Vaibhav Arcade
KPR BUILDERS AND DEVELOPERS · Rangareddy · RERA P02400003910
VAIBHAV ARCADE is a residential apartment project in Miyapur, Serilingampally Mandal, Ranga Reddy District, developed by KPR BUILDERS AND DEVELOPERS. The registered site area is 334.01 sq m, with one block and one tower comprising 1 stilt + 5 upper floors and 10 proposed 2BHK units, each with a RERA-filed saleable area of 54.62 sq m. Its TG-RERA registration number is P02400003910, issued 06/01/2022, and the proposed completion date is 08/02/2028.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | VAIBHAV ARCADE RERA record |
| Project type | Residential apartment project RERA filing |
| Phase / registered portion | No separate phase name is disclosed; the RERA registration is for the project. RERA record |
| TG-RERA registration | P02400003910, issued 06/01/2022; the certificate states a five-year validity period ending 08/10/2027. Registration validity is distinct from the completion undertaking and from occupancy certification. RERA record |
| Registered promoter | KPR BUILDERS AND DEVELOPERS; RERA filing identifies the entity type as partnership. RERA filing Corporate record |
| RERA status in supplied record | Registered; the certificate records grant under section 5. No extension is recorded in the supplied certificate. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Miyapur; the building-permit record specifies Miyapur village and HMT Swarnapuri Colony, Miyapur. RERA record |
| Mandal / district / PIN | Serilingampally / Ranga Reddy / 500049. RERA record |
| Project survey number(s) | Survey No. 112; no project subdivision is stated in the supplied RERA identity or building-permit record. RERA record |
| Plot identifier | Plot No. 61. RERA filing |
| Registered site area | 334.01 sq m; the filed land details also state total area 334.01 sq m, net area 334.01 sq m and affected area 0 sq m. RERA filing |
| Boundaries | East: Plot No. 60; West: Plot No. 62; North: Plot No. 74; South: 9 m road. RERA filing |
| Site-area context | The cadastral record is for the whole Survey No. 112 and gives its extent as 7,752.66 sq m; that is not the filed project-site extent. Cadastral map |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building approval | Building Permit Order 2/C21/09913/2021, dated 08 October 2021. The filed order also lists file no. 2/C21/04626/2021. Approvals record |
| Sanctioned configuration | One residential building, described in the permit as 1 Stilt + 5 upper floors; approved height is 14.95 m. No basement or podium is identified in the supplied permit extraction. |
| Approved built-up area | The RERA project fields state 950.70 sq m as approved built-up area. The permit extraction separately lists 950.70 for residential and 177.43 for stilt parking; the latter is identified there as stilt parking, not residential area. RERA filing |
| Building / tower count | One building; the RERA unit summary records one block and one tower. RERA filing RERA unit table |
| Parking-level details | Stilt parking is shown in the permit. A sanctioned parking-space count is not established in the supplied extract. |
| Unit counts | GHMC permit: total units as sanctioned are not specified in the supplied extraction. RERA filing: 10 proposed units. RERA filing RERA unit table |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configuration | 2BHK, 10 units. RERA unit table |
| RERA-filed saleable area | 54.62 sq m per unit. RERA unit table |
| Booked / available | 0 booked; 10 available, as last read from the TG-RERA portal. The portal record has no as-of date, so these counts are indicative. RERA unit table |
| Completion timeline | Form B records the promoter’s undertaking to complete by 08 October 2027; the project header separately gives a proposed completion date of 08/02/2028. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project records. The GHMC permit makes an occupancy certificate compulsory before occupation. Document index |
| Construction stage | The supplied records do not establish independently verified construction progress or a current site stage. Document index |
2. The project story
VAIBHAV ARCADE is recorded with TG-RERA as a residential apartment project at Plot No. 61, Survey No. 112, Miyapur, in HMT Swarnapuri Colony, Serilingampally Mandal, Ranga Reddy District. The approved scheme is a single residential building with a stilt level and five upper floors. RERA record RERA filing
The RERA filing offers ten 2BHK units, with a filed saleable area of 54.62 sq m per unit. The portal’s last-read booking figures show all ten as available, but carry no as-of date. RERA unit table The supplied material does not provide a verified construction-progress percentage, a site inspection, or an occupancy/completion certificate; accordingly, it does not establish whether construction is currently under way or any portion is complete or occupied. Document index
3. Master plan, architecture & building design
The RERA-filed site is 334.01 sq m, with the same figure reported for total and net area and zero affected area. The GHMC building-permit extraction records a residential building with 1 stilt + 5 upper floors and a height of 14.95 m. It lists 950.70 for the residential component and 177.43 for stilt parking; these are kept as separately labelled permit entries. RERA filing RERA filing
The permit lists a tot-lot area of 0 sq m, one rainwater-harvesting pit, and 15 trees. It also requires peripheral greenery and tree planting, and says the tot-lot is to be fenced and maintained as greenery before issue of an occupancy certificate. The supplied evidence does not establish the building footprint, flats per floor, detailed room layouts, lift or stair arrangement, or internal circulation. Although two drawings are reported in the floor-plan dataset, no flat designs were measured from them. Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 54.62 sq m | Not established | Not supplied |
RERA unit table RERA unit details Floor plans
The 54.62 sq m figure is the RERA-filed saleable area. Software measurement of carpet area from the approved floor-plan drawings is not available for this configuration: the supplied drawing review reports zero flat designs measured. No room dimensions, balcony or utility areas, or loading figure are established in the supplied material. RERA unit table Floor plans
5. Parking & vehicle circulation
The GHMC permit identifies stilt parking and states that the approved stilt/cellar areas for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The supplied permit extraction does not establish a cellar level or give a count of sanctioned car or two-wheeler spaces.
No resident-versus-visitor allocation, accessible-parking count, EV charging provision, ramp arrangement, internal driveway plan, or unit-specific parking allotment is established in the supplied records. A parking bay shown on a plan, where present, would not by itself establish exclusive ownership.
6. Amenities, recreation & open spaces
The table below summarizes facilities appearing in the supplied GHMC permit or RERA amenity record. A listed facility or requirement is not evidence that it has been completed or independently inspected.
| Description / size | Listed in the RERA amenity record; no size or facility details supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; no independent completion verification. |
| Description / size | Permit extraction records tot-lot as 0 sq m and requires greenery to be maintained. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress recorded as 0%; completion not verified. |
| Description / size | GHMC conditions require tree planting along the periphery and in front; permit extraction specifies 15 trees and a peripheral green strip. |
|---|---|
| Declared progress / verified status | Requirement stated in permit; delivery not verified. |
| Description / size | RERA amenity record marks availability “YES”; GHMC conditions require a garbage house within the premises. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress recorded as 0%; completion not verified. |
| Description / size | RERA amenity record marks availability “YES”; permit lists one rainwater-harvesting pit. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA progress recorded as 0%; completion not verified. |
| Description / size | Marked “YES” in the RERA amenity record; details are not supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Progress recorded as 0%; completion not verified. |
7. Utilities, building services & safety
The RERA amenity record marks water supply and an electrical meter room/sub-station/receiving station as available, while recording 0% progress for those entries. GHMC conditions require space for a transformer, an on-site garbage house, rainwater harvesting and an ETP to standard specification. The permit also lists storm-water drains and sewerage/STP-related facilities in the RERA amenity record, but the supplied evidence does not specify system capacities, water sources or storage, treatment capacity, reuse, or operational status. RERA amenities
The GHMC permit requires plumbing, fire-safety, lift and electrical installations to be carried out under qualified technical supervision. It also makes structural and means-of-escape safety the responsibility of the relevant project professionals and requires an occupancy fire NOC before an occupancy certificate. These are recorded approval conditions, not evidence that the systems or clearances have been completed. The supplied materials do not specify lift count or capacity, fire-system design, backup power, CCTV, access control, waste segregation arrangements, or accessible circulation.
8. Location, access & connectivity
The registered project location is Miyapur, Serilingampally Mandal, Ranga Reddy District, PIN 500049; the permit specifies HMT Swarnapuri Colony, Miyapur. The site boundaries identify a 9 m road on the south. RERA record RERA filing
The supplied location record gives HITEC City as 8.6 km away. This is a recorded distance; no travel time is supplied. Location record The project evidence does not establish an approach-road route, public-transport service details, or other measured landmark distances.
9. Developer & development status
The registered promoter is KPR BUILDERS AND DEVELOPERS, identified in the RERA filing as a partnership. Its GSTIN is 36AAMFK6335Q1ZK. The supplied promoter address is Flat No. 402, 3rd Floor, Privik Residency, Plot No. 2, 9-63, HMT Swarnapuri Colony, Miyapur, Serilingampally, Ranga Reddy, Telangana, 500049. The supplied record does not provide an official website or contact details. Corporate record Parties record
Form B, dated 9 November 2021, is a promoter declaration signed by authorized signatory K. Panduranga Rao. It undertakes completion by 08 October 2027 and includes declarations concerning title, encumbrances, project funds and pending approvals. The project header separately records a proposed completion date of 08/02/2028. The supplied evidence does not establish the current construction stage, any independently verified progress, or a granted extension. RERA record Document index
10. Approvals, official records & documents
| Identifier / date | P02400003910; issued 06/01/2022; certificate states validity to 08/10/2027. |
|---|---|
| Scope and record status | FORM C records registration of VAIBHAV ARCADE under section 5 and includes a separate-account condition. |
| Identifier / date | Approval no. 2/C21/09913/2021; dated 08 October 2021. |
|---|---|
| Scope and record status | Building permission for a residential building on Survey No. 112, Miyapur; the filed extraction states 1 stilt + 5 upper floors. |
| Identifier / date | 2/C21/04626/2021. |
|---|---|
| Scope and record status | Listed with the building-permit record. |
| Identifier / date | Proceeding no. 294/BP/2520/92-93; permit no. 002281. |
|---|---|
| Scope and record status | References listed in the GHMC permit extraction; a separate approved-layout document is not established in the supplied evidence. |
| Identifier / date | Dated 9 November 2021. |
|---|---|
| Scope and record status | Promoter declaration by K. Panduranga Rao as authorized signatory for KPR BUILDERS AND DEVELOPERS. |
| Identifier / date | Drawing document 196829, page 1; drawing stamp read as 11-10-2021 from the drawing text layer and flagged as needing review. |
|---|---|
| Scope and record status | Drawing record is listed; the supplied material does not provide a complete drawing extraction for architectural detail. |
| Identifier / date | Not present in supplied records. |
|---|---|
| Scope and record status | The supplied GHMC permit states that an occupancy certificate is compulsory before occupation. Document index |
1. Project at a glance
Project identity
Registered project name: VAIBHAV ARCADE
Project type: Residential apartment project
Phase / registered portion: No separate phase name is disclosed; the RERA registration is for the project.
TG-RERA registration: P02400003910, issued 06/01/2022; the certificate states a five-year validity period ending 08/10/2027. Registration validity is distinct from the completion undertaking and from occupancy certification.
Registered promoter: KPR BUILDERS AND DEVELOPERS; RERA filing identifies the entity type as partnership.
RERA status in supplied record: Registered; the certificate records grant under section 5. No extension is recorded in the supplied certificate.
Land and geographic identity
Locality / revenue village: Miyapur; the building-permit record specifies Miyapur village and HMT Swarnapuri Colony, Miyapur.
Mandal / district / PIN: Serilingampally / Ranga Reddy / 500049.
Project survey number(s): Survey No. 112; no project subdivision is stated in the supplied RERA identity or building-permit record.
Plot identifier: Plot No. 61.
Registered site area: 334.01 sq m; the filed land details also state total area 334.01 sq m, net area 334.01 sq m and affected area 0 sq m.
Boundaries: East: Plot No. 60; West: Plot No. 62; North: Plot No. 74; South: 9 m road.
Site-area context: The cadastral record is for the whole Survey No. 112 and gives its extent as 7,752.66 sq m; that is not the filed project-site extent.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: Building Permit Order 2/C21/09913/2021, dated 08 October 2021. The filed order also lists file no. 2/C21/04626/2021.
Sanctioned configuration: One residential building, described in the permit as 1 Stilt + 5 upper floors; approved height is 14.95 m. No basement or podium is identified in the supplied permit extraction.
Approved built-up area: The RERA project fields state 950.70 sq m as approved built-up area. The permit extraction separately lists 950.70 for residential and 177.43 for stilt parking; the latter is identified there as stilt parking, not residential area.
Building / tower count: One building; the RERA unit summary records one block and one tower.
Parking-level details: Stilt parking is shown in the permit. A sanctioned parking-space count is not established in the supplied extract.
Unit counts: GHMC permit: total units as sanctioned are not specified in the supplied extraction. RERA filing: 10 proposed units.
Offering and status
RERA-filed configuration: 2BHK, 10 units.
RERA-filed saleable area: 54.62 sq m per unit.
Booked / available: 0 booked; 10 available, as last read from the TG-RERA portal. The portal record has no as-of date, so these counts are indicative.
Completion timeline: Form B records the promoter’s undertaking to complete by 08 October 2027; the project header separately gives a proposed completion date of 08/02/2028.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project records. The GHMC permit makes an occupancy certificate compulsory before occupation.
Construction stage: The supplied records do not establish independently verified construction progress or a current site stage.
2. The project story
VAIBHAV ARCADE is recorded with TG-RERA as a residential apartment project at Plot No. 61, Survey No. 112, Miyapur, in HMT Swarnapuri Colony, Serilingampally Mandal, Ranga Reddy District. The approved scheme is a single residential building with a stilt level and five upper floors.
The RERA filing offers ten 2BHK units, with a filed saleable area of 54.62 sq m per unit. The portal’s last-read booking figures show all ten as available, but carry no as-of date. The supplied material does not provide a verified construction-progress percentage, a site inspection, or an occupancy/completion certificate; accordingly, it does not establish whether construction is currently under way or any portion is complete or occupied.
3. Master plan, architecture & building design
The RERA-filed site is 334.01 sq m, with the same figure reported for total and net area and zero affected area. The GHMC building-permit extraction records a residential building with 1 stilt + 5 upper floors and a height of 14.95 m. It lists 950.70 for the residential component and 177.43 for stilt parking; these are kept as separately labelled permit entries.
The permit lists a tot-lot area of 0 sq m, one rainwater-harvesting pit, and 15 trees. It also requires peripheral greenery and tree planting, and says the tot-lot is to be fenced and maintained as greenery before issue of an occupancy certificate. The supplied evidence does not establish the building footprint, flats per floor, detailed room layouts, lift or stair arrangement, or internal circulation. Although two drawings are reported in the floor-plan dataset, no flat designs were measured from them.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 0 | 10 | 54.62 sq m | Not established | Not supplied |
The 54.62 sq m figure is the RERA-filed saleable area. Software measurement of carpet area from the approved floor-plan drawings is not available for this configuration: the supplied drawing review reports zero flat designs measured. No room dimensions, balcony or utility areas, or loading figure are established in the supplied material.
5. Parking & vehicle circulation
The GHMC permit identifies stilt parking and states that the approved stilt/cellar areas for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The supplied permit extraction does not establish a cellar level or give a count of sanctioned car or two-wheeler spaces.
No resident-versus-visitor allocation, accessible-parking count, EV charging provision, ramp arrangement, internal driveway plan, or unit-specific parking allotment is established in the supplied records. A parking bay shown on a plan, where present, would not by itself establish exclusive ownership.
6. Amenities, recreation & open spaces
The table below summarizes facilities appearing in the supplied GHMC permit or RERA amenity record. A listed facility or requirement is not evidence that it has been completed or independently inspected.
| Description / size | Listed in the RERA amenity record; no size or facility details supplied. |
|---|---|
| Declared progress / verified status | Progress recorded as 0%; no independent completion verification. |
| Description / size | Permit extraction records tot-lot as 0 sq m and requires greenery to be maintained. |
|---|---|
| Declared progress / verified status | RERA progress recorded as 0%; completion not verified. |
| Description / size | GHMC conditions require tree planting along the periphery and in front; permit extraction specifies 15 trees and a peripheral green strip. |
|---|---|
| Declared progress / verified status | Requirement stated in permit; delivery not verified. |
| Description / size | RERA amenity record marks availability “YES”; GHMC conditions require a garbage house within the premises. |
|---|---|
| Declared progress / verified status | RERA progress recorded as 0%; completion not verified. |
| Description / size | RERA amenity record marks availability “YES”; permit lists one rainwater-harvesting pit. |
|---|---|
| Declared progress / verified status | RERA progress recorded as 0%; completion not verified. |
| Description / size | Marked “YES” in the RERA amenity record; details are not supplied. |
|---|---|
| Declared progress / verified status | Progress recorded as 0%; completion not verified. |
7. Utilities, building services & safety
The RERA amenity record marks water supply and an electrical meter room/sub-station/receiving station as available, while recording 0% progress for those entries. GHMC conditions require space for a transformer, an on-site garbage house, rainwater harvesting and an ETP to standard specification. The permit also lists storm-water drains and sewerage/STP-related facilities in the RERA amenity record, but the supplied evidence does not specify system capacities, water sources or storage, treatment capacity, reuse, or operational status.
The GHMC permit requires plumbing, fire-safety, lift and electrical installations to be carried out under qualified technical supervision. It also makes structural and means-of-escape safety the responsibility of the relevant project professionals and requires an occupancy fire NOC before an occupancy certificate. These are recorded approval conditions, not evidence that the systems or clearances have been completed. The supplied materials do not specify lift count or capacity, fire-system design, backup power, CCTV, access control, waste segregation arrangements, or accessible circulation.
8. Location, access & connectivity
The registered project location is Miyapur, Serilingampally Mandal, Ranga Reddy District, PIN 500049; the permit specifies HMT Swarnapuri Colony, Miyapur. The site boundaries identify a 9 m road on the south.
The supplied location record gives HITEC City as 8.6 km away. This is a recorded distance; no travel time is supplied. The project evidence does not establish an approach-road route, public-transport service details, or other measured landmark distances.
9. Developer & development status
The registered promoter is KPR BUILDERS AND DEVELOPERS, identified in the RERA filing as a partnership. Its GSTIN is 36AAMFK6335Q1ZK. The supplied promoter address is Flat No. 402, 3rd Floor, Privik Residency, Plot No. 2, 9-63, HMT Swarnapuri Colony, Miyapur, Serilingampally, Ranga Reddy, Telangana, 500049. The supplied record does not provide an official website or contact details.
Form B, dated 9 November 2021, is a promoter declaration signed by authorized signatory K. Panduranga Rao. It undertakes completion by 08 October 2027 and includes declarations concerning title, encumbrances, project funds and pending approvals. The project header separately records a proposed completion date of 08/02/2028. The supplied evidence does not establish the current construction stage, any independently verified progress, or a granted extension.
10. Approvals, official records & documents
| Identifier / date | P02400003910; issued 06/01/2022; certificate states validity to 08/10/2027. |
|---|---|
| Scope and record status | FORM C records registration of VAIBHAV ARCADE under section 5 and includes a separate-account condition. |
| Identifier / date | Approval no. 2/C21/09913/2021; dated 08 October 2021. |
|---|---|
| Scope and record status | Building permission for a residential building on Survey No. 112, Miyapur; the filed extraction states 1 stilt + 5 upper floors. |
| Identifier / date | 2/C21/04626/2021. |
|---|---|
| Scope and record status | Listed with the building-permit record. |
| Identifier / date | Proceeding no. 294/BP/2520/92-93; permit no. 002281. |
|---|---|
| Scope and record status | References listed in the GHMC permit extraction; a separate approved-layout document is not established in the supplied evidence. |
| Identifier / date | Dated 9 November 2021. |
|---|---|
| Scope and record status | Promoter declaration by K. Panduranga Rao as authorized signatory for KPR BUILDERS AND DEVELOPERS. |
| Identifier / date | Drawing document 196829, page 1; drawing stamp read as 11-10-2021 from the drawing text layer and flagged as needing review. |
|---|---|
| Scope and record status | Drawing record is listed; the supplied material does not provide a complete drawing extraction for architectural detail. |
| Identifier / date | Not present in supplied records. |
|---|---|
| Scope and record status | The supplied GHMC permit states that an occupancy certificate is compulsory before occupation. |
Frequently asked questions
Is VAIBHAV ARCADE registered with Telangana RERA?
Yes. VAIBHAV ARCADE is registered with the Telangana Real Estate Regulatory Authority as P02400003910; the registration status is New Project.
Who is the developer of VAIBHAV ARCADE?
The promoter named in the RERA registration is KPR BUILDERS AND DEVELOPERS.
Where is VAIBHAV ARCADE located?
VAIBHAV ARCADE is in Miyapur, Serilingampally, Rangareddy, Telangana (500049).
When will VAIBHAV ARCADE be completed?
The promoter's proposed date of completion filed with RERA is 08/02/2028. This is the promoter's declaration, not a guarantee.
More projects in Miyapur