ARs Sree Lakshmi Residency

ARD CONSTRUCTIONS · Hyderabad · RERA P02500004903

ARs Sree Lakshmi Residency is a residential apartment project in Mansoorabad, Saroornagar mandal, Hyderabad district, developed by registered promoter ARD CONSTRUCTIONS. It is on a site of 418.06 sq. m and comprises one residential building with 1 Stilt + 5 upper floors. The TG-RERA filing lists 10 3BHK units, each with a saleable area of 67.36 sq. m. It is registered under TG-RERA number P02500004903, with proposed completion before 4 July 2025.

More from Ard Constructions · 3 projects →

01What we found

Period endedTG-RERA registration ran to 30 Jun 2025 - check its extension on TG-RERA
14documents on file - each fact links to its page
14court cases on this project's land (survey 28, 29, 30, 44, Mansoorabad)
15items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

15 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from magicbricks.com

1. Project at a glance

Project identity

FieldRecord
Registered project nameARs Sree Lakshmi Residency RERA record
Project type / registered portionResidential apartment project; phase or separate registered portion not disclosed RERA record RERA filing
TG-RERA registrationP02500004903
Registration validity29 August 2022 to 30 June 2025, unless extended by the Authority; the certificate extract records no extension
Registered promoterARD CONSTRUCTIONS; partnership RERA filing Corporate record
RERA status in supplied recordRegistration certificate issued. The registered validity end date has passed; a current extension or renewed status is not shown in the supplied record Approvals record

Land and geographic identity

FieldRecord
Locality / revenue villageMansoorabad; the RERA filing identifies Mansoorabad village RERA record RERA filing
MandalSaroornagar is stated in the GHMC building permit and promoter’s Form B; mandal is not disclosed in the canonical land identity
DistrictHyderabad in the RERA project record RERA record RERA filing
PIN500068 RERA record
Survey numbers28, 29, 30 and 44 RERA filing
PlotPlot No. 57 RERA filing
Site extent418.06 sq. m; net plot area 418.06 sq. m. The RERA filing records total area 418.06 sq. m and affected area 0 sq. m RERA filing
BoundariesEast: Plot No. 25; West: Plot No. 27; North: Plot No. 47; South: 30 Wide Road RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC), LB Nagar Zone
Principal building permit2164/GHMC/LBN/2022-BP, approved 04 July 2022 Approvals record
GHMC file number005659/GHMC/2838/LBN2/2022-BP
Approved building configuration1 Stilt + 5 upper floors; residential building
Height recorded in permit14.95
Approved built-up area1360.43 sq. m, as recorded in the RERA filing RERA filing
Building / tower countThe filing records one approved building unit and one proposed building unit; the unit record also identifies one tower RERA filing RERA unit table
Parking area in permitTotal Parking Area 224.6; parking-space count and allocation are not stated in the supplied evidence
Approved versus RERA-declared homesThe RERA filing records 10 units; the supplied permit extract does not state a sanctioned dwelling-unit count RERA unit table

Offering and status

FieldRecord
RERA-filed configuration3BHK; 10 units RERA unit table
RERA-filed saleable area67.36 sq. m per unit RERA unit table
Booking snapshot0 booked and 10 available in the TG-RERA portal record; no as-of date is supplied, so these counts are indicative RERA unit table
Construction stageNot established by an independently verified site-progress record in the supplied evidence; the RERA QPR entries shown report 0% for listed amenities, which does not establish overall building completion RERA amenities
Completion datesGHMC permit states construction to be completed before 04 July 2025; the promoter’s Form B undertakes completion before 4 July 2025; the RERA certificate validity ends 30 June 2025
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents. GHMC’s permit states an occupancy certificate is compulsory before occupation

2. The project story

ARs Sree Lakshmi Residency is a residential apartment development registered with TG-RERA as P02500004903. The project record places it at Plot No. 57 in Mansoorabad village, on Survey Nos. 28, 29, 30 and 44, with a recorded site extent of 418.06 sq. m. It is identified as a single residential building, sanctioned as 1 Stilt + 5 upper floors. RERA record RERA filing

The RERA filing offers ten 3BHK units and records each at a saleable area of 67.36 sq. m. The portal’s supplied booking snapshot shows none booked and ten available, but has no as-of date. RERA unit table

The permit and Form B contain completion commitments in 2025, but the supplied evidence does not establish the building’s present physical progress or show an occupancy/completion certificate. The 80% completeness figure in the project header is not identified as an independently verified construction-progress measurement. RERA record

3. Master plan, architecture & building design

The GHMC building permit is for one residential building on a plot area of 418.06 sq. m, with net plot area also recorded as 418.06 sq. m. The RERA filing records approved built-up area of 1360.43 sq. m. These are separately stated measures; the supplied material does not provide an FSI-counted area, carpet area for the building as a whole, or a drawing-derived building footprint. RERA filing

The approved configuration is 1 Stilt + 5 upper floors, with a recorded building height of 14.95. The permit also records Total Parking Area 224.6, but the supplied extract does not specify the number of bays, parking allocation, or a detailed vehicle-circulation plan. Detailed floor-plan drawings are not supplied here, so flats per floor, lift and stair arrangements, entrances, exits, and internal circulation cannot be described from this evidence. Floor plans

The permit lists a periphery greenery strip and requires a tot-lot to be fenced and maintained as greenery before issue of an occupancy certificate. The permit’s amenity entry says “Tot Lot NA”; the extent or drawing of any open space is not established in the supplied material.

4. Homes, configurations & floor plans

The TG-RERA unit record lists ten 3BHK units, all shown as available in a booking snapshot with no supplied as-of date. The filed saleable area is 67.36 sq. m per unit. No measured carpet area or loading figure is supplied. RERA unit table RERA unit details RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK1001067.36 sq. mNot suppliedNot supplied

The floor-plan record says measurements are from approved floor-plan drawings, but reports no measured flat designs for this configuration. Accordingly, room dimensions and drawing-based carpet area cannot be stated. Saleable area is the RERA-filed figure; it should not be treated as a measured carpet-area figure. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC permit records a Total Parking Area of 224.6. It does not provide a parking-space count, distinguish resident from visitor or accessible parking, or specify bay allocation to individual apartments in the supplied extract. A separate RERA-filed mortgage area of 112.46 sq. m is recorded, but it is not a parking count or allocation. RERA filing

The available evidence does not establish parking levels beyond the building’s approved stilt configuration, or document ramps, vehicle entries/exits, pedestrian separation, mechanical parking, EV charging, or exclusive parking rights for particular units.

6. Amenities, recreation & open spaces

The RERA amenity record lists 14 project-level items. It shows 0% against the listed progress fields; this is a portal-recorded status, not an independent inspection. GHMC’s building permit separately records requirements for rainwater harvesting, a garbage house, transformer space, and a greenery strip. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsSize not statedRERA amenity record RERA amenities0% recorded; no independent completion verification
Water SupplyDetails not statedRERA amenity record RERA amenities“YES”; 0% progress field; no independent verification
Sewerage (Chamber, Lines, Septic Tank, STP)System details not statedRERA amenity record RERA amenities“YES”; 0% progress field; no independent verification
Storm Water DrainsDetails not statedRERA amenity record RERA amenities0% recorded; no independent completion verification
Green Strip / TOT LOT / ParkPermit requires a fenced tot-lot maintained as greenery; size not statedRERA amenities0% recorded in RERA amenity record; no independent verification
Street LightingDetails not statedRERA amenity record RERA amenities0% recorded; no independent completion verification
Community BuildingsDetails not statedRERA amenity record RERA amenities0% recorded; no independent completion verification
Treatment and Disposal of Sewage and Sullage WaterDetails not statedRERA amenity record RERA amenities0% recorded; no independent completion verification
Solid Waste Management and DisposalPermit requires a garbage house within the premises; further system details not statedRERA amenities0% recorded; no independent completion verification
Water Conservation / Rainwater HarvestingPermit records 1 rainwater-harvesting pit and requires a rainwater-harvesting structure (percolation pit)RERA amenities“YES”; 0% progress field; no independent verification
Energy managementDetails not statedRERA amenity record RERA amenities0% recorded; no independent completion verification
Fire Protection and Fire Safety RequirementsPermit requires an occupancy Fire NOC before issue of the occupancy certificateRERA amenities0% recorded in RERA amenity record; no Fire NOC supplied
Electrical Meter Room / Sub-Station / Receiving StationPermit requires transformer space on siteRERA amenities“YES”; 0% progress field; no independent verification
Aggregate recreational open spaceArea not statedRERA amenity record RERA amenities0% recorded; no independent completion verification

The vendor list also advertises facilities including a swimming pool, gym, children’s play area, clubhouse, CCTV, power backup, RO water, and fire-fighting equipment. These are vendor-attributed claims, not established as sanctioned, delivered, or independently verified by the supplied project records. Promoter website

7. Utilities, building services & safety

The RERA amenity record marks water supply, sewerage, storm-water drainage, rainwater harvesting, and an electrical meter room/sub-station/receiving station as “YES” where shown; the corresponding progress fields are recorded as 0%. It gives no water source, storage or treatment capacity, sewerage-treatment capacity, reuse arrangement, storm-water design, electrical backup capacity, or substation specification. RERA amenities

The GHMC permit specifies one rainwater-harvesting pit, requires transformer space and a garbage house, and states that an occupancy Fire NOC must be obtained before issue of the occupancy certificate. It also says an occupancy certificate is compulsory before occupation. The supplied documents do not include a Fire NOC or occupancy certificate.

No project-specific evidence supplied here establishes lift count or capacity, fire-system equipment details, escape-stair configuration, CCTV or access-control installation, waste-segregation arrangements, or accessible routes and facilities. Vendor references to lifts, security, CCTV, fire equipment, backup power, RO water and waste management remain vendor claims. Promoter website

8. Location, access & connectivity

The registered location is Mansoorabad village, Hyderabad district, PIN 500068. The project record identifies the southern boundary as “30 Wide Road”; the GHMC permit records an 18 mt. road width. These are the road descriptions supplied in the respective records. RERA record RERA filing

A supplied geocode identifies the cadastral parcel centroid as 17.41528, 78.35459. The only measured connectivity distance in the supplied location data is Financial District (Nanakramguda), 1.2 km. Location record

The vendor describes nearby schools, airports, restaurants, bus stops and railway stations but provides no measured distances or named routes in the supplied record; those proximity claims are not independently established here. Promoter website

9. Developer & development status

The registered promoter is ARD CONSTRUCTIONS, identified in the RERA filing as a partnership and with GSTIN 36ABGFA9380E1ZC. The authorized signatory is recorded as Mahipal Reddy Dubbaka. The supplied address entry is Plot No. 154/3, Road No. 71, Mansoorabad Village, Hyderabad, Telangana, 500068; the registration certificate extract separately records the promoter office as Hyderabad, PIN 500033. No official website or contact details are supplied. RERA filing Corporate record Parties record

The promoter’s Form B declares that it entered into a Development Agreement-cum-General Power of Attorney dated 28 February 2022, Document No. 1216 of 2022, with the stated landowner; it also declares the land free from encumbrances and undertakes completion before 4 July 2025. These are promoter declarations.

The supplied record gives a completion deadline and registration validity date but no independently verified construction-progress assessment, current completion certificate, or occupancy certificate. The RERA certificate extract does not record an extension.

10. Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP02500004903; issued 29 August 2022; validity to 30 June 2025
What the supplied record establishesRegistration of ARs Sree Lakshmi Residency; certificate includes the separate-account condition
GHMC building permit order
Identifier / date2164/GHMC/LBN/2022-BP; approved 04 July 2022
What the supplied record establishesConditional permission for a residential building of 1 Stilt + 5 upper floors on Plot No. 57 in Survey Nos. 28, 29, 30 and 44
GHMC file number
Identifier / date005659/GHMC/2838/LBN2/2022-BP
What the supplied record establishesFile number stated in the building permit
RERA Form B declaration
Identifier / dateDeclaration verified in July 2022; exact day illegible
What the supplied record establishesPromoter’s declarations concerning the development agreement, encumbrances, completion undertaking and project funds
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied record establishesThe GHMC permit requires a completion notice and occupancy certificate; no certificate is included in this evidence set
Detailed floor-plan material
Identifier / dateNot available in the supplied project records for description here
What the supplied record establishesThe supplied floor-plan summary reports no measured flat designs for the 3BHK configuration Floor plans

The GHMC permit states that permission does not confer ownership rights and requires adherence to the sanctioned plan. Its listed conditions also include a rainwater-harvesting structure, transformer space, garbage house, a greenery strip, and an occupancy Fire NOC before issue of the occupancy certificate.

Frequently asked questions

Is ARs Sree Lakshmi Residency registered with Telangana RERA?

Yes. ARs Sree Lakshmi Residency is registered with the Telangana Real Estate Regulatory Authority as P02500004903; the registration status is New Project.

Who is the developer of ARs Sree Lakshmi Residency?

The promoter named in the RERA registration is ARD CONSTRUCTIONS.

Where is ARs Sree Lakshmi Residency located?

ARs Sree Lakshmi Residency is in Mansoorabad, Hyderabad, Telangana (500068).

When will ARs Sree Lakshmi Residency be completed?

The promoter's proposed date of completion filed with RERA is 30/06/2025. This is the promoter's declaration, not a guarantee.