Southwind Towers
BRBS REALITY · Medchal-Malkajgiri · RERA P02200005360
SOUTHWIND TOWERS is a residential apartment project in Khapra, Khapra mandal, Medchal-Malkajgiri district, developed by registered promoter BRBS REALITY. The project covers 504.62 sq. m and consists of one residential building with 1 Stilt + 5 upper floors and 10 apartments: 5 two-bedroom units of 111.94 sq. m and 5 three-bedroom units of 141.21 sq. m. It is registered under TG-RERA number P02200005360, with a proposed completion date of 16 February 2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 1 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SOUTHWIND TOWERS RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; the registration describes the project on Plot Nos. 13 and 14 |
| TG-RERA registration | P02200005360 RERA record |
| Registration validity | 25 November 2022 to 16 February 2025; the supplied certificate records no extension. This is the registration period, not the construction deadline or the OC date. |
| Registered promoter | BRBS REALITY; partnership RERA record RERA filing Corporate record |
| RERA status in supplied record | Registration certificate issued; the stated validity ended 16 February 2025. Current registration status is not established by the supplied record. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Khapra (also rendered “Kapra” in the building permit and related records) RERA record Land records |
| Mandal | Khapra is stated on the OC extraction; the project identity record does not disclose a mandal. Land records |
| District | Medchal-Malkajgiri RERA record RERA filing |
| PIN | 500062 RERA record |
| Survey numbers | 375, 378, 379 and 380; no subdivisions are specified in the supplied project identity or approval extracts. RERA record Land records |
| Plot numbers | 13 and 14 RERA filing |
| Site extent | 504.62 sq. m; the building-permit extract records both plot area and net plot area as 504.62 sq. m, with road-affected and nala-affected area each recorded as 0.0. RERA filing |
| Boundaries filed with RERA | East: 40 - 0 WIDE ROAD; South: 40 - 0 WIDE ROAD; West: NEIGHBOURS LAND; North: PLOT NO 15. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit Order 2188/GHMC/LBN/2022-BP, dated 16 February 2022 Approvals record |
| Other approval reference in permit | File No. _005298/GHMC/2869/LBN2/2021-BP |
| Approved built-up area | 1,403.70 sq. m as recorded in the project information fields. The permit extract separately gives 1,158.65 for upper-floors area and 230.63 for stilt area; it does not label these figures as the same area measure. RERA filing |
| Building count and arrangement | One residential building, identified in the permit as Building A in Plot Nos. 13 and 14 RERA filing |
| Sanctioned floors | 1 Stilt + 5 upper floors |
| Parking provision in permit | The permit extract records 242.8 as Total Parking Area and states that approved stilt parking is to be used exclusively for parking. A parking-space count and unit-by-unit allocation are not established here. |
| Unit count | 10 total apartment units in the RERA unit record: 5 two-bedroom and 5 three-bedroom units. The fields also record 1 total building unit, which is not the apartment count. RERA unit table RERA unit details |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configurations | 2BHK and 3BHK RERA unit table RERA unit details |
| RERA-filed saleable areas | 2BHK: 111.94 sq. m; 3BHK: 141.21 sq. m RERA unit table RERA unit details |
| Booked / available | Portal-derived counts show 0 booked and 5 available for each configuration, or 0 booked and 10 available in total. The booking record has no as-of date, so these counts are indicative. RERA unit table RERA unit details |
| Construction stage | GHMC issued an occupancy certificate for the building; an architect’s Form 1A also certifies project completion. These records concern the single building identified in the supplied project documents. |
| Completion dates | RERA Form B and the building permit state a completion deadline of 16 February 2025. The OC extraction records a completion notice date of 26 June 2024. |
| Occupancy certificate | GHMC OC 2979/GHMC/LBN/2024-OC, dated 1 October 2024; the extracted record covers the residential building on Plot Nos. 13 and 14. |
2. The project story
SOUTHWIND TOWERS is recorded as a residential apartment project on Plot Nos. 13 and 14 in Khapra, on survey numbers 375, 378, 379 and 380. The project documents identify one residential building, with a GHMC-sanctioned configuration of one stilt level and five upper floors. RERA record Land records
The RERA unit schedule lists ten homes: five 2BHK and five 3BHK apartments. Its portal-derived booking snapshot shows all ten as available and none booked, but the record has no as-of date. RERA unit table RERA unit details
The supplied GHMC occupancy certificate covers the building at the project site and states that it was inspected and declared fit for occupation. An architect’s Form 1A separately certifies completion of the registered project. These are documentary completion records; no independent site inspection or current physical-condition verification is supplied.
3. Master plan, architecture & building design
The building permit describes Building A as residential and sanctions one stilt plus five upper floors, with a stated building height of 14.95. It records a site extent and net plot area of 504.62 sq. m, upper-floors area of 1,158.65, stilt area of 230.63 and total parking area of 242.8. The source does not state the unit for the height or label the upper-floors figure as gross built-up, FSI-counted, carpet or saleable area. The project information fields separately record approved built-up area as 1,403.70 sq. m. RERA filing
The supplied records do not provide a readable floor-plan extraction establishing flats per floor, lift and stair arrangements, internal circulation, building footprint, or common-area distribution. Two floor-plan drawings are listed, but neither has been software-measured. Floor plans
The building permit lists a tot-lot, rainwater-harvesting pits, transformer space and a garbage house among its requirements or site provisions. The OC extraction records the tot-lot area as 0 m²; this Overview does not infer a delivered open-space area from the permit’s tot-lot condition.
4. Homes, configurations & floor plans
The RERA unit schedule records the following configurations and saleable areas. Booking counts are portal-derived and have no stated as-of date. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 111.94 sq. m | Not available | Not supplied |
| 3BHK | 5 | 0 | 5 | 141.21 sq. m | Not available | Not supplied |
Carpet area measurements have not been produced: both listed floor-plan drawings are pending measurement. The RERA saleable areas are filing figures and are not drawing-based carpet measurements. Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC building-permit extract records 242.8 as Total Parking Area and requires the approved stilt parking area to be used exclusively for vehicle parking without partition walls or rolling shutters. It does not provide a count of car or two-wheeler spaces, identify visitor or accessible spaces, or establish unit-specific parking allocations.
The RERA unit schedule marks both configurations as mortgaged, but does not specify parking rights or an allotment arrangement. A parking bay shown or provided in a plan does not, by itself, establish exclusive ownership or allocation to a particular apartment. RERA unit table RERA unit table
6. Amenities, recreation & open spaces
The GHMC permit lists site provisions or conditions for a tot-lot, rainwater-harvesting pits, transformer space and a garbage house. The RERA amenities schedule marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available at 100%; these are filing-status entries, not independent verification of present operation. RERA amenities
| Description / size | Permit condition calls for a fenced tot-lot maintained as greenery; OC extraction records tot-lot area as 0 m². |
|---|---|
| Declared progress / verified status | Permit condition and OC-recorded figure; no independent current-site verification supplied. |
| Description / size | Permit requires a rainwater-harvesting structure; RERA amenities schedule marks water conservation/rainwater harvesting available at 100%. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-declared available; independent operation or performance verification not supplied. |
| Description / size | RERA amenities schedule marks available at 100%. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-declared available. |
| Description / size | RERA schedule’s sewerage entry, including chamber, lines, septic tank and STP, is marked available at 100%. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-declared available; the supplied record does not separately confirm which listed components are installed or operating. |
| Description / size | RERA amenities schedule marks available at 100%. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-declared available. |
| Description / size | Permit requires transformer space; RERA schedule marks electrical meter room/sub-station/receiving station available at 100%. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Permit requirement and RERA-declared availability; independent verification not supplied. |
| Description / size | Building permit requires a garbage house within the premises. |
|---|---|
| Declared progress / verified status | Permit requirement; delivered status not independently verified. |
The vendor record lists a pool, gym, children’s play area, clubhouse, common garden and other features, but these are vendor/marketing claims rather than confirmed RERA-filed or delivered facilities. Promoter website
7. Utilities, building services & safety
The RERA amenities schedule marks water supply, sewerage, storm-water drains, rainwater harvesting, and an electrical meter room/sub-station/receiving station as available at 100%. The schedule does not specify capacities, water sources, storage, treatment equipment, sewerage-treatment capacity, reuse arrangements, electrical load, backup supply or equipment operating status. RERA amenities
The building permit requires rainwater harvesting, transformer space and a garbage house. It also requires a fire NOC from the Director (EV&DM) before issue of the occupancy certificate. The supplied OC is documentary evidence of occupancy certification, but the material here does not separately identify fire-system equipment or provide the fire NOC itself.
The supplied records do not establish lift numbers or capacities, fire-fighting equipment, escape-stair details, CCTV or access-control systems, waste-segregation arrangements, EV charging provision, or accessible routes. Vendor-listed security, surveillance and charging features are marketing information, not verified project-service records. Promoter website
8. Location, access & connectivity
The official project identity places the site in Khapra, Medchal-Malkajgiri district, PIN 500062, on Plot Nos. 13 and 14 and survey numbers 375, 378, 379 and 380. The permit identifies Kapra/Khapra and records two site boundaries on 40 - 0 WIDE ROAD. RERA record Land records
A supplied location record gives the Financial District (Nanakramguda) as an anchor at 1.2 km. No public-transport route, travel time, or further measured access distance is supplied. Location record
9. Developer & development status
The registered promoter is BRBS REALITY, identified in the RERA record as a partnership. The supplied corporate identifier is GSTIN 36AAYFB6080F1Z2. Its address is ATHURI ARCADE, G BLOCK COLONY, KRISHNA ENCLAVE, KHAPRA, Medchal-Malkajgiri, 500062. The supplied record lists Atluri Venkata Satish Kumar as authorized signatory and Atluri Venkata Rajeev Kumar as partner. Corporate record Parties record
RERA Form B, signed by the authorized signatory, declares that the project would be completed by 16 February 2025. The GHMC occupancy certificate and architect’s Form 1A are completion records for the project building; no separate independent construction-progress assessment or current-condition inspection is supplied.
The promoter’s website is listed as https://www.brbsreality.com/. The evidence does not provide a project contact telephone number or email address. Parties record
10. Approvals, official records & documents
| Identifier / date | P02200005360; issued 25 November 2022; stated validity to 16 February 2025 |
|---|---|
| Scope and source | SOUTHWIND TOWERS, Plot Nos. 13 and 14, survey numbers 375, 378, 379 and 380. |
| Identifier / date | 2188/GHMC/LBN/2022-BP; 16 February 2022 |
|---|---|
| Scope and source | Building permit for Building A, Plot Nos. 13 and 14, survey numbers 375, 378, 379 and 380; sanctions one stilt plus five upper floors. |
| Identifier / date | _005298/GHMC/2869/LBN2/2021-BP |
|---|---|
| Scope and source | Recorded in the GHMC building-permit extract. |
| Identifier / date | 2979/GHMC/LBN/2024-OC; 1 October 2024; application 007773/GHMC/3656/LBN2/2024-OC |
|---|---|
| Scope and source | OC extract identifies the residential building on Plot Nos. 13 and 14, survey numbers 375, 378, 379 and 380. |
| Identifier / date | References GHMC approval 007773/GHMC/3656/LBN2/2024-OC and TG-RERA P02200005360 |
|---|---|
| Scope and source | Architect’s certificate states the registered project is complete in all aspects as per the agreement for sale and Form B. |
| Identifier / date | Dated 12 September 2022 |
|---|---|
| Scope and source | Search and title investigation report for the project site; listed in the project documents. |
| Identifier / date | Sale deeds and Development Agreement-cum-GPA, including document references 4293 of 2003, 4300 of 2003 and 2242 of 2022 |
|---|---|
| Scope and source | Filed title materials concern Plot Nos. 13 and 14 and the project development arrangement. |
| Identifier / date | Project completion undertaking: 16 February 2025 |
|---|---|
| Scope and source | Promoter declaration filed for SOUTHWIND TOWERS. |
A layout reference, 5647/MP2/H/02, appears in the building-permit record; the supplied material does not include a readable layout-plan extraction.
1. Project at a glance
Project identity
Registered project name: SOUTHWIND TOWERS
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified in the supplied record; the registration describes the project on Plot Nos. 13 and 14
TG-RERA registration: P02200005360
Registration validity: 25 November 2022 to 16 February 2025; the supplied certificate records no extension. This is the registration period, not the construction deadline or the OC date.
Registered promoter: BRBS REALITY; partnership
RERA status in supplied record: Registration certificate issued; the stated validity ended 16 February 2025. Current registration status is not established by the supplied record.
Land and geographic identity
Locality / revenue village: Khapra (also rendered “Kapra” in the building permit and related records)
Mandal: Khapra is stated on the OC extraction; the project identity record does not disclose a mandal.
District: Medchal-Malkajgiri
PIN: 500062
Survey numbers: 375, 378, 379 and 380; no subdivisions are specified in the supplied project identity or approval extracts.
Plot numbers: 13 and 14
Site extent: 504.62 sq. m; the building-permit extract records both plot area and net plot area as 504.62 sq. m, with road-affected and nala-affected area each recorded as 0.0.
Boundaries filed with RERA: East: 40 - 0 WIDE ROAD; South: 40 - 0 WIDE ROAD; West: NEIGHBOURS LAND; North: PLOT NO 15.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 2188/GHMC/LBN/2022-BP, dated 16 February 2022
Other approval reference in permit: File No. _005298/GHMC/2869/LBN2/2021-BP
Approved built-up area: 1,403.70 sq. m as recorded in the project information fields. The permit extract separately gives 1,158.65 for upper-floors area and 230.63 for stilt area; it does not label these figures as the same area measure.
Building count and arrangement: One residential building, identified in the permit as Building A in Plot Nos. 13 and 14
Sanctioned floors: 1 Stilt + 5 upper floors
Parking provision in permit: The permit extract records 242.8 as Total Parking Area and states that approved stilt parking is to be used exclusively for parking. A parking-space count and unit-by-unit allocation are not established here.
Unit count: 10 total apartment units in the RERA unit record: 5 two-bedroom and 5 three-bedroom units. The fields also record 1 total building unit, which is not the apartment count.
Offering and status
RERA-filed configurations: 2BHK and 3BHK
RERA-filed saleable areas: 2BHK: 111.94 sq. m; 3BHK: 141.21 sq. m
Booked / available: Portal-derived counts show 0 booked and 5 available for each configuration, or 0 booked and 10 available in total. The booking record has no as-of date, so these counts are indicative.
Construction stage: GHMC issued an occupancy certificate for the building; an architect’s Form 1A also certifies project completion. These records concern the single building identified in the supplied project documents.
Completion dates: RERA Form B and the building permit state a completion deadline of 16 February 2025. The OC extraction records a completion notice date of 26 June 2024.
Occupancy certificate: GHMC OC 2979/GHMC/LBN/2024-OC, dated 1 October 2024; the extracted record covers the residential building on Plot Nos. 13 and 14.
2. The project story
SOUTHWIND TOWERS is recorded as a residential apartment project on Plot Nos. 13 and 14 in Khapra, on survey numbers 375, 378, 379 and 380. The project documents identify one residential building, with a GHMC-sanctioned configuration of one stilt level and five upper floors.
The RERA unit schedule lists ten homes: five 2BHK and five 3BHK apartments. Its portal-derived booking snapshot shows all ten as available and none booked, but the record has no as-of date.
The supplied GHMC occupancy certificate covers the building at the project site and states that it was inspected and declared fit for occupation. An architect’s Form 1A separately certifies completion of the registered project. These are documentary completion records; no independent site inspection or current physical-condition verification is supplied.
3. Master plan, architecture & building design
The building permit describes Building A as residential and sanctions one stilt plus five upper floors, with a stated building height of 14.95. It records a site extent and net plot area of 504.62 sq. m, upper-floors area of 1,158.65, stilt area of 230.63 and total parking area of 242.8. The source does not state the unit for the height or label the upper-floors figure as gross built-up, FSI-counted, carpet or saleable area. The project information fields separately record approved built-up area as 1,403.70 sq. m.
The supplied records do not provide a readable floor-plan extraction establishing flats per floor, lift and stair arrangements, internal circulation, building footprint, or common-area distribution. Two floor-plan drawings are listed, but neither has been software-measured.
The building permit lists a tot-lot, rainwater-harvesting pits, transformer space and a garbage house among its requirements or site provisions. The OC extraction records the tot-lot area as 0 m²; this Overview does not infer a delivered open-space area from the permit’s tot-lot condition.
4. Homes, configurations & floor plans
The RERA unit schedule records the following configurations and saleable areas. Booking counts are portal-derived and have no stated as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 111.94 sq. m | Not available | Not supplied |
| 3BHK | 5 | 0 | 5 | 141.21 sq. m | Not available | Not supplied |
Carpet area measurements have not been produced: both listed floor-plan drawings are pending measurement. The RERA saleable areas are filing figures and are not drawing-based carpet measurements.
5. Parking & vehicle circulation
The GHMC building-permit extract records 242.8 as Total Parking Area and requires the approved stilt parking area to be used exclusively for vehicle parking without partition walls or rolling shutters. It does not provide a count of car or two-wheeler spaces, identify visitor or accessible spaces, or establish unit-specific parking allocations.
The RERA unit schedule marks both configurations as mortgaged, but does not specify parking rights or an allotment arrangement. A parking bay shown or provided in a plan does not, by itself, establish exclusive ownership or allocation to a particular apartment.
6. Amenities, recreation & open spaces
The GHMC permit lists site provisions or conditions for a tot-lot, rainwater-harvesting pits, transformer space and a garbage house. The RERA amenities schedule marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available at 100%; these are filing-status entries, not independent verification of present operation.
| Description / size | Permit condition calls for a fenced tot-lot maintained as greenery; OC extraction records tot-lot area as 0 m². |
|---|---|
| Declared progress / verified status | Permit condition and OC-recorded figure; no independent current-site verification supplied. |
| Description / size | Permit requires a rainwater-harvesting structure; RERA amenities schedule marks water conservation/rainwater harvesting available at 100%. |
|---|---|
| Declared progress / verified status | RERA-declared available; independent operation or performance verification not supplied. |
| Description / size | RERA amenities schedule marks available at 100%. |
|---|---|
| Declared progress / verified status | RERA-declared available. |
| Description / size | RERA schedule’s sewerage entry, including chamber, lines, septic tank and STP, is marked available at 100%. |
|---|---|
| Declared progress / verified status | RERA-declared available; the supplied record does not separately confirm which listed components are installed or operating. |
| Description / size | RERA amenities schedule marks available at 100%. |
|---|---|
| Declared progress / verified status | RERA-declared available. |
| Description / size | Permit requires transformer space; RERA schedule marks electrical meter room/sub-station/receiving station available at 100%. |
|---|---|
| Declared progress / verified status | Permit requirement and RERA-declared availability; independent verification not supplied. |
| Description / size | Building permit requires a garbage house within the premises. |
|---|---|
| Declared progress / verified status | Permit requirement; delivered status not independently verified. |
The vendor record lists a pool, gym, children’s play area, clubhouse, common garden and other features, but these are vendor/marketing claims rather than confirmed RERA-filed or delivered facilities.
7. Utilities, building services & safety
The RERA amenities schedule marks water supply, sewerage, storm-water drains, rainwater harvesting, and an electrical meter room/sub-station/receiving station as available at 100%. The schedule does not specify capacities, water sources, storage, treatment equipment, sewerage-treatment capacity, reuse arrangements, electrical load, backup supply or equipment operating status.
The building permit requires rainwater harvesting, transformer space and a garbage house. It also requires a fire NOC from the Director (EV&DM) before issue of the occupancy certificate. The supplied OC is documentary evidence of occupancy certification, but the material here does not separately identify fire-system equipment or provide the fire NOC itself.
The supplied records do not establish lift numbers or capacities, fire-fighting equipment, escape-stair details, CCTV or access-control systems, waste-segregation arrangements, EV charging provision, or accessible routes. Vendor-listed security, surveillance and charging features are marketing information, not verified project-service records.
8. Location, access & connectivity
The official project identity places the site in Khapra, Medchal-Malkajgiri district, PIN 500062, on Plot Nos. 13 and 14 and survey numbers 375, 378, 379 and 380. The permit identifies Kapra/Khapra and records two site boundaries on 40 - 0 WIDE ROAD.
A supplied location record gives the Financial District (Nanakramguda) as an anchor at 1.2 km. No public-transport route, travel time, or further measured access distance is supplied.
9. Developer & development status
The registered promoter is BRBS REALITY, identified in the RERA record as a partnership. The supplied corporate identifier is GSTIN 36AAYFB6080F1Z2. Its address is ATHURI ARCADE, G BLOCK COLONY, KRISHNA ENCLAVE, KHAPRA, Medchal-Malkajgiri, 500062. The supplied record lists Atluri Venkata Satish Kumar as authorized signatory and Atluri Venkata Rajeev Kumar as partner.
RERA Form B, signed by the authorized signatory, declares that the project would be completed by 16 February 2025. The GHMC occupancy certificate and architect’s Form 1A are completion records for the project building; no separate independent construction-progress assessment or current-condition inspection is supplied.
The promoter’s website is listed as https://www.brbsreality.com/. The evidence does not provide a project contact telephone number or email address.
10. Approvals, official records & documents
| Identifier / date | P02200005360; issued 25 November 2022; stated validity to 16 February 2025 |
|---|---|
| Scope and source | SOUTHWIND TOWERS, Plot Nos. 13 and 14, survey numbers 375, 378, 379 and 380. |
| Identifier / date | 2188/GHMC/LBN/2022-BP; 16 February 2022 |
|---|---|
| Scope and source | Building permit for Building A, Plot Nos. 13 and 14, survey numbers 375, 378, 379 and 380; sanctions one stilt plus five upper floors. |
| Identifier / date | _005298/GHMC/2869/LBN2/2021-BP |
|---|---|
| Scope and source | Recorded in the GHMC building-permit extract. |
| Identifier / date | 2979/GHMC/LBN/2024-OC; 1 October 2024; application 007773/GHMC/3656/LBN2/2024-OC |
|---|---|
| Scope and source | OC extract identifies the residential building on Plot Nos. 13 and 14, survey numbers 375, 378, 379 and 380. |
| Identifier / date | References GHMC approval 007773/GHMC/3656/LBN2/2024-OC and TG-RERA P02200005360 |
|---|---|
| Scope and source | Architect’s certificate states the registered project is complete in all aspects as per the agreement for sale and Form B. |
| Identifier / date | Dated 12 September 2022 |
|---|---|
| Scope and source | Search and title investigation report for the project site; listed in the project documents. |
| Identifier / date | Sale deeds and Development Agreement-cum-GPA, including document references 4293 of 2003, 4300 of 2003 and 2242 of 2022 |
|---|---|
| Scope and source | Filed title materials concern Plot Nos. 13 and 14 and the project development arrangement. |
| Identifier / date | Project completion undertaking: 16 February 2025 |
|---|---|
| Scope and source | Promoter declaration filed for SOUTHWIND TOWERS. |
A layout reference, 5647/MP2/H/02, appears in the building-permit record; the supplied material does not include a readable layout-plan extraction.
Frequently asked questions
Is SOUTHWIND TOWERS registered with Telangana RERA?
Yes. SOUTHWIND TOWERS is registered with the Telangana Real Estate Regulatory Authority as P02200005360; the registration status is New Project.
Who is the developer of SOUTHWIND TOWERS?
The promoter named in the RERA registration is BRBS REALITY.
Where is SOUTHWIND TOWERS located?
SOUTHWIND TOWERS is in KHAPRA, Medchal-Malkajgiri, Telangana (500062).
When will SOUTHWIND TOWERS be completed?
The promoter's proposed date of completion filed with RERA is 16/02/2025. This is the promoter's declaration, not a guarantee.
More projects in Medchal-Malkajgiri