Emmaar Homes Block III
SRI BHAVANA BUILDERS AND DEVELOPERS · Medchal-Malkajgiri · RERA P02200002282
EMMAAR HOMES BLOCK III is a residential apartment project in MALKAJGIRI, Medchal-Malkajgiri district; the mandal is not disclosed in the supplied project identity. The registered promoter is SRI BHAVANA BUILDERS AND DEVELOPERS. The project occupies 397.91 sq. m and comprises one building with 1 Stilt + 4 upper floors and 12 apartments: eight 1BHK and four 2BHK homes. It is registered under TG-RERA number P02200002282, with a proposed completion date of 30/07/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | EMMAAR HOMES BLOCK III RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | “BLOCK III” is the registered project name; whether this is part of a larger phased development is not disclosed in the supplied record RERA record |
| TG-RERA registration | P02200002282 RERA record |
| Registration validity | 31/10/2020–30/07/2025; the certificate says four years and states validity unless extended by the Authority. The supplied record says no extension is recorded |
| Registered promoter | SRI BHAVANA BUILDERS AND DEVELOPERS RERA record Corporate record |
| RERA project status | On-Going Project in the supplied TG-RERA project record RERA filing |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | MALKAJGIRI; the building permit identifies MARUTHI NAGAR RERA record RERA filing |
| Revenue village | Malkajgiri RERA record Land records |
| Mandal | Not disclosed in the supplied project identity Land records |
| District | Medchal-Malkajgiri RERA record RERA filing |
| PIN | 500015 RERA record |
| Survey numbers / subdivisions | 351 and 354/1 Land records |
| Registered site area | 397.91 sq. m; RERA land details state total area and net area as 397.91 sq. m Land records |
| Boundaries in RERA land details | North: PLOT 237; South: PLOT NO 235; East: ROAD WIDTH 9; West: PLOT NO 233 Land records |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | 2/C28/11724/2019, dated 30 July. 2019 in the extracted permit record Approvals record |
| Building permit file number | 2/C28/06290/2019 Approvals record |
| Approved built-up area | The RERA form reports 1184.15 sq. m as approved built-up area. The building-permit extraction separately lists Upper floors Area (m2): 947.32 and Parking floors Area (m2): 223.64; these are shown as recorded figures, not treated as interchangeable measures RERA filing |
| Building count and configuration | One building; the building permit describes 1 Stilt + 4 upper floors and a height of 11.60 m Land records |
| Parking area / levels | The permit lists Parking floors Area (m2): 223.64 and Cellar 0.00. A separate number of parking spaces is not disclosed |
| Unit counts | RERA land details state 1 total building unit and 1 proposed building unit “as per agreement”; the unit inventory separately lists 12 apartments Land records RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| Configurations | 1BHK and 2BHK RERA unit table |
| RERA-filed saleable areas | 1BHK: 75.95 sq. m; 2BHK: 83.04 sq. m RERA unit table |
| Inventory shown on the supplied TG-RERA record | 12 total; 0 booked and 12 available—8 1BHK and 4 2BHK. The portal record supplied has no booking “as of” date, so counts are indicative RERA unit table |
| Construction stage | The supplied record does not establish current site progress or independently verified completion RERA filing RERA amenities |
| Completion undertaking and proposed date | Promoter’s Form B undertakes completion by 30/07/2025; the project record lists original and revised proposed completion as 30/07/2025 RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied documents; certificate status is therefore not established by this record Document index |
2. The project story
EMMAAR HOMES BLOCK III is registered as a residential apartment project at Malkajgiri, in the revenue village of Malkajgiri, on Survey Nos. 351 and 354/1. The RERA record gives a site extent of 397.91 sq. m and identifies one building. The GHMC permit describes a residential building of 1 Stilt + 4 upper floors, with a stated height of 11.60 m. RERA record Land records
The RERA inventory lists 12 homes: eight 1BHK units and four 2BHK units. The promoter’s filed completion undertaking and the registration record both give 30/07/2025 as the completion date. The supplied evidence does not give a current, independently verified construction percentage, establish that the building is complete, or identify an issued occupancy/completion certificate. RERA unit table RERA filing Document index
3. Master plan, architecture & building design
The GHMC building-permit extraction identifies a site area and net area of 397.91 m², a building height of 11.60 m, 1 Stilt + 4 upper floors, and a residential building named “KANEE SREE-1 (PATEL).” It records upper-floor area of 947.32 m², parking-floor area of 223.64 m², and cellar area of 0.00. The project record gives approved built-up area as 1184.15 sq. m; the supplied evidence does not provide a separate FSI-counted area, carpet-area total, or a drawing-based building footprint. RERA filing
The permit extraction also lists a Compound Wall 78.05 RM, 15 Trees, and No. of RWHPS: 2. Detailed floor plans, internal circulation, stair and lift arrangements, residential/common-area distribution, and phase organization are not established by the supplied drawing data. Floor plans
4. Homes, configurations & floor plans
RERA-filed inventory and saleable areas are shown below. The supplied floor-plan record reports no measured flat designs for either configuration, so it does not establish software-measured carpet areas or room dimensions. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 1BHK | 8 | 0 | 8 | 75.95 sq. m | Not established from measured drawings | Not supplied |
| 2BHK | 4 | 0 | 4 | 83.04 sq. m | Not established from measured drawings | Not supplied |
The areas above are RERA-filed saleable areas, not carpet-area measurements. The supplied evidence does not provide a usable drawing-based room schedule or verified measurements for balconies, utility areas, or common-area loading. RERA unit details Floor plans
5. Parking & vehicle circulation
The GHMC permit extraction records Parking floors Area (m2): 223.64 and Cellar 0.00. The RERA amenity schedule and vendor-supplied description refer to parking, including closed and open car parking, but the supplied evidence does not establish the number of spaces, their location by level, visitor or accessible allocation, EV charging, ramp and driveway arrangements, or legally documented allocation to individual homes. A drawn or described parking provision does not by itself establish exclusive ownership. RERA amenities Promoter website
6. Amenities, recreation & open spaces
The supplied RERA amenity schedule records the following items and progress percentages. These are filed schedule entries, not independent site verification. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | No capacity or source specified | RERA amenity schedule | Available: YES; 10% recorded; not independently verified RERA amenities |
| Sewerage (Chamber, Lines, Septic Tank, STP) | No capacity specified | RERA amenity schedule | Available: YES; 0% recorded; not independently verified RERA amenities |
| Green Strip/TOT LOT/Park | No area specified | RERA amenity schedule | Available: YES; 10% recorded; not independently verified RERA amenities |
| Water conservation / rainwater harvesting | GHMC permit lists 2 rainwater-harvesting pits | RERA amenity schedule; GHMC permit | Available: YES; 0% recorded in RERA schedule; not independently verified RERA amenities |
| Electrical meter room, sub-station, receiving station | No capacity specified | RERA amenity schedule | Available: YES; 0% recorded; not independently verified RERA amenities |
| Internal roads & footpaths | No dimensions specified | RERA amenity schedule | 0% recorded RERA amenities |
| Storm-water drains | No dimensions specified | RERA amenity schedule | 0% recorded RERA amenities |
| Street lighting | No details specified | RERA amenity schedule | 0% recorded RERA amenities |
| Community buildings | No details specified | RERA amenity schedule | 0% recorded RERA amenities |
| Treatment and disposal of sewage and sullage water | No capacity specified | RERA amenity schedule | 0% recorded RERA amenities |
| Solid-waste management and disposal | No details specified | RERA amenity schedule | 0% recorded RERA amenities |
| Energy management | No details specified | RERA amenity schedule | 0% recorded RERA amenities |
| Fire protection and fire-safety requirements | No system details specified | RERA amenity schedule | 0% recorded RERA amenities |
| Aggregate recreational open space | No area specified | RERA amenity schedule | 0% recorded RERA amenities |
The vendor-supplied amenity list also names closed and open car parking, an electrical meter room, sub-station, receiving station, sewage treatment plant, rainwater harvesting and 24×7 water supply. These are vendor descriptions, not evidence of completed or independently verified facilities. Promoter website
7. Utilities, building services & safety
The RERA amenity schedule marks water supply, sewerage and rainwater harvesting as available, but records 10% progress for water supply and 0% for the listed sewerage and rainwater-harvesting entries. The GHMC permit extraction lists 2 rainwater-harvesting pits. No water source, storage or treatment capacity, STP capacity, reuse arrangement, storm-water system design, electrical backup capacity, lift count or capacity, or fire-system specification is provided. RERA amenities
The permit lists an electrical meter room, sub-station and receiving station in the RERA amenity schedule, each with 0% recorded progress. Fire protection and fire-safety requirements are also listed with 0% recorded progress. These entries do not establish completion or statutory compliance. The supplied evidence does not describe waste segregation, security systems, accessible circulation, or emergency access. RERA amenities
8. Location, access & connectivity
The official project identity places the development in Malkajgiri, locality MALKAJGIRI, district Medchal-Malkajgiri, PIN 500015, with the building permit identifying MARUTHI NAGAR. The recorded site boundaries identify a road on the east as ROAD WIDTH 9 and plots on the other three sides. RERA record RERA filing Land records
A vendor-supplied connectivity list gives Vani Nagar Bus Stop at 0.15 km, Rknagar Bus Stop at 0.31 km, Malkajgiri Bus Stop at 0.33 km, Anutex Bus Stop at 0.38 km, and Indian Oil Petrol at 0.42 km. These are vendor-reported distances. The supplied project location record does not provide verified approach-road details or public-transport routes. Promoter website
9. Developer & development status
The registered promoter is SRI BHAVANA BUILDERS AND DEVELOPERS, recorded as a Proprietorship; ADEPU MOHAN RAO is listed as its authorized signatory and is named in the filed Form B declaration. The supplied promoter address is B, LAL BAHADUR NAGAR, MARUTHI NAGAR, MALKAJGIRI, Medchal-Malkajgiri, 500015. No official contact details or website are supplied. Corporate record Parties record
The promoter’s Form B declares that the project would be completed by 30/07/2025. The supplied record does not establish current construction progress, an extension of registration, or an issued occupancy/completion certificate. Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C for EMMAAR HOMES BLOCK III, registration P02200002282, granted under section 5; valid 31/10/2020–30/07/2025 as stated on the certificate |
| GHMC building permit | Permit order dated 30 July. 2019; approval 2/C28/11724/2019, file number 2/C28/06290/2019; survey numbers 351 and 354/1 |
| Other permit identifiers | Layout / Sub Divn. No. LRS15022018061048; structural engineer licence 80/strl.engineer/TP10/GHMC; licensed surveyor licence 52/SURVYOR- 1; building plan reference BL/2480/2013 |
| RERA promoter declaration | Form B affidavit-cum-declaration by ADEPU MOHAN RAO, identifying SRI BHAVANA BUILDERS & DEVELOPERS and a completion undertaking of 30/07/2025 |
| Occupancy/completion certificate | Not identified in the supplied documents Document index |
| Approved drawings | A drawing record is listed as document 137178, but its extraction is marked unavailable; no drawing-derived floor-plan measurements are established in the supplied data Document index Floor plans |
| Other project-specific official records | No other approval or completion record is established by the supplied evidence Approvals record Document index |
1. Project at a glance
Project identity
Registered project name: EMMAAR HOMES BLOCK III
Project type: Residential apartment project
Phase / registered portion: “BLOCK III” is the registered project name; whether this is part of a larger phased development is not disclosed in the supplied record
TG-RERA registration: P02200002282
Registration validity: 31/10/2020–30/07/2025; the certificate says four years and states validity unless extended by the Authority. The supplied record says no extension is recorded
Registered promoter: SRI BHAVANA BUILDERS AND DEVELOPERS
RERA project status: On-Going Project in the supplied TG-RERA project record
Land and geographic identity
Locality: MALKAJGIRI; the building permit identifies MARUTHI NAGAR
Revenue village: Malkajgiri
Mandal: Not disclosed in the supplied project identity
District: Medchal-Malkajgiri
PIN: 500015
Survey numbers / subdivisions: 351 and 354/1
Registered site area: 397.91 sq. m; RERA land details state total area and net area as 397.91 sq. m
Boundaries in RERA land details: North: PLOT 237; South: PLOT NO 235; East: ROAD WIDTH 9; West: PLOT NO 233
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: 2/C28/11724/2019, dated 30 July. 2019 in the extracted permit record
Building permit file number: 2/C28/06290/2019
Approved built-up area: The RERA form reports 1184.15 sq. m as approved built-up area. The building-permit extraction separately lists Upper floors Area (m2): 947.32 and Parking floors Area (m2): 223.64; these are shown as recorded figures, not treated as interchangeable measures
Building count and configuration: One building; the building permit describes 1 Stilt + 4 upper floors and a height of 11.60 m
Parking area / levels: The permit lists Parking floors Area (m2): 223.64 and Cellar 0.00. A separate number of parking spaces is not disclosed
Unit counts: RERA land details state 1 total building unit and 1 proposed building unit “as per agreement”; the unit inventory separately lists 12 apartments
Offering and status
Configurations: 1BHK and 2BHK
RERA-filed saleable areas: 1BHK: 75.95 sq. m; 2BHK: 83.04 sq. m
Inventory shown on the supplied TG-RERA record: 12 total; 0 booked and 12 available—8 1BHK and 4 2BHK. The portal record supplied has no booking “as of” date, so counts are indicative
Construction stage: The supplied record does not establish current site progress or independently verified completion
Completion undertaking and proposed date: Promoter’s Form B undertakes completion by 30/07/2025; the project record lists original and revised proposed completion as 30/07/2025
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied documents; certificate status is therefore not established by this record
2. The project story
EMMAAR HOMES BLOCK III is registered as a residential apartment project at Malkajgiri, in the revenue village of Malkajgiri, on Survey Nos. 351 and 354/1. The RERA record gives a site extent of 397.91 sq. m and identifies one building. The GHMC permit describes a residential building of 1 Stilt + 4 upper floors, with a stated height of 11.60 m.
The RERA inventory lists 12 homes: eight 1BHK units and four 2BHK units. The promoter’s filed completion undertaking and the registration record both give 30/07/2025 as the completion date. The supplied evidence does not give a current, independently verified construction percentage, establish that the building is complete, or identify an issued occupancy/completion certificate.
3. Master plan, architecture & building design
The GHMC building-permit extraction identifies a site area and net area of 397.91 m², a building height of 11.60 m, 1 Stilt + 4 upper floors, and a residential building named “KANEE SREE-1 (PATEL).” It records upper-floor area of 947.32 m², parking-floor area of 223.64 m², and cellar area of 0.00. The project record gives approved built-up area as 1184.15 sq. m; the supplied evidence does not provide a separate FSI-counted area, carpet-area total, or a drawing-based building footprint.
The permit extraction also lists a Compound Wall 78.05 RM, 15 Trees, and No. of RWHPS: 2. Detailed floor plans, internal circulation, stair and lift arrangements, residential/common-area distribution, and phase organization are not established by the supplied drawing data.
4. Homes, configurations & floor plans
RERA-filed inventory and saleable areas are shown below. The supplied floor-plan record reports no measured flat designs for either configuration, so it does not establish software-measured carpet areas or room dimensions.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 1BHK | 8 | 0 | 8 | 75.95 sq. m | Not established from measured drawings | Not supplied |
| 2BHK | 4 | 0 | 4 | 83.04 sq. m | Not established from measured drawings | Not supplied |
The areas above are RERA-filed saleable areas, not carpet-area measurements. The supplied evidence does not provide a usable drawing-based room schedule or verified measurements for balconies, utility areas, or common-area loading.
5. Parking & vehicle circulation
The GHMC permit extraction records Parking floors Area (m2): 223.64 and Cellar 0.00. The RERA amenity schedule and vendor-supplied description refer to parking, including closed and open car parking, but the supplied evidence does not establish the number of spaces, their location by level, visitor or accessible allocation, EV charging, ramp and driveway arrangements, or legally documented allocation to individual homes. A drawn or described parking provision does not by itself establish exclusive ownership.
6. Amenities, recreation & open spaces
The supplied RERA amenity schedule records the following items and progress percentages. These are filed schedule entries, not independent site verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | No capacity or source specified | RERA amenity schedule | Available: YES; 10% recorded; not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | No capacity specified | RERA amenity schedule | Available: YES; 0% recorded; not independently verified |
| Green Strip/TOT LOT/Park | No area specified | RERA amenity schedule | Available: YES; 10% recorded; not independently verified |
| Water conservation / rainwater harvesting | GHMC permit lists 2 rainwater-harvesting pits | RERA amenity schedule; GHMC permit | Available: YES; 0% recorded in RERA schedule; not independently verified |
| Electrical meter room, sub-station, receiving station | No capacity specified | RERA amenity schedule | Available: YES; 0% recorded; not independently verified |
| Internal roads & footpaths | No dimensions specified | RERA amenity schedule | 0% recorded |
| Storm-water drains | No dimensions specified | RERA amenity schedule | 0% recorded |
| Street lighting | No details specified | RERA amenity schedule | 0% recorded |
| Community buildings | No details specified | RERA amenity schedule | 0% recorded |
| Treatment and disposal of sewage and sullage water | No capacity specified | RERA amenity schedule | 0% recorded |
| Solid-waste management and disposal | No details specified | RERA amenity schedule | 0% recorded |
| Energy management | No details specified | RERA amenity schedule | 0% recorded |
| Fire protection and fire-safety requirements | No system details specified | RERA amenity schedule | 0% recorded |
| Aggregate recreational open space | No area specified | RERA amenity schedule | 0% recorded |
The vendor-supplied amenity list also names closed and open car parking, an electrical meter room, sub-station, receiving station, sewage treatment plant, rainwater harvesting and 24×7 water supply. These are vendor descriptions, not evidence of completed or independently verified facilities.
7. Utilities, building services & safety
The RERA amenity schedule marks water supply, sewerage and rainwater harvesting as available, but records 10% progress for water supply and 0% for the listed sewerage and rainwater-harvesting entries. The GHMC permit extraction lists 2 rainwater-harvesting pits. No water source, storage or treatment capacity, STP capacity, reuse arrangement, storm-water system design, electrical backup capacity, lift count or capacity, or fire-system specification is provided.
The permit lists an electrical meter room, sub-station and receiving station in the RERA amenity schedule, each with 0% recorded progress. Fire protection and fire-safety requirements are also listed with 0% recorded progress. These entries do not establish completion or statutory compliance. The supplied evidence does not describe waste segregation, security systems, accessible circulation, or emergency access.
8. Location, access & connectivity
The official project identity places the development in Malkajgiri, locality MALKAJGIRI, district Medchal-Malkajgiri, PIN 500015, with the building permit identifying MARUTHI NAGAR. The recorded site boundaries identify a road on the east as ROAD WIDTH 9 and plots on the other three sides.
A vendor-supplied connectivity list gives Vani Nagar Bus Stop at 0.15 km, Rknagar Bus Stop at 0.31 km, Malkajgiri Bus Stop at 0.33 km, Anutex Bus Stop at 0.38 km, and Indian Oil Petrol at 0.42 km. These are vendor-reported distances. The supplied project location record does not provide verified approach-road details or public-transport routes.
9. Developer & development status
The registered promoter is SRI BHAVANA BUILDERS AND DEVELOPERS, recorded as a Proprietorship; ADEPU MOHAN RAO is listed as its authorized signatory and is named in the filed Form B declaration. The supplied promoter address is B, LAL BAHADUR NAGAR, MARUTHI NAGAR, MALKAJGIRI, Medchal-Malkajgiri, 500015. No official contact details or website are supplied.
The promoter’s Form B declares that the project would be completed by 30/07/2025. The supplied record does not establish current construction progress, an extension of registration, or an issued occupancy/completion certificate.
10. Approvals, official records & documents
TG-RERA registration: Form C for EMMAAR HOMES BLOCK III, registration P02200002282, granted under section 5; valid 31/10/2020–30/07/2025 as stated on the certificate
GHMC building permit: Permit order dated 30 July. 2019; approval 2/C28/11724/2019, file number 2/C28/06290/2019; survey numbers 351 and 354/1
Other permit identifiers: Layout / Sub Divn. No. LRS15022018061048; structural engineer licence 80/strl.engineer/TP10/GHMC; licensed surveyor licence 52/SURVYOR- 1; building plan reference BL/2480/2013
RERA promoter declaration: Form B affidavit-cum-declaration by ADEPU MOHAN RAO, identifying SRI BHAVANA BUILDERS & DEVELOPERS and a completion undertaking of 30/07/2025
Occupancy/completion certificate: Not identified in the supplied documents
Approved drawings: A drawing record is listed as document 137178, but its extraction is marked unavailable; no drawing-derived floor-plan measurements are established in the supplied data
Other project-specific official records: No other approval or completion record is established by the supplied evidence
Frequently asked questions
Is EMMAAR HOMES BLOCK III registered with Telangana RERA?
Yes. EMMAAR HOMES BLOCK III is registered with the Telangana Real Estate Regulatory Authority as P02200002282; the registration status is On-Going Project.
Who is the developer of EMMAAR HOMES BLOCK III?
The promoter named in the RERA registration is SRI BHAVANA BUILDERS AND DEVELOPERS.
Where is EMMAAR HOMES BLOCK III located?
EMMAAR HOMES BLOCK III is in MALKAJGIRI, Medchal-Malkajgiri, Telangana (500015).
When will EMMAAR HOMES BLOCK III be completed?
The promoter's proposed date of completion filed with RERA is 30/07/2025. This is the promoter's declaration, not a guarantee.
More projects in Medchal-Malkajgiri