Shiva Nivasa
ACE SRIJA CONSTRUCTIONS · Medchal-Malkajgiri · RERA P02200002515
SHIVA NIVASA is a residential apartment project in Nagole, Uppal mandal, Medchal-Malkajgiri district, developed by registered promoter ACE SRIJA CONSTRUCTIONS. The project is on a site of 502.49 sq. m and comprises one building with 1 Stilt + 5 upper floors and 10 3BHK units. It is registered under TG-RERA number P02200002515, with proposed completion on 28/09/2026.
More from Ace Srija Constructions · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SHIVA NIVASA RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | No separate phase name or phase number is disclosed. The registered site is in Survey No. 92, including Plot Nos. 185-PART, 186-PART, 187 and 188-PART. RERA filing |
| TG-RERA registration | P02200002515 |
| Registration validity | 01/02/2021 to 28/09/2026, unless extended by the Authority; the certificate records no extension. This is registration validity, not confirmation of project completion or occupancy. |
| Registered promoter | ACE SRIJA CONSTRUCTIONS, partnership Corporate record |
| RERA status | New Project; the supplied registration record gives the validity above. RERA filing |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Nagole; the RERA-filed land and registration records identify Nagole village. RERA record RERA filing |
| Mandal / district / PIN | Uppal / Medchal-Malkajgiri / 500068 RERA record |
| Project survey and plot identifiers | Survey No. 92; Plot Nos. 185-PART, 186-PART, 187 & 188-PART. The building-permit extraction also lists survey/plot identifiers as “92”, “185-PART”, “186-PART”, “187” and “188-PART”. |
| Registered site extent | 502.49 sq. m site area and 502.49 sq. m net area in the GHMC building-permit record. The architect’s certificate records 502.61 Sq.Mts. |
| Boundaries | East: ROAD 30 WIDE; West: PLOT NO 185 PARTS AND 186 PART; North: PLOT NOS 185 PART AND 186 PART; South: PLOT NO 190 AND 189 PART. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building-permit number / date | 2/C3/10444/2020, approved 28 September, 2020; the permit extraction also lists file no. 2/C3/09809/2020. Approvals record |
| Approved built-up area | The permit extraction lists 1,208.80 m² residential upper-floor area and 228.01 m² stilt parking area. These are the recorded component areas, not a separately stated total approved built-up area. |
| Building count and floors | One building is recorded in the RERA fields. GHMC permits 1 Stilt + 5 upper floors; the extracted sanctioned height is 15 m. RERA filing |
| Parking level / sanctioned area | Stilt parking: 1, 228.01 m². The supplied extracts do not state a sanctioned bay count. |
| Unit counts | RERA fields record 10 total building units; the architect’s certificate also describes 10 units. The approval extract states that sanctioned unit numbers must not be increased without GHMC approval, but does not give a separate unit total. RERA filing |
Offering and status
| Item | Record |
|---|---|
| Configuration | 3BHK; RERA-filed saleable area 121.0 m² RERA unit table RERA unit details |
| Booked / available | 10 booked / 0 available, as last read from the TG-RERA portal; no as-of date is supplied, so the count is indicative. RERA unit table |
| Construction stage | A Form–1A architect’s certificate dated 23-06-2023 is on file, but the supplied material does not provide a current, independently verified site-stage assessment. |
| Completion date | Proposed completion 28/09/2026 in the project record. A separate original/revised completion-date history is not supplied. RERA record RERA filing |
| Occupancy certificate | No occupancy certificate is identified in the supplied project documents. The GHMC permit makes an occupancy certificate compulsory before occupation. |
2. The project story
SHIVA NIVASA is a RERA-registered residential apartment project in Nagole, on the registered portion identified as Survey No. 92 and Plot Nos. 185-PART, 186-PART, 187 and 188-PART. The project record describes one building and 10 residential units; the registered offering is 3BHK apartments. RERA filing RERA unit table
GHMC’s building-permit record describes a proposed residential building of 1 Stilt + 5 upper floors, with stilt parking. An architect’s Form–1A dated 23-06-2023 identifies the project and its 10 units, but the supplied record does not establish the project’s present on-site construction stage or confirm completion. No occupancy certificate is identified in the evidence provided.
3. Master plan, architecture & building design
The GHMC permit records a 502.49 m² site and net area and a 1,208.80 m² residential upper-floor area, alongside 228.01 m² of stilt parking. It describes one building with 1 Stilt + 5 upper floors and an extracted height of 15 m. The permit also records a 89.71 m² tot-lot.
The supplied records do not give a separate figure for total approved built-up area, building footprint, flats per floor, lifts, staircases, internal circulation, or detailed open-area distribution. A floor-plan drawing is available as document 140657, but its extracted contents do not provide those details here.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 10 | 0 | 121.0 m² | Software-measured range: 86.8–102.5 m²; median 97.8 m² | 19% |
The RERA filing records the unit count, booking count and saleable area. Carpet-area figures and the loading figure are software measurements from floor-plan drawings, not RERA disclosures; the measurement record says four flat designs were measured and notes that the drawing-based figures need review. One drawing-panel example labels bedrooms, hall, kitchen, toilets, a wash area and two balconies; the supplied evidence does not establish that this single example applies identically to every apartment. RERA unit table RERA unit details Floor plans
Saleable area and carpet area are distinct measurements: the drawing-measured carpet figure is not the filed saleable area, and the supplied measurement caveat notes that saleable area also counts the home’s share of common areas. The supplied material does not separately quantify balcony area or common-area loading beyond the stated software-measured loading. Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC permit provides for 1 stilt parking level with a recorded area of 228.01 m². The permit condition states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied record gives no sanctioned number of parking bays, visitor or accessible parking count, EV provision, ramp details, or unit-specific parking allocation. A drawn or sanctioned parking provision does not, on the available evidence, establish an individual buyer’s exclusive allocation.
6. Amenities, recreation & open spaces
| Description / size | GHMC permit records 89.71 m² and requires the tot-lot to be fenced and maintained as greenery. |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Permit condition; the supplied evidence does not independently verify delivery. |
| Description / size | Listed as available, 100% in the RERA amenity record; no source, storage or capacity is supplied. RERA amenities |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | RERA record says available; independent verification not supplied. |
| Description / size | RERA amenity record lists “Sewerage (Chamber, Lines, Septic Tank, STP)” as available, 100%. The GHMC permit separately requires an ETP; the Form–1A lists sewage-treatment components. RERA amenities |
|---|---|
| Evidence source | RERA amenity record, permit and Form–1A |
| Declared progress / verified status | RERA record says available; no independent verification of the installed system is supplied. |
| Description / size | One rainwater-harvesting structure is listed in the permit; the RERA amenity record marks water conservation/rainwater harvesting available, 100%. RERA amenities |
|---|---|
| Evidence source | GHMC building permit and RERA amenity record |
| Declared progress / verified status | Recorded as available in RERA; completion is not independently verified. |
| Description / size | RERA amenity record lists available, 100%; specific equipment or features are not described. RERA amenities |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | RERA record says available; independent verification not supplied. |
| Description / size | RERA amenity record lists the electrical meter room/sub-station/receiving station as available, 100%; GHMC requires transformer space. RERA amenities |
|---|---|
| Evidence source | RERA amenity record and GHMC permit |
| Declared progress / verified status | RERA record says available; independent verification not supplied. |
The vendor record additionally lists facilities such as a clubhouse, gym, swimming pool and visitor parking, but these are vendor-attributed details rather than facilities established by the supplied TG-RERA or GHMC records. They are not treated here as sanctioned or delivered amenities. Promoter website
7. Utilities, building services & safety
The RERA amenity record marks water supply, sewerage (including chambers, lines, septic tank and STP), rainwater harvesting/water conservation, energy management, and electrical meter room/sub-station/receiving station as available at 100%. These are portal-recorded statuses; the supplied material does not independently verify current operation or state capacity, supply source, storage, treatment capacity or backup arrangements. RERA amenities
GHMC’s permit calls for a rainwater-harvesting percolation pit, transformer space and a garbage house, and requires an ETP. It also requires a fire NOC before issue of an occupancy certificate. These are permit requirements or recorded provisions, not evidence that the installations have been completed or that an occupancy certificate or fire NOC has been issued.
The supplied records do not specify lift numbers or capacities, fire-system equipment, escape-stair details, CCTV, access control, waste-segregation arrangements, accessible routes or ramps.
8. Location, access & connectivity
The registered location is Nagole village, Uppal mandal, Medchal-Malkajgiri district, Telangana, PIN 500068. The GHMC permit describes the locality as Co.op. Bank colony (Nagole), and the project fields identify the road on the east boundary as “ROAD 30 WIDE.” The permit extraction separately refers to “18 mt. road widths” in its road-related record; no further approach-road description is supplied here. RERA filing
The supplied location data records the nearest sampled Outer Ring Road interchange at approximately 8.8 km. No measured distances or verified travel times to public transport, schools, hospitals or other landmarks are provided. Location record
9. Developer & development status
The registered promoter is ACE SRIJA CONSTRUCTIONS, identified in the project records as a partnership. The RERA certificate lists its office location as Village Nagole, Mandal Uppal, District Medchal-Malkajgiri, PIN 500068. The project record names SRIKANTH MAKKAPATI and SHYAM SUNDER RAO MAKKAPATI as authorized signatories and identifies Shyam Sunder Rao Makkapati as a partner. No official website or contact details are supplied. Corporate record Parties record
The project record gives 28/09/2026 as the proposed completion date, while the RERA certificate records registration validity through that date unless extended. These are separate records of the completion undertaking and registration validity; neither confirms physical completion. A Form–1A architect’s certificate is dated 23-06-2023, but no current construction progress or occupancy certification is established by the supplied evidence. RERA record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C for SHIVA NIVASA, registration P02200002515, valid 01/02/2021–28/09/2026 unless extended. |
| GHMC building permit | Building Permit Order 2/C3/10444/2020, approved 28 September, 2020; file no. 2/C3/09809/2020. The extraction describes one proposed residential building with 1 Stilt + 5 upper floors. |
| RERA project declaration | Form B filed for ACE SRIJA CONSTRUCTIONS; the extracted text records promoter declarations concerning title, encumbrances, funds, audits and pending approvals. The declaration date is garbled in the extraction and is not reliable as a date. |
| Architect’s certificate | Form–1A dated 23-06-2023, identifying SHIVA NIVASA, ACE SRIJA CONSTRUCTIONS and 10 residential units. It is a progress/cost certificate, not a building or layout approval. |
| Floor-plan drawing | Document 140657, described in the RERA file as a floor-plan drawing; drawing-based measurements are separately identified as software-measured, not RERA-filed. Floor plans |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied documents. The GHMC permit states that an occupancy certificate is required before occupation. |
1. Project at a glance
Project identity
Registered project name: SHIVA NIVASA
Project type: Residential apartment project
Phase / registered portion: No separate phase name or phase number is disclosed. The registered site is in Survey No. 92, including Plot Nos. 185-PART, 186-PART, 187 and 188-PART.
TG-RERA registration: P02200002515
Registration validity: 01/02/2021 to 28/09/2026, unless extended by the Authority; the certificate records no extension. This is registration validity, not confirmation of project completion or occupancy.
Registered promoter: ACE SRIJA CONSTRUCTIONS, partnership
RERA status: New Project; the supplied registration record gives the validity above.
Land and geographic identity
Locality / revenue village: Nagole; the RERA-filed land and registration records identify Nagole village.
Mandal / district / PIN: Uppal / Medchal-Malkajgiri / 500068
Project survey and plot identifiers: Survey No. 92; Plot Nos. 185-PART, 186-PART, 187 & 188-PART. The building-permit extraction also lists survey/plot identifiers as “92”, “185-PART”, “186-PART”, “187” and “188-PART”.
Registered site extent: 502.49 sq. m site area and 502.49 sq. m net area in the GHMC building-permit record. The architect’s certificate records 502.61 Sq.Mts.
Boundaries: East: ROAD 30 WIDE; West: PLOT NO 185 PARTS AND 186 PART; North: PLOT NOS 185 PART AND 186 PART; South: PLOT NO 190 AND 189 PART.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building-permit number / date: 2/C3/10444/2020, approved 28 September, 2020; the permit extraction also lists file no. 2/C3/09809/2020.
Approved built-up area: The permit extraction lists 1,208.80 m² residential upper-floor area and 228.01 m² stilt parking area. These are the recorded component areas, not a separately stated total approved built-up area.
Building count and floors: One building is recorded in the RERA fields. GHMC permits 1 Stilt + 5 upper floors; the extracted sanctioned height is 15 m.
Parking level / sanctioned area: Stilt parking: 1, 228.01 m². The supplied extracts do not state a sanctioned bay count.
Unit counts: RERA fields record 10 total building units; the architect’s certificate also describes 10 units. The approval extract states that sanctioned unit numbers must not be increased without GHMC approval, but does not give a separate unit total.
Offering and status
Configuration: 3BHK; RERA-filed saleable area 121.0 m²
Booked / available: 10 booked / 0 available, as last read from the TG-RERA portal; no as-of date is supplied, so the count is indicative.
Construction stage: A Form–1A architect’s certificate dated 23-06-2023 is on file, but the supplied material does not provide a current, independently verified site-stage assessment.
Completion date: Proposed completion 28/09/2026 in the project record. A separate original/revised completion-date history is not supplied.
Occupancy certificate: No occupancy certificate is identified in the supplied project documents. The GHMC permit makes an occupancy certificate compulsory before occupation.
2. The project story
SHIVA NIVASA is a RERA-registered residential apartment project in Nagole, on the registered portion identified as Survey No. 92 and Plot Nos. 185-PART, 186-PART, 187 and 188-PART. The project record describes one building and 10 residential units; the registered offering is 3BHK apartments.
GHMC’s building-permit record describes a proposed residential building of 1 Stilt + 5 upper floors, with stilt parking. An architect’s Form–1A dated 23-06-2023 identifies the project and its 10 units, but the supplied record does not establish the project’s present on-site construction stage or confirm completion. No occupancy certificate is identified in the evidence provided.
3. Master plan, architecture & building design
The GHMC permit records a 502.49 m² site and net area and a 1,208.80 m² residential upper-floor area, alongside 228.01 m² of stilt parking. It describes one building with 1 Stilt + 5 upper floors and an extracted height of 15 m. The permit also records a 89.71 m² tot-lot.
The supplied records do not give a separate figure for total approved built-up area, building footprint, flats per floor, lifts, staircases, internal circulation, or detailed open-area distribution. A floor-plan drawing is available as document 140657, but its extracted contents do not provide those details here.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 10 | 0 | 121.0 m² | Software-measured range: 86.8–102.5 m²; median 97.8 m² | 19% |
The RERA filing records the unit count, booking count and saleable area. Carpet-area figures and the loading figure are software measurements from floor-plan drawings, not RERA disclosures; the measurement record says four flat designs were measured and notes that the drawing-based figures need review. One drawing-panel example labels bedrooms, hall, kitchen, toilets, a wash area and two balconies; the supplied evidence does not establish that this single example applies identically to every apartment.
Saleable area and carpet area are distinct measurements: the drawing-measured carpet figure is not the filed saleable area, and the supplied measurement caveat notes that saleable area also counts the home’s share of common areas. The supplied material does not separately quantify balcony area or common-area loading beyond the stated software-measured loading.
5. Parking & vehicle circulation
The GHMC permit provides for 1 stilt parking level with a recorded area of 228.01 m². The permit condition states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied record gives no sanctioned number of parking bays, visitor or accessible parking count, EV provision, ramp details, or unit-specific parking allocation. A drawn or sanctioned parking provision does not, on the available evidence, establish an individual buyer’s exclusive allocation.
6. Amenities, recreation & open spaces
| Description / size | GHMC permit records 89.71 m² and requires the tot-lot to be fenced and maintained as greenery. |
|---|---|
| Evidence source | GHMC building permit |
| Declared progress / verified status | Permit condition; the supplied evidence does not independently verify delivery. |
| Description / size | Listed as available, 100% in the RERA amenity record; no source, storage or capacity is supplied. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | RERA record says available; independent verification not supplied. |
| Description / size | RERA amenity record lists “Sewerage (Chamber, Lines, Septic Tank, STP)” as available, 100%. The GHMC permit separately requires an ETP; the Form–1A lists sewage-treatment components. |
|---|---|
| Evidence source | RERA amenity record, permit and Form–1A |
| Declared progress / verified status | RERA record says available; no independent verification of the installed system is supplied. |
| Description / size | One rainwater-harvesting structure is listed in the permit; the RERA amenity record marks water conservation/rainwater harvesting available, 100%. |
|---|---|
| Evidence source | GHMC building permit and RERA amenity record |
| Declared progress / verified status | Recorded as available in RERA; completion is not independently verified. |
| Description / size | RERA amenity record lists available, 100%; specific equipment or features are not described. |
|---|---|
| Evidence source | RERA amenity record |
| Declared progress / verified status | RERA record says available; independent verification not supplied. |
| Description / size | RERA amenity record lists the electrical meter room/sub-station/receiving station as available, 100%; GHMC requires transformer space. |
|---|---|
| Evidence source | RERA amenity record and GHMC permit |
| Declared progress / verified status | RERA record says available; independent verification not supplied. |
The vendor record additionally lists facilities such as a clubhouse, gym, swimming pool and visitor parking, but these are vendor-attributed details rather than facilities established by the supplied TG-RERA or GHMC records. They are not treated here as sanctioned or delivered amenities.
7. Utilities, building services & safety
The RERA amenity record marks water supply, sewerage (including chambers, lines, septic tank and STP), rainwater harvesting/water conservation, energy management, and electrical meter room/sub-station/receiving station as available at 100%. These are portal-recorded statuses; the supplied material does not independently verify current operation or state capacity, supply source, storage, treatment capacity or backup arrangements.
GHMC’s permit calls for a rainwater-harvesting percolation pit, transformer space and a garbage house, and requires an ETP. It also requires a fire NOC before issue of an occupancy certificate. These are permit requirements or recorded provisions, not evidence that the installations have been completed or that an occupancy certificate or fire NOC has been issued.
The supplied records do not specify lift numbers or capacities, fire-system equipment, escape-stair details, CCTV, access control, waste-segregation arrangements, accessible routes or ramps.
8. Location, access & connectivity
The registered location is Nagole village, Uppal mandal, Medchal-Malkajgiri district, Telangana, PIN 500068. The GHMC permit describes the locality as Co.op. Bank colony (Nagole), and the project fields identify the road on the east boundary as “ROAD 30 WIDE.” The permit extraction separately refers to “18 mt. road widths” in its road-related record; no further approach-road description is supplied here.
The supplied location data records the nearest sampled Outer Ring Road interchange at approximately 8.8 km. No measured distances or verified travel times to public transport, schools, hospitals or other landmarks are provided.
9. Developer & development status
The registered promoter is ACE SRIJA CONSTRUCTIONS, identified in the project records as a partnership. The RERA certificate lists its office location as Village Nagole, Mandal Uppal, District Medchal-Malkajgiri, PIN 500068. The project record names SRIKANTH MAKKAPATI and SHYAM SUNDER RAO MAKKAPATI as authorized signatories and identifies Shyam Sunder Rao Makkapati as a partner. No official website or contact details are supplied.
The project record gives 28/09/2026 as the proposed completion date, while the RERA certificate records registration validity through that date unless extended. These are separate records of the completion undertaking and registration validity; neither confirms physical completion. A Form–1A architect’s certificate is dated 23-06-2023, but no current construction progress or occupancy certification is established by the supplied evidence.
10. Approvals, official records & documents
TG-RERA registration: Form C for SHIVA NIVASA, registration P02200002515, valid 01/02/2021–28/09/2026 unless extended.
GHMC building permit: Building Permit Order 2/C3/10444/2020, approved 28 September, 2020; file no. 2/C3/09809/2020. The extraction describes one proposed residential building with 1 Stilt + 5 upper floors.
RERA project declaration: Form B filed for ACE SRIJA CONSTRUCTIONS; the extracted text records promoter declarations concerning title, encumbrances, funds, audits and pending approvals. The declaration date is garbled in the extraction and is not reliable as a date.
Architect’s certificate: Form–1A dated 23-06-2023, identifying SHIVA NIVASA, ACE SRIJA CONSTRUCTIONS and 10 residential units. It is a progress/cost certificate, not a building or layout approval.
Floor-plan drawing: Document 140657, described in the RERA file as a floor-plan drawing; drawing-based measurements are separately identified as software-measured, not RERA-filed.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied documents. The GHMC permit states that an occupancy certificate is required before occupation.
Frequently asked questions
Is SHIVA NIVASA registered with Telangana RERA?
Yes. SHIVA NIVASA is registered with the Telangana Real Estate Regulatory Authority as P02200002515; the registration status is New Project.
Who is the developer of SHIVA NIVASA?
The promoter named in the RERA registration is ACE SRIJA CONSTRUCTIONS.
Where is SHIVA NIVASA located?
SHIVA NIVASA is in Nagole, Uppal, Medchal-Malkajgiri, Telangana (500068).
When will SHIVA NIVASA be completed?
The promoter's proposed date of completion filed with RERA is 28/09/2026. This is the promoter's declaration, not a guarantee.