Sri Sai Balaji Nilayam

SRI BALAJI DEVELOPERS · Hyderabad · RERA P02500000520

SRI SAI BALAJI NILAYAM is a residential apartment project in Uppal / Swaroop Nagar, Uppal, Hyderabad district; the mandal is not disclosed. The registered promoter is SRI BALAJI DEVELOPERS. The project occupies 585.6 sq m and comprises one building, Building A, with a Stilt + 5 configuration and 15 2BHK homes. It is registered with TG-RERA under P02500000520, and its declared completion deadline is 14 June 2024.

01What we found

Period endedTG-RERA registration ran to 14 Jun 2024 - check its extension on TG-RERA
9documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameSRI SAI BALAJI NILAYAM RERA record
Project typeResidential apartment project RERA record
Phase / registered portionA single registered project is shown; a separate phase name is not disclosed. The GHMC permit describes Building A. RERA record
TG-RERA registrationP02500000520, granted 22 March 2019; certificate validity ends 14 June 2024. RERA record
Registered promoterSRI BALAJI DEVELOPERS (also rendered “Sri Balaji Developers” on the certificate). RERA record
RERA statusThe supplied certificate records the registration period above and no extension. Current registration status is not independently established by the supplied record.

Land and geographic identity

FieldProject record
LocalityUppal / Swaroop Nagar, Uppal RERA record
Revenue villageUppal in the project identity record; the GHMC building-permit extraction separately reads “khantam/Abadi.” RERA record
MandalNot disclosed Land records
DistrictHyderabad RERA record
PIN500039 RERA record
Project survey number55/PART RERA record Land records
Plot number290
Site extent585.6 sq m; the filed land details state total area 585.6 sq m and net area 585.60 sq m. Land records
BoundariesEast: Plot No. 291; West: Plot No. 287; North: Plot No. 289; South: 30 FEET WID EPROPOSED RC (as recorded). Land records

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building-permit number2/C2/10151/2018, approved 14 June 2018 Approvals record
Other permit referenceFile No. 2/C2/09142/2018
Approved built-up area1,300.50 sq m, as recorded in the RERA filing’s approved built-up-area field. The permit extraction separately lists “Ground Area (m2) 1,300.50.” RERA filing
Building countOne building is recorded in the project filing; the GHMC permit identifies Building A. RERA filing
Sanctioned floor configurationStilt + 5
Basement / cellarPermit extraction records Cellar 0.00.
Approved versus RERA-filed unitsThe project filing records 15 total units; the permit’s supplied extraction does not state a sanctioned unit count. RERA unit table
Parking levels / sanctioned parking countNot established in the supplied permit extraction or filing details. RERA unit table

Offering and status

FieldProject record
RERA-filed configuration2BHK; the filing rows are recorded as “DOBULE BEDROOM” and “DOUBLE BEDROOM.” RERA unit table RERA unit details
RERA-filed saleable area260.1 sq m RERA unit table RERA unit details
Booked / available0 booked; 15 available in the supplied TG-RERA-derived unit record. The portal record has no as-of date, so these counts are indicative. RERA unit table RERA unit details
Declared completion deadline14 June 2024, as stated in Form B.
Registration validityCertificate validity ended 14 June 2024; this is distinct from the completion deadline.
Construction stageRERA filing records 80% completeness; this is a declared record, not an independently verified site inspection. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents. The GHMC permit requires an occupancy certificate before occupation.

2. The project story

SRI SAI BALAJI NILAYAM is a residential apartment project registered with TG-RERA under P02500000520, on Plot No. 290 in Survey No. 55/PART, at Uppal / Swaroop Nagar, Hyderabad. The project record describes one building and a total site area of 585.6 sq m; the GHMC permit identifies the building as Building A and authorizes a Stilt + 5 configuration. RERA record Land records

The TG-RERA unit record lists 15 two-bedroom units, each with a filed saleable area of 260.1 sq m. It records 0 booked and 15 available, but does not give an as-of date for those counts. The project filing reports 80% completeness; that is a filed progress figure, not an independent confirmation of current physical progress. RERA unit table RERA unit details RERA record

The promoter’s Form B declaration undertook completion by 14 June 2024. The supplied material does not include an occupancy or completion certificate; the GHMC permit states that an occupancy certificate is required before occupation.

3. Master plan, architecture & building design

The GHMC building-permit record is for a residential Building A on Survey No. 55/PART, at Swaroop Nagar, Uppal. It specifies Stilt + 5, a height of 14.9 m, site area of 585.6 sq m, and a ground-area figure of 1,300.50 sq m in the extracted permit fields. The project filing separately records approved built-up area of 1,300.5 sq m. RERA filing

The permit extraction records setbacks as Front 3.5, Rear 3.5, Side I 3.5, and Side II 10; units for these setback figures are not stated in the extraction. It also lists a 92.96 RM compound wall and a 145.66 sq m mortgaged built-up area. The permit identifies the “Floor handed over” as second floor.

The supplied record does not establish the building footprint by floor, flats per floor, lift or stair configuration, internal circulation, or a complete floor-by-floor area schedule. No measured floor-plan data for individual flats is available in the supplied drawing-derived records. The GHMC permit lists a tot-lot, 25 trees, transformer space, and a garbage house; it does not provide a tot-lot area in the extracted figure. Floor plans

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK15015260.1 sq mNot availableNot supplied

The TG-RERA filing lists two bedroom-description rows—“DOBULE BEDROOM” and “DOUBLE BEDROOM”—which together are normalized in the supplied record as 15 2BHK units. The filing gives a saleable area of 260.1 sq m. The available count is indicative because the portal-derived record has no as-of date. RERA unit table RERA unit details

The floor-plan review record says two drawings were measured, but reports 0 measured 2BHK flat designs; accordingly, no software-measured carpet area or room dimensions can be reported. The RERA-filed saleable area is not a carpet-area measurement. Floor plans

5. Parking & vehicle circulation

The GHMC permit extraction does not provide a sanctioned parking-space count or a parking-level arrangement. The project record does not establish resident, visitor, accessible, two-wheeler, or EV parking numbers; nor does it establish ramps, vehicle entry/exit arrangements, or unit-specific parking allocations. RERA unit table

A vendor listing mentions “covered car parking” and “dedicated parking area for car and bike”; these are vendor claims, not a verified sanctioned count or documented allocation. Promoter website

6. Amenities, recreation & open spaces

The RERA-derived amenity record lists the following project facilities. Its progress fields are 0% for the listed items, and the record does not establish independent completion or verification. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads and footpathsSize not suppliedRERA amenities0%; not independently verified
Water supplyAvailability recorded as “YES”RERA amenities0%; not independently verified
Sewerage“Chamber, Lines, Septic Tank, STP”; availability recorded as “YES”RERA amenities0%; not independently verified
Storm-water drainsSize/details not suppliedRERA amenities0%; not independently verified
Green strip / tot-lot / parkSize not supplied in the amenity recordRERA amenities0%; not independently verified
Street lightingDetails not suppliedRERA amenities0%; not independently verified
Community buildingsType/size not suppliedRERA amenities0%; not independently verified
Treatment and disposal of sewage and sullage waterDetails not suppliedRERA amenities0%; not independently verified
Solid-waste management and disposalDetails not suppliedRERA amenities0%; not independently verified
Water conservation / rainwater harvestingAvailability recorded as “YES”RERA amenities0%; not independently verified
Energy managementDetails not suppliedRERA amenities0%; not independently verified
Fire protection and fire-safety requirementsSystems/details not suppliedRERA amenities0%; not independently verified
Electrical meter room / sub-station / receiving stationAvailability recorded as “YES”RERA amenities0%; not independently verified
Aggregate recreational open spaceArea not suppliedRERA amenities0%; not independently verified
Tot-lot and treesGHMC permit lists a tot-lot and 25 Trees; tot-lot area not stated in the extractionPermit condition / listed provision; completion not established

A vendor listing additionally describes a swimming pool, gym, children’s play area, clubhouse, fire safety, power backup, security, rainwater harvesting, and CCTV. These are vendor-reported claims; the supplied project records do not establish them as sanctioned or delivered facilities. Promoter website

7. Utilities, building services & safety

The RERA-derived amenity record marks water supply, sewerage, rainwater harvesting, and an electrical meter room/sub-station/receiving station as “YES,” while each listed amenity’s progress field is 0%. It does not state water source or storage capacity, treatment capacity, sewerage or storm-water design, electrical capacity, backup provision, lift details, or security-system specifications. RERA amenities

The GHMC permit requires construction of a rainwater-harvesting percolation pit, provision of transformer space, and a garbage house. It also states that an occupancy certificate is compulsory before occupation and requires the tot-lot to be fenced and maintained as greenery before an occupancy certificate is issued. These are permit conditions; the supplied evidence does not establish that the works have been completed.

A vendor listing mentions borewell water, generator backup, CCTV, security, and fire safety; these details are not independently verified in the supplied project documents. Promoter website

8. Location, access & connectivity

The registered project location is Uppal, Hyderabad, PIN 500039, with the permit identifying Swaroop Nagar, Uppal. The project is recorded on Survey No. 55/PART. RERA record Land records

The supplied location record lists these measured distances:

Nearby placeDistance
Financial District (Nanakramguda)1.2 km
IndusInd Bank0.4 km
Unnamed bus station2.2 km
Manuu Polytechnic Hyderabad1.6 km
Sankaraya Eye Hospital1.6 km
ADP0.0 km
South India Shopping Mall2.6 km
Unnamed park1.2 km
Nanakramguda Government Primary School0.5 km

Location record

The vendor listing refers generally to Uppal as a nearby landmark and says bus stops and railway stations are in close proximity; it provides no measured distances for those claims. Promoter website

9. Developer & development status

The registered promoter is SRI BALAJI DEVELOPERS. Its entity type is recorded as a partnership in the project information. The supplied address is Plot No. 20/D, Padmavathi Colony, Swaroop Nagar, Uppal, Hyderabad, 500039. The project filing names NAVEEN KUMAR as authorized signatory. RERA record Corporate record Parties record

Form B, signed by Naveen Kumar as authorized signatory, declares a completion undertaking of 14 June 2024 and makes the stated project-fund, audit, and pending-approval undertakings. The project record reports 80% completeness, but this is not independently verified construction progress. No phase-wise construction schedule or tower-specific progress is supplied. RERA record

The record does not provide a verified corporate registration identifier, official promoter website, or contact details beyond the supplied address. Corporate record Parties record

10. Approvals, official records & documents

RecordSupplied details
TG-RERA registration certificateForm C for SRI SAI BALAJI NILAYAM, registration P02500000520, issued 22 March 2019; validity stated through 14 June 2024.
GHMC building permitBuilding Permit Order for Building A, residential, Stilt + 5, Survey No. 55/PART; principal approval 2/C2/10151/2018, approved 14 June 2018; file reference 2/C2/09142/2018.
Permit-related identifiersLayout / Sub Divn. No. LRS16112017103020; Affidavit No. 10475/2018; architect licence BL/2584/2013; structural engineer licence 201/Str.Engineer/TP10/GHMC/2014; architect registration CA/2011/51937.
Form B declarationPromoter declaration by authorized signatory Naveen Kumar, dated 29* day of November, 2018 as extracted; includes the declared completion date of 14 June 2024.
Occupancy / completion certificateNo such certificate is included in the supplied project documents. The permit requires an occupancy certificate before occupation.
Approved layout planA layout-plan document is listed, but the supplied record does not contain an extracted layout plan. Document index
Current construction verificationNot supplied; the 80% completeness figure is a project-record declaration. RERA record

The permit extraction identifies an 18 mt. road width and includes permit conditions concerning construction notices, the tot-lot, rainwater harvesting, transformer space, garbage house, and occupancy certification. The full sanction conditions should be consulted in the permit record.

Frequently asked questions

Is SRI SAI BALAJI NILAYAM registered with Telangana RERA?

Yes. SRI SAI BALAJI NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02500000520; the registration status is New Project.

Who is the developer of SRI SAI BALAJI NILAYAM?

The promoter named in the RERA registration is SRI BALAJI DEVELOPERS.

Where is SRI SAI BALAJI NILAYAM located?

SRI SAI BALAJI NILAYAM is in UPPAL, Hyderabad, Telangana (500039).

When will SRI SAI BALAJI NILAYAM be completed?

The promoter's proposed date of completion filed with RERA is 14/06/2024. This is the promoter's declaration, not a guarantee.

More projects in Hyderabad