Shiva Vikasa-I
ACE SRIJA CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200002516
SHIVA VIKASA-I is a residential apartment project in Nagole, Uppal Mandal, Medchal-Malkajgiri District, developed by the registered promoter ACE SRIJA CONSTRUCTIONS. The registered site extent is 501.1 sq.mts, and the project records one building with 1 Stilt + 5 upper floors. Its TG-RERA unit schedule lists 4 1BHK units. The project is registered under TG-RERA number P02200002516, with proposed completion on 16/10/2026.
More from Ace Srija Constructions · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
12 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SHIVA VIKASA-I RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | Recorded as the registered project SHIVA VIKASA-I; a separate phase name or phase number is not disclosed RERA record |
| TG-RERA registration | P02200002516 |
| Registration validity | 01/02/2021–16/10/2026; the certificate says five years, unless extended. The supplied certificate records no extension |
| Registered promoter | ACE SRIJA CONSTRUCTIONS, recorded as a partnership RERA record RERA filing |
| RERA status | Registration certificate supplied; the project header records status as New Project. This is distinct from the registration’s stated validity and the completion undertaking RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / address description | Nagole; the RERA completion certificate describes Block No.4, Co-operative Bank Colony, Nagole. The building permit describes Co.op. Bank colony (Nagole) RERA record |
| Revenue village | Nagole RERA record |
| Mandal / district / PIN | Uppal / Medchal-Malkajgiri / 500068 RERA record |
| Project survey and plot identity | Survey No. 92, including Plot Nos. 185-PART & 188-PART; the building-permit extraction also lists “185-PART” and “188-PART” as survey numbers, while the RERA land record identifies them as plot numbers RERA record RERA filing |
| Registered site extent | 501.1 m² in the building permit and RERA land record; the RERA completion certificate states 501.3 Sq.Mtrs. RERA filing |
| Net / total area | RERA land record: total 501.1 sq.mts and net 501.10 sq.mts; affected area recorded as 0 RERA filing |
| Boundaries (RERA land record) | East: PLOT Nos 185 Parts And 188 Part; West: Road 40 wide; North: PLOT Nos 185 Part; South: PLOT No 189 RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit Order 2/C3/10959/2020, approved 16 October, 2020 Approvals record |
| Other file number on permit | 2/C3/09808/2020 |
| Approved built-up area | RERA project record: 1305.90 sqmts RERA filing |
| Building count | One building is recorded in the RERA land details; the permit describes Building - PROPOSED-1 RERA filing |
| Sanctioned floors and height | 1 Stilt + 5 upper floors; sanctioned height 15 m |
| Parking / other sanctioned parameters | Stilt parking area 203.90 m2; number of parking spaces is not stated in the supplied permit extraction |
| Unit counts | RERA land details record 1 total and proposed building unit; the RERA unit schedule records 4 1BHK units. The permit extraction says 5 units, while the completion certificate identifies 10 units; the supplied records do not explain these counts RERA filing RERA unit table |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configuration | 1BHK, 4 units; filed saleable area 108.83 sqm RERA unit table |
| Booked / available | 3 booked; 1 available, as last read from the TG-RERA portal; no as-of date is provided, so these figures are indicative RERA unit table |
| Construction stage | A Form–1A architect’s certificate describing cost incurred and work progress is supplied, but the extracted information does not state a completion percentage or a dated current construction stage |
| Completion date | The project header records proposed completion 16/10/2026 RERA record |
| Occupancy certificate (OC) | No OC is identified in the supplied project evidence; the building permit states that an OC is compulsory before occupation |
2. The project story
SHIVA VIKASA-I is registered with TG-RERA as a residential apartment project at Nagole, Uppal Mandal, Medchal-Malkajgiri District. The filed land identity is Survey No. 92 and Plot Nos. 185-PART & 188-PART, with a site extent recorded as 501.1 sq.mts in the RERA land details. The GHMC building permit describes one proposed residential building with stilt parking and five upper floors. RERA record RERA filing
The RERA unit schedule offers four 1BHK units, with three recorded as booked and one as available; the portal extract has no as-of date. A RERA-filed architect’s Form–1A certificate describes work-progress and cost information, but the supplied extraction does not establish a current completion percentage or independently verified site condition. The evidence supplied does not identify an occupancy certificate. RERA unit table
3. Master plan, architecture & building design
The supplied GHMC building permit records one proposed residential building of 1 Stilt + 5 upper floors, with a sanctioned height of 15 m. It records residential upper-floor area of 1,088.25 m2, stilt parking area of 203.90 m2, and compound wall length of 79.4 RM. The project’s RERA fields separately record approved built-up area of 1305.90 sqmts. These are separately labelled figures from different record fields. RERA filing
The permit records a 74.83 m2 tot-lot, 2 rainwater-harvesting pits (RWHPs), and a requirement to provide space for a transformer. It also specifies 25 trees. The supplied material does not provide a complete drawing-derived account of floor-by-floor unit arrangement, number of flats per floor, lift or stair configuration, building footprint, internal circulation, or open-space plan.
A typical floor-plan drawing is available for measurement, but the software-measured figures are not RERA-filed measurements and are marked as needing review. Floor plans RERA unit details
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 1BHK | 4 | 3 | 1 | 108.83 sqm | Software-measured from drawings: median 90.3 sqm, range 82.0–94.8 sqm; drawing measurements need review | 17% |
RERA unit table RERA unit details Floor plans
The filed figure is saleable area. The carpet-area figures are software measurements from the typical-floor-plan drawing, not RERA disclosures; the supplied measurement note says saleable area also includes the home’s share of common areas. The measured sample covers four flat designs. One illustrated flat includes a living/dining area, kitchen, bedroom, toilet, wash area and a balcony labelled 1.54 M. WIDE BALC; the balcony is excluded from the measured carpet area. Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC permit records a 203.90 m2 stilt parking area. The supplied permit extraction does not state the number of parking bays or identify resident, visitor or accessible-space allocations. The RERA registration records a mortgage area of 111.88 sqmts, and the building permit specifies a handed-over second-floor area of 111.88 m2; the supplied material does not establish unit-specific parking ownership or allocation. RERA filing RERA record
The supplied records do not specify parking levels beyond the stilt, parking ramps, EV charging, or separate pedestrian and vehicle routes.
6. Amenities, recreation & open spaces
| Description / size | Tot-lot 74.83 m2; permit requires it to be fenced and maintained as greenery before OC |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Sanctioned condition; completion not independently verified |
| Description / size | 25 trees recorded in sanctioned parameters; Form–1A lists landscaping and tree planting |
|---|---|
| Evidence source | GHMC building permit; architect’s Form–1A |
| Declared progress / verified status | Listed in records; completion status not independently verified |
No project-specific clubhouse, indoor recreation, or sports facilities are established in the supplied TG-RERA documents or sanctioned parameters. The supplied evidence does not provide independently verified completion status for the listed open-space and landscaping items. RERA amenities
7. Utilities, building services & safety
| Evidence in the supplied project record | Form–1A lists water supply; the amenity record marks water supply available at 100% |
|---|---|
| Status / limitation | RERA-filed/declared information; independent verification is not supplied RERA amenities |
| Evidence in the supplied project record | Form–1A lists sewerage chambers, lines, septic tanks and STP; the permit requires ETP as per standard specification |
|---|---|
| Status / limitation | The records name these provisions; capacities and independent completion verification are not supplied |
| Evidence in the supplied project record | Form–1A lists storm-water drains; the amenity record reports 0% |
|---|---|
| Status / limitation | Listed in the certificate; progress is recorded as 0% in the supplied amenity record RERA amenities |
| Evidence in the supplied project record | Permit records 2 RWHPs; Form–1A lists rainwater harvesting; the amenity record reports 100% for water conservation/rainwater harvesting |
|---|---|
| Status / limitation | Declared in project records; independent verification is not supplied RERA amenities |
| Evidence in the supplied project record | Form–1A lists an electrical meter room and transformer; permit requires transformer space |
|---|---|
| Status / limitation | Listed/required; independent completion verification is not supplied |
| Evidence in the supplied project record | Permit requires an Occupancy FIRE NOC from Director (EV&DM) before issue of OC |
|---|---|
| Status / limitation | Requirement recorded; no Fire NOC or OC is identified in the supplied evidence |
| Evidence in the supplied project record | The supplied extracts do not specify lift number or capacity, backup power, waste management, CCTV/security systems, or accessibility provisions |
|---|---|
| Status / limitation | Not disclosed in the supplied project records |
8. Location, access & connectivity
The registered project location is Nagole, Uppal Mandal, Medchal-Malkajgiri District, PIN 500068. The RERA completion certificate places it at Block No.4, Co-operative Bank Colony, Nagole; the GHMC permit describes Co.op. Bank colony (Nagole). The RERA land record lists a western boundary as Road 40 wide. RERA record RERA filing
No project-specific approach route, public-transport details, or verified distances to nearby facilities are provided in the supplied RERA location evidence. Location record
9. Developer & development status
The registered promoter is ACE SRIJA CONSTRUCTIONS, recorded in the project filing as a partnership. The RERA record lists SRIKANTH MAKKAPATI and SHYAM SUNDER RAO MAKKAPATI as authorized signatories and identifies Shyam Sunder Rao Makkapati as a partner. The RERA completion certificate gives the promoter’s office location as Nagole, Uppal, Medchal-Malkajgiri, PIN 500068. The supplied records do not provide a verified corporate identifier, official website, or contact details. RERA record RERA filing Parties record
An architect’s Form–1A certificate is filed for the project and describes cost incurred and work progress. The extracted information does not give a dated percentage of completion. The project header records proposed completion 16/10/2026; this completion timeline is separate from the registration-validity period ending 16/10/2026. No occupancy certificate is identified in the supplied evidence. RERA record
10. Approvals, official records & documents
| Supplied evidence | Form ‘C’, registration P02200002516, issued 01/02/2021, stated validity to 16/10/2026 |
|---|---|
| Scope / note | SHIVA VIKASA-I; certificate includes conditions on agreement for sale, conveyance and separate-account deposit |
| Supplied evidence | Building Permit Order 2/C3/10959/2020, approved 16 October, 2020 |
|---|---|
| Scope / note | Proposed residential building at Nagole; permit lists 1 Stilt + 5 upper floors and conditions including OC before occupation |
| Supplied evidence | 2/C3/09808/2020 |
|---|---|
| Scope / note | Listed on the GHMC permit |
| Supplied evidence | Certificate of cost incurred and work progress for SHIVA VIKASA-1 |
|---|---|
| Scope / note | RERA-filed certificate; extracted record does not state a completion percentage |
| Supplied evidence | Affidavit-cum-declaration by Shyam Sunder Rao Makkapati for ACE Srija Constructions |
|---|---|
| Scope / note | Promoter declaration; declaration date is rendered in the supplied extraction as “23Y-day of January 2934” |
| Supplied evidence | Typical floor-plan drawing in document 141302 |
|---|---|
| Scope / note | Used for software measurement; measurement needs review |
| Supplied evidence | Not identified in the supplied evidence |
|---|---|
| Scope / note | The GHMC permit states an OC is compulsory before occupation |
The supplied project records identify the principal registration and building-permit documents above. An approved-layout record, a project-specific occupancy certificate, and a separate completion certificate are not identified in the supplied evidence.
1. Project at a glance
Project identity
Registered project name: SHIVA VIKASA-I
Project type: Residential apartment project
Phase / registered portion: Recorded as the registered project SHIVA VIKASA-I; a separate phase name or phase number is not disclosed
TG-RERA registration: P02200002516
Registration validity: 01/02/2021–16/10/2026; the certificate says five years, unless extended. The supplied certificate records no extension
Registered promoter: ACE SRIJA CONSTRUCTIONS, recorded as a partnership
RERA status: Registration certificate supplied; the project header records status as New Project. This is distinct from the registration’s stated validity and the completion undertaking
Land and geographic identity
Locality / address description: Nagole; the RERA completion certificate describes Block No.4, Co-operative Bank Colony, Nagole. The building permit describes Co.op. Bank colony (Nagole)
Revenue village: Nagole
Mandal / district / PIN: Uppal / Medchal-Malkajgiri / 500068
Project survey and plot identity: Survey No. 92, including Plot Nos. 185-PART & 188-PART; the building-permit extraction also lists “185-PART” and “188-PART” as survey numbers, while the RERA land record identifies them as plot numbers
Registered site extent: 501.1 m² in the building permit and RERA land record; the RERA completion certificate states 501.3 Sq.Mtrs.
Net / total area: RERA land record: total 501.1 sq.mts and net 501.10 sq.mts; affected area recorded as 0
Boundaries (RERA land record): East: PLOT Nos 185 Parts And 188 Part; West: Road 40 wide; North: PLOT Nos 185 Part; South: PLOT No 189
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 2/C3/10959/2020, approved 16 October, 2020
Other file number on permit: 2/C3/09808/2020
Approved built-up area: RERA project record: 1305.90 sqmts
Building count: One building is recorded in the RERA land details; the permit describes Building - PROPOSED-1
Sanctioned floors and height: 1 Stilt + 5 upper floors; sanctioned height 15 m
Parking / other sanctioned parameters: Stilt parking area 203.90 m2; number of parking spaces is not stated in the supplied permit extraction
Unit counts: RERA land details record 1 total and proposed building unit; the RERA unit schedule records 4 1BHK units. The permit extraction says 5 units, while the completion certificate identifies 10 units; the supplied records do not explain these counts
Offering and status
RERA-filed configuration: 1BHK, 4 units; filed saleable area 108.83 sqm
Booked / available: 3 booked; 1 available, as last read from the TG-RERA portal; no as-of date is provided, so these figures are indicative
Construction stage: A Form–1A architect’s certificate describing cost incurred and work progress is supplied, but the extracted information does not state a completion percentage or a dated current construction stage
Completion date: The project header records proposed completion 16/10/2026
Occupancy certificate (OC): No OC is identified in the supplied project evidence; the building permit states that an OC is compulsory before occupation
2. The project story
SHIVA VIKASA-I is registered with TG-RERA as a residential apartment project at Nagole, Uppal Mandal, Medchal-Malkajgiri District. The filed land identity is Survey No. 92 and Plot Nos. 185-PART & 188-PART, with a site extent recorded as 501.1 sq.mts in the RERA land details. The GHMC building permit describes one proposed residential building with stilt parking and five upper floors.
The RERA unit schedule offers four 1BHK units, with three recorded as booked and one as available; the portal extract has no as-of date. A RERA-filed architect’s Form–1A certificate describes work-progress and cost information, but the supplied extraction does not establish a current completion percentage or independently verified site condition. The evidence supplied does not identify an occupancy certificate.
3. Master plan, architecture & building design
The supplied GHMC building permit records one proposed residential building of 1 Stilt + 5 upper floors, with a sanctioned height of 15 m. It records residential upper-floor area of 1,088.25 m2, stilt parking area of 203.90 m2, and compound wall length of 79.4 RM. The project’s RERA fields separately record approved built-up area of 1305.90 sqmts. These are separately labelled figures from different record fields.
The permit records a 74.83 m2 tot-lot, 2 rainwater-harvesting pits (RWHPs), and a requirement to provide space for a transformer. It also specifies 25 trees. The supplied material does not provide a complete drawing-derived account of floor-by-floor unit arrangement, number of flats per floor, lift or stair configuration, building footprint, internal circulation, or open-space plan.
A typical floor-plan drawing is available for measurement, but the software-measured figures are not RERA-filed measurements and are marked as needing review.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 1BHK | 4 | 3 | 1 | 108.83 sqm | Software-measured from drawings: median 90.3 sqm, range 82.0–94.8 sqm; drawing measurements need review | 17% |
The filed figure is saleable area. The carpet-area figures are software measurements from the typical-floor-plan drawing, not RERA disclosures; the supplied measurement note says saleable area also includes the home’s share of common areas. The measured sample covers four flat designs. One illustrated flat includes a living/dining area, kitchen, bedroom, toilet, wash area and a balcony labelled 1.54 M. WIDE BALC; the balcony is excluded from the measured carpet area.
5. Parking & vehicle circulation
The GHMC permit records a 203.90 m2 stilt parking area. The supplied permit extraction does not state the number of parking bays or identify resident, visitor or accessible-space allocations. The RERA registration records a mortgage area of 111.88 sqmts, and the building permit specifies a handed-over second-floor area of 111.88 m2; the supplied material does not establish unit-specific parking ownership or allocation.
The supplied records do not specify parking levels beyond the stilt, parking ramps, EV charging, or separate pedestrian and vehicle routes.
6. Amenities, recreation & open spaces
| Description / size | Tot-lot 74.83 m2; permit requires it to be fenced and maintained as greenery before OC |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Sanctioned condition; completion not independently verified |
| Description / size | 25 trees recorded in sanctioned parameters; Form–1A lists landscaping and tree planting |
|---|---|
| Evidence source | GHMC building permit; architect’s Form–1A |
| Declared progress / verified status | Listed in records; completion status not independently verified |
No project-specific clubhouse, indoor recreation, or sports facilities are established in the supplied TG-RERA documents or sanctioned parameters. The supplied evidence does not provide independently verified completion status for the listed open-space and landscaping items.
7. Utilities, building services & safety
| Evidence in the supplied project record | Form–1A lists water supply; the amenity record marks water supply available at 100% |
|---|---|
| Status / limitation | RERA-filed/declared information; independent verification is not supplied |
| Evidence in the supplied project record | Form–1A lists sewerage chambers, lines, septic tanks and STP; the permit requires ETP as per standard specification |
|---|---|
| Status / limitation | The records name these provisions; capacities and independent completion verification are not supplied |
| Evidence in the supplied project record | Form–1A lists storm-water drains; the amenity record reports 0% |
|---|---|
| Status / limitation | Listed in the certificate; progress is recorded as 0% in the supplied amenity record |
| Evidence in the supplied project record | Permit records 2 RWHPs; Form–1A lists rainwater harvesting; the amenity record reports 100% for water conservation/rainwater harvesting |
|---|---|
| Status / limitation | Declared in project records; independent verification is not supplied |
| Evidence in the supplied project record | Form–1A lists an electrical meter room and transformer; permit requires transformer space |
|---|---|
| Status / limitation | Listed/required; independent completion verification is not supplied |
| Evidence in the supplied project record | Permit requires an Occupancy FIRE NOC from Director (EV&DM) before issue of OC |
|---|---|
| Status / limitation | Requirement recorded; no Fire NOC or OC is identified in the supplied evidence |
| Evidence in the supplied project record | The supplied extracts do not specify lift number or capacity, backup power, waste management, CCTV/security systems, or accessibility provisions |
|---|---|
| Status / limitation | Not disclosed in the supplied project records |
8. Location, access & connectivity
The registered project location is Nagole, Uppal Mandal, Medchal-Malkajgiri District, PIN 500068. The RERA completion certificate places it at Block No.4, Co-operative Bank Colony, Nagole; the GHMC permit describes Co.op. Bank colony (Nagole). The RERA land record lists a western boundary as Road 40 wide.
No project-specific approach route, public-transport details, or verified distances to nearby facilities are provided in the supplied RERA location evidence.
9. Developer & development status
The registered promoter is ACE SRIJA CONSTRUCTIONS, recorded in the project filing as a partnership. The RERA record lists SRIKANTH MAKKAPATI and SHYAM SUNDER RAO MAKKAPATI as authorized signatories and identifies Shyam Sunder Rao Makkapati as a partner. The RERA completion certificate gives the promoter’s office location as Nagole, Uppal, Medchal-Malkajgiri, PIN 500068. The supplied records do not provide a verified corporate identifier, official website, or contact details.
An architect’s Form–1A certificate is filed for the project and describes cost incurred and work progress. The extracted information does not give a dated percentage of completion. The project header records proposed completion 16/10/2026; this completion timeline is separate from the registration-validity period ending 16/10/2026. No occupancy certificate is identified in the supplied evidence.
10. Approvals, official records & documents
| Supplied evidence | Form ‘C’, registration P02200002516, issued 01/02/2021, stated validity to 16/10/2026 |
|---|---|
| Scope / note | SHIVA VIKASA-I; certificate includes conditions on agreement for sale, conveyance and separate-account deposit |
| Supplied evidence | Building Permit Order 2/C3/10959/2020, approved 16 October, 2020 |
|---|---|
| Scope / note | Proposed residential building at Nagole; permit lists 1 Stilt + 5 upper floors and conditions including OC before occupation |
| Supplied evidence | 2/C3/09808/2020 |
|---|---|
| Scope / note | Listed on the GHMC permit |
| Supplied evidence | Certificate of cost incurred and work progress for SHIVA VIKASA-1 |
|---|---|
| Scope / note | RERA-filed certificate; extracted record does not state a completion percentage |
| Supplied evidence | Affidavit-cum-declaration by Shyam Sunder Rao Makkapati for ACE Srija Constructions |
|---|---|
| Scope / note | Promoter declaration; declaration date is rendered in the supplied extraction as “23Y-day of January 2934” |
| Supplied evidence | Typical floor-plan drawing in document 141302 |
|---|---|
| Scope / note | Used for software measurement; measurement needs review |
| Supplied evidence | Not identified in the supplied evidence |
|---|---|
| Scope / note | The GHMC permit states an OC is compulsory before occupation |
The supplied project records identify the principal registration and building-permit documents above. An approved-layout record, a project-specific occupancy certificate, and a separate completion certificate are not identified in the supplied evidence.
Frequently asked questions
Is SHIVA VIKASA-I registered with Telangana RERA?
Yes. SHIVA VIKASA-I is registered with the Telangana Real Estate Regulatory Authority as P02200002516; the registration status is New Project.
Who is the developer of SHIVA VIKASA-I?
The promoter named in the RERA registration is ACE SRIJA CONSTRUCTIONS.
Where is SHIVA VIKASA-I located?
SHIVA VIKASA-I is in Nagole, Uppal, Medchal-Malkajgiri, Telangana (500068).
When will SHIVA VIKASA-I be completed?
The promoter's proposed date of completion filed with RERA is 16/10/2026. This is the promoter's declaration, not a guarantee.