Mahitha S Green Grove Block-B
MAHITHA HOMES · Rangareddy · RERA P02400003456
MAHITHA S GREEN GROVE BLOCK-B is a residential apartment project in Madeenaguda, Serilingampally Mandal, Ranga Reddy District, developed by the registered promoter MAHITHA HOMES. It is on a 325.67 sq m site and comprises one residential building with 1 Stilt + 5 upper floors and 10 2BHK apartments. The project is registered with TG-RERA as P02400003456, and its proposed completion date is 26-04-2027.
More from Mahitha Homes · 4 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | MAHITHA S GREEN GROVE BLOCK-B RERA record |
| Project type / registered portion | Residential apartment project; Block-B is the named registered project. The available records describe one building. RERA record RERA filing |
| TG-RERA registration | P02400003456; registered on 24/09/2021, valid through 26/04/2027. Registration validity is not the project’s completion deadline. RERA record Approvals record |
| Registered promoter | MAHITHA HOMES, identified as a partnership in the RERA filing. RERA record RERA filing |
| RERA status | The supplied certificate records registration under section 5. The project is listed as “New Project” in the filing; an architect’s completion certificate and GHMC occupancy records are also in the supplied project file. RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Madeenaguda / MADEENAGUDA RERA record RERA filing |
| Revenue village | Serilingampally is the village identified in the project header and RERA fields; the filed land and building documents also describe the site as Madeenaguda Village. RERA record RERA filing |
| Mandal / district / PIN | Serilingampally Mandal, Ranga Reddy District, PIN 500049. RERA record RERA filing |
| Project survey numbers | 203/A and 202/2/A. RERA record Land records |
| Plot | Plot No. 95 PART. RERA filing |
| Site extent | 325.67 sq m total and net area in the project land and building-permit records. The Form B declaration describes the site as 390 sq yards. Land records |
| Boundaries recorded in RERA filing | East: “MEIGHBOURS LAND”; West: 40FT ROAD; North: PLOT NO 95 PART; South: PLOT NO 96. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building approval | Building Permit No. 2/C21/06061/2021, approved 26 April, 2021. The permit record also gives file No. 2/C21/03497/2021. Approvals record |
| Building count and use | One residential building, identified in the permit as BLDG-1. |
| Sanctioned configuration | 1 Stilt + 5 upper floors; the recorded height is 14.95 m. No separate basement or podium is established in the supplied building-permit facts. |
| Approved area figures | The permit records “Residential upper floors area 832.85 m2” and “Parking floors area 153.58 m2”; it separately labels “Proposed Covered builtup area 40,059.90” without a unit in the supplied extraction. The unit and area basis for that last figure are not stated here. |
| Units | The RERA unit record shows 10 approved-plan units and 10 units proposed as per agreement. The RERA unit schedule lists 10 2BHK units. RERA filing RERA unit table RERA unit details |
Offering and status
| Item | Project record |
|---|---|
| Unit type | 2BHK apartments; RERA-filed saleable area is 51.09 sq m per unit. RERA unit table RERA unit details |
| Booked / available | 10 booked; 0 available in the portal record as read. The portal record does not provide an as-of date, so these counts are indicative rather than a current availability confirmation. RERA unit table |
| Completion deadline | Promoter’s Form B declaration and RERA project record state 26-04-2027 as the completion date. RERA record |
| Occupancy certificate | GHMC occupancy certificate records identify the building at Plot No. 95 Part, Surveys 203/A and 202/2/A, with completion notice dated 03 June, 2022 and occupancy issued 25 June, 2022. The supplied architect’s Form 1A also states completion of the registered project. These records concern the named project/building; see the evidence index below. |
| Construction stage | The supplied records include completion and occupancy documents; no independently verified present-day site inspection or construction-progress report is provided. Document index |
2. The project story
MAHITHA S GREEN GROVE BLOCK-B is a residential apartment project registered with TG-RERA as P02400003456. Its filed location is Madeenaguda, in Serilingampally Mandal, Ranga Reddy District; the project land is identified as Plot No. 95 PART in Survey Nos. 203/A and 202/2/A. The land record gives a net site area of 325.67 sq m. RERA record Land records
The GHMC building permit describes one residential building with a stilt and five upper floors. The RERA unit schedule records ten 2BHK apartments. The supplied project file includes a GHMC occupancy certificate dated 25 June, 2022 and an architect’s Form 1A dated 27-06-2024 certifying completion. Those are document-record assertions; this review does not independently inspect the building or verify its current physical condition. RERA unit table
The project’s registration remains recorded as valid through 26/04/2027. That registration-validity date is distinct from the occupancy certificate date and the completion date stated in the promoter’s Form B declaration.
3. Master plan, architecture & building design
The GHMC permit records a single residential building, BLDG-1, on a 325.67 sq m site, with 1 Stilt + 5 upper floors and a stated building height of 14.95 m. It records residential upper-floors area of 832.85 m2 and parking-floors area of 153.58 m2. The permit extraction also gives “Proposed Covered builtup area 40,059.90” but does not identify the unit or measurement basis for that figure; it is therefore not used as an approved built-up area figure here.
The supplied permit facts identify parking provision in the stilt and require that approved stilt parking be used exclusively for vehicles. They also list a transformer space, garbage house, rainwater-harvesting structure and a periphery greenery strip. The supplied data do not establish flat-per-floor distribution, lift or stair configuration, building footprint, internal circulation, landscaping area, or a detailed common-area schedule.
The RERA filing records approved built-up area of 855.44 sq m and mortgage area of 85.44 sq m. These are filing fields and are not substituted for the permit’s separately labelled residential upper-floors and parking-floors area figures. RERA filing
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 10 | 0 | 51.09 sq m | Not established | Not supplied |
The 2BHK count, booking count, availability and saleable area are from the TG-RERA unit record; booking counts have no recorded as-of date. RERA unit details RERA unit table
The supplied floor-plan review states that measurements from approved floor-plan drawings are software measurements, not RERA disclosures, and need review. No measured 2BHK carpet-area result is supplied: the configuration record reports zero measured flat designs. Accordingly, no carpet area, room dimensions, balcony or utility area, or loading figure can be stated. Saleable area and carpet area are different measures; the supplied record notes that saleable area includes the home’s share of common areas. Floor plans RERA unit details
5. Parking & vehicle circulation
The GHMC permit records 153.58 m2 as parking-floors area and describes stilt parking. The occupancy-certificate records give parking area as 153.58 m2 per the sanctioned plan and 170.99 m2 per the site building plan. The supplied records do not state a number of car or two-wheeler spaces, visitor or accessible spaces, an allocation by apartment, or any exclusive parking rights. A drawn or recorded parking provision does not by itself establish a buyer’s allocated space.
The permit requires the approved stilt parking to be used exclusively for vehicle parking and records a road boundary described as 40FT ROAD; it does not provide a detailed ramp, driveway or pedestrian-separation description in the supplied extraction. RERA filing
6. Amenities, recreation & open spaces
| Description / size | RERA amenity entry says “YES”; no area or dimensions supplied. Permit records a periphery greenery strip and 0 m2 for “Tot-lot.” |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal amenity entry shows 100%; no independent completion verification supplied. |
| Description / size | RERA amenity entry says “YES”; permit records 3 rainwater-harvesting structures and requires rainwater-harvesting pits. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal amenity entry shows 100%; permit and occupancy records describe provision, not independent operational testing. |
| Description / size | No facility or size details supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal progress entry is 0%; no further status established. |
The RERA amenity schedule also lists storm-water drains, street lighting, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection, electrical meter room/sub-station/receiving station, recreational open space, internal roads and footpaths, water supply, and sewerage. Their portal progress entries are 0%, except water supply and sewerage, which are marked “YES” and 100%. These are portal declarations; the supplied materials do not provide detailed capacities or independent operational verification. RERA amenities
7. Utilities, building services & safety
The portal amenity schedule marks water supply and sewerage as “YES” with 100% progress; it does not identify the water source, storage or treatment capacity, sewer connection, STP capacity, or reuse arrangements. The permit requires an ETP as per standard specification and rainwater harvesting; it records three rainwater-harvesting structures. No capacity or commissioning evidence is supplied. RERA amenities
The permit records space for a transformer and a garbage house. The supplied records do not establish electrical supply capacity, backup generation, lifts, service lifts, CCTV installation or operating status, waste-segregation arrangements, accessibility provisions, or detailed fire systems. The permit includes requirements concerning fire extinguishers and an occupancy Fire NOC; the provided extract does not include evidence of a Fire NOC. These permit conditions should not be read as confirmation of installation or present operation.
8. Location, access & connectivity
The project is recorded at Madeenaguda, Serilingampally Mandal, Ranga Reddy District, PIN 500049, on Plot No. 95 PART in Survey Nos. 203/A and 202/2/A. The RERA boundary description identifies a 40FT ROAD on the west side. RERA record RERA filing RERA filing
The supplied location record places the cadastral parcel centroid at 17.480159466183146, 78.31971885703882 and lists the nearest sampled Outer Ring Road interchange at approximately 7.0 km. No public-transport stops, other approach-road details, landmarks or travel times are supplied. Location record
9. Developer & development status
The registered promoter is MAHITHA HOMES, identified in the RERA filing as a partnership. The supplied project records identify Bobba Vijaya Lakshmi as an authorized signatory and M. Srinivasa Rao as a partner. The available project data do not provide a verified corporate registration number or a project-specific official contact or website. RERA filing Parties record
The promoter’s Form B affidavit, dated August 2021, declares the project completion date as 26-04-2027 and includes project-fund, audit and approval commitments. The registration certificate records validity through 26/04/2027. GHMC occupancy documentation records an occupancy certificate issued on 25 June, 2022, and the architect’s Form 1A states the project was completed in all aspects. No independently verified current site-progress assessment is supplied.
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C records registration under section 5 as P02400003456, issued 24/09/2021 and valid through 26/04/2027. |
| GHMC building permit | Building Permit Order for BLDG-1, Surveys 203/A and 202/2/A; approval No. 2/C21/06061/2021, dated 26 April, 2021; file No. 2/C21/03497/2021. |
| Occupancy certificate | GHMC occupancy certificate for Plot No. 95 Part, Surveys 203/A and 202/2/A; proceedings No. 2026/GHMC/SLP/2022-OC, application No. 006055/GHMC/3041/SLP2/2022-OC; completion notice dated 03 June, 2022 and occupancy issued 25 June, 2022. |
| Additional occupancy record | GHMC occupancy certificate extract for the same plot and surveys, with building permit No. 2/C21/06061/2021 and proceedings No. 2026/GHMC/SLP/2022-OC. |
| Architect’s completion certificate | Form 1A dated 27-06-2024 for MAHITHA S GREEN GROVE BLOCK-B; it records the GHMC occupancy certificate and states the project is complete in all aspects. |
| Project declaration | Form B affidavit by B. Balakrishna, authorized by MAHITHA HOMES, declaring title, the project site and proposed completion by 26-04-2027. |
| Layout and floor-plan evidence | The RERA file lists a layout-plan document, but the supplied record says it was not extracted. Floor-plan review data report no measured flat designs for the 2BHK configuration. Document index Floor plans |
The supplied records do not include an independently reviewed copy of the approved layout drawing or a measured apartment floor plan. The project’s official file includes the listed permit, occupancy and completion records; this overview does not independently validate their current status with the authorities.
1. Project at a glance
Project identity
Registered project name: MAHITHA S GREEN GROVE BLOCK-B
Project type / registered portion: Residential apartment project; Block-B is the named registered project. The available records describe one building.
TG-RERA registration: P02400003456; registered on 24/09/2021, valid through 26/04/2027. Registration validity is not the project’s completion deadline.
Registered promoter: MAHITHA HOMES, identified as a partnership in the RERA filing.
RERA status: The supplied certificate records registration under section 5. The project is listed as “New Project” in the filing; an architect’s completion certificate and GHMC occupancy records are also in the supplied project file.
Land and geographic identity
Locality: Madeenaguda / MADEENAGUDA
Revenue village: Serilingampally is the village identified in the project header and RERA fields; the filed land and building documents also describe the site as Madeenaguda Village.
Mandal / district / PIN: Serilingampally Mandal, Ranga Reddy District, PIN 500049.
Project survey numbers: 203/A and 202/2/A.
Plot: Plot No. 95 PART.
Site extent: 325.67 sq m total and net area in the project land and building-permit records. The Form B declaration describes the site as 390 sq yards.
Boundaries recorded in RERA filing: East: “MEIGHBOURS LAND”; West: 40FT ROAD; North: PLOT NO 95 PART; South: PLOT NO 96.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: Building Permit No. 2/C21/06061/2021, approved 26 April, 2021. The permit record also gives file No. 2/C21/03497/2021.
Building count and use: One residential building, identified in the permit as BLDG-1.
Sanctioned configuration: 1 Stilt + 5 upper floors; the recorded height is 14.95 m. No separate basement or podium is established in the supplied building-permit facts.
Approved area figures: The permit records “Residential upper floors area 832.85 m2” and “Parking floors area 153.58 m2”; it separately labels “Proposed Covered builtup area 40,059.90” without a unit in the supplied extraction. The unit and area basis for that last figure are not stated here.
Units: The RERA unit record shows 10 approved-plan units and 10 units proposed as per agreement. The RERA unit schedule lists 10 2BHK units.
Offering and status
Unit type: 2BHK apartments; RERA-filed saleable area is 51.09 sq m per unit.
Booked / available: 10 booked; 0 available in the portal record as read. The portal record does not provide an as-of date, so these counts are indicative rather than a current availability confirmation.
Completion deadline: Promoter’s Form B declaration and RERA project record state 26-04-2027 as the completion date.
Occupancy certificate: GHMC occupancy certificate records identify the building at Plot No. 95 Part, Surveys 203/A and 202/2/A, with completion notice dated 03 June, 2022 and occupancy issued 25 June, 2022. The supplied architect’s Form 1A also states completion of the registered project. These records concern the named project/building; see the evidence index below.
Construction stage: The supplied records include completion and occupancy documents; no independently verified present-day site inspection or construction-progress report is provided.
2. The project story
MAHITHA S GREEN GROVE BLOCK-B is a residential apartment project registered with TG-RERA as P02400003456. Its filed location is Madeenaguda, in Serilingampally Mandal, Ranga Reddy District; the project land is identified as Plot No. 95 PART in Survey Nos. 203/A and 202/2/A. The land record gives a net site area of 325.67 sq m.
The GHMC building permit describes one residential building with a stilt and five upper floors. The RERA unit schedule records ten 2BHK apartments. The supplied project file includes a GHMC occupancy certificate dated 25 June, 2022 and an architect’s Form 1A dated 27-06-2024 certifying completion. Those are document-record assertions; this review does not independently inspect the building or verify its current physical condition.
The project’s registration remains recorded as valid through 26/04/2027. That registration-validity date is distinct from the occupancy certificate date and the completion date stated in the promoter’s Form B declaration.
3. Master plan, architecture & building design
The GHMC permit records a single residential building, BLDG-1, on a 325.67 sq m site, with 1 Stilt + 5 upper floors and a stated building height of 14.95 m. It records residential upper-floors area of 832.85 m2 and parking-floors area of 153.58 m2. The permit extraction also gives “Proposed Covered builtup area 40,059.90” but does not identify the unit or measurement basis for that figure; it is therefore not used as an approved built-up area figure here.
The supplied permit facts identify parking provision in the stilt and require that approved stilt parking be used exclusively for vehicles. They also list a transformer space, garbage house, rainwater-harvesting structure and a periphery greenery strip. The supplied data do not establish flat-per-floor distribution, lift or stair configuration, building footprint, internal circulation, landscaping area, or a detailed common-area schedule.
The RERA filing records approved built-up area of 855.44 sq m and mortgage area of 85.44 sq m. These are filing fields and are not substituted for the permit’s separately labelled residential upper-floors and parking-floors area figures.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 10 | 10 | 0 | 51.09 sq m | Not established | Not supplied |
The 2BHK count, booking count, availability and saleable area are from the TG-RERA unit record; booking counts have no recorded as-of date.
The supplied floor-plan review states that measurements from approved floor-plan drawings are software measurements, not RERA disclosures, and need review. No measured 2BHK carpet-area result is supplied: the configuration record reports zero measured flat designs. Accordingly, no carpet area, room dimensions, balcony or utility area, or loading figure can be stated. Saleable area and carpet area are different measures; the supplied record notes that saleable area includes the home’s share of common areas.
5. Parking & vehicle circulation
The GHMC permit records 153.58 m2 as parking-floors area and describes stilt parking. The occupancy-certificate records give parking area as 153.58 m2 per the sanctioned plan and 170.99 m2 per the site building plan. The supplied records do not state a number of car or two-wheeler spaces, visitor or accessible spaces, an allocation by apartment, or any exclusive parking rights. A drawn or recorded parking provision does not by itself establish a buyer’s allocated space.
The permit requires the approved stilt parking to be used exclusively for vehicle parking and records a road boundary described as 40FT ROAD; it does not provide a detailed ramp, driveway or pedestrian-separation description in the supplied extraction.
6. Amenities, recreation & open spaces
| Description / size | RERA amenity entry says “YES”; no area or dimensions supplied. Permit records a periphery greenery strip and 0 m2 for “Tot-lot.” |
|---|---|
| Declared progress / verified status | Portal amenity entry shows 100%; no independent completion verification supplied. |
| Description / size | RERA amenity entry says “YES”; permit records 3 rainwater-harvesting structures and requires rainwater-harvesting pits. |
|---|---|
| Declared progress / verified status | Portal amenity entry shows 100%; permit and occupancy records describe provision, not independent operational testing. |
| Description / size | No facility or size details supplied. |
|---|---|
| Declared progress / verified status | Portal progress entry is 0%; no further status established. |
The RERA amenity schedule also lists storm-water drains, street lighting, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection, electrical meter room/sub-station/receiving station, recreational open space, internal roads and footpaths, water supply, and sewerage. Their portal progress entries are 0%, except water supply and sewerage, which are marked “YES” and 100%. These are portal declarations; the supplied materials do not provide detailed capacities or independent operational verification.
7. Utilities, building services & safety
The portal amenity schedule marks water supply and sewerage as “YES” with 100% progress; it does not identify the water source, storage or treatment capacity, sewer connection, STP capacity, or reuse arrangements. The permit requires an ETP as per standard specification and rainwater harvesting; it records three rainwater-harvesting structures. No capacity or commissioning evidence is supplied.
The permit records space for a transformer and a garbage house. The supplied records do not establish electrical supply capacity, backup generation, lifts, service lifts, CCTV installation or operating status, waste-segregation arrangements, accessibility provisions, or detailed fire systems. The permit includes requirements concerning fire extinguishers and an occupancy Fire NOC; the provided extract does not include evidence of a Fire NOC. These permit conditions should not be read as confirmation of installation or present operation.
8. Location, access & connectivity
The project is recorded at Madeenaguda, Serilingampally Mandal, Ranga Reddy District, PIN 500049, on Plot No. 95 PART in Survey Nos. 203/A and 202/2/A. The RERA boundary description identifies a 40FT ROAD on the west side.
The supplied location record places the cadastral parcel centroid at 17.480159466183146, 78.31971885703882 and lists the nearest sampled Outer Ring Road interchange at approximately 7.0 km. No public-transport stops, other approach-road details, landmarks or travel times are supplied.
9. Developer & development status
The registered promoter is MAHITHA HOMES, identified in the RERA filing as a partnership. The supplied project records identify Bobba Vijaya Lakshmi as an authorized signatory and M. Srinivasa Rao as a partner. The available project data do not provide a verified corporate registration number or a project-specific official contact or website.
The promoter’s Form B affidavit, dated August 2021, declares the project completion date as 26-04-2027 and includes project-fund, audit and approval commitments. The registration certificate records validity through 26/04/2027. GHMC occupancy documentation records an occupancy certificate issued on 25 June, 2022, and the architect’s Form 1A states the project was completed in all aspects. No independently verified current site-progress assessment is supplied.
10. Approvals, official records & documents
TG-RERA registration: Form C records registration under section 5 as P02400003456, issued 24/09/2021 and valid through 26/04/2027.
GHMC building permit: Building Permit Order for BLDG-1, Surveys 203/A and 202/2/A; approval No. 2/C21/06061/2021, dated 26 April, 2021; file No. 2/C21/03497/2021.
Occupancy certificate: GHMC occupancy certificate for Plot No. 95 Part, Surveys 203/A and 202/2/A; proceedings No. 2026/GHMC/SLP/2022-OC, application No. 006055/GHMC/3041/SLP2/2022-OC; completion notice dated 03 June, 2022 and occupancy issued 25 June, 2022.
Additional occupancy record: GHMC occupancy certificate extract for the same plot and surveys, with building permit No. 2/C21/06061/2021 and proceedings No. 2026/GHMC/SLP/2022-OC.
Architect’s completion certificate: Form 1A dated 27-06-2024 for MAHITHA S GREEN GROVE BLOCK-B; it records the GHMC occupancy certificate and states the project is complete in all aspects.
Project declaration: Form B affidavit by B. Balakrishna, authorized by MAHITHA HOMES, declaring title, the project site and proposed completion by 26-04-2027.
Layout and floor-plan evidence: The RERA file lists a layout-plan document, but the supplied record says it was not extracted. Floor-plan review data report no measured flat designs for the 2BHK configuration.
The supplied records do not include an independently reviewed copy of the approved layout drawing or a measured apartment floor plan. The project’s official file includes the listed permit, occupancy and completion records; this overview does not independently validate their current status with the authorities.
Other registrations of Mahitha S Green Grove
Frequently asked questions
Is MAHITHA S GREEN GROVE BLOCK-B registered with Telangana RERA?
Yes. MAHITHA S GREEN GROVE BLOCK-B is registered with the Telangana Real Estate Regulatory Authority as P02400003456; the registration status is New Project.
Who is the developer of MAHITHA S GREEN GROVE BLOCK-B?
The promoter named in the RERA registration is MAHITHA HOMES.
Where is MAHITHA S GREEN GROVE BLOCK-B located?
MAHITHA S GREEN GROVE BLOCK-B is in MADEENAGUDA, Serilingampally, Rangareddy, Telangana (500049).
When will MAHITHA S GREEN GROVE BLOCK-B be completed?
The promoter's proposed date of completion filed with RERA is 26/04/2027. This is the promoter's declaration, not a guarantee.
More projects in Serilingampally





