Mahitha S Green Grove Block-A
MAHITHA HOMES · Rangareddy · RERA P02400003351
MAHITHA S GREEN GROVE BLOCK-A is a residential apartment project in Madeenaguda, Serilingampally Mandal, Ranga Reddy District, developed by the registered promoter MAHITHA HOMES. It covers 673.69 sq. m and comprises one residential building, BLDG-1, with 1 Stilt + 5 upper floors and 20 2BHK units. The project is registered with TG-RERA under P02400003351, and the promoter’s Form B states completion by 26-04-2027.
More from Mahitha Homes · 4 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | MAHITHA S GREEN GROVE BLOCK-A RERA record |
| Project type / phase | Residential apartment project; registered portion is identified as BLOCK-A. RERA record RERA filing |
| TG-RERA registration | P02400003351; Form C issued 25/08/2021; validity stated through 26/04/2027. Registration validity is not the same as a construction-completion or occupancy date. RERA record |
| Registered promoter | MAHITHA HOMES; entity type recorded as Partnership. RERA record RERA filing |
| RERA status in the record | The registration certificate records the project as registered. The record also includes an architect’s completion certificate and GHMC occupancy-certificate records; those are summarized below with their stated project/building scope. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Madeenaguda RERA record RERA filing |
| Revenue village | Serilingampally is the village recorded in the project identity; the filed permit, title and occupancy documents describe the site as Madeenaguda Village. RERA record RERA filing |
| Mandal / district / PIN | Serilingampally Mandal; Ranga Reddy District; 500049 RERA record RERA filing |
| Survey numbers and subdivisions | 203/A and 202/2/A RERA record Land records |
| Plot reference | Plots 93, 94 and 95 Part RERA filing |
| Registered site extent | 673.69 sq. m in the project land record and permit. The permit separately states Net Area 670.58 sq. m; the occupancy record states Net Area 673.69 sq. m. RERA filing |
| Boundaries in project filing | East: neighbours’ land; west: 40 ft wide road; north: 40 ft wide road; south: Plot No. 95 Part RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building permit | 2/C21/06062/2021, dated 26 April, 2021; file no. 2/C21/03495/2021 Approvals record |
| Building configuration | One residential building, BLDG-1, sanctioned as 1 Stilt + 5 upper floors; stated height 14.95 m. |
| Approved floor area | Permit states upper-floor residential area of 1,793.30 m² and stilt parking area of 331.52 m². |
| Buildings / units | One building. The project filing records 20 units; the approved-unit count is not separately established in the supplied records. RERA filing RERA unit table |
| Parking | Stilt is identified for parking. The permit’s stated parking area is 331.52 m²; a sanctioned count of parking spaces is not available in the supplied evidence. |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 2BHK; 20 units RERA unit table RERA unit details |
| RERA-filed saleable area | 85.81 m² per recorded unit configuration RERA unit table RERA unit details |
| Booked / available | Portal-derived record shows 20 booked, 0 available; the portal record has no as-of date, so these counts are indicative rather than a current inventory confirmation. RERA unit table |
| Construction / completion record | GHMC occupancy-certificate records state that the building is fit for occupation; an architect’s Form 1A dated 27-06-2024 certifies the registered project as completed. These records concern the building/project identified in the cited documents, not a separate phase or tower. |
| Completion dates in supplied records | Promoter’s Form B states completion by 26-04-2027; the GHMC occupancy record states the building completion date as 20 July, 2022. These dates describe different recorded milestones and are not the RERA registration-validity date. |
2. The project story
MAHITHA S GREEN GROVE BLOCK-A is registered with TG-RERA as a residential apartment project at Madeenaguda, on survey numbers 203/A and 202/2/A, within the project identity’s Serilingampally village and mandal, Ranga Reddy District. Its filed land reference is Plots 93, 94 and 95 Part. RERA record RERA filing
The GHMC permit describes one building, BLDG-1, with a stilt and five upper floors. The RERA unit record lists 20 2BHK apartments. The filed unit inventory currently shows all 20 as booked, but the portal extract has no as-of date. RERA unit table
The supplied GHMC occupancy-certificate records state that the residential building is fit for occupation, and the architect’s Form 1A dated 27-06-2024 certifies the registered project as completed. These are documentary completion statements; no independent site inspection or current physical-progress verification is supplied.
3. Master plan, architecture & building design
The GHMC building permit identifies a single residential building, BLDG-1, with 1 Stilt + 5 upper floors, a stated height of 14.95 m, and 1,793.30 m² of upper-floor residential area. It separately records 331.52 m² of stilt parking area. The permit also records a site area of 673.69 m² and net area of 670.58 m².
The project filing identifies one building and 20 units. The supplied evidence does not establish a floor-by-floor unit schedule, flat count per floor, lift or stair configuration, building footprint, or detailed internal circulation. RERA filing RERA unit table Document index
The permit lists six rainwater-harvesting pits, 30 trees, space for a transformer, a garbage house and an ETP. It records the tot-lot area as 0 m². The permit’s listed conditions include provision for parking in the stilt, a fenced tot-lot/greenery requirement before occupancy, and fire and environmental provisions; these recorded conditions are not, by themselves, evidence that every facility was installed or independently inspected.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 20 | 0 | 85.81 m² | Software-measured drawing range: 66.0–85.2 m²; median 73.0 m² | Not supplied |
The unit count, booking count and saleable area are TG-RERA filing/portal-derived values; booked and available counts have no as-of date in the supplied record. The carpet figures are software measurements from approved floor-plan drawing geometry, not RERA-filed disclosures, and are marked as needing review. RERA unit table RERA unit details Floor plans
The measurement record covers eight measured 2BHK designs and includes a typical-floor-plan room schedule for flat 02: living/dining, two bedrooms, kitchen, wash area and two toilets. Individual room measurements are drawing-derived software measurements, not independent on-site measurements; verify them against the drawing and the unit-specific sale documents. RERA unit details Floor plans
Carpet area describes the measured home area in the drawing record; the RERA-filed saleable area is a separate figure and includes a different area basis. No loading figure is supplied. RERA unit details Floor plans
5. Parking & vehicle circulation
The GHMC permit identifies 331.52 m² of stilt parking area and states that the stilt and any cellar approved for parking are to be used exclusively for vehicle parking. The permit’s building configuration specifies a stilt but does not specify a parking-space count.
No resident, visitor, accessible or two-wheeler parking counts, parking allocation schedule, ramp or driveway details, EV-charging provision, or legally documented exclusive allocation to individual units are established in the supplied evidence. A parking area or drawn bay does not establish an individual buyer’s exclusive parking entitlement. Document index
6. Amenities, recreation & open spaces
The following are listed in the project’s RERA amenity record. Percentages are the recorded declared-progress values, not independent verification of delivery. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | No source, storage or capacity stated | RERA amenities | RERA amenity record: YES, 100%; not independently verified |
| Sewerage | Listed as “Sewerage (Chamber, Lines, Septic Tank, STP)” | RERA amenities | RERA amenity record: YES, 100%; not independently verified |
| Green strip / tot lot / park | Permit records tot-lot area as 0 m² and lists 30 Trees | RERA amenities | RERA amenity record: YES, 100%; not independently verified |
| Water conservation / rainwater harvesting | Permit lists 6 rainwater-harvesting pits | RERA amenities | RERA amenity record: YES, 100%; not independently verified |
| Internal roads and footpaths | No size or detail supplied | RERA amenities | Recorded progress: 0% |
| Storm-water drains | No size or detail supplied | RERA amenities | Recorded progress: 0% |
| Street lighting | No detail supplied | RERA amenities | Recorded progress: 0% |
| Community buildings | No detail supplied | RERA amenities | Recorded progress: 0% |
| Sewage/sullage treatment and disposal | No treatment system detail supplied | RERA amenities | Recorded progress: 0% |
| Solid-waste management and disposal | No detail supplied | RERA amenities | Recorded progress: 0% |
| Energy management | No detail supplied | RERA amenities | Recorded progress: 0% |
| Fire protection and fire-safety requirements | No installed-system detail supplied | RERA amenities | Recorded progress: 0% |
| Electrical meter room, sub-station or receiving station | Permit separately lists space for a transformer | RERA amenities | RERA amenity record: 0%; transformer-space provision is recorded in the permit |
| Aggregate recreational open space | No area supplied | RERA amenities | Recorded progress: 0% |
The permit also lists a garbage house and ETP. The supplied records do not establish their size, installed capacity, or independently verified operating status.
7. Utilities, building services & safety
The RERA amenity record marks water supply, sewerage, green strip/tot-lot/park, and rainwater harvesting as available at 100% declared progress. The permit specifies six rainwater-harvesting pits and an ETP, but no water source, storage volume, treatment capacity, reuse arrangement, or storm-water system capacity is supplied. These declarations and permit entries do not establish independent operational verification. RERA amenities
For electrical services, the permit lists space for a transformer; no supply capacity, backup system, or EV-charging details are supplied. No lift number or capacity, fire-system specification, escape-stair details, CCTV/access-control system, waste-segregation arrangement, or accessibility design details are established by the supplied evidence. RERA amenities Document index
The permit’s conditions refer to obtaining a fire NOC before occupancy, installing a working fire extinguisher on each floor, providing an ETP and rainwater-harvesting pits, and maintaining specified greenery. These are recorded permit conditions; the supplied evidence does not independently establish the installation or continuing operation of each item.
8. Location, access & connectivity
The project is recorded at Madeenaguda, Serilingampally Mandal, Ranga Reddy District, PIN 500049, on survey numbers 203/A and 202/2/A. Its stated site boundaries include 40 ft wide roads on the north and west. RERA record RERA filing
The supplied location data identifies the nearest sampled Outer Ring Road interchange at approximately 7.0 km. No public-transport details, verified travel times, or measured distances to other landmarks are supplied. Location record
9. Developer & development status
The registered promoter is MAHITHA HOMES, recorded as a partnership. The project record names BOBBA VIJAYA LAKSHMI as authorized signatory and M SRINIVASA RAO as partner. A promoter registered-office address and official contact details are not established in the supplied evidence. RERA filing Parties record
The promoter’s Form B, signed by B.BALAKRISHNA as authorized signatory, declares title to the land, states that it is free from encumbrances, and undertakes completion by 26-04-2027. These are promoter declarations.
The GHMC occupancy-certificate record states that the building is fit for occupation, and the architect’s Form 1A dated 27-06-2024 certifies the registered project as completed. The supplied evidence contains no independent site-progress inspection.
10. Approvals, official records & documents
| Identifier / date | P02400003351; issued 25/08/2021, valid through 26/04/2027 |
|---|---|
| What the supplied record establishes | Form C registration for MAHITHA S GREEN GROVE BLOCK-A. |
| Identifier / date | 2/C21/06062/2021; 26 April, 2021; file 2/C21/03495/2021 |
|---|---|
| What the supplied record establishes | Permit for BLDG-1 on survey numbers 203/A and 202/2/A. |
| Identifier / date | 3695/GHMC/SLP/2022-OC; dated 21 October, 2022; application 009358/GHMC/4611/SLP2/2022-OC |
|---|---|
| What the supplied record establishes | Occupancy-certificate record for the residential building; states it is fit for occupation. |
| Identifier / date | Completion notice dated 20 July, 2022 |
|---|---|
| What the supplied record establishes | Record identifies the building as Stilt + 5 Upper Floor and records sanctioned-plan and site-plan measurements. |
| Identifier / date | Dated 27-06-2024 |
|---|---|
| What the supplied record establishes | Certifies completion of MAHITHA S GREEN GROVE BLOCK-A and records the GHMC occupancy certificate. |
| Identifier / date | Sale deed dated 27 January 2021, registration no. 2214/2021, cited in the title report |
|---|---|
| What the supplied record establishes | Filed deed record concerns Plots 93, 94 and part of 95 in survey numbers 203/A and 202/2/A. |
| Identifier / date | 167093 |
|---|---|
| What the supplied record establishes | Floor-plan drawing source used for software-measured unit and room data; the drawing measurement is not a RERA area disclosure. |
| Identifier / date | Dated 13-08-2021 |
|---|---|
| What the supplied record establishes | Promoter declaration covering title basis, encumbrance statement, separate-account undertaking and completion undertaking. |
The supplied evidence does not establish a publicly verified approved-layout lookup or provide a complete independent record of site utilities and facilities.
1. Project at a glance
Project identity
Registered project name: MAHITHA S GREEN GROVE BLOCK-A
Project type / phase: Residential apartment project; registered portion is identified as BLOCK-A.
TG-RERA registration: P02400003351; Form C issued 25/08/2021; validity stated through 26/04/2027. Registration validity is not the same as a construction-completion or occupancy date.
Registered promoter: MAHITHA HOMES; entity type recorded as Partnership.
RERA status in the record: The registration certificate records the project as registered. The record also includes an architect’s completion certificate and GHMC occupancy-certificate records; those are summarized below with their stated project/building scope.
Land and geographic identity
Locality: Madeenaguda
Revenue village: Serilingampally is the village recorded in the project identity; the filed permit, title and occupancy documents describe the site as Madeenaguda Village.
Mandal / district / PIN: Serilingampally Mandal; Ranga Reddy District; 500049
Survey numbers and subdivisions: 203/A and 202/2/A
Plot reference: Plots 93, 94 and 95 Part
Registered site extent: 673.69 sq. m in the project land record and permit. The permit separately states Net Area 670.58 sq. m; the occupancy record states Net Area 673.69 sq. m.
Boundaries in project filing: East: neighbours’ land; west: 40 ft wide road; north: 40 ft wide road; south: Plot No. 95 Part
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building permit: 2/C21/06062/2021, dated 26 April, 2021; file no. 2/C21/03495/2021
Building configuration: One residential building, BLDG-1, sanctioned as 1 Stilt + 5 upper floors; stated height 14.95 m.
Approved floor area: Permit states upper-floor residential area of 1,793.30 m² and stilt parking area of 331.52 m².
Buildings / units: One building. The project filing records 20 units; the approved-unit count is not separately established in the supplied records.
Parking: Stilt is identified for parking. The permit’s stated parking area is 331.52 m²; a sanctioned count of parking spaces is not available in the supplied evidence.
Offering and status
RERA-filed configuration: 2BHK; 20 units
RERA-filed saleable area: 85.81 m² per recorded unit configuration
Booked / available: Portal-derived record shows 20 booked, 0 available; the portal record has no as-of date, so these counts are indicative rather than a current inventory confirmation.
Construction / completion record: GHMC occupancy-certificate records state that the building is fit for occupation; an architect’s Form 1A dated 27-06-2024 certifies the registered project as completed. These records concern the building/project identified in the cited documents, not a separate phase or tower.
Completion dates in supplied records: Promoter’s Form B states completion by 26-04-2027; the GHMC occupancy record states the building completion date as 20 July, 2022. These dates describe different recorded milestones and are not the RERA registration-validity date.
2. The project story
MAHITHA S GREEN GROVE BLOCK-A is registered with TG-RERA as a residential apartment project at Madeenaguda, on survey numbers 203/A and 202/2/A, within the project identity’s Serilingampally village and mandal, Ranga Reddy District. Its filed land reference is Plots 93, 94 and 95 Part.
The GHMC permit describes one building, BLDG-1, with a stilt and five upper floors. The RERA unit record lists 20 2BHK apartments. The filed unit inventory currently shows all 20 as booked, but the portal extract has no as-of date.
The supplied GHMC occupancy-certificate records state that the residential building is fit for occupation, and the architect’s Form 1A dated 27-06-2024 certifies the registered project as completed. These are documentary completion statements; no independent site inspection or current physical-progress verification is supplied.
3. Master plan, architecture & building design
The GHMC building permit identifies a single residential building, BLDG-1, with 1 Stilt + 5 upper floors, a stated height of 14.95 m, and 1,793.30 m² of upper-floor residential area. It separately records 331.52 m² of stilt parking area. The permit also records a site area of 673.69 m² and net area of 670.58 m².
The project filing identifies one building and 20 units. The supplied evidence does not establish a floor-by-floor unit schedule, flat count per floor, lift or stair configuration, building footprint, or detailed internal circulation.
The permit lists six rainwater-harvesting pits, 30 trees, space for a transformer, a garbage house and an ETP. It records the tot-lot area as 0 m². The permit’s listed conditions include provision for parking in the stilt, a fenced tot-lot/greenery requirement before occupancy, and fire and environmental provisions; these recorded conditions are not, by themselves, evidence that every facility was installed or independently inspected.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| 2BHK | 20 | 20 | 0 | 85.81 m² | Software-measured drawing range: 66.0–85.2 m²; median 73.0 m² | Not supplied |
The unit count, booking count and saleable area are TG-RERA filing/portal-derived values; booked and available counts have no as-of date in the supplied record. The carpet figures are software measurements from approved floor-plan drawing geometry, not RERA-filed disclosures, and are marked as needing review.
The measurement record covers eight measured 2BHK designs and includes a typical-floor-plan room schedule for flat 02: living/dining, two bedrooms, kitchen, wash area and two toilets. Individual room measurements are drawing-derived software measurements, not independent on-site measurements; verify them against the drawing and the unit-specific sale documents.
Carpet area describes the measured home area in the drawing record; the RERA-filed saleable area is a separate figure and includes a different area basis. No loading figure is supplied.
5. Parking & vehicle circulation
The GHMC permit identifies 331.52 m² of stilt parking area and states that the stilt and any cellar approved for parking are to be used exclusively for vehicle parking. The permit’s building configuration specifies a stilt but does not specify a parking-space count.
No resident, visitor, accessible or two-wheeler parking counts, parking allocation schedule, ramp or driveway details, EV-charging provision, or legally documented exclusive allocation to individual units are established in the supplied evidence. A parking area or drawn bay does not establish an individual buyer’s exclusive parking entitlement.
6. Amenities, recreation & open spaces
The following are listed in the project’s RERA amenity record. Percentages are the recorded declared-progress values, not independent verification of delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Water supply | No source, storage or capacity stated | RERA amenity record: YES, 100%; not independently verified | |
| Sewerage | Listed as “Sewerage (Chamber, Lines, Septic Tank, STP)” | RERA amenity record: YES, 100%; not independently verified | |
| Green strip / tot lot / park | Permit records tot-lot area as 0 m² and lists 30 Trees | RERA amenity record: YES, 100%; not independently verified | |
| Water conservation / rainwater harvesting | Permit lists 6 rainwater-harvesting pits | RERA amenity record: YES, 100%; not independently verified | |
| Internal roads and footpaths | No size or detail supplied | Recorded progress: 0% | |
| Storm-water drains | No size or detail supplied | Recorded progress: 0% | |
| Street lighting | No detail supplied | Recorded progress: 0% | |
| Community buildings | No detail supplied | Recorded progress: 0% | |
| Sewage/sullage treatment and disposal | No treatment system detail supplied | Recorded progress: 0% | |
| Solid-waste management and disposal | No detail supplied | Recorded progress: 0% | |
| Energy management | No detail supplied | Recorded progress: 0% | |
| Fire protection and fire-safety requirements | No installed-system detail supplied | Recorded progress: 0% | |
| Electrical meter room, sub-station or receiving station | Permit separately lists space for a transformer | RERA amenity record: 0%; transformer-space provision is recorded in the permit | |
| Aggregate recreational open space | No area supplied | Recorded progress: 0% |
The permit also lists a garbage house and ETP. The supplied records do not establish their size, installed capacity, or independently verified operating status.
7. Utilities, building services & safety
The RERA amenity record marks water supply, sewerage, green strip/tot-lot/park, and rainwater harvesting as available at 100% declared progress. The permit specifies six rainwater-harvesting pits and an ETP, but no water source, storage volume, treatment capacity, reuse arrangement, or storm-water system capacity is supplied. These declarations and permit entries do not establish independent operational verification.
For electrical services, the permit lists space for a transformer; no supply capacity, backup system, or EV-charging details are supplied. No lift number or capacity, fire-system specification, escape-stair details, CCTV/access-control system, waste-segregation arrangement, or accessibility design details are established by the supplied evidence.
The permit’s conditions refer to obtaining a fire NOC before occupancy, installing a working fire extinguisher on each floor, providing an ETP and rainwater-harvesting pits, and maintaining specified greenery. These are recorded permit conditions; the supplied evidence does not independently establish the installation or continuing operation of each item.
8. Location, access & connectivity
The project is recorded at Madeenaguda, Serilingampally Mandal, Ranga Reddy District, PIN 500049, on survey numbers 203/A and 202/2/A. Its stated site boundaries include 40 ft wide roads on the north and west.
The supplied location data identifies the nearest sampled Outer Ring Road interchange at approximately 7.0 km. No public-transport details, verified travel times, or measured distances to other landmarks are supplied.
9. Developer & development status
The registered promoter is MAHITHA HOMES, recorded as a partnership. The project record names BOBBA VIJAYA LAKSHMI as authorized signatory and M SRINIVASA RAO as partner. A promoter registered-office address and official contact details are not established in the supplied evidence.
The promoter’s Form B, signed by B.BALAKRISHNA as authorized signatory, declares title to the land, states that it is free from encumbrances, and undertakes completion by 26-04-2027. These are promoter declarations.
The GHMC occupancy-certificate record states that the building is fit for occupation, and the architect’s Form 1A dated 27-06-2024 certifies the registered project as completed. The supplied evidence contains no independent site-progress inspection.
10. Approvals, official records & documents
| Identifier / date | P02400003351; issued 25/08/2021, valid through 26/04/2027 |
|---|---|
| What the supplied record establishes | Form C registration for MAHITHA S GREEN GROVE BLOCK-A. |
| Identifier / date | 2/C21/06062/2021; 26 April, 2021; file 2/C21/03495/2021 |
|---|---|
| What the supplied record establishes | Permit for BLDG-1 on survey numbers 203/A and 202/2/A. |
| Identifier / date | 3695/GHMC/SLP/2022-OC; dated 21 October, 2022; application 009358/GHMC/4611/SLP2/2022-OC |
|---|---|
| What the supplied record establishes | Occupancy-certificate record for the residential building; states it is fit for occupation. |
| Identifier / date | Completion notice dated 20 July, 2022 |
|---|---|
| What the supplied record establishes | Record identifies the building as Stilt + 5 Upper Floor and records sanctioned-plan and site-plan measurements. |
| Identifier / date | Dated 27-06-2024 |
|---|---|
| What the supplied record establishes | Certifies completion of MAHITHA S GREEN GROVE BLOCK-A and records the GHMC occupancy certificate. |
| Identifier / date | Sale deed dated 27 January 2021, registration no. 2214/2021, cited in the title report |
|---|---|
| What the supplied record establishes | Filed deed record concerns Plots 93, 94 and part of 95 in survey numbers 203/A and 202/2/A. |
| Identifier / date | 167093 |
|---|---|
| What the supplied record establishes | Floor-plan drawing source used for software-measured unit and room data; the drawing measurement is not a RERA area disclosure. |
| Identifier / date | Dated 13-08-2021 |
|---|---|
| What the supplied record establishes | Promoter declaration covering title basis, encumbrance statement, separate-account undertaking and completion undertaking. |
The supplied evidence does not establish a publicly verified approved-layout lookup or provide a complete independent record of site utilities and facilities.
Other registrations of Mahitha S Green Grove
Frequently asked questions
Is MAHITHA S GREEN GROVE BLOCK-A registered with Telangana RERA?
Yes. MAHITHA S GREEN GROVE BLOCK-A is registered with the Telangana Real Estate Regulatory Authority as P02400003351; the registration status is New Project.
Who is the developer of MAHITHA S GREEN GROVE BLOCK-A?
The promoter named in the RERA registration is MAHITHA HOMES.
Where is MAHITHA S GREEN GROVE BLOCK-A located?
MAHITHA S GREEN GROVE BLOCK-A is in MADEENAGUDA, Serilingampally, Rangareddy, Telangana (500049).
When will MAHITHA S GREEN GROVE BLOCK-A be completed?
The promoter's proposed date of completion filed with RERA is 26/04/2027. This is the promoter's declaration, not a guarantee.
More projects in Serilingampally