KEY s NEWLAND APARTMENTS
KEY CONSTRUCTIONS · Hyderabad · RERA P02500003687
KEY s NEWLAND APARTMENTS is a residential apartment project in SOGBOWLI, Hyderabad district; the mandal is not disclosed. It is being developed by registered promoter KEY CONSTRUCTIONS, a partnership, on 525.02 sq m of land, with one residential building comprising 1 stilt + 5 upper floors and 10 apartments: five 2BHK and five 3BHK. The TG-RERA registration is P02500003687, issued 03/12/2021, and the promoter’s Form B declares completion by 29/02/2024.
More from Key Constructions · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | KEY s NEWLAND APARTMENTS |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase not stated; the registration is for this project. RERA record |
| TG-RERA registration | P02500003687; issued 03/12/2021, valid from 03/12/2021 to 29/02/2024. The certificate records a two-year validity and says it may be extended by the Authority; the supplied record says no extension. |
| Registered promoter | KEY CONSTRUCTIONS; partnership. RERA record RERA filing |
| RERA status | The supplied certificate records the registration period above. A current registration status is not established by the supplied evidence. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | SOGBOWLI; the building permit also spells the location “SAGBOWLI.” The RERA filing gives village Sogbowli. RERA record RERA filing |
| Mandal | Not disclosed. Land records |
| District / PIN | Hyderabad / 500048. RERA record |
| Project survey number(s) | Survey No. 3. The building permit’s survey field reads “khantam/Abadi.” Land records |
| Registered site extent | 525.02 sq m; total and net area are each stated as 525.02 sq m, with 0 affected area in the RERA filing. RERA filing |
| Boundaries in RERA filing | East: EXISTING BUILDING; west: ROAD WIDTH - 9; north: EXISTING BUILDING -; south: EXISTING BUILDING -. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). |
| Principal building approval | 2/C11/02937/2020; building permit order approved 29 February 2020. The order also gives file number 2/C11/00887/2020. Approvals record |
| Approved built-up area | 1,289.50 m² residential area is stated in the building-permit sanctioned parameters; the RERA filing separately reports approved built-up area of 1,556.61 sq m. RERA filing |
| Buildings / floors | One residential building: 1 stilt + 5 upper floors; sanctioned height 15 m. |
| Parking | Stilt parking area stated as 244.86 m²; a parking-space count is not available in the supplied record. |
| Unit count | 10 units in the RERA filing: 5 2BHK and 5 3BHK. The filing also reports one building and one proposed building unit. RERA unit table RERA filing |
Offering and status
| Field | Project record |
|---|---|
| Configurations | 2BHK and 3BHK apartments. RERA unit table |
| RERA-filed saleable areas | 2BHK: 127.23 sq m; 3BHK: 129.7 sq m. RERA unit table |
| Booked / available | 0 booked and 5 available in each configuration, as last read from the TG-RERA portal; the record has no as-of date, so these figures are indicative. RERA unit table |
| Completion date | The promoter’s Form B declares completion by 29/02/2024. The registration certificate also ends on 29/02/2024. No revised completion date is supplied. |
| Construction stage | No independently verified or RERA-filed construction-stage assessment is supplied. Amenity progress fields in the supplied record are 0%; those figures do not establish overall construction progress. RERA amenities |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The building permit says an occupancy certificate is required before occupation. The available evidence does not establish whether one has since been issued. |
The project story
KEY s NEWLAND APARTMENTS is registered as a residential apartment project on land identified in the RERA filing as Survey No. 3, Sogbowli, Hyderabad. The filing describes a single building and 10 apartments—five 2BHK and five 3BHK. RERA record Land records RERA unit table
GHMC’s building permit order dated 29 February 2020 authorizes a stilt-plus-five-upper-floor residential building at Sagbowli, with a stated site area of 525.02 m² and a sanctioned height of 15 m. The RERA registration certificate records registration from 03/12/2021 through 29/02/2024, and the promoter’s Form B declares completion by 29/02/2024. These dates describe registration validity and the promoter’s declared completion deadline; they do not establish construction completion or occupancy certification. No site-verified progress or occupancy certificate is included in the supplied material.
Master plan, architecture & building design
The available project record describes one residential building on a 525.02 m² site, with 525.02 m² net area and no recorded affected area. The building permit specifies stilt parking and five upper residential floors; it states a 15 m building height. The permit records 1,289.50 m² of residential area, while the RERA filing lists 1,556.61 sq m as approved built-up area. These are the figures under their respective recorded labels; no floor-area breakdown explaining the latter figure is supplied here. RERA filing RERA filing
The RERA-filed building and unit counts are one building and 10 apartments. The supplied material does not establish flats per floor, building footprint, lift or stair arrangements, entry and exit locations, internal circulation, landscaping, or phase-wise organization. The building permit records 0 m² for tot-lot and lists 25 trees and space for a transformer; these entries do not establish completed facilities. RERA filing RERA unit table
Homes, configurations & floor plans
The RERA filing records 10 apartments, with five in each configuration. RERA saleable area is the filed unit area; the drawing-derived carpet estimates below are software measurements, not RERA disclosures. The drawing measurement record says its carpet-area figures were generated from plan geometry and need review. Carpet area excludes balcony and utility areas; saleable area is a separate measure and should not be read as carpet area. RERA unit table RERA unit details Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 127.23 sq m | Not supplied | Not supplied |
| 3BHK | 5 | 0 | 5 | 129.7 sq m | Software-measured median 104.6 sq m; range 95.8–113.1 sq m | 19% (drawing-measurement record) |
The 3BHK drawing measurements cover four flat designs. A typical measured flat drawing labels bedrooms, kitchen, living/dining, toilets, utility and balconies. The supplied drawing-derived areas include a utility of 2.83 m² and balconies of 5.74 m² and 2.21 m²; these are excluded from the recorded carpet measurement. Room dimensions and areas are drawing measurements, not RERA-filed unit specifications, and the measurement record flags them for review. RERA unit details Floor plans
Parking & vehicle circulation
The building permit specifies a stilt parking area of 244.86 m². The supplied material does not establish the number or type of parking spaces, visitor or accessible provision, parking allocation to particular apartments, or a parking-level circulation plan. A designated parking area in a sanctioned drawing does not by itself establish an exclusive parking allocation to a buyer.
Amenities, recreation & open spaces
The project record lists infrastructure and amenity categories, but the supplied progress entries are 0% and do not verify delivery. The building permit records nine rainwater-harvesting structures, 25 trees, 0 m² tot-lot and space for a transformer. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | No size supplied | RERA amenity record RERA amenities | 0%; completion not verified |
| Water supply | Listed as available: YES; no source, storage or capacity specified | RERA amenity record RERA amenities | 0%; completion not verified |
| Sewerage | Listed as available: YES under “Sewerage (Chamber, Lines, Septic Tank, STP)”; specific system and capacity not established | RERA amenity record RERA amenities | 0%; completion not verified |
| Storm-water drains | Listed; no size supplied | RERA amenity record RERA amenities | 0%; completion not verified |
| Green strip / tot-lot / park | Permit records tot-lot as 0 m²; no park area supplied | RERA amenity record RERA amenities; building permit | 0%; completion not verified |
| Street lighting | Listed; no quantity supplied | RERA amenity record RERA amenities | 0%; completion not verified |
| Community buildings | Listed; no description or size supplied | RERA amenity record RERA amenities | 0%; completion not verified |
| Sewage and sullage treatment/disposal | Listed; no treatment capacity supplied | RERA amenity record RERA amenities | 0%; completion not verified |
| Solid-waste management and disposal | Listed; no system details supplied | RERA amenity record RERA amenities | 0%; completion not verified |
| Water conservation / rainwater harvesting | Listed in RERA amenities; permit specifies 9 rainwater-harvesting structures | RERA amenities | RERA progress 0%; completion not verified |
| Energy management | Listed; no system details supplied | RERA amenity record RERA amenities | 0%; completion not verified |
| Fire protection and fire safety | Listed; no system details supplied | RERA amenity record RERA amenities | 0%; completion not verified |
| Electrical meter room / sub-station / receiving station | Listed; permit separately requires space for a transformer | RERA amenities | RERA progress 0%; completion not verified |
| Recreational open space | Listed; no area supplied | RERA amenity record RERA amenities | 0%; completion not verified |
| Trees | Permit specifies 25 trees | Completion not verified |
Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drainage, sewage/sullage treatment and disposal, solid-waste management, energy management, fire safety, and electrical meter-room/sub-station/receiving-station provision. It does not specify capacities, technical designs, or verified completion. The building permit requires rainwater harvesting, space for a transformer, and a garbage house within the premises; it also states that an occupancy Fire NOC is to be obtained before issue of an occupancy certificate. The supplied material does not establish whether these works or approvals have been completed. RERA amenities
Location, access & connectivity
The RERA-filed location is Sogbowli, Hyderabad, PIN 500048; the building permit identifies the locality as Sogbowli and village as Sagbowli. The mandal is not disclosed. The supplied location record gives a 1.2 km distance to Financial District (Nanakramguda), measured from the cadastral parcel centroid. No other independently sourced road, public-transport or landmark distances are provided. RERA record Land records Location record
Developer & development status
The registered promoter is KEY CONSTRUCTIONS, identified in the RERA filing as a partnership. The filing lists Mohammed Mohsin Uddin as authorized signatory and Zaki Ahmed Rabbani as partner; the GSTIN is 36AAJFK1133F1Z0. The promoter address in the filing is Housing Board, No. 65/3RT, Vijayanagar Colony, Sogbowli, Hyderabad, 500048. A separate registered office address or official promoter website/contact details are not established by the supplied evidence. RERA filing Parties record Corporate record
The RERA filing identifies Mohammed Mohsin Uddin and Zaki Ahmed Rabbani as landowners under area-share agreements. Mohammed Mohsin Uddin’s Form B declares a completion date of 29/02/2024. The supplied evidence does not include independently verified construction progress, a revised completion timeline, or an occupancy certificate. Parties record
Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C for KEY s NEWLAND APARTMENTS, registration P02500003687; issued 03/12/2021 and valid through 29/02/2024. |
| GHMC building permit | Building Permit Order dated 29 February 2020; approval no. 2/C11/02937/2020 and file no. 2/C11/00887/2020. It authorizes a stilt-plus-five-upper-floor residential building. |
| Building-plan material | A drawing record is filed under document 195893. Its extracted 3BHK measurements are software-derived and flagged for review. |
| Promoter declaration | Form B affidavit-cum-declaration by Mohammed Mohsin Uddin, including a declared completion date of 29/02/2024. |
| Title report and deed material | Title-report documents 195895 and 195899 are listed in the project record. Document index |
| Occupancy / completion certificate | Not present in the supplied documents. The building permit requires an occupancy certificate before occupation. |
Project at a glance
Project identity
Registered project name: KEY s NEWLAND APARTMENTS
Project type: Residential apartment project
Phase / registered portion: Phase not stated; the registration is for this project.
TG-RERA registration: P02500003687; issued 03/12/2021, valid from 03/12/2021 to 29/02/2024. The certificate records a two-year validity and says it may be extended by the Authority; the supplied record says no extension.
Registered promoter: KEY CONSTRUCTIONS; partnership.
RERA status: The supplied certificate records the registration period above. A current registration status is not established by the supplied evidence.
Land and geographic identity
Locality / revenue village: SOGBOWLI; the building permit also spells the location “SAGBOWLI.” The RERA filing gives village Sogbowli.
Mandal: Not disclosed.
District / PIN: Hyderabad / 500048.
Project survey number(s): Survey No. 3. The building permit’s survey field reads “khantam/Abadi.”
Registered site extent: 525.02 sq m; total and net area are each stated as 525.02 sq m, with 0 affected area in the RERA filing.
Boundaries in RERA filing: East: EXISTING BUILDING; west: ROAD WIDTH - 9; north: EXISTING BUILDING -; south: EXISTING BUILDING -.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: 2/C11/02937/2020; building permit order approved 29 February 2020. The order also gives file number 2/C11/00887/2020.
Approved built-up area: 1,289.50 m² residential area is stated in the building-permit sanctioned parameters; the RERA filing separately reports approved built-up area of 1,556.61 sq m.
Buildings / floors: One residential building: 1 stilt + 5 upper floors; sanctioned height 15 m.
Parking: Stilt parking area stated as 244.86 m²; a parking-space count is not available in the supplied record.
Unit count: 10 units in the RERA filing: 5 2BHK and 5 3BHK. The filing also reports one building and one proposed building unit.
Offering and status
Configurations: 2BHK and 3BHK apartments.
RERA-filed saleable areas: 2BHK: 127.23 sq m; 3BHK: 129.7 sq m.
Booked / available: 0 booked and 5 available in each configuration, as last read from the TG-RERA portal; the record has no as-of date, so these figures are indicative.
Completion date: The promoter’s Form B declares completion by 29/02/2024. The registration certificate also ends on 29/02/2024. No revised completion date is supplied.
Construction stage: No independently verified or RERA-filed construction-stage assessment is supplied. Amenity progress fields in the supplied record are 0%; those figures do not establish overall construction progress.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The building permit says an occupancy certificate is required before occupation. The available evidence does not establish whether one has since been issued.
The project story
KEY s NEWLAND APARTMENTS is registered as a residential apartment project on land identified in the RERA filing as Survey No. 3, Sogbowli, Hyderabad. The filing describes a single building and 10 apartments—five 2BHK and five 3BHK.
GHMC’s building permit order dated 29 February 2020 authorizes a stilt-plus-five-upper-floor residential building at Sagbowli, with a stated site area of 525.02 m² and a sanctioned height of 15 m. The RERA registration certificate records registration from 03/12/2021 through 29/02/2024, and the promoter’s Form B declares completion by 29/02/2024. These dates describe registration validity and the promoter’s declared completion deadline; they do not establish construction completion or occupancy certification. No site-verified progress or occupancy certificate is included in the supplied material.
Master plan, architecture & building design
The available project record describes one residential building on a 525.02 m² site, with 525.02 m² net area and no recorded affected area. The building permit specifies stilt parking and five upper residential floors; it states a 15 m building height. The permit records 1,289.50 m² of residential area, while the RERA filing lists 1,556.61 sq m as approved built-up area. These are the figures under their respective recorded labels; no floor-area breakdown explaining the latter figure is supplied here.
The RERA-filed building and unit counts are one building and 10 apartments. The supplied material does not establish flats per floor, building footprint, lift or stair arrangements, entry and exit locations, internal circulation, landscaping, or phase-wise organization. The building permit records 0 m² for tot-lot and lists 25 trees and space for a transformer; these entries do not establish completed facilities.
Homes, configurations & floor plans
The RERA filing records 10 apartments, with five in each configuration. RERA saleable area is the filed unit area; the drawing-derived carpet estimates below are software measurements, not RERA disclosures. The drawing measurement record says its carpet-area figures were generated from plan geometry and need review. Carpet area excludes balcony and utility areas; saleable area is a separate measure and should not be read as carpet area.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 5 | 0 | 5 | 127.23 sq m | Not supplied | Not supplied |
| 3BHK | 5 | 0 | 5 | 129.7 sq m | Software-measured median 104.6 sq m; range 95.8–113.1 sq m | 19% (drawing-measurement record) |
The 3BHK drawing measurements cover four flat designs. A typical measured flat drawing labels bedrooms, kitchen, living/dining, toilets, utility and balconies. The supplied drawing-derived areas include a utility of 2.83 m² and balconies of 5.74 m² and 2.21 m²; these are excluded from the recorded carpet measurement. Room dimensions and areas are drawing measurements, not RERA-filed unit specifications, and the measurement record flags them for review.
Parking & vehicle circulation
The building permit specifies a stilt parking area of 244.86 m². The supplied material does not establish the number or type of parking spaces, visitor or accessible provision, parking allocation to particular apartments, or a parking-level circulation plan. A designated parking area in a sanctioned drawing does not by itself establish an exclusive parking allocation to a buyer.
Amenities, recreation & open spaces
The project record lists infrastructure and amenity categories, but the supplied progress entries are 0% and do not verify delivery. The building permit records nine rainwater-harvesting structures, 25 trees, 0 m² tot-lot and space for a transformer.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | No size supplied | RERA amenity record | 0%; completion not verified |
| Water supply | Listed as available: YES; no source, storage or capacity specified | RERA amenity record | 0%; completion not verified |
| Sewerage | Listed as available: YES under “Sewerage (Chamber, Lines, Septic Tank, STP)”; specific system and capacity not established | RERA amenity record | 0%; completion not verified |
| Storm-water drains | Listed; no size supplied | RERA amenity record | 0%; completion not verified |
| Green strip / tot-lot / park | Permit records tot-lot as 0 m²; no park area supplied | RERA amenity record; building permit | 0%; completion not verified |
| Street lighting | Listed; no quantity supplied | RERA amenity record | 0%; completion not verified |
| Community buildings | Listed; no description or size supplied | RERA amenity record | 0%; completion not verified |
| Sewage and sullage treatment/disposal | Listed; no treatment capacity supplied | RERA amenity record | 0%; completion not verified |
| Solid-waste management and disposal | Listed; no system details supplied | RERA amenity record | 0%; completion not verified |
| Water conservation / rainwater harvesting | Listed in RERA amenities; permit specifies 9 rainwater-harvesting structures | RERA progress 0%; completion not verified | |
| Energy management | Listed; no system details supplied | RERA amenity record | 0%; completion not verified |
| Fire protection and fire safety | Listed; no system details supplied | RERA amenity record | 0%; completion not verified |
| Electrical meter room / sub-station / receiving station | Listed; permit separately requires space for a transformer | RERA progress 0%; completion not verified | |
| Recreational open space | Listed; no area supplied | RERA amenity record | 0%; completion not verified |
| Trees | Permit specifies 25 trees | Completion not verified |
Utilities, building services & safety
The RERA amenity record lists water supply, sewerage, storm-water drainage, sewage/sullage treatment and disposal, solid-waste management, energy management, fire safety, and electrical meter-room/sub-station/receiving-station provision. It does not specify capacities, technical designs, or verified completion. The building permit requires rainwater harvesting, space for a transformer, and a garbage house within the premises; it also states that an occupancy Fire NOC is to be obtained before issue of an occupancy certificate. The supplied material does not establish whether these works or approvals have been completed.
Location, access & connectivity
The RERA-filed location is Sogbowli, Hyderabad, PIN 500048; the building permit identifies the locality as Sogbowli and village as Sagbowli. The mandal is not disclosed. The supplied location record gives a 1.2 km distance to Financial District (Nanakramguda), measured from the cadastral parcel centroid. No other independently sourced road, public-transport or landmark distances are provided.
Developer & development status
The registered promoter is KEY CONSTRUCTIONS, identified in the RERA filing as a partnership. The filing lists Mohammed Mohsin Uddin as authorized signatory and Zaki Ahmed Rabbani as partner; the GSTIN is 36AAJFK1133F1Z0. The promoter address in the filing is Housing Board, No. 65/3RT, Vijayanagar Colony, Sogbowli, Hyderabad, 500048. A separate registered office address or official promoter website/contact details are not established by the supplied evidence.
The RERA filing identifies Mohammed Mohsin Uddin and Zaki Ahmed Rabbani as landowners under area-share agreements. Mohammed Mohsin Uddin’s Form B declares a completion date of 29/02/2024. The supplied evidence does not include independently verified construction progress, a revised completion timeline, or an occupancy certificate.
Approvals, official records & documents
TG-RERA registration: Form C for KEY s NEWLAND APARTMENTS, registration P02500003687; issued 03/12/2021 and valid through 29/02/2024.
GHMC building permit: Building Permit Order dated 29 February 2020; approval no. 2/C11/02937/2020 and file no. 2/C11/00887/2020. It authorizes a stilt-plus-five-upper-floor residential building.
Building-plan material: A drawing record is filed under document 195893. Its extracted 3BHK measurements are software-derived and flagged for review.
Promoter declaration: Form B affidavit-cum-declaration by Mohammed Mohsin Uddin, including a declared completion date of 29/02/2024.
Title report and deed material: Title-report documents 195895 and 195899 are listed in the project record.
Occupancy / completion certificate: Not present in the supplied documents. The building permit requires an occupancy certificate before occupation.
Frequently asked questions
Is KEY s NEWLAND APARTMENTS registered with Telangana RERA?
Yes. KEY s NEWLAND APARTMENTS is registered with the Telangana Real Estate Regulatory Authority as P02500003687; the registration status is New Project.
Who is the developer of KEY s NEWLAND APARTMENTS?
The promoter named in the RERA registration is KEY CONSTRUCTIONS.
Where is KEY s NEWLAND APARTMENTS located?
KEY s NEWLAND APARTMENTS is in SOGBOWLI, Hyderabad, Telangana (500048).
When will KEY s NEWLAND APARTMENTS be completed?
The promoter's proposed date of completion filed with RERA is 29/02/2024. This is the promoter's declaration, not a guarantee.
More projects in Hyderabad