Sign in

Sn Enclave

S N KOTA INFRA · Hyderabad · RERA P02500005587

SN ENCLAVE is a residential apartment project in Jayaram Nagar, Hyderabad district; the mandal is not disclosed in the supplied project identity record. The registered promoter is S N KOTA INFRA. The project covers 401.24 sq m, with one building of 1 Stilt + 5 upper floors and 10 proposed 2BHK units. Its TG-RERA registration number is P02500005587, and the project header records proposed completion as 04/01/2027.

More from S N Kota Infra · 3 projects →

01What we found

Period endedTG-RERA registration ran to 4 Sep 2026 - check its extension on TG-RERA
16documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from houssed.com

1. Project at a glance

Project identity

FieldProject record
Registered nameSN ENCLAVE RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase is not separately identified. The registration covers the project recorded at Plot Nos. 3 & 4.
TG-RERA registrationP02500005587; Form ‘C’ certificate issued 27/12/2022; valid from 27/12/2022 to 04/09/2026. No extension is recorded in the supplied certificate. Registration validity is separate from the completion deadline and occupancy status. RERA record
Registered promoterS N KOTA INFRA; entity type recorded as Partnership. RERA filing Corporate record
RERA statusThe project is recorded as registered. The supplied registration record does not establish current construction or occupancy status.

Land and geographic identity

FieldProject record
LocalityJayaram Nagar RERA record RERA filing
Revenue villageJeedimetla Village is stated in the filed title and building-permit documents; the project filing also uses Jayaram Nagar as the village/locality label. RERA filing
MandalNot disclosed in the supplied project identity record. Land records
District / PINHyderabad / 500055 RERA record RERA filing
Project survey numbers210, 211, 218, 223, 224 & 225; no subdivisions are stated. RERA record Land records
Plot identityPlot Nos. 3 & 4 RERA filing
Site extentRERA filing: 401.24 sq m total and net area. Building-permit extraction: site area 401.24 m2. RERA filing
BoundariesEast: Plot No. 2; west: Plot No. 5; north: “OTHERS - NEIGHS LAND”; south: road width 12. RERA filing
Road / affected area recorded in permit extractionRoad width: 18 mt. The extracted permit parameters also list road-affected area 6 m2 and nala-affected area 7 m2.

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building-permit number / date2/C25/09479/2020, approved 04 September, 2020 Approvals record
Other permit file number2/C25/08408/2020
Approved built-up areaBuilding-permit extraction states Proposed Covered builtup area 1,083.10; the project filing separately records approved built-up area 1310.65 sq m. These labels are reported as recorded, not treated as interchangeable measures. RERA filing
Building count and configurationOne building; permit describes 1 Stilt + 5 upper floors. RERA filing
Parking levels / provisionThe permit states that cellar and stilts approved for parking must be used exclusively for vehicle parking. The supplied extraction does not give a parking-space count.
Approved versus RERA-declared unitsGHMC permit extraction does not state a unit count. The RERA filing records 10 total building units and 10 proposed units. RERA filing RERA unit table

Offering and status

FieldProject record
RERA-filed configuration2BHK; 10 units RERA unit table
RERA-filed saleable area117.16 sq m RERA unit table
Booked / availablePortal-read figures: 0 booked / 10 available. The portal record has no as-of date, so these counts are indicative, not a live inventory confirmation. RERA unit table
Construction stageNo independently verified site-progress record is supplied. The permit records a 1 Stilt + 5 upper-floor building, but its extracted milestone fields include conflicting-looking construction dates; construction stage cannot be established from the supplied evidence.
Completion deadlineProject header records proposed completion 04/01/2027; Form B records a completion undertaking of 04/09/2026. The supplied records therefore contain differing completion dates; this overview reports both as recorded and does not resolve them. RERA record
Occupancy / completion certificateThe GHMC permit requires an occupancy certificate before occupation. The supplied permit extraction states completion certified: false; no occupancy or completion certificate is supplied.

2. The project story

SN ENCLAVE is registered with TG-RERA as a residential apartment project on Plot Nos. 3 & 4 in Jeedimetla Village, identified in the project filing with Jayaram Nagar locality and Survey Nos. 210, 211, 218, 223, 224 & 225. The RERA filing records a site area of 401.24 sq m and ten proposed units. RERA record Land records

The GHMC building-permit record describes one residential building of 1 Stilt + 5 upper floors. The RERA inventory is recorded as ten 2BHK units. The supplied records do not establish the current construction stage, and no completion or occupancy certificate is included; the permit states that an occupancy certificate is required before occupation. RERA unit table

3. Master plan, architecture & building design

The GHMC permit extraction identifies one residential building, “Building - 1-1 (SUCHITRA),” configured as 1 Stilt + 5 upper floors, with a stated height of 14.75 m. It records site area 401.24 m2 and “Proposed Covered builtup area 1,083.10”; the project filing separately lists approved built-up area as 1310.65 sq m. These are retained under their supplied labels and are not treated as equivalent area measures. RERA filing

The permit extraction lists front, rear and two side setbacks of 2.5 each. It also lists “Tot-lot (m2)” without a size, 10 rainwater-harvesting pits, 20 Trees, transformer space, a garbage house and ETP. The supplied drawing-derived information does not establish floor-by-floor flat counts, lift or stair details, building footprint, internal circulation, or the area of open space.

The RERA filing records one building and ten proposed units; no separate phase organization is disclosed. The approved drawing file is identified as 269878, page 1, with the drawing-stamp approval number read from its text layer; the stamp is noted as needing review. RERA filing RERA unit table Approvals record

4. Homes, configurations & floor plans

RERA records ten 2BHK units, with a filed saleable area of 117.16 sq m per unit. The portal-read counts show zero booked and ten available, but no as-of date is attached to the inventory record. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK10010117.16 sq m70–72 sq m; median 71.0 sq m (software-measured from drawings; needs review)39% (software-derived)
3BHKNot recorded in RERA filingNot recordedNot recordedNot recorded98.0–98.3 sq m; median 98.2 sq m (software-measured from drawings; needs review)Not supplied

The 2BHK drawing measurement is based on two measured flat designs in drawing 269878. One illustrated plan identifies flat 02 on the “SECOND FLOOR PLAN (SCALE=1:100)” and shows two bedrooms, living/dining, kitchen and a balcony labelled 2.04 M. WIDE BALC. The balcony is excluded from the software-measured carpet figure. The filing’s saleable area and software-measured carpet area are different area concepts: saleable area includes the home’s share of common areas, while the drawing measurement is an estimate of internal carpet area; verify the measured dimensions against the drawing. RERA unit details Floor plans

The same drawing file has software-measured 3BHK designs, including a typical-floor plan. The supplied RERA configuration record does not list 3BHK units, so the drawing measurement is not evidence of a RERA-filed 3BHK offering. RERA unit details Floor plans

5. Parking & vehicle circulation

The GHMC permit extraction states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide a parking-space count, identify resident or visitor allocations, or disclose an accessible-parking provision.

The project filing records a mortgage area of 108.96 sq m, while the permit extraction identifies a mortgaged built-up area of 108.97 m2 and states that it may be registered only after an occupancy certificate is produced. No unit-level parking allocation, ramp configuration, vehicle-entry arrangement, pedestrian separation or EV-charging provision is established in the supplied project records. RERA filing

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lotListed; size not providedGHMC permit extractionNo completion status supplied
Trees20 Trees listedGHMC permit extractionNo completion status supplied
Green strip / tot lot / parkListed in RERA amenity fieldsRERA project filingProgress field recorded as 0; not independently verified complete RERA amenities
Community buildingsListed in RERA amenity fieldsRERA project filingProgress field recorded as 0 RERA amenities
Internal roads and footpathsListed in RERA amenity fieldsRERA project filingProgress field recorded as 0 RERA amenities
Street lightingListed in RERA amenity fieldsRERA project filingProgress field recorded as 0 RERA amenities

No separately evidenced clubhouse or indoor recreation facility is supplied. The amenity register records progress percentages as 0 for the listed items; it does not establish that facilities have been completed or independently inspected. RERA amenities

7. Utilities, building services & safety

The GHMC permit extraction lists 10 rainwater-harvesting pits, a rainwater-harvesting percolation structure, transformer space, a garbage house and ETP. It also records a Fire NOC as a requirement to be obtained, rather than supplying a fire-clearance certificate.

The RERA amenity register marks water supply, sewerage (chambers, lines, septic tank, STP), storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available; the associated progress fields are recorded as 0. The register does not state capacities, water source, treatment or reuse arrangements, power-backup capacity, lift details, fire-system specifications, CCTV or access-control arrangements, or accessibility provisions. These facilities should not be read as independently verified complete. RERA amenities

8. Location, access & connectivity

The registered project location is Jayaram Nagar, Jeedimetla Village, Hyderabad district, PIN 500055, on Plot Nos. 3 & 4 in Survey Nos. 210, 211, 218, 223, 224 & 225. The land record gives the southern boundary as a road width of 12; the GHMC permit extraction separately lists a road width of 18 mt. RERA record Land records RERA filing

The supplied location data includes a cadastral parcel-centroid coordinate of 17.41528, 78.35459 and one connectivity entry: Financial District (Nanakramguda), 1.2 km. No approach-road route, public-transport detail or additional independently sourced landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is S N KOTA INFRA, recorded as a partnership, with GSTIN 36ADHFS5729C1Z0. The RERA filing lists its address as B, HARSHAVARDHAN COLONY, RUKMINI ESTATES, JAYARAM NAGAR, Hyderabad, 500055. The supplied records identify KOTA SUBHASH CHANDRA REDDY as authorized signatory and KOTA SHAILAJA as partner. RERA filing Corporate record Parties record

The permit identifies SN KOTA INFRA as developer/builder; the TG-RERA certificate identifies the same registered promoter. The project filing gives proposed completion as 04/01/2027, while the Form B declaration states 04/09/2026. No project-specific, independently verified construction-progress report or occupancy/completion certificate is supplied. RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm ‘C’ certificate for SN ENCLAVE, registration P02500005587, valid 27/12/2022–04/09/2026; certificate records a three-year validity and project registration conditions.
GHMC building permitBuilding Permit Order, approval 2/C25/09479/2020, approved 04 September, 2020; file number 2/C25/08408/2020.
Drawing / layout recordsDrawing file 269878 is supplied as an approved-drawing source; its stamp number is read from the drawing text layer and noted as needing review. Layout document 290057 is listed but not extracted. The HMDA approved-layout lookup is recorded as unavailable from the public channel. Approvals record Document index HMDA
Title and development documentsFiled title materials include title-report documents 272406, 272469, 272470 and 272407, and Development Agreement-cum-GPA document 272391. Document index
Promoter declarationForm B declaration by authorized signatory KOTA SUBHASH CHANDRA REDDY, document 273330.
Occupancy / completion certificateNone supplied. The GHMC permit requires an occupancy certificate before occupation; the permit extraction records completion certified as false.

Frequently asked questions

Is SN ENCLAVE registered with Telangana RERA?

Yes. SN ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P02500005587; the registration status is New Project.

Who is the developer of SN ENCLAVE?

The promoter named in the RERA registration is S N KOTA INFRA.

Where is SN ENCLAVE located?

SN ENCLAVE is in JAYARAM NAGAR, Hyderabad, Telangana (500055).

When will SN ENCLAVE be completed?

The promoter's proposed date of completion filed with RERA is 04/01/2027. This is the promoter's declaration, not a guarantee.

More projects in Hyderabad