AKSHAYA ARCADE is a commercial project at ARUNODAYA NAGR, Nagole, Uppal, Medchal-Malkajgiri. It is being developed by registered promoter ULTIMA BUILDERS, a partnership. The project covers 907.89 sq m and comprises one building with 1 Cellar + Ground + 4 upper floors and five office-use units: one on the ground floor and one on each of the first through fourth floors. It is registered under TG-RERA **P02200005868**, and the project fields state proposed completion **12/08/2027**.

More from Ultima Builders · 2 projects →

01What we found

RegisteredTG-RERA - valid till 12 Apr 2027
13documents on file - each fact links to its page
7court cases on this project's land (survey 92, Nagole)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameAKSHAYA ARCADE RERA record
Project typeCommercial; the building-permit document also describes the permitted building as an apartment project. The RERA unit schedule identifies office-use units. RERA filing RERA unit table
Phase / registered portionPhase not identified in the supplied RERA record. The registered site is at Plot Nos. 85/A and 85/B.
TG-RERA registrationP02200005868, issued 28/03/2023; stated validity 28/03/2023–12/04/2027. Registration validity is not the project completion deadline.
Registered promoterULTIMA BUILDERS, partnership. RERA filing Parties record
RERA statusRegistration certificate records a grant under section 5. The certificate says registration is not extended.

Land and geographic identity

ItemProject record
Revenue villageNagole; the GHMC permit labels the village NAGOLE. RERA record
LocalityARUNODAYA NAGR in the RERA project fields; the building-permit document names Arunodaya Nagar. RERA filing
Mandal / district / PINUppal / Medchal-Malkajgiri / 500068. RERA record
Project survey numbersSurvey Nos. 92 and 93; no subdivision is stated in the supplied project identity. RERA record
Plot identifiers85/A and 85/B. Land records
Registered site extent907.89 sq m total site area; 726.18 sq m net area, as stated in the building-permit extraction.
RERA land-form areasTotal area 907.89 sq m; road widening/FTL/Nala affected area 181.71 sq m; net area 726.18 sq m. RERA filing
BoundariesEast: ROAD WIDTH 9; West: PLOT NO 107A; North: PLOT NO 86; South: ROAD WIDTH 16. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC).
Principal building permitPermit 1/C3/05486/2021, dated 12 April, 2021; file 1/C3/00863/2019. Approvals record
Sanctioned buildingOne building, 1 Cellar + Ground + 4 upper floors; stated height 14.99 m.
Approved built-up areaRERA project fields state approved built-up area 1,645.37 sq m. The permit extraction separately reports ground-floor area 197.38 m² and four upper floors area 1,448.00 m². RERA filing
Parking levelCellar parking is shown as 1 area 473.03 m²; the permit conditions say the cellar and any approved stilt parking are for vehicle parking.
Unit countsThe permit extraction does not supply a unit count. The RERA record lists 5 office-use units; the project fields separately state 1 total building unit and 1 proposed building unit, without clarifying that count against the office schedule. RERA filing RERA unit table

Offering and status

ItemProject record
RERA-filed offeringFive office-use units: ground floor and first through fourth floors. RERA unit table
RERA-filed saleable area284.74–389.72 sq m across the five units. RERA unit table
Booked / available0 booked / 5 available as last read from the TG-RERA portal; the supplied record gives no as-of date, so counts are indicative. RERA unit table
Construction stageNo construction-progress figure or independently verified site-stage evidence is supplied. The RERA amenities/infrastructure progress entries shown are each 0%. RERA amenities
Completion deadlineThe promoter’s Form B undertaking states completion by 12-APRIL-2027. The project fields state proposed completion 12/08/2027. RERA filing
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The building permit requires an occupancy certificate before occupation. Document index

2. The project story

AKSHAYA ARCADE is a TG-RERA-registered commercial development at Plot Nos. 85/A and 85/B in Survey Nos. 92 and 93, Nagole, Uppal Mandal, Medchal-Malkajgiri District. The permitted development is one building arranged as a cellar, ground floor and four upper floors. The RERA unit schedule describes five office-use units, one on each of the ground through fourth floors. RERA record Land records RERA unit table

The available record establishes the GHMC building permit and the RERA registration, but does not establish actual construction progress or completion. The RERA progress fields supplied for listed infrastructure and amenities show 0%; that is a record of the filed progress values, not an independent site inspection. No occupancy or completion certificate is included in the supplied documents. RERA amenities Document index

3. Master plan, architecture & building design

The GHMC permit extraction describes one building, 1 Cellar + Ground + 4 upper floors, with a stated height of 14.99 m. It records a ground-floor area of 197.38 m², four upper floors with area 1,448.00 m², and cellar parking area 473.03 m². Separately, the RERA project fields state approved built-up area 1,645.37 sq m. These figures are retained under their respective source labels; the supplied material does not define them as interchangeable area measures. RERA filing

The permit extraction records site area 907.89 m², road-affected area 176.74 m², and net area 726.18 m². The RERA land form instead records affected area 181.71 sq m. The building-permit extraction lists four rainwater-harvesting structures, six trees, a 0 m² tot-lot, and a compound wall of 105.17 RM. RERA filing

The supplied drawing review contains two drawings, both recorded as having no flats; no measured floor-plan areas are available. Detailed information on floor-by-floor circulation, lifts, stairs, entrances, office layouts, common-area distribution, and internal open-space arrangement is not established by the supplied extracts. Floor plans

4. Homes, configurations & floor plans

The RERA schedule identifies office-use units rather than homes. Its filed count, booking status and saleable areas are:

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Ground floor office101284.74 sq mNot measuredNot supplied
1st-floor office use101389.72 sq mNot measuredNot supplied
2nd-floor office use101389.72 sq mNot measuredNot supplied
3rd-floor office use101389.72 sq mNot measuredNot supplied
4th-floor office use101389.72 sq mNot measuredNot supplied

RERA unit table RERA unit details Floor plans

No carpet-area measurements were produced from the supplied drawings. The floor-plan review records two drawings and no measured units. RERA saleable area is the filed figure; it should not be treated as a carpet-area measurement. The supplied materials do not provide a loading figure or room dimensions. Floor plans RERA unit details

5. Parking & vehicle circulation

The GHMC permit extraction identifies a cellar parking area of 473.03 m² and states that the cellar and any stilt approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not state a number of parking spaces or provide unit-wise parking allocations.

The RERA unit schedule marks the second-floor office-use unit as mortgaged; the project fields also state a mortgage area of 167.39 sq m. The supplied documents do not establish parking ownership, exclusive allocation, visitor or accessible spaces, parking access arrangements, EV charging, or a vehicle-space count. RERA unit table RERA filing

6. Amenities, recreation & open spaces

The RERA progress record lists the following infrastructure and amenity categories, each at 0%. This is the filed progress information supplied, not independent verification of site conditions.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads & footpathsSize not statedRERA amenities0%; not independently verified
Water supplySource/capacity not stated in RERA progress itemRERA amenities0%; not independently verified
Sewerage, treatment and disposalChamber, lines, septic tank and STP category; size/capacity not statedRERA amenities0%; not independently verified
Storm-water drainsSize/details not statedRERA amenities0%; not independently verified
Green strip / tot-lot / parkThe permit extraction records tot-lot 0 m² and 6 treesRERA amenitiesRERA progress entry 0%; completion not verified
Street lightingDetails not statedRERA amenities0%; not independently verified
Community buildingsDetails not statedRERA amenities0%; not independently verified
Solid-waste management and disposalDetails not statedRERA amenities0%; not independently verified
Water conservation / rainwater harvestingPermit extraction lists 4 rainwater-harvesting structuresRERA amenitiesRERA progress entry 0%; completion not verified
Energy managementDetails not statedRERA amenities0%; not independently verified
Fire protection and fire-safety requirementsDetails not stated in the progress recordRERA amenities0%; not independently verified
Electrical meter room / sub-station / receiving stationPermit condition requires transformer space; other details not statedRERA amenitiesRERA progress entry 0%; completion not verified
Recreational open spaceArea not stated in the progress recordRERA amenities0%; not independently verified

The permit extraction also lists a garbage house, an effluent-treatment provision (ETP), and cellar storm-water dewatering arrangements. These are permit-document provisions; the supplied evidence does not confirm their installation or operation.

7. Utilities, building services & safety

The GHMC permit extraction requires provision of transformer space, an ETP, rainwater harvesting, and a cellar mud sump with a motor for dewatering excess water. It also requires an occupancy fire NOC from the Director (EV&DM) before issue of an occupancy certificate. These are stated permit requirements; the supplied evidence does not establish completion, operational status, capacity, or issuance of the fire NOC or occupancy certificate.

The record does not establish water source or storage capacity, a completed STP, wastewater reuse, electrical backup, lift number or capacity, CCTV, access control, waste-segregation arrangements, accessibility features, or the number and arrangement of escape stairs. The RERA progress entries for water supply, sewerage, storm-water drainage, fire safety, energy management, and electrical facilities are each recorded at 0%. RERA amenities

8. Location, access & connectivity

The registered location is ARUNODAYA NAGR, revenue village Nagole, Uppal Mandal, Medchal-Malkajgiri District, PIN 500068. The building-permit document identifies the locality as Arunodaya Nagar, Nagole. RERA record

The location data provides an approximate sampled distance of 8.8 km to the nearest sampled Outer Ring Road interchange. No further project-specific road, public-transport or landmark distances are supplied in the location record. Location record

9. Developer & development status

The registered promoter is ULTIMA BUILDERS, identified in the RERA record as a partnership with GSTIN 36AAFFU7699N1Z2. The listed partners are SHYAM SUNDER RAO and SRINIVAS REDDY ADDUPULA; VENKATESWAR REDDY A is listed as authorized signatory. The promoter address in the project record is POORNODAY COLONY, ARUNODAYA NAGAR, ARUNODAYA NAGR, Uppal, Medchal-Malkajgiri, 500068. The supplied record does not establish an official website or contact details. Corporate record Parties record

The promoter’s Form B declares completion by 12-APRIL-2027. The project fields state proposed completion 12/08/2027. No project-specific construction progress assessment, completion certificate or occupancy certificate is supplied, so the construction stage and delivery status cannot be confirmed from this evidence. RERA filing Document index

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for AKSHAYA ARCADE, registration P02200005868; issued 28/03/2023 and valid through 12/04/2027.
GHMC building permitBuilding Permit Order 1/C3/05486/2021, dated 12 April, 2021; file 1/C3/00863/2019. The extraction describes one cellar, ground and four upper floors.
RERA land/title submissionsLegal title report and title-related documents include the filed report at doc 293997, sale-deed documents 293622, 293628 and 293631, and development agreement-cum-GPA 293625. Document index
Promoter declarationForm B declaration by A VENKATESWAR REDDY for ULTIMA BUILDERS.
Layout-plan submissionRERA lists a layout-plan document, but the supplied record says it was not extracted. Document index
Commencement / occupancy / completion evidenceThe GHMC document is a building permit order; no separate commencement notice, occupancy certificate or completion certificate is supplied. The permit states that an occupancy certificate is compulsory before occupation. Document index

Frequently asked questions

Is AKSHAYA ARCADE registered with Telangana RERA?

Yes. AKSHAYA ARCADE is registered with the Telangana Real Estate Regulatory Authority as P02200005868; the registration status is New Project.

Who is the developer of AKSHAYA ARCADE?

The promoter named in the RERA registration is ULTIMA BUILDERS.

Where is AKSHAYA ARCADE located?

AKSHAYA ARCADE is in ARUNODAYA NAGR, Nagole, Uppal, Medchal-Malkajgiri, Telangana (500068).

When will AKSHAYA ARCADE be completed?

The promoter's proposed date of completion filed with RERA is 12/08/2027. This is the promoter's declaration, not a guarantee.