilities below and shows 0% progress for each listed item. The municipal permit and OC provide specific approval or area records for some items; these records should not be read as an independent assessment of their current condition. RERA amenities

Community hall
Description / sizeRERA unit table lists one common-area row, 170.38 m².
Evidence sourceRERA unit table
Declared progress / verified statusPortal snapshot shows 0% for “Community Buildings”; current condition not independently verified. RERA amenities
Gym
Description / sizeRERA unit table lists one common-area row, 170.38 m².
Evidence sourceRERA unit table
Declared progress / verified statusNo separate progress or completion verification supplied.
Tot-lot / green strip
Description / sizePermit records tot-lot area of 511.59 m² and requires fencing and maintenance as greenery.
Declared progress / verified statusPortal entry for “Green Strip/TOT LOT/Park” shows 0%; implementation not independently verified. RERA amenities
Rainwater harvesting
Description / sizePermit specifies rainwater-harvesting structures/percolation pits and records 9 RWHPs. The OC record lists rainwater harvesting.
Declared progress / verified statusRERA amenity progress entry shows 0%; installation and operation not independently verified. RERA amenities
Open parking
Description / sizeVendor record describes open parking.
Evidence sourcePromoter website
Declared progress / verified statusMarketing/vendor description only; no parking-space count or allocation evidence supplied.
Community buildings
Description / sizeListed in the RERA amenity schedule.
Evidence sourceRERA amenities
Declared progress / verified status0% recorded; no delivered facility independently verified.

No separately evidenced sports or recreation facilities are supplied beyond the tot-lot, community hall and gym rows.

7. Utilities, building services & safety

The RERA amenity schedule marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available, but records 0% progress across its listed items. The municipal permit requires water supply and electricity connections to be provided only upon production of an Occupancy Certificate; it also requires rainwater-harvesting structures, transformer space and a garbage house. These are recorded requirements or filing entries, not independent verification of current operation. RERA amenities

The building permit specifies separate underground static water storage of 25,000 L and a separate residential terrace tank of 25,000 litres. It also sets out fire-safety requirements including emergency lighting in corridors/common passages and staircases, a manual alarm system, hose reels and down corners, and fire extinguishers; sprinklers are required if the basement area exceeds 200 m². The permit further requires fire-resistant swing doors for collapsible lifts. No evidence supplied establishes lift count or capacity, installed-system testing, water-treatment capacity, an STP, sewage-reuse arrangements, backup-generator capacity, CCTV, access-control systems, or accessible circulation.

8. Location, access & connectivity

The registered location is RAJA RAJESHWARA NAGAR JAGTIAL, Jagtial ( U), Jagithyal, Telangana 505327. The permit describes the locality as Raja Rajeshwara Nagar_W29. The site boundaries recorded in the RERA filing include 12M WIDE ROAD along the east and south, with neighbouring land to the north and west. RERA record RERA filing

The supplied project evidence contains no verified public-transport information, landmark distances or travel-time measurements. The available geocode and connectivity record is not presented as verified access information for this project, so no connectivity claim is made.

9. Developer & development status

The registered promoter is M/S SHIVA BALAJI BUILDERS AND DEVELOPERS, identified in the RERA filing as a partnership, with an address in Raja Rajeshwara Nagar, Jagtial ( U), Jagithyal, 505327. The filing names 13 partners and two authorized signatories, YAMSANI MAHESH and VOODE JITHENDER. No verified corporate registration identifier, official website or contact details are supplied. Parties record RERA filing

The promoter’s Form B affidavit, made by YAMSANI MAHESH and VOODE JITHENDER as managing partners, declares the land free from encumbrances and undertakes completion within 84 months; these are promoter declarations. The filing lists 30/11/2025 as the proposed and revised completion date. The supplied documents do not include an independently verified current construction-progress report. RERA filing

An Occupancy Certificate dated 29 May 2024 records occupancy for Blocks A–E at the site under permit 3009/W29/2019/1090. It states that the building was inspected and declared fit for occupation; this statement is the authority’s certificate record, not a present-condition inspection for this report.

10. Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP02800002330; issued 10/11/2020; stated valid through 30/11/2025 unless extended
Scope recordedRegistration of the named five-block residential project; the certificate includes the separate-account condition.
Building Permit Order
Identifier / date3009/W29/2019/1090; 30 November 2019
Scope recordedJAGITYAL Municipality permit for the five residential blocks on survey numbers 1365 and 1563.
DTCP-related filed record
Identifier / dateFile REA02800023988; record dated 11/06/2019
Scope recordedSupplied letter states that permission was obtained through the local ULB under the cited BP number and dealt with in DPMS.
Occupancy Certificate
Identifier / date0051/OC/3009/2024; 29 May 2024; application 003700/OC/DTCP/3009/0011/2024
Scope recordedCertificate identifies the residential building and Blocks A–E; records completion date 01 April 2024 and that the building was declared fit for occupation.
Approved floor-plan drawing
Identifier / dateDocument 128057, page 6
Scope recordedDrawing record used for software-measured unit and room-area estimates; those measurements are not RERA disclosures.
Form B declaration
Identifier / dateDocument 128059, page 1
Scope recordedPromoter affidavit/declaration, including title basis, encumbrance declaration, completion undertaking and project-account undertakings.
Title search report
Identifier / dateDocument 128053
Scope recordedAdvocate’s report concerning 6,292.00 square yards in survey numbers 1365 and 1563 at Jagtial Village sivar.

The project’s legal-title and encumbrance materials, including deed records and title-chain qualifications, are addressed in the Land & Title section.

Frequently asked questions

Is GOKULA NANDANA BLOCK-A KESHAVA BLOCK-B MADHAV BLOCK-C RADHAKRISHNA BLOCK-D GOPALA BLOCK-E SHIVAM registered with Telangana RERA?

Yes. GOKULA NANDANA BLOCK-A KESHAVA BLOCK-B MADHAV BLOCK-C RADHAKRISHNA BLOCK-D GOPALA BLOCK-E SHIVAM is registered with the Telangana Real Estate Regulatory Authority as P02800002330; the registration status is On-Going Project.

Who is the developer of GOKULA NANDANA BLOCK-A KESHAVA BLOCK-B MADHAV BLOCK-C RADHAKRISHNA BLOCK-D GOPALA BLOCK-E SHIVAM?

The promoter named in the RERA registration is M/S SHIVA BALAJI BUILDERS AND DEVELOPERS.

Where is GOKULA NANDANA BLOCK-A KESHAVA BLOCK-B MADHAV BLOCK-C RADHAKRISHNA BLOCK-D GOPALA BLOCK-E SHIVAM located?

GOKULA NANDANA BLOCK-A KESHAVA BLOCK-B MADHAV BLOCK-C RADHAKRISHNA BLOCK-D GOPALA BLOCK-E SHIVAM is in RAJA RAJESHWARA NAGAR JAGTIAL, Jagtial ( U ), Jagtial, Telangana (505327).

When will GOKULA NANDANA BLOCK-A KESHAVA BLOCK-B MADHAV BLOCK-C RADHAKRISHNA BLOCK-D GOPALA BLOCK-E SHIVAM be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2025. This is the promoter's declaration, not a guarantee.

More projects in Jagtial