Sign in

Hic Green Avenue Phase 2

HYDERABAD INSULATIONS CORPORATION · Rangareddy · RERA P02400001551

HIC GREEN AVENUE PHASE 2 is a residential apartment project in Kondapur revenue village, Serilingampally mandal, Ranga Reddy district. The registered promoter developing it is HYDERABAD INSULATIONS CORPORATION, a partnership. The project covers 517.33 sq m and comprises one building with 1 Stilt + 5 upper floors and 20 homes: 5 1BHK units with a RERA saleable area of 38.12 m² and 15 2BHK units with a RERA saleable area of 61.35 m². Its TG-RERA registration number is P02400001551, and the proposed completion date is 4 March 2025.

More from Hyderabad Insulations Corporation · 2 projects →

01What we found

Period endedTG-RERA registration ran to 4 Mar 2025 - check its extension on TG-RERA
11documents on file - each fact links to its page
3court cases on this project's land (survey 113, Kondapur)
10items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from quikr.com

1. Project at a glance

Project identity

ItemProject record
Registered project nameHIC GREEN AVENUE PHASE 2 RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase 2, as named in the TG-RERA registration; the record describes one proposed building RERA record
TG-RERA registrationP02400001551 RERA record
Registration validity27 December 2019 to 4 March 2025; certificate states five years. Registration validity is distinct from the completion deadline below. RERA record
Registered promoterHYDERABAD INSULATIONS CORPORATION, a partnership RERA record RERA filing
RERA statusThe supplied certificate records registration through 4 March 2025. No extension is recorded in the supplied evidence; the current registration status is therefore unverified.

Land and geographic identity

ItemProject record
Locality / revenue villageSerilingampally locality; Kondapur revenue village RERA record RERA filing
Mandal / district / PINSerilingampally mandal; Ranga Reddy district; 500019 RERA record
Project survey number and subdivisionSurvey No. 113 PART (also described in the title documents as Survey No. 113 Part) RERA filing Land records
Registered site extent517.33 sq m; the building-permit record gives both site area and net area as 517.33 m², with road-affected area 0. RERA filing
Boundaries in TG-RERA filingEast: road width 9 feet; West: boundary of Lingampally; North and South: open land, Survey No. 113 Part. RERA filing

Development identity

ItemProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approval2/C20/03688/2019, approved 4 March 2019; GHMC building-permit order Approvals record
Related file number2/SL/01087/2019 Approvals record
Approved building configurationOne building, 1 Stilt + 5 upper floors; stated height 15 m
Approved area figuresGHMC order states residential upper-floor area of 1,243.30 m² and stilt area of 239.85 m². These are the figures identified in the order; no separate aggregate approved built-up-area figure is established here.
Building and unit countsOne building; 20 RERA-listed units. The supplied approval extraction does not state a separate sanctioned unit count. RERA record RERA unit table
Parking levels / countThe permit describes a stilt and includes a condition that cellar and stilt areas approved for parking be used exclusively for vehicle parking. No parking-space count is established in the supplied records.

Offering and status

ItemProject record
RERA-listed configurations1BHK: 5 units; 2BHK: 15 units RERA unit table
RERA saleable area1BHK: 38.12 m²; 2BHK: 61.35 m² RERA unit table
Booked / available0 booked and 5 available 1BHK; 0 booked and 15 available 2BHK, as last read from the TG-RERA portal. The record has no as-of date, so counts are indicative. RERA unit table
Completion deadline4 March 2025 in the project record and building-permit parameters. This is separate from the TG-RERA registration-validity period. RERA record
Construction stageNo independently verified current construction-stage evidence is supplied. TG-RERA amenity records show Water Supply and Electrical Meter Room/Sub-Station/Receiving Station at 10%; the other listed progress entries are 0%. RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents; current certificate status and scope are unverified. Document index

2. The project story

HIC Green Avenue Phase 2 is registered as a residential apartment project in Kondapur village, Serilingampally mandal, Ranga Reddy district. Its filed site is 517.33 m² in Survey No. 113 PART, and the GHMC permit provides for one residential building arranged as a stilt and five upper floors. RERA record Land records

The TG-RERA unit record lists 20 homes: five 1BHK and 15 2BHK apartments. It shows all 20 as available and none booked, but the portal extract has no as-of date. This is a portal-record snapshot, not a current sales confirmation. RERA unit table

The registered completion date was 4 March 2025. The supplied records do not establish present construction completion, independent site progress, or an occupancy/completion certificate. The RERA certificate records registration validity through the same date but does not show an extension. RERA record RERA amenities Document index

3. Master plan, architecture & building design

The GHMC permit identifies one building, Building A, on a 517.33 m² site in Survey No. 113 PART. It records a net area of 517.33 m², road-affected area of 0, and a 1 Stilt + 5 upper floors configuration, with a stated building height of 15 m. The order separately records 1,243.30 m² for residential upper floors and 239.85 m² for the stilt; these figures should not be treated as interchangeable with carpet or saleable area.

The order records a tot-lot area of 0 m². It specifies three rainwater-harvesting structures, 25 trees, a transformer space, a garbage house and a fenced tot-lot condition. The supplied evidence does not establish a building footprint, flats per floor, number of lifts or stairs, internal circulation details, or landscaped/open-space area beyond those stated figures.

The approved building-permit record is identified as 2/C20/03688/2019, with related file number 2/SL/01087/2019 and layout/subdivision number 2/C20/16624/2018. Approvals record

4. Homes, configurations & floor plans

The TG-RERA filing lists 20 units in two configurations. Saleable area is the filed unit-area figure; carpet area below is software-measured from approved floor-plan drawing geometry and is not a RERA disclosure. The measurement record cautions that the drawings need review. “Loading” is included as supplied; no loading methodology is independently verified here. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
1BHK50538.12 m²22.2–26.0 m²; median 24.1 m² (software-measured)37%
2BHK1501561.35 m²37.0–45.7 m²; median 43.1 m² (software-measured)30%

The measured 1BHK drawing sample includes a master bedroom, kitchen, toilet and utility; the utility is marked excluded from carpet area. A measured 2BHK example shows a master bedroom, second bedroom, toilet and combined living/kitchen area. These are drawing-based measurements, not filed room-area disclosures. RERA unit details

Carpet area is not the same as saleable area: the supplied measurement note says saleable area also counts the home’s share of common areas. The evidence does not provide a separately verified balcony area or a complete common-area loading breakdown. Floor plans

5. Parking & vehicle circulation

The GHMC order requires any cellar and stilt areas approved for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters and without conversion to another use. The supplied extract does not establish the number of sanctioned car or two-wheeler spaces, visitor or accessible bays, parking allocation to individual apartments, or any EV charging provision.

A stilt is recorded in the approved building configuration; the supplied materials do not describe parking-ramp arrangements, vehicle entry/exit layout, or pedestrian separation. The permit’s parking-use condition does not by itself establish exclusive parking ownership or an apartment-specific allocation.

6. Amenities, recreation & open spaces

Water supply
Description / sizeListed as available; no source, storage or capacity stated
Evidence sourceTG-RERA amenity record
Declared progress / verified status10% recorded; completion not independently verified RERA amenities
Water conservation / rainwater harvesting
Description / sizeGHMC permit specifies 3 rainwater-harvesting structures (percolation pits)
Evidence sourceGHMC permit; TG-RERA amenity record
Declared progress / verified statusPermit condition; amenity progress recorded as 0% RERA amenities
Green strip / tot-lot / park
Description / sizePermit records tot-lot area as 0 m² and requires a fenced tot-lot maintained as greenery
Evidence sourceGHMC permit; TG-RERA amenity record
Declared progress / verified statusAmenity progress recorded as 0%; delivered status not verified RERA amenities
Trees / peripheral greenery
Description / sizePermit records 25 trees and requires tree planting along the site periphery and in front
Evidence sourceGHMC permit
Declared progress / verified statusRequired by permit; completion not independently verified
Community buildings
Description / sizeListed in TG-RERA amenity record; no description or size supplied
Evidence sourceTG-RERA amenity record
Declared progress / verified status0% recorded RERA amenities
Internal roads and footpaths
Description / sizeListed in TG-RERA amenity record; no dimensions supplied
Evidence sourceTG-RERA amenity record
Declared progress / verified status0% recorded RERA amenities
Street lighting
Description / sizeListed in TG-RERA amenity record
Evidence sourceTG-RERA amenity record
Declared progress / verified status0% recorded RERA amenities

The TG-RERA amenity extract also lists sewerage, storm-water drains, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection and recreational open space; each is recorded at 0% in that extract. These are progress entries, not confirmation that facilities have been completed or independently inspected. RERA amenities

7. Utilities, building services & safety

The GHMC permit requires a rainwater-harvesting structure and records three RWHPs. It also requires space for a transformer and a garbage house within the premises. The TG-RERA amenity record marks water supply and electrical meter room/sub-station/receiving station as available, with 10% progress recorded for each; the underlying extract does not establish service capacities or completion. RERA amenities

The permit makes occupancy certification a condition before occupation and states that public water and electricity connections will be provided only on production of an occupancy certificate. It also places responsibility for fire-safety installations, structural safety and building services—including sanitation, plumbing, lifts and electrical installations—on the owner/developer and relevant technical personnel. These are permit conditions, not evidence that the installations have been completed.

The supplied project records do not establish an STP design or capacity, sewer connection, water source or storage capacity, backup-power capacity, lift count or capacity, fire-system specifications, waste-segregation arrangements, CCTV/security system, or accessibility features. No occupancy/completion certificate is supplied. Document index RERA amenities

8. Location, access & connectivity

The registered project location is Kondapur village, Serilingampally mandal, Ranga Reddy district, Telangana, PIN 500019. The TG-RERA filing describes the site as Survey No. 113 PART, bounded to the east by a road stated as 9 feet wide. RERA record RERA filing RERA filing

A supplied location record gives HITEC City at 5.6 km from the project’s mapped cadastral parcel centroid. No travel time or route is stated. The supplied records do not establish public-transport stops, approach-road details beyond the filed eastern boundary, or additional verified landmark distances. Location record

9. Developer & development status

The registered promoter is HYDERABAD INSULATIONS CORPORATION, identified in the project record as a partnership. The listed partners are Mirza Sadath Ali Baig and Mirza Abdul Muqeem Baig; Mirza Abdul Muqtader Baig is listed as authorized signatory. RERA record RERA filing Corporate record

The promoter’s project address is HIC Towers, Vinayak Nagar, Yadav Street, Serilingampally, Ranga Reddy, 500019. The supplied TG-RERA certificate lists the promoter office as Hyderabad, PIN 500032, without a street address. The evidence does not provide an official contact number or promoter website. Corporate record

The project record gives 4 March 2025 as the proposed completion date; no revised completion date, current independently verified construction progress, or occupancy/completion certificate is supplied. The Form B declaration dated 27 December 2018 includes undertakings on title, encumbrances, project funds, audits and approvals, but does not specify a completion period. RERA record

10. Approvals, official records & documents

TG-RERA registration certificate
Supplied evidenceForm C; P02400001551, issued 27 December 2019; validity stated through 4 March 2025
Scope / noteHIC Green Avenue Phase 2; Survey No. 113 PART
GHMC building-permit order
Supplied evidenceApproval 2/C20/03688/2019, dated 4 March 2019; file 2/SL/01087/2019
Scope / noteBuilding A, Kondapur, Survey No. 113 PART; conditional building permission
Layout / subdivision reference
Supplied evidence2/C20/16624/2018
Scope / noteReference appearing in the GHMC permit; a separately reviewed approved-layout document is not established in the supplied evidence
Form B declaration
Supplied evidencePromoter affidavit-cum-declaration dated 27 December 2018
Scope / noteIncludes promoter declarations and undertakings; no completion period is filled in
Title-search report
Supplied evidenceAdvocate’s title opinion dated 13 September 2018
Scope / noteCites the title chain for the land; detailed title review belongs in the Land & Title section
Title-deed documents
Supplied evidenceSale-deed records and title documents are supplied, including document references 61591 p4 and 61592 pp3–4
Scope / noteLand-title evidence; not a building completion certificate
Occupancy / completion certificate
Supplied evidenceNot present in supplied project documents Document index
Scope / noteCurrent issue status and coverage are unverified

Other registrations of Hic Green Avenue

Frequently asked questions

Is HIC GREEN AVENUE PHASE 2 registered with Telangana RERA?

Yes. HIC GREEN AVENUE PHASE 2 is registered with the Telangana Real Estate Regulatory Authority as P02400001551; the registration status is New Project.

Who is the developer of HIC GREEN AVENUE PHASE 2?

The promoter named in the RERA registration is HYDERABAD INSULATIONS CORPORATION.

Where is HIC GREEN AVENUE PHASE 2 located?

HIC GREEN AVENUE PHASE 2 is in SERILLINGAMPALLY, Kondapur, Serilingampally, Rangareddy, Telangana (500019).

When will HIC GREEN AVENUE PHASE 2 be completed?

The promoter's proposed date of completion filed with RERA is 04/03/2025. This is the promoter's declaration, not a guarantee.

More projects in Kondapur