Kakatiya Elite I

KAKATIYA CONSTRUCTIONS · Hyderabad · RERA P02500003883

KAKATIYA ELITE I is a residential apartment project in Gopanpally, Serilingampally Mandal, Hyderabad district, developed by registered promoter KAKATIYA CONSTRUCTIONS, a partnership. The project covers 334.37 m2 and comprises one residential building with 1 Stilt + 5 upper floors and 10 2BHK apartments, each with a saleable area of 102.84 sq m. It is registered with TG-RERA under P02500003883, and the promoter’s proposed completion date is 05/07/2023.

More from Kakatiya Constructions · 6 projects →

01What we found

Period endedTG-RERA registration ran to 5 Jul 2023 - check its extension on TG-RERA
11documents on file - each fact links to its page
12court cases on this project's land (survey 231, Gopanpalle Serilingampally)
7items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from housing.com

1. Project at a glance

Project identity

FieldProject record
Registered project nameKAKATIYA ELITE I RERA record
Project type / statusResidential apartment project; TG-RERA record labels it “New Project.” RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied TG-RERA record; the registration covers the project identified as KAKATIYA ELITE I.
TG-RERA registrationP02500003883; granted under section 5. The certificate states validity from 06/01/2022 through 05/07/2023. No extension is recorded in the supplied certificate.
Registered promoterKAKATIYA CONSTRUCTIONS, a partnership. Parties record Corporate record
RERA statusThe supplied certificate records the registration period above. Current registration status beyond that period is not established by the supplied record.

Land and geographic identity

FieldProject record
Locality / revenue villageGopanpally / GOPANPALLE; the TG-RERA identity record names the village as Gopanpalle Serilingampally. RERA record Land records
MandalSerilingampally Mandal, as stated in the building permit order.
District / PINHyderabad / 500046. RERA record
Survey numbers and subdivisions230, 231P, 233AA, 234, 307, 308 and 309. RERA record Land records
Site extent334.37 m2; approved-order figures also state site area 334.37 m2, road-affected area 0, and net area 334.37 m2.
Plot referencePlot Nos. 35 & 36.
Boundaries in TG-RERA land recordEast: PLOT NO - 26 27 AND 28; West: ROAD WIDTH - 12; North: PLOT NO - 34; South: PLOT NO - 37. Land records

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC).
Principal building approvalBuilding Permit Order 2/C20/08591/2021, approved 16 July, 2021. The order also lists file number 2/C20/07583/2021. Approvals record
Approved built-up area1102.26 sq m in the TG-RERA project fields. The supplied permit extraction separately includes the figures 918.55 and Stilt 1 170.68 without a fully labelled total-area breakdown. RERA filing
Building configurationOne residential building, sanctioned as 1 Stilt + 5 upper floors; stated height 14.95 m.
Parking levels / provisionThe permit identifies stilt parking and says approved cellar and stilt spaces are to be used exclusively for vehicle parking. A parking-space count is not supplied; a cellar level is not specified in the extracted floor configuration.
Approved vs RERA-declared unitsThe TG-RERA fields state 1 total building unit and 1 proposed building unit; the RERA unit record lists 10 2BHK apartments. These are different record fields and are not reconciled in the supplied material. RERA filing RERA unit table

Offering and status

FieldProject record
Configuration / filed saleable area2BHK; 102.84 sq m saleable area per unit in the TG-RERA unit record. RERA unit table RERA unit details
Booked / available7 booked; 3 available, as read from the TG-RERA portal; the record has no as-of date, so counts are indicative. RERA unit table
Construction stageNot established by an independent site inspection or dated construction-progress evidence in the supplied material. The promoter’s Form B states a completion undertaking of 05/07/2023.
Completion deadlinePromoter-declared completion date: 05/07/2023. No revised date is supplied.
Registration validity06/01/2022–05/07/2023, as stated in the TG-RERA certificate; this is separate from the completion undertaking above.
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. GHMC’s permit states that an occupancy certificate is compulsory before occupation.

2. The project story

KAKATIYA ELITE I is recorded with TG-RERA as a residential apartment project on Plot Nos. 35 and 36 in Gopanpally, Hyderabad district. Its registered land identity comprises Survey Nos. 230, 231P, 233AA, 234, 307, 308 and 309. The GHMC building-permit order describes one proposed residential building with a stilt and five upper floors. RERA record Land records

The TG-RERA unit record lists ten 2BHK apartments, seven booked and three available; the booking figures have no stated as-of date. The supplied evidence does not establish current on-site progress, nor does it include an occupancy or completion certificate. The promoter’s filed completion undertaking gives 05/07/2023; it should not be read as evidence that construction was completed or that occupation was certified. RERA unit table

3. Master plan, architecture & building design

The GHMC order sanctions one residential building, “PROPOSED-1 (BUILDING),” with 1 Stilt + 5 upper floors and a stated height of 14.95 m. It records site area and net area as 334.37 m2, with road-affected area 0. The TG-RERA project fields report approved built-up area of 1102.26 sq m. The permit extraction also contains 918.55 and Stilt 1 170.68, but the supplied extract does not label these figures sufficiently to assign them confidently to a total-area category. RERA filing

The supplied material does not provide drawing-derived details for flat distribution by floor, building footprint, lift or stair layout, internal circulation, or common-area configuration. GHMC’s conditions require the sanctioned plan to be followed, require prior approval for modifications, and provide that the sanctioned number of units is not to be increased without prior GHMC approval.

4. Homes, configurations & floor plans

The TG-RERA unit record lists ten 2BHK apartments, with 102.84 sq m saleable area per unit. It records seven booked and three available, but supplies no booking-count date. RERA unit table RERA unit details

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1073102.84 sq mNot suppliedNot supplied

Two floor-plan drawings are recorded as measured, but no configuration-level software-measured carpet area, room dimensions, balcony or utility measurements are included in the supplied data. Any such drawing measurement would be software-measured rather than a TG-RERA disclosure and would need review against the drawing. Saleable area is the RERA-filed figure; it should not be treated as carpet area. Floor plans RERA unit details

5. Parking & vehicle circulation

The building permit states that cellar and stilt areas approved for parking are to be used exclusively for vehicle parking, without partition walls or rolling shutters. The extracted floor configuration specifies a stilt but does not separately identify a cellar level. The supplied material does not establish the number or type of parking bays, visitor or accessible parking, EV charging, ramp arrangements, or unit-specific parking allocations. A drawn or generally sanctioned parking space, by itself, does not establish exclusive ownership or allocation to a particular apartment.

6. Amenities, recreation & open spaces

The GHMC order contains conditions concerning greenery, a tot-lot, rainwater harvesting, a transformer space and an on-site garbage house. These are approval conditions or stated provisions, not evidence that the facilities have been completed. The supplied amenity record reports selected utilities as available at 100%, but does not provide independent completion verification. RERA amenities

Green strip / tot-lot
Description / sizePermit extraction states “Tot-lot (m2) 0”; conditions require the tot-lot to be fenced and maintained as greenery before an occupancy certificate.
Evidence sourceRERA amenities
Declared progress / verified statusGHMC condition; amenity record reports 0%. Completion not independently verified.
Tree planting / greenery
Description / sizePermit requires tree plantation along the site periphery and in front, and maintenance of a peripheral greenery strip; it also specifies avenue plantation inside the perimeter of at least 2 m height and rooftop greenery.
Declared progress / verified statusRequired by permit; completion not verified.
Rainwater harvesting
Description / sizePermit records 1 rainwater-harvesting pit and requires a percolation pit with piped connection from the terrace and all sides.
Evidence sourceRERA amenities
Declared progress / verified statusAmenity record marks water conservation/rainwater harvesting available at 100%; independent verification not supplied.
Community buildings
Description / sizeNo project-specific building or size identified.
Evidence sourceRERA amenities
Declared progress / verified statusAmenity record reports 0%.
Other recreation or clubhouse facilities
Description / sizeNo project-specific TG-RERA or permit evidence supplied.
Evidence sourceRERA amenities
Declared progress / verified statusNot established.

7. Utilities, building services & safety

The TG-RERA amenity record marks water supply, sewerage, storm-water drains, and water conservation/rainwater harvesting “YES” at 100%; these are recorded declarations, not independently verified completion findings. The same record reports 0% for treatment and disposal of sewage and sullage water, solid-waste management and disposal, energy management, fire protection, and electrical meter room/sub-station/receiving station. RERA amenities

GHMC’s permit requires a transformer space, an on-site garbage house, rainwater harvesting, and services including sanitation, plumbing, fire-safety requirements, lifts and electrical installations to be executed under qualified technical supervision. It also requires a fire extinguisher on each floor, a fire NOC before issue of an occupancy certificate, CCTV installation, twin bins for each tenement, and a dust-mitigation/control plan during construction. These are permit conditions; the supplied material does not verify implementation, capacities, or statutory clearances.

8. Location, access & connectivity

The registered location is Gopanpally/GOPANPALLE, Serilingampally Mandal, Hyderabad district, PIN 500046, across the listed project surveys 230, 231P, 233AA, 234, 307, 308 and 309. The supplied geocode is identified as a cadastral parcel centroid at 17.41528, 78.35459. RERA record Land records Location record

A supplied location record identifies the Financial District (Nanakramguda) at 1.2 km. No approach-road route, public-transport stop, or other measured connectivity detail is established in the project-location record. Location record

9. Developer & development status

The TG-RERA registered promoter is KAKATIYA CONSTRUCTIONS, recorded as a partnership. The supplied corporate identifier is GSTIN 36AANFK4631L1ZY. The project record identifies MADAMANCHI GANGADHAR as authorized signatory and TALLURUI VENU SUMANTH as partner. A registered-office address and official promoter website or contact details are not established in the supplied evidence. Parties record Corporate record

The promoter’s Form B declares a completion date of 05/07/2023. The supplied record does not establish actual completion progress or provide an occupancy certificate; it also does not record a revised completion date. Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02500003883; issued 06/01/2022; validity stated through 05/07/2023
What the supplied record establishesRegistration of KAKATIYA ELITE I under section 5; the certificate includes a separate-account condition.
GHMC building permit order
Identifier / dateApproval 2/C20/08591/2021; approved 16 July, 2021; file 2/C20/07583/2021
What the supplied record establishesBuilding permit for one proposed residential building, 1 Stilt + 5 upper floors, on the stated survey parcels.
Layout reference in permit
Identifier / dateG/264/LP/4236/2004
What the supplied record establishesListed in the building-permit order as Layout / Sub Divn. No.
RERA land-title / supporting records
Identifier / dateSale deeds and development-agreement records are included in the filed title materials.
What the supplied record establishesThe supplied documents include a legal title report and related instruments; full title-chain review is addressed in the Land & Title section.
Promoter declaration
Identifier / dateForm B, declaration date shown as “Tha. of March 2025”
What the supplied record establishesPromoter declaration includes a completion undertaking of 05/07/2023 and an encumbrance statement.
Occupancy / completion record
Identifier / dateNot supplied
What the supplied record establishesNo occupancy or completion certificate is included in the materials reviewed for this overview. Document index

Frequently asked questions

Is KAKATIYA ELITE I registered with Telangana RERA?

Yes. KAKATIYA ELITE I is registered with the Telangana Real Estate Regulatory Authority as P02500003883; the registration status is New Project.

Who is the developer of KAKATIYA ELITE I?

The promoter named in the RERA registration is KAKATIYA CONSTRUCTIONS.

Where is KAKATIYA ELITE I located?

KAKATIYA ELITE I is in GOPANPALLE SERILINGAMPALLY, Hyderabad, Telangana (500046).

When will KAKATIYA ELITE I be completed?

The promoter's proposed date of completion filed with RERA is 05/07/2023. This is the promoter's declaration, not a guarantee.