SHIVASAI CONSTRUCTION is a residential apartment project in Vasavi Colony, Saroornagar mandal, Ranga Reddy district, developed by the registered promoter SHIVASAI CONSTRUCTION, recorded as a Partnership. The project covers 501 sq. m. and comprises one building, Building A, with Stilt + 5 floors and 10 proposed 3BHK units, each with a RERA-filed saleable area of 122.03 sq. m. Its TG-RERA registration number is P02400000247, issued 29 January 2019, and its proposed completion date is 26 September 2024.

01What we found

Period endedTG-RERA registration ran to 26 Sep 2024 - check its extension on TG-RERA
13documents on file - each fact links to its page
1court case on this project's land (survey 8, Vasavi Colony)
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameSHIVASAI CONSTRUCTION RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionRegistered portion is recorded as Survey No. 8, Plot Nos. M1 M2 M3; the registration certificate does not identify a separate phase
TG-RERA registrationP02400000247; issued 29 January 2019; certificate states validity through 26 September 2024, unless extended by the Authority RERA record Approvals record
RERA statusRegistration record lists the project validity end date as 26 September 2024; no extension is identified in the supplied certificate extract Approvals record
Registered promoterSHIVASAI CONSTRUCTION; entity type recorded as Partnership Parties record RERA filing
Current completion / OC statusThe supplied records do not establish construction progress or an issued occupancy/completion certificate for the project Document index RERA amenities

Land and geographic identity

ItemRecord
LocalityVasavi Colony RERA record
Revenue villageNot disclosed in the project land fields. Title materials refer to Saroornagar Village; the registration certificate gives Saroornagar without specifying a revenue village Land records Title record
Mandal / district / PINSaroornagar / Ranga Reddy / 500035 RERA record RERA filing
Survey number(s)Survey No. 8; no subdivision is stated in the registration certificate Land records
Plot referencesM1 M2 M3 in the RERA registration certificate
Registered site extent501 sq. m. in the project land record and building-permit extract Land records
Net / total areaNet area 501.00 sq. m.; total area 501 sq. m. Land records
Recorded boundariesEast: Plot No. M-5; west: Plot No. M-2; north: neighbouring house; south: 30 wide road Land records
Parcel centroid17.41528, 78.35459; cadastral parcel centroid, not a surveyed boundary coordinate Location record

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approvalBuilding Permit Order No. 2/C5/15473/2018, dated 26 September 2018; file No. 2/C5/13137/2018 Approvals record
Building configurationBuilding A; Stilt + 5 floors; sanctioned height 14.99 m
Approved built-up area1,220.35 sq. m. recorded for upper-floor area in the permit extract; project RERA fields record approved built-up area of 1,220.34 sq. m. RERA filing
Stilt / parking provisionStilt area 230.96 sq. m.; permit extract records 0 parking floors and 0 parking-floor area
Building and unit countsOne building is recorded in the project fields; 10 proposed 3BHK units are recorded in the TG-RERA unit data RERA filing RERA unit table
Sanctioned unit countThe permit extract requires that sanctioned unit numbers not be increased without GHMC approval, but the supplied extract does not state the sanctioned unit count

Offering and status

ItemRecord
RERA-filed configuration3BHK; 10 units RERA unit table RERA unit details
RERA-filed saleable area122.03 sq. m. per unit RERA unit table RERA unit table
Booked / available0 booked and 10 available in the portal data supplied; no as-of date is attached, so these counts are indicative RERA unit table RERA unit details
Mortgaged area136.52 sq. m. recorded in project fields; the supplied data does not identify which units or areas this covers RERA filing
Original completion date26 September 2024 is recorded as the proposed completion date and in the promoter’s Form B undertaking RERA record
Revised completion dateNot disclosed in the supplied records Approvals record Document index
Occupancy / completion certificateNo issued certificate is included in the supplied project documents Document index

Registration validity, the project’s stated completion date and occupancy-certificate status are separate matters: the registration certificate records validity through 26 September 2024, the project record gives the same date as proposed completion, and the supplied documents do not establish an issued occupancy/completion certificate. RERA record Document index

2. The project story

  • SHIVASAI CONSTRUCTION is registered with TG-RERA as a residential apartment project at Vasavi Colony, associated in the registration record with Survey No. 8 and Plot Nos. M1 M2 M3. The site is recorded as 501 sq. m. and the project fields describe one building with 10 proposed 3BHK apartments. RERA record Land records RERA unit table
  • The GHMC building-permit extract describes Building A as Stilt + 5, with a stated height of 14.99 m. The project record states a proposed completion date of 26 September 2024. The evidence supplied here does not establish the present construction stage, whether any portion is complete, or whether an occupancy/completion certificate has been issued; the RERA portal’s unit counts are undated and should be treated as indicative rather than a current sales position. RERA record RERA unit table Document index

3. Master plan, architecture & building design

  • The project is documented as a single residential building on a 501 sq. m. site. The GHMC permit extract identifies Building A, Stilt + 5 floors and a height of 14.99 m. It records 1,220.35 sq. m. as upper-floor area and a stilt area of 230.96 sq. m.; these are the labels and figures in the permit extract, not a carpet-area or saleable-area measurement. The project fields list approved built-up area as 1,220.34 sq. m. Land records RERA filing
  • The supplied evidence does not include a readable, extracted floor-plan or layout drawing from which to describe apartment placement, floor-by-floor unit arrangement, footprint, circulation, lifts, stairs, entries, exits, landscaping or common-area distribution. The layout-plan document is recorded as not extracted.
  • No separate phase organization is identified in the registration extract.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010122.03 sq. m. per unitNot measured in supplied drawing dataNot supplied

RERA unit table RERA unit details RERA unit table Floor plans

  • The RERA-filed saleable area is the figure reported for the apartments; it is not presented here as carpet area. The supplied floor-plan record reports two drawings, neither with measured apartment geometry, and provides no software-measured carpet area or room dimensions. The available evidence therefore does not support a description of room layouts, balconies, utility areas or typical floor arrangements. Floor plans RERA unit table

5. Parking & vehicle circulation

  • The GHMC permit extract records a stilt area of 230.96 sq. m., but lists zero parking floors and zero parking-floor area. It does not provide a parking-space count or distinguish resident, visitor or accessible spaces.
  • The project-specific records supplied do not establish parking allocation to individual apartments, vehicle entry or exit arrangements, ramps, internal driveways, pedestrian separation, mechanical parking or EV charging. The building permit also states that the mortgaged built-up area may be registered only after an Occupancy Certificate is produced.

6. Amenities, recreation & open spaces

The following are listed in the GHMC permit extract or TG-RERA amenity records. The supplied data does not establish that any of them have been completed or independently verified.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / greenery125.37 sq. m.; permit conditions say it is to be fenced and maintained as greenery before issue of an occupancy certificatePermit condition; completion not established
Trees25 trees listedPermit extract; planting or maintenance not verified
Rainwater-harvesting structures11 RWHPS listedPermit extract; installation not verified
Green strip / tot-lot / parkNamed in the TG-RERA amenity listRERA amenitiesPortal progress recorded as 0%; independently verified status not available
Internal roads and footpathsNamed in the TG-RERA amenity listRERA amenitiesPortal progress recorded as 0%; independently verified status not available
Community buildingsNamed in the TG-RERA amenity listRERA amenitiesPortal progress recorded as 0%; independently verified status not available
  • The supplied RERA amenity list also names water supply, sewerage, storm-water drains, street lighting, sewage and sullage treatment/disposal, solid-waste management, water conservation, energy management, fire protection, an electrical meter room/sub-station/receiving station, and aggregate recreational open space. Each is recorded with progress of 0% in the supplied data; no separate completion verification or facility dimensions are provided. RERA amenities

7. Utilities, building services & safety

  • The GHMC permit extract requires a rainwater-harvesting structure, space for a transformer, a garbage house within the premises, and compliance with specified separation distances from high- and low-tension electrical lines. It also requires construction to follow the sanctioned plan and an Occupancy Certificate before occupation. These are permit conditions; the supplied records do not verify their implementation or establish overall statutory compliance.
  • The RERA amenity list names water supply, sewerage, storm-water drainage, sewage and sullage treatment/disposal, solid-waste management, water conservation, energy management, fire protection, and an electrical meter room/sub-station/receiving station, each with portal progress recorded as 0%. The evidence provided does not specify water sources or storage, treatment or reuse capacities, electrical backup, lift numbers or capacities, fire-system details, security systems, or accessibility provisions. RERA amenities

8. Location, access & connectivity

  • The registered location is Vasavi Colony, Saroornagar, Ranga Reddy district, PIN 500035; the registration certificate identifies the project as being at Saroornagar, and the project fields identify Vasavi Colony and Saroornagar mandal. The revenue village is not disclosed in the project land fields; title materials refer to Saroornagar Village. RERA record RERA filing Land records Title record
  • The supplied location record lists these distances: Financial District (Nanakramguda), 1.2 km; IndusInd Bank, 0.4 km; an unnamed bus station, 2.2 km; Manuu Polytechnic Hyderabad, 1.6 km; Sankaraya Eye Hospital, 1.6 km; ADP, 0.0 km; South India Shopping Mall, 2.6 km; an unnamed park, 1.2 km; and Nanakramguda Government Primary School, 0.5 km. These are recorded location distances; no travel times or route descriptions are supplied. Location record

9. Developer & development status

  • The TG-RERA-registered promoter is SHIVASAI CONSTRUCTION, recorded as a partnership. The supplied party record identifies GADAGOJU SHASHIDHAR as a partner and V HARIKRISHNA as an authorized signatory. Parties record RERA filing
  • The certificate gives a promoter-office entry as “Village: Mandal: District: Hyderabad, Pin: 500034”; the village and mandal fields are blank in that extract.
  • The project record gives a proposed completion date of 26 September 2024. The supplied information does not provide an updated completion schedule, construction-progress certification, or issued occupancy/completion certificate. RERA record Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for SHIVASAI CONSTRUCTION, registration P02400000247, issued 29 January 2019; stated validity through 26 September 2024 unless extended by the Authority
GHMC building permissionBuilding Permit Order No. 2/C5/15473/2018, file No. 2/C5/13137/2018, dated 26 September 2018; permit extract describes Building A, Stilt + 5
RERA Form B declarationPromoter declaration includes statements on title, encumbrances, separate-account arrangements and a completion undertaking; the printed completion-date text is “26 • Sop 2024”
Layout / plan materialLayout-plan document is listed in the RERA filing but is marked not extracted; the supplied evidence does not provide an extracted layout description
Occupancy/completion certificateNo issued occupancy or completion certificate appears in the supplied project documents Document index
  • The building-permit extract also records GHMC conditions concerning the sanctioned plan, rainwater harvesting, transformer space, garbage house, greenery and occupancy before occupation.

Frequently asked questions

Is SHIVASAI CONSTRUCTION registered with Telangana RERA?

Yes. SHIVASAI CONSTRUCTION is registered with the Telangana Real Estate Regulatory Authority as P02400000247; the registration status is New Project.

Who is the developer of SHIVASAI CONSTRUCTION?

The promoter named in the RERA registration is SHIVASAI CONSTRUCTION.

Where is SHIVASAI CONSTRUCTION located?

SHIVASAI CONSTRUCTION is in VASAVI COLONY, Saroornagar, Rangareddy, Telangana (500035).

When will SHIVASAI CONSTRUCTION be completed?

The promoter's proposed date of completion filed with RERA is 26/09/2024. This is the promoter's declaration, not a guarantee.