Sign in

Sri Krishna Residency

V R ASSOCIATES · Medchal-Malkajgiri · RERA P02200003032

SRI KRISHNA RESIDENCY is a residential apartment project in BHAGYA NAGAR PHASE II, Medchal-Malkajgiri district; the mandal is not disclosed in the RERA identity data. The registered promoter is V R ASSOCIATES, recorded as a Partnership. The project has a site area of 501.68 sq m and one residential building, Building A-1, recorded as 1 stilt + 5 upper floors, with 10 3BHK units. Its TG-RERA registration is P02200003032, and the proposed completion date is 31/01/2023.

More from V. R. Associates · 5 projects →

01What we found

Period endedTG-RERA registration ran to 31 Jan 2023 - check its extension on TG-RERA
9documents on file - each fact links to its page
30court cases on this project's land (survey 172, Bhagya Nagar Phase Ii)
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

FieldProject record
Registered nameSRI KRISHNA RESIDENCY RERA record
Project typeResidential apartment project RERA filing
Phase / registered portionPhase not separately identified in the supplied record; registration is for SRI KRISHNA RESIDENCY
TG-RERA registrationP02200003032; issued 17/06/2021, valid through 31/01/2023. The certificate records no extension; this is the registration validity, not a completion certificate or occupancy certificate. RERA record
Registered promoterV R ASSOCIATES; entity type recorded as Partnership RERA filing Corporate record
Project statusTG-RERA filing labels it “New Project.” A current construction-stage or completion status is not established by the supplied RERA data. RERA filing

Land and geographic identity

FieldProject record
LocalityBHAGYA NAGAR PHASE II RERA filing
Revenue villageBhagya Nagar Phase Ii in the RERA identity and land fields; the GHMC permit extract identifies Baghameer. RERA record RERA filing
MandalNot disclosed in the RERA identity data. Land records
DistrictMedchal-Malkajgiri in the RERA project and land fields RERA record RERA filing
PIN500072 RERA record
Project survey number(s)Survey No. 172; no subdivision is stated in the project land particulars. RERA record RERA filing
Plot identifierPlot 61, Map II RERA filing
Site areaTotal area 501.68 sq m; net area 501.68 sq m; road-widening/FTL/Nala affected area recorded as 0 sq m. RERA filing
Boundaries in RERA land detailsEast: Plot No. 60; West: Plot No. 62; North: Plot No. 71; South: road width 9. RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building-permit approval2/C24/01571/2021, approved 03 February 2021; associated file number 2/C24/11433/2020. Approvals record
Building arrangementOne residential building, Building A-1 (SRI KRISHNA RESIDENCY), recorded as 1 stilt + 5 upper floors.
Approved built-up areaRERA project fields record 1201.93 sq m approved built-up area. The permit extract separately gives “Proposed Covered builtup area 82,698.00”; the supplied material does not establish its unit or reconcile it, so it is not used here as an area figure. RERA filing
Sanctioned unitsGHMC permit conditions refer to a sanctioned unit count but the supplied permit extract does not state the count.
RERA-declared units10 units, all recorded as 3BHK. RERA unit table RERA unit details
ParkingThe plan requires stilt and any cellar approved for parking to be used exclusively for vehicle parking; the supplied record does not establish the number of spaces or parking allocation.

Offering and status

FieldProject record
Configuration3BHK apartments; RERA filing records 10 units. RERA unit table RERA unit details
RERA-filed saleable area146.42 sq m per unit. RERA unit table RERA unit details
Booked / availablePortal-derived filing data records 0 booked and 10 available; no as-of date is supplied, so counts are indicative rather than a current inventory confirmation. RERA unit table RERA unit details
Completion dateRERA registration record gives proposed completion as 31/01/2023; the Form B extract contains an undertaking transcribed as “3110/2023,” with the day illegible. RERA record
Construction stageNot established by a current progress report or independent site inspection in the supplied evidence. RERA amenities
Occupancy / completion certificateNo occupancy certificate or completion certificate is supplied. The GHMC permit says an occupancy certificate is required before occupation.

The project story

SRI KRISHNA RESIDENCY is recorded with TG-RERA as a residential apartment project on Plot 61, Map II, in Survey No. 172, at Bhagya Nagar Phase II. The registered site is stated as 501.68 sq m, with the RERA land details listing no affected area. The GHMC permit extract describes one residential building, Building A-1, with a stilt level and five upper floors. RERA record RERA filing

The RERA filing lists ten 3BHK apartments, with none booked and ten available in the portal data provided. That inventory has no stated as-of date. The project’s RERA registration ran from 17/06/2021 to 31/01/2023, while its declared proposed completion date is 31/01/2023; these are distinct dates and do not establish that construction was completed or that an occupancy certificate was issued. No current construction-stage evidence is supplied. RERA record RERA unit table RERA unit details

The GHMC permit extract includes a tot-lot, rainwater-harvesting structure, transformer space, garbage house and ETP among its recorded requirements or facilities. The supplied amenity progress figures are 0%, and there is no independent verification of completion. RERA amenities

Master plan, architecture & building design

The RERA land record gives a total and net site area of 501.68 sq m. The building permit extract identifies a single residential building, Building A-1 (SRI KRISHNA RESIDENCY), and records 1 stilt + 5 upper floors and a height of 14.9 m. The permit also records a tot-lot area of 83.65; its unit is not stated in the supplied extraction. RERA filing

RERA records approved built-up area as 1201.93 sq m. The permit extraction’s separate field reads “Proposed Covered builtup area 82,698.00”; no unit is supplied, so that entry cannot be reliably described as a floor-area measurement here. The supplied material does not establish a basement, podium, floor-by-floor unit arrangement, flats per floor, building footprint, internal circulation, or phase organization. RERA filing

The permit extract records setbacks of 3.5 m on each of Side I, Side II, front and rear. It also specifies a fenced tot-lot to be maintained as greenery, tree planting and a peripheral greenery strip. These are permit conditions, not evidence that the features have been delivered.

Homes, configurations & floor plans

The RERA filing records ten 3BHK units, with a saleable area of 146.42 sq m per unit. The portal-derived count is 0 booked and 10 available, with no as-of date supplied. RERA unit details RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010146.42 sq m per unitSoftware-measured range: 78.8–96.3 sq m; median 90.4 sq m38% (software-derived)

The carpet measurements come from software analysis of approved floor-plan drawing geometry, not from the RERA filing. Six flat designs were measured and marked as needing review. RERA saleable area and drawing-measured carpet area are different area measures; the drawing review notes that saleable area includes the home’s share of common areas. Verify the measured figures against the plan and the unit-specific registered agreement before relying on them. Floor plans RERA unit details

The typical plan panel identifies bedrooms, living/dining, a puja space, kitchen, toilets, balcony and utility. The supplied drawing-derived room schedule includes a 1.43 m-wide balcony and a utility area; these are drawing readings, not separately RERA-filed room or area specifications. RERA unit details

Parking & vehicle circulation

The GHMC permit requires the stilt and any cellar approved for parking to remain exclusively for vehicle parking and not to be partitioned or repurposed. The supplied material does not confirm whether a cellar is included, the number or type of parking spaces, visitor or accessible parking, ramps, entry/exit arrangements, EV charging, or a unit-by-unit parking allocation. A parking provision in a plan or permit condition does not by itself establish exclusive allocation to a particular apartment.

Amenities, recreation & open spaces

Green strip / tot-lot / park
Description / sizePermit extract records a tot-lot of 83.65 (unit not stated), to be fenced and maintained as greenery, and requires peripheral greenery and tree planting.
Evidence sourceGHMC permit extract; RERA amenities RERA amenities
Declared progress / verified statusRERA amenity record marks Green Strip/TOT LOT/Park “YES” and 0% progress; completion not independently verified.
Water conservation / rainwater harvesting
Description / sizePermit requires a rainwater-harvesting structure (percolation pit); RERA amenity record marks water conservation/rainwater harvesting “YES.”
Evidence sourceGHMC permit extract; RERA amenities RERA amenities
Declared progress / verified statusRERA amenity record shows 0%; completion not independently verified.
Other project amenities
Description / sizeThe RERA amenity list also includes water supply; sewerage (chamber, lines, septic tank, STP); storm-water drains; street lighting; community buildings; sewage and sullage treatment/disposal; solid-waste management; energy management; fire protection; electrical meter room/sub-station/receiving station; and aggregate recreational open space.
Evidence sourceRERA amenities RERA amenities
Declared progress / verified statusWater supply, sewerage, and electrical meter room/sub-station/receiving station are marked “YES”; other listed rows show 0% progress. No independent completion verification is supplied.

The GHMC permit additionally records space for a transformer and a garbage house. These are permit-recorded items; the supplied evidence does not establish their installation or operational status.

Utilities, building services & safety

The RERA amenity record marks water supply and sewerage as available in the filing, but supplies no source, capacity, treatment details or independent commissioning evidence. The GHMC permit calls for rainwater harvesting, an ETP, a garbage house, transformer space and an occupancy certificate before occupation; it also says public water and electricity connections are to be provided only on production of the occupancy certificate. These are recorded requirements and declarations, not confirmation that services are complete or active. RERA amenities

The permit requires services such as sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical supervision. It also assigns responsibility for structural safety, means of escape and required fire-fighting installations, and states that an Occupancy Fire NOC is to be obtained before issue of an occupancy certificate. The supplied record does not confirm lift numbers or capacities, fire-system installation, a Fire NOC, accessibility features, backup power, CCTV, or operational waste management.

Location, access & connectivity

The registered project location is Bhagya Nagar Phase II, PIN 500072, in Medchal-Malkajgiri district; the RERA land fields identify Survey No. 172 and Plot 61, Map II. The GHMC permit extract identifies Baghameer and Bhagya Nagar Phase II. A cadastral-parcel centroid is supplied at 17.41528, 78.35459. RERA record RERA filing RERA filing Location record

The location data gives Financial District (Nanakramguda) as an anchor at 1.2 km. No approach-road, public-transport or other landmark measurements are supplied for this project. Location record

Developer & development status

The registered promoter is V R ASSOCIATES, recorded as a partnership. The project filing identifies Venkataramana Ravi Gandepalli as authorized signatory and partner, with Venkata Susheel Karthik Gandepally and Vijayalakshmi Gandepally also listed as partners. The supplied promoter address is Divya Sai Shakti Apts, Dwarkapuri Colony, Narayan IIT Campus Road, Bhagya Nagar Phase II, Medchal-Malkajgiri, PIN 500072. A company registration identifier, official website and project contact details are not established in the supplied data. Corporate record Parties record RERA filing

The Form B affidavit is a promoter declaration that includes a completion undertaking transcribed as “3110/2023,” with the day illegible in the source extraction. The RERA project record separately states proposed completion as 31/01/2023. No current progress report, independent construction assessment or occupancy/completion certificate is supplied, so the present development stage and delivery status remain unverified. RERA record

Approvals, official records & documents

TG-RERA registration
Supplied evidenceForm C certificate, P02200003032, issued 17/06/2021; validity through 31/01/2023.
Scope / noteSRI KRISHNA RESIDENCY; certificate records the separate-account condition.
GHMC building permit
Supplied evidenceBuilding Permit Order 2/C24/01571/2021, dated 03 February 2021; file 2/C24/11433/2020.
Scope / noteResidential Building A-1, Survey No. 172; permit extract records 1 stilt + 5 upper floors.
Building-plan drawing
Supplied evidenceDrawing stamp read as 2/C24/01571/2021, dated 11-02-2021.
Scope / noteExtracted from drawing text layer; source notes that it needs review.
Form B declaration
Supplied evidencePromoter affidavit filed for the project; declaration date is March 2021, but day is illegible.
Scope / noteOCR does not establish which alternative title statement was selected.
Occupancy / completion certificate
Supplied evidenceNone supplied. Document index
Scope / noteGHMC permit states that an occupancy certificate is compulsory before occupation.
Other project records
Supplied evidencePermit extract records contractor’s all-risk policy 433702/44/2021/989, notarised affidavit 55/2021, and mortgage reference Bk - 1, CS No 66/2021.
Scope / noteListed as identifiers in the permit extraction; this overview does not assess their legal effect.

Frequently asked questions

Is SRI KRISHNA RESIDENCY registered with Telangana RERA?

Yes. SRI KRISHNA RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02200003032; the registration status is New Project.

Who is the developer of SRI KRISHNA RESIDENCY?

The promoter named in the RERA registration is V R ASSOCIATES.

Where is SRI KRISHNA RESIDENCY located?

SRI KRISHNA RESIDENCY is in BHAGYA NAGAR PHASE II, Medchal-Malkajgiri, Telangana (500072).

When will SRI KRISHNA RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 31/01/2023. This is the promoter's declaration, not a guarantee.

More projects in Medchal-Malkajgiri