Sign in

Sai Raghavendra Arcade

SHIKARA CONSTRUCTIONS · Rangareddy · RERA P02400002705

SAI RAGHAVENDRA ARCADE is a residential apartment project in BIRAMULAGUDA, Saroornagar, Ranga Reddy. It is being developed by registered promoter SHIKARA CONSTRUCTIONS, recorded as a partnership. The project covers 744.00 sq. m and comprises one building with 1 Stilt + 5 upper floors and 15 apartments: 5 two-bedroom units of 95.0 sq. m and 10 three-bedroom units of 137.3 sq. m. It is registered with TG-RERA as P02400002705, with proposed completion on 19/03/2024.

More from Shikara Constructions · 2 projects →

01What we found

Period endedTG-RERA registration ran to 19 Mar 2024 - check its extension on TG-RERA
14documents on file - each fact links to its page
2court cases on this project's land (survey 29, Biramulaguda)
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Biramulaguda, Saroornagar, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameSAI RAGHAVENDRA ARCADE RERA record
Project typeResidential apartment project RERA record
Phase / registered portionNo phase name is recorded. The TG-RERA certificate identifies plot Nos. 16 SOUTH PART 17 18 19; phase boundaries beyond the filed land details are not separately described.
TG-RERA registrationP02400002705 RERA record
Registration validity18/03/2021 to 19/03/2024; the certificate states three years. No extension is recorded in the supplied registration-certificate data. This is the registration period, not the completion deadline.
Registered promoterSHIKARA CONSTRUCTIONS, recorded as a partnership Parties record RERA filing
RERA statusRecorded as On-Going Project. The registration certificate’s validity ended on 19/03/2024; no extension is shown in the supplied record. RERA record

Land and geographic identity

ItemRecord
Locality / revenue villageLocality: BIRAMULAGUDA; the title and building-permit documents refer to Bairamalguda Village. RERA record RERA filing
Mandal / district / PINSaroornagar, Ranga Reddy, 500079 RERA record
Project survey number29/1 RERA record Land records
Plot description16 SOUTH PART 17 18 19 in the TG-RERA certificate; the title-report extraction describes plots 16 (southern part), 17, 18 and 19 (southern part).
Site extent744.00 sq. m recorded for the project land; the building-permit extraction also states site area 744 m² and net area 744 m². Land records RERA filing
BoundariesEast: 30 FEET ROAD; west: 30 FEET ROAD; north: PLOT NO 16 19; south: NAIGHBOURS LAND. RERA filing
Layout / subdivision references recorded on building permitLRS24052016114354; LRS2405201603271; LRS24052016032811; LRS15102016055304. Their individual land coverage is not specified in the supplied extraction.

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approvalApproval 2/C4/04622/2019, approved 19 March 2019; the permit also records file no. 2/C4/24143/2018. Approvals record
Building / useBuilding - A (residential)
Approved built-up areaNot established from the supplied extraction. The permit extraction contains a “Proposed Covered builtup area” figure rendered as 128,803.00, but its scale/format is unclear; it is not used here as a verified area.
Sanctioned floors and height1 Stilt + 5 upper floors; sanctioned height recorded as 15 m. The supplied record does not identify a basement or podium.
Buildings / towersOne building is recorded in the RERA project information; the permit names Building - A. RERA filing
UnitsGHMC permit extraction does not supply a reliable unit count. TG-RERA filing records 15 units: 5 two-bedroom and 10 three-bedroom apartments. RERA unit table RERA unit details

Offering and status

ItemRecord
RERA-filed configurations2BHK and 3BHK RERA unit details RERA unit table
RERA-filed saleable areas2BHK: 95.0 sq. m; 3BHK: 137.3 sq. m RERA unit details RERA unit table
Booked / availablePortal-derived counts show 2BHK: 0 booked / 5 available; 3BHK: 0 booked / 10 available. The portal record has no as-of date, so these counts are indicative, not a current inventory confirmation. RERA unit table RERA unit details
Construction stageRERA project status is On-Going Project; no independently verified site-progress measurement is supplied. RERA record RERA amenities
Original / revised completion date19/03/2024 / 19/03/2024, as recorded in the project information; the promoter’s Form B also undertakes completion by 19/03/2024. RERA record
Occupancy / completion certificateNo occupancy certificate or completion certificate is included in the supplied project documents. The GHMC permit states an occupancy certificate is compulsory before occupation. Document index

2. The project story

SAI RAGHAVENDRA ARCADE is registered with TG-RERA as a residential apartment project on survey 29/1 in the Biramulaguda / Bairamalguda locality, Saroornagar Mandal, Ranga Reddy District. Its filed land area is 744.00 sq. m, and the building-permit record identifies a single residential building, Building - A. RERA record Land records

The filed offering comprises 15 apartments: five 2BHK units and ten 3BHK units. The available-unit figures are portal readings without an as-of date and should be treated as indicative. The project’s filed completion date was 19/03/2024, while the supplied record labels its status “On-Going Project”; the evidence does not provide an independently verified construction-progress assessment or an occupancy certificate. RERA unit table RERA unit details RERA record Document index

3. Master plan, architecture & building design

The GHMC building permit is for a residential building on survey 29/1, with a stated site area and net area of 744 m². It identifies Building - A as 1 Stilt + 5 upper floors, with a recorded height of 15 m. No basement or podium is identified in the supplied permit extraction.

The permit extraction records residential use and no commercial or “other” area in its land-use breakdown. It also lists a stilt area of 355.53; the supplied text does not specify the unit for that figure. The permit’s “Proposed Covered builtup area” entry is rendered as 128,803.00, but the extraction does not make its scale or formatting sufficiently clear to report it as a verified approved built-up area. No reliable evidence is supplied for building footprint, floor-by-floor apartment arrangement, lifts, stairs, internal circulation, open-space dimensions or phase organization.

The title-report extraction describes the development agreement as covering plots 16 (southern part), 17, 18 and 19 (southern part), stated there to total 889.32 square yards; that document describes development rights and an area-share arrangement.

4. Homes, configurations & floor plans

TG-RERA records the following apartment configurations and saleable areas. Unit counts and availability are portal-filed figures with no recorded as-of date. RERA unit details RERA unit table RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK50595.0 sq. mNot availableNot supplied
3BHK10010137.3 sq. mNot availableNot supplied

The supplied floor-plan record reports two drawings, with no flat layouts measured. Carpet area and room dimensions therefore cannot be reported. RERA-filed saleable area is distinct from carpet area: no software-measured carpet figures, balcony or utility measurements, or loading figures are supplied for this project. Floor plans RERA unit details

5. Parking & vehicle circulation

The supplied records do not establish a count of sanctioned car or two-wheeler spaces, visitor or accessible parking, parking levels, ramps, driveway arrangements, EV charging provision, or unit-specific parking allocations. The GHMC permit identifies a stilt floor but does not, in the extracted information, specify parking capacity or allocation. A vendor listing mentions covered car parking and EV charging stations, but those claims are not established as sanctioned or delivered project provisions in the supplied RERA and permit records. Promoter website

6. Amenities, recreation & open spaces

The project filing records certain site facilities as available, while the supplied RERA amenity data shows 0% progress for the listed items. These figures are filing data, not independent verification of completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Clubhouse / indoorNo clubhouse or indoor recreation facility documentedRERA amenitiesNot established
Sports / recreationGreen strip / tot-lot / park recorded as available; permit also lists a tot-lotRERA amenitiesRERA amenity progress: 0%; completion not independently verified
Landscape / open spacePermit extraction lists 35 Trees; no landscaping or open-space area is suppliedPermit-listed provision; planting/completion not independently verified
Convenience / communityCommunity buildings listed in RERA amenity fields; no size or facility detail suppliedRERA amenitiesRERA amenity progress: 0%; delivery not verified

7. Utilities, building services & safety

The RERA amenity fields mark water supply, sewerage, rainwater harvesting / water conservation, and an electrical meter room, sub-station or receiving station as available. Their capacities, exact configuration and completed status are not supplied. The same amenity record lists storm-water drains, sewage treatment/disposal, solid-waste management, energy management, fire protection and street lighting, each with 0% progress; no independent completion verification is provided. RERA amenities

The GHMC permit requires a rainwater-harvesting percolation pit, space for a transformer and a garbage house. It also states that an occupancy certificate is compulsory before occupation. The permit extraction lists 4 RWHPs, but does not explain their configuration or capacity. No specific water source, storage or treatment capacity, STP capacity, backup power, lift or service-lift details, fire-system equipment, accessibility arrangements, or CCTV/access-control system is established by the project filing and permit information supplied here. RERA amenities

8. Location, access & connectivity

The registered project location is BIRAMULAGUDA, in Saroornagar Mandal, Ranga Reddy District, PIN 500079. The project’s filed boundaries include 30 FEET ROAD on both the east and west. The building-permit record refers to Bairamula Guda and records road widths of 18 mt.; the supplied extraction does not explain the relationship between that figure and the boundary descriptions. RERA record RERA filing

The supplied location record gives the Financial District (Nanakramguda) as an anchor at 1.2 km. No other verified road, public-transport or landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is SHIKARA CONSTRUCTIONS, recorded as a partnership. Its GSTIN is 36ADTFS3980R1ZS. The supplied promoter address is SRI SAI NIVAS, ROAD NO 1, YASHODHODA NAGAR, BIRAMULAGUDA, Saroornagar, Ranga Reddy, 500079; the project record does not provide an official telephone number or website. Parties record RERA filing Corporate record

P. SURENDER REDDY signed the Form B declaration as authorized signatory. In the declaration dated 11/02/2021, the promoter states a legal-title basis for the project land, declares that the land is free from encumbrances, and undertakes completion by 19/03/2024. These are promoter declarations, not independent verification.

The RERA record labels the project “On-Going Project,” but the supplied evidence does not include a verified construction-progress report or an occupancy certificate. The registration certificate records validity only through 19/03/2024, and no extension is shown in the supplied certificate data. RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C records SAI RAGHAVENDRA ARCADE, registration P02400002705, granted under section 5; validity 18/03/2021–19/03/2024.
GHMC building permitBuilding Permit Order for Building - A (residential), survey 29/1, approval 2/C4/04622/2019, approved 19 March 2019; file no. 2/C4/24143/2018.
Approved plan / drawingA layout-plan document is listed in the RERA file, but it is not extracted as a readable approved-plan drawing in the supplied evidence. Document index
Promoter declarationForm B dated 11/02/2021, signed by P. SURENDER REDDY as authorized signatory for SHIKARA CONSTRUCTIONS.
Occupancy / completion certificateNot included in the supplied project documents. The GHMC permit says an occupancy certificate is compulsory before occupation. Document index
Other recorded permit identifiersPermit extraction lists layout/subdivision references LRS24052016114354, LRS2405201603271, LRS24052016032811 and LRS15102016055304.

Frequently asked questions

Is SAI RAGHAVENDRA ARCADE registered with Telangana RERA?

Yes. SAI RAGHAVENDRA ARCADE is registered with the Telangana Real Estate Regulatory Authority as P02400002705; the registration status is On-Going Project.

Who is the developer of SAI RAGHAVENDRA ARCADE?

The promoter named in the RERA registration is SHIKARA CONSTRUCTIONS.

Where is SAI RAGHAVENDRA ARCADE located?

SAI RAGHAVENDRA ARCADE is in BIRAMULAGUDA, Saroornagar, Rangareddy, Telangana (500079).

When will SAI RAGHAVENDRA ARCADE be completed?

The promoter's proposed date of completion filed with RERA is 19/03/2024. This is the promoter's declaration, not a guarantee.

More projects in Saroornagar