Sign in

Krishna Urban

Krishna Prasad Boppana · Rangareddy · RERA P02400004319

Krishna Urban is a residential apartment project in Mayuri Nagar, Serilingampally mandal, Ranga Reddy district, developed by registered promoter Krishna Prasad Boppana. The project covers 432 sq. m and comprises one residential building with 1 stilt and 5 upper floors, with 15 double-bedroom units of 62.33 m² saleable area each. Its TG-RERA registration number is P02400004319, and the building permit states completion before 15 September, 2027.

01What we found

Period endedTG-RERA registration ran to 31 Dec 2023 - check its extension on TG-RERA
15documents on file - each fact links to its page
24court cases on this project's land (survey 20, 28, Miyapur)
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameKrishna Urban RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionNo phase name or phase number disclosed. The registered project concerns Plot Nos. 674 & 675.
TG-RERA registrationP02400004319
Registration validity24/03/2022 to 31/12/2023; the certificate records no extension. The supplied certificate’s stated validity ended on 31/12/2023; the evidence provided does not establish any later extension or current registration status. Registration validity is separate from the building-permit completion deadline below.
Registered promoterKrishna Prasad Boppana RERA record
RERA statusA registration certificate is on file.

Land and geographic identity

ItemProject record
LocalityMAYURI NAGAR RERA record RERA filing
Revenue villageMiyapur RERA record RERA filing
Mandal / district / PINSerilingampally / Ranga Reddy / 500049 RERA record
Project survey numbers20 and 28/1; no further project subdivision is specified in the supplied project identity RERA record RERA filing
Registered site extent432 sq. m in the building permit. The RERA filing separately records total area 432 sq. m and net area 432.00 sq. m RERA filing
Plot identifiers674 & 675 in Category-II MIG of the Miyapur HUDA Residential Complex RERA filing
Boundaries (RERA filing)East: MIG 683 684; west: 9 METRE ROAD; north: MIG 676; south: MIG 673 RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC)
Principal building approvalApproval No. 2/C21/09626/2021; building permit dated 15 September, 2021 Approvals record
Related file number2/C21/08639/2021
Sanctioned built-up areas recorded in permitUpper-floor residential area: 1,187.50 m²; parking-floor area: 225.38 m². These are the permit’s listed areas, not a RERA saleable-area figure.
Building count and configurationOne residential building, identified as PROP-1 (BUILDING): 1 Stilt + 5 upper floors.
Height14.99 m.
Parking levelsStilt parking is indicated by the sanctioned floor configuration; no total parking-space count is supplied.
Unit countsThe building permit’s extract does not state a unit count. The RERA filing records 15 “DOUBLE BEDROOM” units; its project information lists 1 total building unit and 1 proposed building unit, so the meaning of those latter fields is not clear from the supplied record RERA filing RERA unit table.

Offering and status

ItemProject record
RERA-filed configurationDOUBLE BEDROOM, 15 units RERA unit table RERA filing
RERA-filed saleable area62.33 m² per recorded configuration RERA unit table
Booking / availability0 booked; 15 available, as last read from the TG-RERA portal. The record has no as-of date, so these counts are indicative rather than a live availability confirmation RERA unit table.
Construction stageNo independently verified site-progress report or present construction stage is supplied. RERA amenity entries record Water Supply at 50% and other listed progress percentages at 0%; these are portal-reported figures, not independent site verification RERA amenities.
Completion datesRERA registration certificate validity ended 31/12/2023. The GHMC permit states construction was to commence before 15 March, 2023 and be completed before 15 September, 2027. The Form B declaration states a completion period of “24 Sponths”; the supplied text does not give a reliably readable date for that undertaking.
Occupancy / completion certificateNo occupancy certificate or completion certificate is included in the supplied project documents; issue or non-issue is not independently confirmed here Document index.

2. The project story

Krishna Urban is registered as a residential apartment project at Plot Nos. 674 & 675, Category-II MIG, in the Miyapur HUDA Residential Complex, within Miyapur village, Serilingampally mandal, Ranga Reddy district. The registered locality is Mayuri Nagar. Its land record identifies Survey Nos. 20 and 28/1, and the GHMC permit describes a 432 m² site RERA record RERA filing.

The sanctioned scheme is one residential building, PROP-1, with a stilt and five upper floors. The TG-RERA filing lists 15 double-bedroom units, each with a filed saleable area of 62.33 m² RERA unit table. The supplied material does not establish how many units are on each floor, nor does it provide a current independently verified construction stage. The portal’s amenity-progress entries are administrative reported values and should not be read as an independent inspection of the site RERA amenities.

The permit specifies an occupancy certificate before occupation and a completion notice after building completion. See the Occupancy / completion certificate entry above; a certified completed or occupied status is not established here.

3. Master plan, architecture & building design

The GHMC building permit identifies a single residential building, PROP-1 (BUILDING), on a 432 m² site, with 1 Stilt + 5 upper floors and a stated height of 14.99 m. It records upper-floor residential area of 1,187.50 m² and parking-floor area of 225.38 m²; these categories are kept separate from the RERA-filed unit saleable area RERA unit table.

The RERA land filing records total and net area of 432 sq. m / 432.00 sq. m, zero road-affected area, and the listed boundaries in the identity table RERA filing. The building permit also records 20 Trees, 3 rainwater-harvesting pits, and a compound wall of 75.54 RM. The approved floor-plan record is described as a drawing, but the supplied drawing-derived data does not establish a reliable tower-by-tower or floor-by-floor unit schedule. No verified details are supplied on lifts, stair count, floor circulation, landscaping layout, or residential/common-area distribution beyond the permit’s stated areas Floor plans.

4. Homes, configurations & floor plans

The TG-RERA filing records one configuration, “DOUBLE BEDROOM,” with 15 units and saleable area 62.33 m². Booked and available counts are portal figures without an as-of date RERA unit table.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
DOUBLE BEDROOM1501562.33 m²Not measured for the RERA-matched configuration in the supplied drawing analysisNot supplied

The drawing analysis also includes software-measured layouts labelled 1BHK and 3BHK. Those labels are not matched to configurations in the TG-RERA filing, so they are not presented as the project’s RERA-filed offering. The measured carpet figures—45.0 m² for one 1BHK design and 60.7 m² for one 3BHK design—are software measurements from drawing geometry, marked as needing review, not RERA disclosures. No verified loading figure is supplied RERA unit details Floor plans.

The drawings’ room data shows a living/kitchen and bedroom spaces, toilets, and a utility area for those measured designs. For example, the measured 1BHK drawing lists a living/kitchen of 4.5 × 4.7 m, a bedroom of 3.0 × 3.23 m, a toilet of 1.5 × 3.0 m, and a utility of 1.2 × 4.5 m; the utility is excluded from the measured carpet area. These drawing measurements are not substitutes for the RERA-filed saleable area RERA unit details.

5. Parking & vehicle circulation

The sanctioned floor configuration includes a stilt and the permit records a parking-floor area of 225.38 m². The evidence does not state the sanctioned number of car or two-wheeler spaces, visitor or accessible spaces, parking allocation by unit, or whether any bays are mechanically operated. A parking bay shown or implied by a plan does not, by itself, establish exclusive ownership or an allotment to a particular apartment.

The permit also refers to an 18 mt. road width and lists an 18-month commencement condition, but the supplied material does not give verified details of vehicle ramps, internal driveways, entry/exit arrangements, pedestrian separation, EV charging, or parking allotment documents.

6. Amenities, recreation & open spaces

Tot-lot
Description / sizeListed in the permit’s sanctioned parameters as 0 m²; no facility size or developed provision is established
Declared progress / verified statusSanctioned record lists it; no verified completion evidence
Rainwater harvesting
Description / size3 rainwater-harvesting pits are recorded in the permit; percolation pit required by the permit
Declared progress / verified statusRequired/listed; completion not independently verified
Transformer space
Description / sizeSpace for a transformer is required by the permit
Declared progress / verified statusPermit condition; installation not verified
Garbage house
Description / sizeRequired within the premises by the permit
Declared progress / verified statusPermit condition; completion not verified
Green strip / tot-lot / park
Description / sizeRERA portal entry says “YES,” with progress recorded as 0%
Evidence sourceRERA amenities
Declared progress / verified statusPortal-reported; not independently verified
Water supply
Description / sizeRERA portal entry says “YES,” with progress recorded as 50%
Evidence sourceRERA amenities
Declared progress / verified statusPortal-reported; not independently verified
Sewerage / STP
Description / sizeRERA portal entry says “YES,” with progress recorded as 0%
Evidence sourceRERA amenities
Declared progress / verified statusPortal-reported; not independently verified
Storm-water drains
Description / sizeRERA portal entry says “YES,” with progress recorded as 0%
Evidence sourceRERA amenities
Declared progress / verified statusPortal-reported; not independently verified
Water conservation / rainwater harvesting
Description / sizeRERA portal entry says “YES,” with progress recorded as 0%
Evidence sourceRERA amenities
Declared progress / verified statusPortal-reported; not independently verified
Electrical meter room / sub-station / receiving station
Description / sizeRERA portal entry says “YES,” with progress recorded as 0%
Evidence sourceRERA amenities
Declared progress / verified statusPortal-reported; not independently verified
Power backup
Description / sizeRERA portal entry says “YES,” with progress recorded as 0%
Evidence sourceRERA amenities
Declared progress / verified statusPortal-reported; no capacity or completed installation verified
Lift
Description / sizeRERA portal entry says “YES,” with progress recorded as 0%
Evidence sourceRERA amenities
Declared progress / verified statusPortal-reported; lift count and capacity not supplied
Other RERA-listed infrastructure
Description / sizeInternal roads and footpaths, street lighting, community buildings, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection and safety, and aggregate recreational open space are listed with 0% progress; some entries do not show a separate “available” value
Evidence sourceRERA amenities
Declared progress / verified statusPortal entries only; completion not independently verified

7. Utilities, building services & safety

The GHMC permit requires a rainwater-harvesting structure, transformer space and a garbage house, and states that an ETP is to be provided “as per standard specification”. The RERA portal also lists water supply, sewerage/STP, storm-water drains, water conservation/rainwater harvesting, an electrical meter room/sub-station/receiving station, power backup and a lift. See the amenity entries above for the portal-reported progress figures RERA amenities. These are reported portal figures; the supplied material does not independently verify installation, operation, capacity, or service availability.

The permit requires an Occupancy FIRE NOC from the Director (EV&DM) before issue of an occupancy certificate, and states that an occupancy certificate is compulsory before occupation. No fire NOC or occupancy certificate is included in the supplied evidence. The materials do not specify water sources or storage, STP capacity or reuse arrangements, electrical supply or backup capacity, lift count or capacity, fire-system equipment, escape-stair details, CCTV, access control, waste segregation, or accessible circulation.

8. Location, access & connectivity

The registered location is MAYURI NAGAR, Miyapur village, Serilingampally mandal, Ranga Reddy district, Telangana, PIN 500049 RERA record RERA filing. The permit identifies the Miyapur site and an 18 mt. road width; the RERA land filing lists a 9 METRE ROAD along the west boundary RERA filing.

The supplied location data gives a measured distance of 7.8 km to HITEC City Location record. No other measured road, transit, or landmark distances are provided. Public transport or travel-time claims are not established by the project records included here.

9. Developer & development status

The registered promoter is Krishna Prasad Boppana RERA record. The RERA filing identifies the organization type as “Others” and names B Aruna Kumari in the promoter/landowner information; it does not establish a company or other incorporated legal-entity type RERA filing Parties record. The Form B affidavit is signed by Mr. B. Krishna Prasad and Mrs. B. ArunaKumari, who declare title to the land, that it is free from encumbrances, and that they will meet the stated project obligations. These are promoter declarations, not independent title or completion findings.

The registration certificate lists the promoter’s office as Village Kondapur, Serilingampally mandal, Ranga Reddy district, PIN 500084. The supplied material does not provide a verified company identifier, official website, or project contact details. No current independently verified construction stage is established. See the completion dates above for the building-permit deadline and RERA certificate validity.

10. Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP02400004319; issued 24/03/2022; stated validity to 31/12/2023
What the supplied record establishesRegistration of Krishna Urban; no extension is recorded on the supplied certificate
GHMC building permit order
Identifier / dateApproval No. 2/C21/09626/2021; dated 15 September, 2021; related file 2/C21/08639/2021
What the supplied record establishesConditional building permission for PROP-1, 1 stilt + 5 upper floors, on Survey Nos. 20 and 28/1
Building/floor-plan drawing
Identifier / date2/C21/09626/2021; drawing stamp dated 20-09-2021
What the supplied record establishesDrawing record is supplied; its drawing text is flagged for review
Form B affidavit-cum-declaration
Identifier / dateDated 14 December 2021
What the supplied record establishesPromoter declarations on title, encumbrances, completion undertaking and regulatory/fund obligations
Advocate title-search report
Identifier / dateDated 15-11-2021
What the supplied record establishesReport concerning Plots 674 and 675, totaling 516.66 Sq yds, and the title chain; the report’s full title analysis is outside this overview
Title deeds included with filing
Identifier / dateDocuments 217568, 217570, 217571, 217572, 217576
What the supplied record establishesSale-deed records relating to Plot Nos. 674 and 675 in the Miyapur HUDA Residential Complex
Encumbrance statements
Identifier / dateDocuments 222115 and 222116
What the supplied record establishesEncumbrance records filed with the project
Occupancy / completion records
Identifier / dateNot supplied
What the supplied record establishesNo occupancy certificate or completion certificate is available in the evidence reviewed Document index

The approval record also cites layout / subdivision number 10552/PFU/HUDA/85. The supplied records identify GHMC as the building-permit authority; they do not include a verified standalone layout-approval document or an occupancy/completion certificate.

Frequently asked questions

Is Krishna Urban registered with Telangana RERA?

Yes. Krishna Urban is registered with the Telangana Real Estate Regulatory Authority as P02400004319; the registration status is New Project.

Who is the developer of Krishna Urban?

The promoter named in the RERA registration is Krishna Prasad Boppana.

Where is Krishna Urban located?

Krishna Urban is in MAYURI NAGAR, Miyapur, Serilingampally, Rangareddy, Telangana (500049).

When will Krishna Urban be completed?

The promoter's proposed date of completion filed with RERA is 31/12/2023. This is the promoter's declaration, not a guarantee.

More projects in Miyapur