Jaswitha Harmony

MAHATHI INFRASTRUCTURES COMPANY AND MARKAZ INFRASTRUCTURE PROJECTS · Rangareddy · RERA P02400010912

JASWITHA HARMONY is a residential apartment building in Kondapur, Serilingampally mandal, Ranga Reddy district. The registered promoters are MAHATHI INFRASTRUCTURES COMPANY and MARKAZ INFRASTRUCTURE PROJECTS. The project is on a 2132.02 sq.m site and comprises one building with 1 Cellar + 1 Stilt + 5 Floors and 40 3 BHK apartments, with RERA-filed saleable areas of 167.22–176.28 sq.m. Its TG-RERA registration number is P02400010912, and the filed proposed completion date is 28/03/2029.

More from Mahathi Infrastructures Company And Markaz Infrastructure Projects · 17 projects →

01What we found

RegisteredTG-RERA - valid till 28 Nov 2028
66documents on file - each fact links to its page
3court cases on this project's land (survey 112, Kondapur)
8items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameJASWITHA HARMONY RERA record
Project typeResidential apartment building RERA record
Phase / registered portionOne building; phase designation not disclosed RERA filing
TG-RERA registrationP02400010912; valid from 28/11/2025 to 28/11/2028 RERA record
Registered promotersMAHATHI INFRASTRUCTURES COMPANY and MARKAZ INFRASTRUCTURE PROJECTS
RERA statusRegistered; certificate records a three-year validity period. Registration validity is separate from the completion date.
RERA-declared completion undertaking28/11/2028 in the Form B declaration
GHMC-filed proposed completion28/03/2029 in the project information RERA filing
Occupancy / completion certificateNo completion certification is recorded in the supplied approval extraction; an occupancy certificate is not evidenced.

Land and geographic identity

FieldProject record
LocalityKondapur RERA record
Revenue villageKondapur
Mandal / district / PINSerilingampally / Ranga Reddy / 500084
Project survey number112/2
Site plot numbers listed in the RERA certificate40/3, 40/2, 41, 42, 42/A, 43, 43/1 and 43/4
Registered site extent2132.02 sq.m
GHMC-filed gross / net plot area2132.02 sq.m / 2132.02 sq.m
BoundariesEast: 30 feet wide road; West: 30 feet wide road; North: 30 feet wide road; South: neighbouring land RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building approval2011/GHMC/SWBP/SLP1/2025, approved 28/11/2025; file no. 002913/GHMC/01566/SWBP/SLP1/2025
Approved building useResidential; one building
Sanctioned configuration1 Cellar + 1 Stilt + 5 Floors
Approved built-up areaThe filed approval extraction separately records Total Proposed BUA excluding Parking: 5685.11 sq.m, Total Proposed BUA including Parking: 8088.28 sq.m, and Gross BUA: 8355.71 sq.m. These are distinct approval-record figures.
Building countOne RERA filing
Sanctioned dwelling units40
TG-RERA unit count40 RERA unit table

Offering and status

FieldProject record
Configuration3 BHK apartments RERA unit table
RERA-filed saleable area167.22–176.28 sq.m RERA unit table
Booked / available3 booked; 37 available, as last read from TG-RERA portal; the portal record supplied has no as-of date, so counts are indicative. RERA unit table
Construction stageThe project is identified as a “New Project”; no independently verified construction-progress assessment is supplied. RERA record RERA amenities
Occupancy statusNo occupancy certificate is evidenced in the supplied records; the building permit requires one before occupation.

2. The project story

JASWITHA HARMONY is a single-building residential apartment project registered with TG-RERA, on a 2132.02 sq.m site in Survey No. 112/2, Kondapur village, Serilingampally mandal, Ranga Reddy district. The RERA certificate lists the associated site plot numbers as 40/3, 40/2, 41, 42, 42/A, 43, 43/1 and 43/4.

The GHMC building-permit record describes one residential building with 1 Cellar + 1 Stilt + 5 Floors and 40 dwelling units. The RERA unit record lists 3 BHK homes and reports 3 booked and 37 available, but does not provide an as-of date for those counts. The supplied materials do not establish the construction stage through an independent site inspection or a dated progress report. RERA unit table

The RERA certificate is valid from 28/11/2025 to 28/11/2028; that is the registration-validity period, not a completion certificate. The project records also contain a RERA-declared completion undertaking of 28/11/2028 and a filed proposed completion date of 28/03/2029. No occupancy or completion certificate is evidenced in the supplied approval extraction. RERA filing

3. Master plan, architecture & building design

The GHMC-filed building-permit extraction records a single residential building on a 2132.02 sq.m gross and net plot, with 1 Cellar + 1 Stilt + 5 Upper Floors. It gives a proposed coverage area of 1252.94 sq.m and vacant plot area of 839.74 sq.m. The approval extraction separately lists proposed built-up-area figures excluding and including parking, and a gross BUA; these should not be treated as interchangeable area measures.

The filed floor-wise figures are: basement 1370.61 sq.m; stilt 1252.94 sq.m; and 1133.88 sq.m for each of the 1st through 5th floors. Terrace area is listed as 62.76 sq.m. The record states a building height of 14.45 m in one sanctioned parameter and also lists proposed height 17.95 m and total height 20.95 m.

The approval record identifies road widths of 9.15m, 4.5m, 5.4m, 2.5m and 18 mt. It lists setbacks of Front 3.0m, Rear Side 5.0m, Side 1 5.0m and Side 2 5.0m.

The supplied data does not give a verified count of apartments per floor, lifts, staircases, entrances or exits, or a detailed circulation, landscaping or common-area plan. The permit extraction identifies a tot-lot, periphery greenery and a rainwater-harvesting structure among the site provisions; the extracted record does not establish their completion.

4. Homes, configurations & floor plans

The TG-RERA record lists 40 3 BHK apartments in total. It records two filed area rows: one 3 BHK unit at 167.22 sq.m saleable area, and 39 3 BHK units at 176.28 sq.m saleable area. The normalized portal data reports 3 booked and 37 available overall; the supplied unit-row data does not provide an as-of date for those counts. RERA unit details RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3 BHK40337167.22–176.28 sq.mSoftware-measured: 98.0–116.3 sq.m; median 103.8 sq.m (16 flat designs measured)40%

The carpet-area figures are software measurements from the approved floor-plan drawing geometry, not RERA-filed measurements; the supplied measurement record says they need review. Saleable area is the RERA-filed figure and includes the home’s share of common areas; the drawing-based carpet measurement is a different measure and does not include the shown balconies. Verify any drawing-measured area against the approved plan. RERA unit details Floor plans

The measured 2nd-floor plan example for flat 207 shows a drawing room, kitchen, living-and-dining area, three bedrooms, toilets and two balconies. The extracted example gives the drawing room as 4.92 × 3.5 m, kitchen 3.0 × 3.5 m, living and dining 1.33 × 2.8 m, and master bedroom 3.48 × 5.0 m. The balconies are identified separately as open-to-air balcony and balcony; they are excluded from the carpet-area measurement. These are drawing-derived measurements, not separate RERA disclosures. RERA unit details

5. Parking & vehicle circulation

The GHMC-filed approval records 64.00 car parking spaces. It lists a required parking area of 1705.53 sq.m and proposed parking area of 2403.17 sq.m; the same extraction also records Net Parking Area: 2607.85 sq.m. These are separately stated figures in the approval record. Visitor parking is listed as 170.55 sq.m (10.00%) required and 204.68 sq.m (12.00%) proposed.

The cellar and stilt are approved for parking and the permit says they are to be used exclusively for vehicles, without partition walls or rolling shutters, and not converted to another use. The supplied record does not identify two-wheeler or accessible-space counts, a parking-allocation schedule for individual apartments, or any exclusive ownership allocation. It also does not document the arrangement of ramps, driveways or pedestrian separation.

The approval conditions require electric-vehicle charging infrastructure in building parking areas. The documents supplied do not establish installation or operational status.

6. Amenities, recreation & open spaces

TG-RERA’s supplied amenity record includes listed facilities, but the entries show 0% progress. That is a portal-recorded progress figure, not an independent confirmation of site condition. The building-permit extraction also lists specific site requirements; the approval itself does not establish that they have been completed. RERA amenities

Tot-lot / green strip
Description / sizeGHMC extraction lists Tot Lot 108.67 sq.m; approval conditions also require it to be fenced and maintained as greenery.
Declared progress / verified statusRequired/listed; completion not verified.
Aggregate recreational open space
Description / sizeRERA amenity record lists this item as available: YES.
Evidence sourceRERA amenities
Declared progress / verified statusProgress shown as 0%; completion not independently verified.
Community buildings
Description / sizeListed in RERA amenity record.
Evidence sourceRERA amenities
Declared progress / verified statusProgress shown as 0%; no specific facility or size supplied.
Vendor-listed amenities
Description / sizePower backup, CCTV camera, entry/exit gate and fire-fighting equipment.
Evidence sourcePromoter website
Declared progress / verified statusVendor-sourced; no supplied evidence of sanctioned or completed status.

No clubhouse, indoor-recreation facility or sports facility with a documented size or capacity is identified in the supplied project records. RERA amenities Document index

7. Utilities, building services & safety

The RERA amenity record marks water supply, sewerage, storm-water drains and water conservation/rainwater harvesting as YES, while showing 0% progress for the listed amenity entries. It does not specify water source, storage capacity, treatment capacity, STP design, reuse volumes or storm-water system capacity. RERA amenities

The building-permit extraction requires a rainwater-harvesting structure/percolation pit, and records 1 rainwater-harvesting pit. It also lists space for a transformer, a garbage house and 100 trees. These are approval-recorded provisions, not verified completed facilities.

The permit conditions address fire and life safety, require an Occupancy Fire NOC from the Director (EV&DM) before an occupancy certificate, and require services including sanitation, plumbing, fire safety, lifts and electrical installations to be executed under qualified technical supervision. No fire NOC, lift count/capacity, electrical-backup capacity, water-storage capacity, accessibility features or verified completion status is supplied.

The permit also requires EV charging infrastructure in parking areas and includes a dual-piping-system condition for specified project thresholds. The supplied records do not establish that these systems have been installed.

8. Location, access & connectivity

The registered location is Kondapur, Serilingampally, Ranga Reddy, 500084, with the project identified in Survey No. 112/2 and the site plots listed as 40/3, 40/2, 41, 42, 42/A, 43, 43/1 and 43/4.

The site boundaries are recorded as 30 feet wide roads to the east, west and north, and neighbouring land to the south. The building-permit extraction also lists road widths of 9.15m, 4.5m, 5.4m, 2.5m and 18 mt. RERA filing

A supplied location record gives HITEC City at 5.3 km. This is a recorded distance; no travel time is supplied. Location record

9. Developer & development status

The TG-RERA certificate names MAHATHI INFRASTRUCTURES COMPANY and MARKAZ INFRASTRUCTURE PROJECTS as the project promoters. The supplied corporate record identifies the organization type as “Others” and does not establish a more specific legal-entity type. It records GSTIN 36AATFM7578E1ZL; the promoter PAN is masked in the supplied data. Corporate record RERA filing

The certificate gives both promoters’ project address as Kondapur, Serilingampally, Ranga Reddy, Telangana, 500084. The registration certificate records a registration-validity period of 28/11/2025 to 28/11/2028. The Form B declaration by authorized signatory SRI ARANI RAMPRASAD REDDY undertakes completion by 28/11/2028; the project information field separately records proposed completion as 28/03/2029. RERA filing

The supplied records identify one building and 40 apartments. No independently verified construction-progress report or occupancy certificate is included; the RERA amenity progress entries show 0%. RERA amenities

10. Approvals, official records & documents

RecordWhat the supplied evidence establishes
TG-RERA registration certificate, P02400010912Form C certificate for JASWITHA HARMONY; promoters are MAHATHI INFRASTRUCTURES COMPANY and MARKAZ INFRASTRUCTURE PROJECTS; validity 28/11/2025–28/11/2028.
GHMC building-permit order, approval no. 2011/GHMC/SWBP/SLP1/2025Approved 28/11/2025; file no. 002913/GHMC/01566/SWBP/SLP1/2025; one residential building, 1 Cellar + 1 Stilt + 5 Floors, 40 units, Survey No. 112/2, Kondapur.
GHMC-filed plan approval extractionRecords site, floor-wise areas, parking, setbacks, open area, tot-lot and other approval parameters and conditions.
Form B declarationPromoter declaration dated 29 November 2025, including title/encumbrance and project-completion undertakings.
Occupancy / completion recordsNo occupancy or completion certificate is evidenced in the supplied documents; the building-permit record requires an occupancy certificate before occupation.

The supplied records do not include a separate approved-layout certificate or a completed-building/occupancy certificate. The GHMC building-permit conditions require a commencement notice before work begins, a completion notice after completion, and an occupancy certificate before occupation.

Frequently asked questions

Is JASWITHA HARMONY registered with Telangana RERA?

Yes. JASWITHA HARMONY is registered with the Telangana Real Estate Regulatory Authority as P02400010912; the registration status is New Project.

Who is the developer of JASWITHA HARMONY?

The promoter named in the RERA registration is MAHATHI INFRASTRUCTURES COMPANY AND MARKAZ INFRASTRUCTURE PROJECTS.

Where is JASWITHA HARMONY located?

JASWITHA HARMONY is in kondapur, Serilingampally, Rangareddy, Telangana (500084).

When will JASWITHA HARMONY be completed?

The promoter's proposed date of completion filed with RERA is 28/03/2029. This is the promoter's declaration, not a guarantee.