G K S Residency
GADEELA · Medchal-Malkajgiri · RERA P02200000291
G K S RESIDENCY is a residential apartment project in MALKAJIGIRI, Malkajgiri mandal, Medchal-Malkajgiri district. The TG-RERA certificate names Gadeela Krishna Reddy as the registered promoter developing it. The project is on a site area of 693.88 m² and comprises one residential building, Building - A (RESI), recorded as Stilt + 5 floors, with 15 3BHK units; the RERA-filed saleable area is 126.69 m². Its TG-RERA registration is P02200000291, and the promoter’s Form B declaration undertakes completion by 27/08/2023.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | G K S RESIDENCY |
| Project type | Residential apartment project; the RERA filing records one building and 15 units. RERA record RERA filing RERA unit table |
| Phase / registered portion | No phase name or separate phase scope is stated in the supplied record. The registration is for the project identified as G K S RESIDENCY. |
| TG-RERA registration | P02200000291, granted under section 5; certificate issued 11/02/2019, valid from 11/02/2019 to 27/08/2023. The certificate records no extension. Registration validity is separate from the building-permit completion date. |
| Registered promoter | The certificate names Gadeela Krishna Reddy; the project header identifies the promoter as GADEELA. Legal entity type is not stated in the supplied record. RERA record Corporate record |
| RERA status | The certificate gives an end date of 27/08/2023 and records no extension. The supplied record does not establish a current registration status beyond that certificate. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / address as filed | Locality: MALKAJIGIRI; street: UPPARGUDA; project village in the RERA filing: Moula Ali. The building-permit document identifies the site as Upparguda, Malkajgiri. RERA filing |
| Revenue village | Moula Ali in the project identity and land records; UPPARGUDA in the building-permit and title documents. Both supplied village labels are retained here; the underlying land records should be checked for the precise revenue-village identity. RERA record Land records |
| Mandal / district / PIN | Malkajgiri / Medchal-Malkajgiri / 500040. RERA record RERA filing |
| Survey and subdivision | Survey No. 604/1; no further subdivision is supplied. RERA record Land records |
| Plot and registered site extent | Plot No. 6; site area 693.88 m², net area 693.88 m², road-affected area 0 m² in the project filing and building-permit record. RERA filing |
| Boundaries filed | East: PLOT NO 6PART; west: NEIGHBOURS HOUSE; north: ROAD; south: NEIGHBOURS HOUSE. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building approval | GHMC building-permit order 2/C17/09043/2018, dated 26 May, 2018. The document also lists file no. 2/C17/02464/2018. Approvals record |
| Approved building form | One residential building, Building - A (RESI), recorded as Stilt + 5 floors, height 14.75 m. |
| Approved built-up area | The project filing records 693.88 m² as approved built-up area. The building-permit extraction also contains the separate sanction entries “Residential upper floors: 5; area 1,716.25 m2”, “Stilt: 1; area 463.87 m2” and a displayed proposed covered built-up-area figure of 120,138.00; these entries are not reconciled here. RERA filing |
| Building / unit count | One building and 15 RERA-filed units; the building permit states that the sanctioned number of units must not be increased without prior GHMC approval. RERA unit table |
| Parking level | The permit says cellar and stilt areas approved for parking must be used exclusively for vehicle parking; the supplied extraction does not state a parking-space count or confirm a cellar level in the floor configuration. |
Offering and status
| Item | Record |
|---|---|
| RERA-filed unit type | 3BHK. RERA unit table |
| RERA-filed saleable area | 126.69 m². The filing’s unit details show this for the 3BHK configuration. RERA unit table RERA unit details |
| Booked / available | Portal snapshot: 0 booked and 15 available. The portal record has no as-of date, so counts are indicative rather than a current inventory confirmation. RERA unit table |
| Completion dates | The promoter’s Form B declaration undertakes completion by 27/08/2023; the GHMC permit extraction states construction to be completed before 26 May, 2024. These are different record entries and are not treated as evidence of actual completion. |
| Construction stage | No independently verified site-progress measurement is supplied. The RERA amenity record shows 0% against its listed infrastructure entries. RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied in the documents reviewed for this Overview. The GHMC permit makes an occupancy certificate compulsory before occupation. |
The project story
G K S RESIDENCY is recorded with TG-RERA as a residential apartment project on Plot No. 6, Survey No. 604/1, at the Moula Ali / Upparguda, Malkajgiri location in Medchal-Malkajgiri district. The filed development comprises one residential building and 15 three-bedroom apartments. RERA record RERA filing Land records RERA unit table
GHMC’s building-permit record describes Building - A (RESI) as Stilt + 5 floors. The TG-RERA unit record lists 15 3BHK apartments, each with a filed saleable area of 126.69 m². The available portal snapshot reports 15 available units, but has no as-of date. RERA unit details RERA unit table
The promoter’s Form B declaration gives a completion undertaking ending 27/08/2023. Neither that undertaking nor the permit’s stated completion-before date establishes construction progress or completion. No current construction-stage certification or occupancy/completion certificate is included in the supplied evidence.
Master plan, architecture & building design
The site area recorded in the filing and GHMC permit is 693.88 m², with net area 693.88 m² and road-affected area 0 m². The project is shown as one residential building, Stilt + 5, with a recorded height of 14.75 m. The permit lists setbacks of Front 3.5 m, Rear 4.5 m, Side I 2.5 m and Side II 3 m. RERA filing
The RERA filing states an approved built-up area of 693.88 m². The extracted permit separately lists upper-floor and stilt areas, but also includes a proposed covered built-up-area entry of 120,138.00; the supplied record does not explain that displayed figure. These area labels should not be treated as interchangeable. RERA filing
The supplied approval extraction does not describe flats per floor, lift or stair count, building footprint, internal circulation, landscaped/open-space area, or a detailed residential/common-area distribution. The site plan and floor-plan document is listed as 18364, but its RERA document description says a floorwise building-plan upload was not required and the uploaded item is not extracted as text.
The GHMC permit records a requirement for a tot-lot to be fenced and maintained as greenery before occupancy certification, and a strip of greenery on the site periphery. The extracted sanction parameters list Tot-lot (m2) 0 and 30 Trees; the documents do not establish that these requirements have been completed.
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 15 | 0 | 15 | 126.69 m² | 74.6–84.0 m²; median 83.2 m² | 34% |
The unit count, booking and availability figures, and saleable area are from the TG-RERA filing; the portal booking snapshot has no stated as-of date. The carpet-area range, median and loading are software measurements from the approved floor-plan drawings, not RERA-filed disclosures, and should be checked against the drawing. The measurement record covers three 3BHK designs. RERA unit details Floor plans RERA unit table
The drawing-measured 3BHK example labels a living room, dining area, kitchen, three bedrooms, two toilets, a lobby and a balcony. In the measured example, the balcony is excluded from carpet area. Carpet area is not the same as RERA saleable area: the supplied drawing-measurement note says saleable area also includes the home’s share of common areas. RERA unit details
Parking & vehicle circulation
The GHMC permit says the cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. It also specifies one entry and one exit to the premises, each with a minimum width of 4.5 mts. and height clearance of 5 mts.
The supplied records do not establish the number of parking spaces, resident or visitor allocation, accessible spaces, parking allotment to individual apartments, or whether any parking is mechanical. A parking provision shown or required in a plan does not by itself establish an exclusive parking right for a particular unit.
Amenities, recreation & open spaces
| Description / size | GHMC permit requires a fenced tot-lot maintained as greenery and a strip of greenery at the site periphery. The extracted sanction parameters list “Tot-lot (m2) 0” and 30 Trees. |
|---|---|
| Evidence source | GHMC building-permit extraction |
| Declared progress / verified status | RERA amenity record shows 0% for Green Strip/TOT LOT/Park. Completion is not independently verified. RERA amenities |
| Description / size | Listed as a RERA amenity category; no facility description or size supplied. |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | 0% recorded; completion not independently verified. RERA amenities |
| Description / size | Listed as “Aggregate area of recreational Open Space”; no area supplied. |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | 0% recorded; completion not independently verified. RERA amenities |
Third-party vendor listings mention facilities such as a swimming pool, gym, clubhouse and children’s play area, but the supplied TG-RERA and approval records do not establish these as sanctioned or delivered project facilities. No facility-completion verification is supplied. Promoter website RERA amenities
Utilities, building services & safety
The TG-RERA amenity record lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection, and an electrical meter room/sub-station/receiving station. It marks water supply, sewerage, rainwater harvesting, energy management and the electrical facility as available “YES”, while recorded progress for the listed infrastructure entries is 0%. These portal entries do not establish completed installation or operational status. RERA amenities
GHMC’s permit conditions require a rainwater-harvesting percolation pit, transformer space, a garbage house, a generator as an alternate electricity source, emergency lighting in corridors/common passages and staircases, and specified fire-safety provisions. The permit also lists separate underground and terrace water tanks of 25,000 lts. capacity each for residential buildings, and calls for fire-fighting installations and related safety measures. These are permit conditions; the supplied evidence does not confirm construction, testing or commissioning.
The permit also requires the applicant to provide an ETP as per standard specification and requires services including sanitation, plumbing, fire safety, lifts and electrical installations to be carried out under qualified technical supervision. No water source, treatment capacity, sewage-treatment capacity, lift count/capacity, backup capacity, CCTV/security system, EV charging provision or accessibility circulation details are established by the supplied project-specific TG-RERA or permit evidence.
Location, access & connectivity
The filed location is Moula Ali, Malkajgiri mandal, Medchal-Malkajgiri district, Telangana, PIN 500040, with street recorded as UPPARGUDA and locality as MALKAJIGIRI. The project land is identified as Plot No. 6, Survey No. 604/1. RERA record RERA filing Land records
The location record identifies Mettuguda as the nearest metro anchor at 2.4 km. The supplied evidence does not provide project-specific approach-road names beyond the site boundary adjoining a road, nor verified distances to bus stops, railway stations or other landmarks. Location record RERA filing
Developer & development status
The TG-RERA registration certificate names Gadeela Krishna Reddy as promoter; the project header uses GADEELA. The Form B declaration is attributed to GADEELA KRISHNA REDDY, identified there as promoter or authorised signatory, and records a completion undertaking to 27/08/2023. The legal entity type, corporate identification number, registered office and official project contact details are not disclosed in the supplied evidence. RERA record Corporate record
The project record describes one residential building and 15 RERA-filed 3BHK units. No independently verified construction-progress report or occupancy/completion certificate is supplied. The registration certificate records validity through 27/08/2023 and no extension; registration validity should not be read as proof that the building was completed or received an occupancy certificate. RERA unit table
Approvals, official records & documents
| Supplied evidence | P02200000291, Form C, issued 11/02/2019, valid through 27/08/2023; no extension recorded. |
|---|---|
| Scope / note | G K S RESIDENCY; Survey No. 604/1. |
| Supplied evidence | Building Permit Order 2/C17/09043/2018, dated 26 May, 2018; file no. 2/C17/02464/2018. |
|---|---|
| Scope / note | One residential Building A; Survey No. 604/1, Plot No. 6. |
| Supplied evidence | Form B declaration by GADEELA KRISHNA REDDY; includes the promoter’s title/encumbrance assertions and completion undertaking to 27/08/2023. |
|---|---|
| Scope / note | Promoter declaration, not an independent title determination. |
| Supplied evidence | RERA document 18364 is listed with a description referring to a floor-plan approval upload; its text was not extracted. |
|---|---|
| Scope / note | The supplied unit measurements derive from software analysis of floor-plan drawings and are not RERA-filed carpet-area figures. Floor plans |
| Supplied evidence | RERA records list title report 24549 and a sale-deed document 25015. |
|---|---|
| Scope / note | Supporting land/title documents; detailed title review belongs in the Land & Title section. |
| Supplied evidence | No such certificate is present in the supplied document set. Document index |
|---|---|
| Scope / note | The GHMC permit states that an occupancy certificate is required before occupation. |
Project at a glance
Project identity
Registered project name: G K S RESIDENCY
Project type: Residential apartment project; the RERA filing records one building and 15 units.
Phase / registered portion: No phase name or separate phase scope is stated in the supplied record. The registration is for the project identified as G K S RESIDENCY.
TG-RERA registration: P02200000291, granted under section 5; certificate issued 11/02/2019, valid from 11/02/2019 to 27/08/2023. The certificate records no extension. Registration validity is separate from the building-permit completion date.
Registered promoter: The certificate names Gadeela Krishna Reddy; the project header identifies the promoter as GADEELA. Legal entity type is not stated in the supplied record.
RERA status: The certificate gives an end date of 27/08/2023 and records no extension. The supplied record does not establish a current registration status beyond that certificate.
Land and geographic identity
Locality / address as filed: Locality: MALKAJIGIRI; street: UPPARGUDA; project village in the RERA filing: Moula Ali. The building-permit document identifies the site as Upparguda, Malkajgiri.
Revenue village: Moula Ali in the project identity and land records; UPPARGUDA in the building-permit and title documents. Both supplied village labels are retained here; the underlying land records should be checked for the precise revenue-village identity.
Mandal / district / PIN: Malkajgiri / Medchal-Malkajgiri / 500040.
Survey and subdivision: Survey No. 604/1; no further subdivision is supplied.
Plot and registered site extent: Plot No. 6; site area 693.88 m², net area 693.88 m², road-affected area 0 m² in the project filing and building-permit record.
Boundaries filed: East: PLOT NO 6PART; west: NEIGHBOURS HOUSE; north: ROAD; south: NEIGHBOURS HOUSE.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: GHMC building-permit order 2/C17/09043/2018, dated 26 May, 2018. The document also lists file no. 2/C17/02464/2018.
Approved building form: One residential building, Building - A (RESI), recorded as Stilt + 5 floors, height 14.75 m.
Approved built-up area: The project filing records 693.88 m² as approved built-up area. The building-permit extraction also contains the separate sanction entries “Residential upper floors: 5; area 1,716.25 m2”, “Stilt: 1; area 463.87 m2” and a displayed proposed covered built-up-area figure of 120,138.00; these entries are not reconciled here.
Building / unit count: One building and 15 RERA-filed units; the building permit states that the sanctioned number of units must not be increased without prior GHMC approval.
Parking level: The permit says cellar and stilt areas approved for parking must be used exclusively for vehicle parking; the supplied extraction does not state a parking-space count or confirm a cellar level in the floor configuration.
Offering and status
RERA-filed unit type: 3BHK.
RERA-filed saleable area: 126.69 m². The filing’s unit details show this for the 3BHK configuration.
Booked / available: Portal snapshot: 0 booked and 15 available. The portal record has no as-of date, so counts are indicative rather than a current inventory confirmation.
Completion dates: The promoter’s Form B declaration undertakes completion by 27/08/2023; the GHMC permit extraction states construction to be completed before 26 May, 2024. These are different record entries and are not treated as evidence of actual completion.
Construction stage: No independently verified site-progress measurement is supplied. The RERA amenity record shows 0% against its listed infrastructure entries.
Occupancy / completion certificate: No occupancy or completion certificate is supplied in the documents reviewed for this Overview. The GHMC permit makes an occupancy certificate compulsory before occupation.
The project story
G K S RESIDENCY is recorded with TG-RERA as a residential apartment project on Plot No. 6, Survey No. 604/1, at the Moula Ali / Upparguda, Malkajgiri location in Medchal-Malkajgiri district. The filed development comprises one residential building and 15 three-bedroom apartments.
GHMC’s building-permit record describes Building - A (RESI) as Stilt + 5 floors. The TG-RERA unit record lists 15 3BHK apartments, each with a filed saleable area of 126.69 m². The available portal snapshot reports 15 available units, but has no as-of date.
The promoter’s Form B declaration gives a completion undertaking ending 27/08/2023. Neither that undertaking nor the permit’s stated completion-before date establishes construction progress or completion. No current construction-stage certification or occupancy/completion certificate is included in the supplied evidence.
Master plan, architecture & building design
The site area recorded in the filing and GHMC permit is 693.88 m², with net area 693.88 m² and road-affected area 0 m². The project is shown as one residential building, Stilt + 5, with a recorded height of 14.75 m. The permit lists setbacks of Front 3.5 m, Rear 4.5 m, Side I 2.5 m and Side II 3 m.
The RERA filing states an approved built-up area of 693.88 m². The extracted permit separately lists upper-floor and stilt areas, but also includes a proposed covered built-up-area entry of 120,138.00; the supplied record does not explain that displayed figure. These area labels should not be treated as interchangeable.
The supplied approval extraction does not describe flats per floor, lift or stair count, building footprint, internal circulation, landscaped/open-space area, or a detailed residential/common-area distribution. The site plan and floor-plan document is listed as 18364, but its RERA document description says a floorwise building-plan upload was not required and the uploaded item is not extracted as text.
The GHMC permit records a requirement for a tot-lot to be fenced and maintained as greenery before occupancy certification, and a strip of greenery on the site periphery. The extracted sanction parameters list Tot-lot (m2) 0 and 30 Trees; the documents do not establish that these requirements have been completed.
Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 15 | 0 | 15 | 126.69 m² | 74.6–84.0 m²; median 83.2 m² | 34% |
The unit count, booking and availability figures, and saleable area are from the TG-RERA filing; the portal booking snapshot has no stated as-of date. The carpet-area range, median and loading are software measurements from the approved floor-plan drawings, not RERA-filed disclosures, and should be checked against the drawing. The measurement record covers three 3BHK designs.
The drawing-measured 3BHK example labels a living room, dining area, kitchen, three bedrooms, two toilets, a lobby and a balcony. In the measured example, the balcony is excluded from carpet area. Carpet area is not the same as RERA saleable area: the supplied drawing-measurement note says saleable area also includes the home’s share of common areas.
Parking & vehicle circulation
The GHMC permit says the cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. It also specifies one entry and one exit to the premises, each with a minimum width of 4.5 mts. and height clearance of 5 mts.
The supplied records do not establish the number of parking spaces, resident or visitor allocation, accessible spaces, parking allotment to individual apartments, or whether any parking is mechanical. A parking provision shown or required in a plan does not by itself establish an exclusive parking right for a particular unit.
Amenities, recreation & open spaces
| Description / size | GHMC permit requires a fenced tot-lot maintained as greenery and a strip of greenery at the site periphery. The extracted sanction parameters list “Tot-lot (m2) 0” and 30 Trees. |
|---|---|
| Evidence source | GHMC building-permit extraction |
| Declared progress / verified status | RERA amenity record shows 0% for Green Strip/TOT LOT/Park. Completion is not independently verified. |
| Description / size | Listed as a RERA amenity category; no facility description or size supplied. |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | 0% recorded; completion not independently verified. |
| Description / size | Listed as “Aggregate area of recreational Open Space”; no area supplied. |
|---|---|
| Evidence source | TG-RERA amenity record |
| Declared progress / verified status | 0% recorded; completion not independently verified. |
Third-party vendor listings mention facilities such as a swimming pool, gym, clubhouse and children’s play area, but the supplied TG-RERA and approval records do not establish these as sanctioned or delivered project facilities. No facility-completion verification is supplied.
Utilities, building services & safety
The TG-RERA amenity record lists water supply, sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting, energy management, fire protection, and an electrical meter room/sub-station/receiving station. It marks water supply, sewerage, rainwater harvesting, energy management and the electrical facility as available “YES”, while recorded progress for the listed infrastructure entries is 0%. These portal entries do not establish completed installation or operational status.
GHMC’s permit conditions require a rainwater-harvesting percolation pit, transformer space, a garbage house, a generator as an alternate electricity source, emergency lighting in corridors/common passages and staircases, and specified fire-safety provisions. The permit also lists separate underground and terrace water tanks of 25,000 lts. capacity each for residential buildings, and calls for fire-fighting installations and related safety measures. These are permit conditions; the supplied evidence does not confirm construction, testing or commissioning.
The permit also requires the applicant to provide an ETP as per standard specification and requires services including sanitation, plumbing, fire safety, lifts and electrical installations to be carried out under qualified technical supervision. No water source, treatment capacity, sewage-treatment capacity, lift count/capacity, backup capacity, CCTV/security system, EV charging provision or accessibility circulation details are established by the supplied project-specific TG-RERA or permit evidence.
Location, access & connectivity
The filed location is Moula Ali, Malkajgiri mandal, Medchal-Malkajgiri district, Telangana, PIN 500040, with street recorded as UPPARGUDA and locality as MALKAJIGIRI. The project land is identified as Plot No. 6, Survey No. 604/1.
The location record identifies Mettuguda as the nearest metro anchor at 2.4 km. The supplied evidence does not provide project-specific approach-road names beyond the site boundary adjoining a road, nor verified distances to bus stops, railway stations or other landmarks.
Developer & development status
The TG-RERA registration certificate names Gadeela Krishna Reddy as promoter; the project header uses GADEELA. The Form B declaration is attributed to GADEELA KRISHNA REDDY, identified there as promoter or authorised signatory, and records a completion undertaking to 27/08/2023. The legal entity type, corporate identification number, registered office and official project contact details are not disclosed in the supplied evidence.
The project record describes one residential building and 15 RERA-filed 3BHK units. No independently verified construction-progress report or occupancy/completion certificate is supplied. The registration certificate records validity through 27/08/2023 and no extension; registration validity should not be read as proof that the building was completed or received an occupancy certificate.
Approvals, official records & documents
| Supplied evidence | P02200000291, Form C, issued 11/02/2019, valid through 27/08/2023; no extension recorded. |
|---|---|
| Scope / note | G K S RESIDENCY; Survey No. 604/1. |
| Supplied evidence | Building Permit Order 2/C17/09043/2018, dated 26 May, 2018; file no. 2/C17/02464/2018. |
|---|---|
| Scope / note | One residential Building A; Survey No. 604/1, Plot No. 6. |
| Supplied evidence | Form B declaration by GADEELA KRISHNA REDDY; includes the promoter’s title/encumbrance assertions and completion undertaking to 27/08/2023. |
|---|---|
| Scope / note | Promoter declaration, not an independent title determination. |
| Supplied evidence | RERA document 18364 is listed with a description referring to a floor-plan approval upload; its text was not extracted. |
|---|---|
| Scope / note | The supplied unit measurements derive from software analysis of floor-plan drawings and are not RERA-filed carpet-area figures. |
| Supplied evidence | RERA records list title report 24549 and a sale-deed document 25015. |
|---|---|
| Scope / note | Supporting land/title documents; detailed title review belongs in the Land & Title section. |
| Supplied evidence | No such certificate is present in the supplied document set. |
|---|---|
| Scope / note | The GHMC permit states that an occupancy certificate is required before occupation. |
Frequently asked questions
Is G K S RESIDENCY registered with Telangana RERA?
Yes. G K S RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02200000291; the registration status is New Project.
Who is the developer of G K S RESIDENCY?
The promoter named in the RERA registration is GADEELA.
Where is G K S RESIDENCY located?
G K S RESIDENCY is in MALKAJIGIRI, Moula Ali, Malkajgiri, Medchal-Malkajgiri, Telangana (500040).
When will G K S RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 27/08/2023. This is the promoter's declaration, not a guarantee.
More projects in Moula Ali







