Sri Sai Balaji Nilayam
SRI BALAJI DEVELOPERS · Hyderabad · RERA P02500000520
SRI SAI BALAJI NILAYAM is a residential apartment project in Uppal / Swaroop Nagar, Uppal, Hyderabad district; the mandal is not disclosed. The registered promoter is SRI BALAJI DEVELOPERS. The project occupies 585.6 sq m and comprises one building, Building A, with a Stilt + 5 configuration and 15 2BHK homes. It is registered with TG-RERA under P02500000520, and its declared completion deadline is 14 June 2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | SRI SAI BALAJI NILAYAM RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | A single registered project is shown; a separate phase name is not disclosed. The GHMC permit describes Building A. RERA record |
| TG-RERA registration | P02500000520, granted 22 March 2019; certificate validity ends 14 June 2024. RERA record |
| Registered promoter | SRI BALAJI DEVELOPERS (also rendered “Sri Balaji Developers” on the certificate). RERA record |
| RERA status | The supplied certificate records the registration period above and no extension. Current registration status is not independently established by the supplied record. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Uppal / Swaroop Nagar, Uppal RERA record |
| Revenue village | Uppal in the project identity record; the GHMC building-permit extraction separately reads “khantam/Abadi.” RERA record |
| Mandal | Not disclosed Land records |
| District | Hyderabad RERA record |
| PIN | 500039 RERA record |
| Project survey number | 55/PART RERA record Land records |
| Plot number | 290 |
| Site extent | 585.6 sq m; the filed land details state total area 585.6 sq m and net area 585.60 sq m. Land records |
| Boundaries | East: Plot No. 291; West: Plot No. 287; North: Plot No. 289; South: 30 FEET WID EPROPOSED RC (as recorded). Land records |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building-permit number | 2/C2/10151/2018, approved 14 June 2018 Approvals record |
| Other permit reference | File No. 2/C2/09142/2018 |
| Approved built-up area | 1,300.50 sq m, as recorded in the RERA filing’s approved built-up-area field. The permit extraction separately lists “Ground Area (m2) 1,300.50.” RERA filing |
| Building count | One building is recorded in the project filing; the GHMC permit identifies Building A. RERA filing |
| Sanctioned floor configuration | Stilt + 5 |
| Basement / cellar | Permit extraction records Cellar 0.00. |
| Approved versus RERA-filed units | The project filing records 15 total units; the permit’s supplied extraction does not state a sanctioned unit count. RERA unit table |
| Parking levels / sanctioned parking count | Not established in the supplied permit extraction or filing details. RERA unit table |
Offering and status
| Field | Project record |
|---|---|
| RERA-filed configuration | 2BHK; the filing rows are recorded as “DOBULE BEDROOM” and “DOUBLE BEDROOM.” RERA unit table RERA unit details |
| RERA-filed saleable area | 260.1 sq m RERA unit table RERA unit details |
| Booked / available | 0 booked; 15 available in the supplied TG-RERA-derived unit record. The portal record has no as-of date, so these counts are indicative. RERA unit table RERA unit details |
| Declared completion deadline | 14 June 2024, as stated in Form B. |
| Registration validity | Certificate validity ended 14 June 2024; this is distinct from the completion deadline. |
| Construction stage | RERA filing records 80% completeness; this is a declared record, not an independently verified site inspection. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied documents. The GHMC permit requires an occupancy certificate before occupation. |
2. The project story
SRI SAI BALAJI NILAYAM is a residential apartment project registered with TG-RERA under P02500000520, on Plot No. 290 in Survey No. 55/PART, at Uppal / Swaroop Nagar, Hyderabad. The project record describes one building and a total site area of 585.6 sq m; the GHMC permit identifies the building as Building A and authorizes a Stilt + 5 configuration. RERA record Land records
The TG-RERA unit record lists 15 two-bedroom units, each with a filed saleable area of 260.1 sq m. It records 0 booked and 15 available, but does not give an as-of date for those counts. The project filing reports 80% completeness; that is a filed progress figure, not an independent confirmation of current physical progress. RERA unit table RERA unit details RERA record
The promoter’s Form B declaration undertook completion by 14 June 2024. The supplied material does not include an occupancy or completion certificate; the GHMC permit states that an occupancy certificate is required before occupation.
3. Master plan, architecture & building design
The GHMC building-permit record is for a residential Building A on Survey No. 55/PART, at Swaroop Nagar, Uppal. It specifies Stilt + 5, a height of 14.9 m, site area of 585.6 sq m, and a ground-area figure of 1,300.50 sq m in the extracted permit fields. The project filing separately records approved built-up area of 1,300.5 sq m. RERA filing
The permit extraction records setbacks as Front 3.5, Rear 3.5, Side I 3.5, and Side II 10; units for these setback figures are not stated in the extraction. It also lists a 92.96 RM compound wall and a 145.66 sq m mortgaged built-up area. The permit identifies the “Floor handed over” as second floor.
The supplied record does not establish the building footprint by floor, flats per floor, lift or stair configuration, internal circulation, or a complete floor-by-floor area schedule. No measured floor-plan data for individual flats is available in the supplied drawing-derived records. The GHMC permit lists a tot-lot, 25 trees, transformer space, and a garbage house; it does not provide a tot-lot area in the extracted figure. Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 15 | 0 | 15 | 260.1 sq m | Not available | Not supplied |
The TG-RERA filing lists two bedroom-description rows—“DOBULE BEDROOM” and “DOUBLE BEDROOM”—which together are normalized in the supplied record as 15 2BHK units. The filing gives a saleable area of 260.1 sq m. The available count is indicative because the portal-derived record has no as-of date. RERA unit table RERA unit details
The floor-plan review record says two drawings were measured, but reports 0 measured 2BHK flat designs; accordingly, no software-measured carpet area or room dimensions can be reported. The RERA-filed saleable area is not a carpet-area measurement. Floor plans
5. Parking & vehicle circulation
The GHMC permit extraction does not provide a sanctioned parking-space count or a parking-level arrangement. The project record does not establish resident, visitor, accessible, two-wheeler, or EV parking numbers; nor does it establish ramps, vehicle entry/exit arrangements, or unit-specific parking allocations. RERA unit table
A vendor listing mentions “covered car parking” and “dedicated parking area for car and bike”; these are vendor claims, not a verified sanctioned count or documented allocation. Promoter website
6. Amenities, recreation & open spaces
The RERA-derived amenity record lists the following project facilities. Its progress fields are 0% for the listed items, and the record does not establish independent completion or verification. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | Size not supplied | RERA amenities | 0%; not independently verified |
| Water supply | Availability recorded as “YES” | RERA amenities | 0%; not independently verified |
| Sewerage | “Chamber, Lines, Septic Tank, STP”; availability recorded as “YES” | RERA amenities | 0%; not independently verified |
| Storm-water drains | Size/details not supplied | RERA amenities | 0%; not independently verified |
| Green strip / tot-lot / park | Size not supplied in the amenity record | RERA amenities | 0%; not independently verified |
| Street lighting | Details not supplied | RERA amenities | 0%; not independently verified |
| Community buildings | Type/size not supplied | RERA amenities | 0%; not independently verified |
| Treatment and disposal of sewage and sullage water | Details not supplied | RERA amenities | 0%; not independently verified |
| Solid-waste management and disposal | Details not supplied | RERA amenities | 0%; not independently verified |
| Water conservation / rainwater harvesting | Availability recorded as “YES” | RERA amenities | 0%; not independently verified |
| Energy management | Details not supplied | RERA amenities | 0%; not independently verified |
| Fire protection and fire-safety requirements | Systems/details not supplied | RERA amenities | 0%; not independently verified |
| Electrical meter room / sub-station / receiving station | Availability recorded as “YES” | RERA amenities | 0%; not independently verified |
| Aggregate recreational open space | Area not supplied | RERA amenities | 0%; not independently verified |
| Tot-lot and trees | GHMC permit lists a tot-lot and 25 Trees; tot-lot area not stated in the extraction | Permit condition / listed provision; completion not established |
A vendor listing additionally describes a swimming pool, gym, children’s play area, clubhouse, fire safety, power backup, security, rainwater harvesting, and CCTV. These are vendor-reported claims; the supplied project records do not establish them as sanctioned or delivered facilities. Promoter website
7. Utilities, building services & safety
The RERA-derived amenity record marks water supply, sewerage, rainwater harvesting, and an electrical meter room/sub-station/receiving station as “YES,” while each listed amenity’s progress field is 0%. It does not state water source or storage capacity, treatment capacity, sewerage or storm-water design, electrical capacity, backup provision, lift details, or security-system specifications. RERA amenities
The GHMC permit requires construction of a rainwater-harvesting percolation pit, provision of transformer space, and a garbage house. It also states that an occupancy certificate is compulsory before occupation and requires the tot-lot to be fenced and maintained as greenery before an occupancy certificate is issued. These are permit conditions; the supplied evidence does not establish that the works have been completed.
A vendor listing mentions borewell water, generator backup, CCTV, security, and fire safety; these details are not independently verified in the supplied project documents. Promoter website
8. Location, access & connectivity
The registered project location is Uppal, Hyderabad, PIN 500039, with the permit identifying Swaroop Nagar, Uppal. The project is recorded on Survey No. 55/PART. RERA record Land records
The supplied location record lists these measured distances:
| Nearby place | Distance |
|---|---|
| Financial District (Nanakramguda) | 1.2 km |
| IndusInd Bank | 0.4 km |
| Unnamed bus station | 2.2 km |
| Manuu Polytechnic Hyderabad | 1.6 km |
| Sankaraya Eye Hospital | 1.6 km |
| ADP | 0.0 km |
| South India Shopping Mall | 2.6 km |
| Unnamed park | 1.2 km |
| Nanakramguda Government Primary School | 0.5 km |
Location record
The vendor listing refers generally to Uppal as a nearby landmark and says bus stops and railway stations are in close proximity; it provides no measured distances for those claims. Promoter website
9. Developer & development status
The registered promoter is SRI BALAJI DEVELOPERS. Its entity type is recorded as a partnership in the project information. The supplied address is Plot No. 20/D, Padmavathi Colony, Swaroop Nagar, Uppal, Hyderabad, 500039. The project filing names NAVEEN KUMAR as authorized signatory. RERA record Corporate record Parties record
Form B, signed by Naveen Kumar as authorized signatory, declares a completion undertaking of 14 June 2024 and makes the stated project-fund, audit, and pending-approval undertakings. The project record reports 80% completeness, but this is not independently verified construction progress. No phase-wise construction schedule or tower-specific progress is supplied. RERA record
The record does not provide a verified corporate registration identifier, official promoter website, or contact details beyond the supplied address. Corporate record Parties record
10. Approvals, official records & documents
| Record | Supplied details |
|---|---|
| TG-RERA registration certificate | Form C for SRI SAI BALAJI NILAYAM, registration P02500000520, issued 22 March 2019; validity stated through 14 June 2024. |
| GHMC building permit | Building Permit Order for Building A, residential, Stilt + 5, Survey No. 55/PART; principal approval 2/C2/10151/2018, approved 14 June 2018; file reference 2/C2/09142/2018. |
| Permit-related identifiers | Layout / Sub Divn. No. LRS16112017103020; Affidavit No. 10475/2018; architect licence BL/2584/2013; structural engineer licence 201/Str.Engineer/TP10/GHMC/2014; architect registration CA/2011/51937. |
| Form B declaration | Promoter declaration by authorized signatory Naveen Kumar, dated 29* day of November, 2018 as extracted; includes the declared completion date of 14 June 2024. |
| Occupancy / completion certificate | No such certificate is included in the supplied project documents. The permit requires an occupancy certificate before occupation. |
| Approved layout plan | A layout-plan document is listed, but the supplied record does not contain an extracted layout plan. Document index |
| Current construction verification | Not supplied; the 80% completeness figure is a project-record declaration. RERA record |
The permit extraction identifies an 18 mt. road width and includes permit conditions concerning construction notices, the tot-lot, rainwater harvesting, transformer space, garbage house, and occupancy certification. The full sanction conditions should be consulted in the permit record.
1. Project at a glance
Project identity
Registered project name: SRI SAI BALAJI NILAYAM
Project type: Residential apartment project
Phase / registered portion: A single registered project is shown; a separate phase name is not disclosed. The GHMC permit describes Building A.
TG-RERA registration: P02500000520, granted 22 March 2019; certificate validity ends 14 June 2024.
Registered promoter: SRI BALAJI DEVELOPERS (also rendered “Sri Balaji Developers” on the certificate).
RERA status: The supplied certificate records the registration period above and no extension. Current registration status is not independently established by the supplied record.
Land and geographic identity
Locality: Uppal / Swaroop Nagar, Uppal
Revenue village: Uppal in the project identity record; the GHMC building-permit extraction separately reads “khantam/Abadi.”
Mandal: Not disclosed
District: Hyderabad
PIN: 500039
Project survey number: 55/PART
Plot number: 290
Site extent: 585.6 sq m; the filed land details state total area 585.6 sq m and net area 585.60 sq m.
Boundaries: East: Plot No. 291; West: Plot No. 287; North: Plot No. 289; South: 30 FEET WID EPROPOSED RC (as recorded).
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building-permit number: 2/C2/10151/2018, approved 14 June 2018
Other permit reference: File No. 2/C2/09142/2018
Approved built-up area: 1,300.50 sq m, as recorded in the RERA filing’s approved built-up-area field. The permit extraction separately lists “Ground Area (m2) 1,300.50.”
Building count: One building is recorded in the project filing; the GHMC permit identifies Building A.
Sanctioned floor configuration: Stilt + 5
Basement / cellar: Permit extraction records Cellar 0.00.
Approved versus RERA-filed units: The project filing records 15 total units; the permit’s supplied extraction does not state a sanctioned unit count.
Parking levels / sanctioned parking count: Not established in the supplied permit extraction or filing details.
Offering and status
RERA-filed configuration: 2BHK; the filing rows are recorded as “DOBULE BEDROOM” and “DOUBLE BEDROOM.”
RERA-filed saleable area: 260.1 sq m
Booked / available: 0 booked; 15 available in the supplied TG-RERA-derived unit record. The portal record has no as-of date, so these counts are indicative.
Declared completion deadline: 14 June 2024, as stated in Form B.
Registration validity: Certificate validity ended 14 June 2024; this is distinct from the completion deadline.
Construction stage: RERA filing records 80% completeness; this is a declared record, not an independently verified site inspection.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied documents. The GHMC permit requires an occupancy certificate before occupation.
2. The project story
SRI SAI BALAJI NILAYAM is a residential apartment project registered with TG-RERA under P02500000520, on Plot No. 290 in Survey No. 55/PART, at Uppal / Swaroop Nagar, Hyderabad. The project record describes one building and a total site area of 585.6 sq m; the GHMC permit identifies the building as Building A and authorizes a Stilt + 5 configuration.
The TG-RERA unit record lists 15 two-bedroom units, each with a filed saleable area of 260.1 sq m. It records 0 booked and 15 available, but does not give an as-of date for those counts. The project filing reports 80% completeness; that is a filed progress figure, not an independent confirmation of current physical progress.
The promoter’s Form B declaration undertook completion by 14 June 2024. The supplied material does not include an occupancy or completion certificate; the GHMC permit states that an occupancy certificate is required before occupation.
3. Master plan, architecture & building design
The GHMC building-permit record is for a residential Building A on Survey No. 55/PART, at Swaroop Nagar, Uppal. It specifies Stilt + 5, a height of 14.9 m, site area of 585.6 sq m, and a ground-area figure of 1,300.50 sq m in the extracted permit fields. The project filing separately records approved built-up area of 1,300.5 sq m.
The permit extraction records setbacks as Front 3.5, Rear 3.5, Side I 3.5, and Side II 10; units for these setback figures are not stated in the extraction. It also lists a 92.96 RM compound wall and a 145.66 sq m mortgaged built-up area. The permit identifies the “Floor handed over” as second floor.
The supplied record does not establish the building footprint by floor, flats per floor, lift or stair configuration, internal circulation, or a complete floor-by-floor area schedule. No measured floor-plan data for individual flats is available in the supplied drawing-derived records. The GHMC permit lists a tot-lot, 25 trees, transformer space, and a garbage house; it does not provide a tot-lot area in the extracted figure.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 15 | 0 | 15 | 260.1 sq m | Not available | Not supplied |
The TG-RERA filing lists two bedroom-description rows—“DOBULE BEDROOM” and “DOUBLE BEDROOM”—which together are normalized in the supplied record as 15 2BHK units. The filing gives a saleable area of 260.1 sq m. The available count is indicative because the portal-derived record has no as-of date.
The floor-plan review record says two drawings were measured, but reports 0 measured 2BHK flat designs; accordingly, no software-measured carpet area or room dimensions can be reported. The RERA-filed saleable area is not a carpet-area measurement.
5. Parking & vehicle circulation
The GHMC permit extraction does not provide a sanctioned parking-space count or a parking-level arrangement. The project record does not establish resident, visitor, accessible, two-wheeler, or EV parking numbers; nor does it establish ramps, vehicle entry/exit arrangements, or unit-specific parking allocations.
A vendor listing mentions “covered car parking” and “dedicated parking area for car and bike”; these are vendor claims, not a verified sanctioned count or documented allocation.
6. Amenities, recreation & open spaces
The RERA-derived amenity record lists the following project facilities. Its progress fields are 0% for the listed items, and the record does not establish independent completion or verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | Size not supplied | 0%; not independently verified | |
| Water supply | Availability recorded as “YES” | 0%; not independently verified | |
| Sewerage | “Chamber, Lines, Septic Tank, STP”; availability recorded as “YES” | 0%; not independently verified | |
| Storm-water drains | Size/details not supplied | 0%; not independently verified | |
| Green strip / tot-lot / park | Size not supplied in the amenity record | 0%; not independently verified | |
| Street lighting | Details not supplied | 0%; not independently verified | |
| Community buildings | Type/size not supplied | 0%; not independently verified | |
| Treatment and disposal of sewage and sullage water | Details not supplied | 0%; not independently verified | |
| Solid-waste management and disposal | Details not supplied | 0%; not independently verified | |
| Water conservation / rainwater harvesting | Availability recorded as “YES” | 0%; not independently verified | |
| Energy management | Details not supplied | 0%; not independently verified | |
| Fire protection and fire-safety requirements | Systems/details not supplied | 0%; not independently verified | |
| Electrical meter room / sub-station / receiving station | Availability recorded as “YES” | 0%; not independently verified | |
| Aggregate recreational open space | Area not supplied | 0%; not independently verified | |
| Tot-lot and trees | GHMC permit lists a tot-lot and 25 Trees; tot-lot area not stated in the extraction | Permit condition / listed provision; completion not established |
A vendor listing additionally describes a swimming pool, gym, children’s play area, clubhouse, fire safety, power backup, security, rainwater harvesting, and CCTV. These are vendor-reported claims; the supplied project records do not establish them as sanctioned or delivered facilities.
7. Utilities, building services & safety
The RERA-derived amenity record marks water supply, sewerage, rainwater harvesting, and an electrical meter room/sub-station/receiving station as “YES,” while each listed amenity’s progress field is 0%. It does not state water source or storage capacity, treatment capacity, sewerage or storm-water design, electrical capacity, backup provision, lift details, or security-system specifications.
The GHMC permit requires construction of a rainwater-harvesting percolation pit, provision of transformer space, and a garbage house. It also states that an occupancy certificate is compulsory before occupation and requires the tot-lot to be fenced and maintained as greenery before an occupancy certificate is issued. These are permit conditions; the supplied evidence does not establish that the works have been completed.
A vendor listing mentions borewell water, generator backup, CCTV, security, and fire safety; these details are not independently verified in the supplied project documents.
8. Location, access & connectivity
The registered project location is Uppal, Hyderabad, PIN 500039, with the permit identifying Swaroop Nagar, Uppal. The project is recorded on Survey No. 55/PART.
The supplied location record lists these measured distances:
Financial District (Nanakramguda): 1.2 km
IndusInd Bank: 0.4 km
Unnamed bus station: 2.2 km
Manuu Polytechnic Hyderabad: 1.6 km
Sankaraya Eye Hospital: 1.6 km
ADP: 0.0 km
South India Shopping Mall: 2.6 km
Unnamed park: 1.2 km
Nanakramguda Government Primary School: 0.5 km
The vendor listing refers generally to Uppal as a nearby landmark and says bus stops and railway stations are in close proximity; it provides no measured distances for those claims.
9. Developer & development status
The registered promoter is SRI BALAJI DEVELOPERS. Its entity type is recorded as a partnership in the project information. The supplied address is Plot No. 20/D, Padmavathi Colony, Swaroop Nagar, Uppal, Hyderabad, 500039. The project filing names NAVEEN KUMAR as authorized signatory.
Form B, signed by Naveen Kumar as authorized signatory, declares a completion undertaking of 14 June 2024 and makes the stated project-fund, audit, and pending-approval undertakings. The project record reports 80% completeness, but this is not independently verified construction progress. No phase-wise construction schedule or tower-specific progress is supplied.
The record does not provide a verified corporate registration identifier, official promoter website, or contact details beyond the supplied address.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C for SRI SAI BALAJI NILAYAM, registration P02500000520, issued 22 March 2019; validity stated through 14 June 2024.
GHMC building permit: Building Permit Order for Building A, residential, Stilt + 5, Survey No. 55/PART; principal approval 2/C2/10151/2018, approved 14 June 2018; file reference 2/C2/09142/2018.
Permit-related identifiers: Layout / Sub Divn. No. LRS16112017103020; Affidavit No. 10475/2018; architect licence BL/2584/2013; structural engineer licence 201/Str.Engineer/TP10/GHMC/2014; architect registration CA/2011/51937.
Form B declaration: Promoter declaration by authorized signatory Naveen Kumar, dated 29* day of November, 2018 as extracted; includes the declared completion date of 14 June 2024.
Occupancy / completion certificate: No such certificate is included in the supplied project documents. The permit requires an occupancy certificate before occupation.
Approved layout plan: A layout-plan document is listed, but the supplied record does not contain an extracted layout plan.
Current construction verification: Not supplied; the 80% completeness figure is a project-record declaration.
The permit extraction identifies an 18 mt. road width and includes permit conditions concerning construction notices, the tot-lot, rainwater harvesting, transformer space, garbage house, and occupancy certification. The full sanction conditions should be consulted in the permit record.
Frequently asked questions
Is SRI SAI BALAJI NILAYAM registered with Telangana RERA?
Yes. SRI SAI BALAJI NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02500000520; the registration status is New Project.
Who is the developer of SRI SAI BALAJI NILAYAM?
The promoter named in the RERA registration is SRI BALAJI DEVELOPERS.
Where is SRI SAI BALAJI NILAYAM located?
SRI SAI BALAJI NILAYAM is in UPPAL, Hyderabad, Telangana (500039).
When will SRI SAI BALAJI NILAYAM be completed?
The promoter's proposed date of completion filed with RERA is 14/06/2024. This is the promoter's declaration, not a guarantee.
More projects in Hyderabad