SLS s SEETHARAMA RESIDENCY
SRI LAKSHMI SRINIVASA DEVELOPERS · Hyderabad · RERA P02500002217
SLS s SEETHARAMA RESIDENCY is a residential apartment project in Kapra, Hyderabad district; the mandal is not disclosed. The registered promoter developing it is Sri Lakshmi Srinivasa Developers. The project is on a reported site area of 627 sq. m and comprises one building, Building - A-1, with 1 Stilt + 5 upper floors and 10 proposed 3BHK apartments, each with a filed saleable area of 164.82 sq. m. Its TG-RERA registration is P02500002217, and the project header records a proposed completion date of 30/11/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | SLS s SEETHARAMA RESIDENCY RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | Phase not separately identified; the registration is for the project on the land described below. RERA record |
| TG-RERA registration | P02500002217 RERA record |
| Registration validity | Certificate states 30/10/2020 to 28/02/2026; this is registration validity, not the completion deadline. The certificate records an end date of 28/02/2026 and no extension. The supplied record does not establish a current registration status beyond that date. RERA record |
| Registered promoter | Sri Lakshmi Srinivasa Developers RERA record |
| TG-RERA status in supplied record | Registration certificate issued. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / site description | Kapra; Manik Sai Enclave is identified in the building permit and title material. RERA record |
| Revenue village | Kapra is the project record’s village; the permit and title report also spell it Khapra in places. RERA record |
| Mandal | Not disclosed in the project identity record. |
| District / PIN | Hyderabad / 500094 RERA record |
| Survey numbers | 612 TO 618 & 619; the registration certificate separates these as 612 TO 618 and 619. RERA record |
| Plot numbers | 16 & 17 RERA filing |
| Site extent | RERA land details report 627 sq. m total and net area. The building permit extract separately states site area and net area of 800 m². RERA filing |
| Boundaries (RERA filing) | East: ROAD WIDTH 9; West, North and South: OTHER LAND. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) Approvals record |
| Principal building approval | Building Permit Order 2/C1/02949/2020, approved 28 February, 2020; associated file no. 2/C1/16078/2019. Approvals record |
| Approved built-up area | RERA project information records 2,010.97 sq. m; the permit extract separately lists residential area 1,648.25 and stilt parking area 323.04 (the extract does not state a unit beside these figures). RERA filing |
| Building count / configuration | One building, Building - A-1, sanctioned as 1 Stilt + 5 upper floors. The permit lists height 14.95 m. RERA filing |
| Parking provision in sanction | Stilt parking area 323.04 is listed in the permit extract; a parking-space count is not supplied. |
| Unit counts | RERA land details record 1 total building unit and 1 proposed building unit as per agreement; the unit schedule records 10 proposed 3BHK apartments. The supplied extracts do not explain the “building units” field. RERA filing RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 3BHK, 10 units; filed saleable area 164.82 sq. m per unit. RERA unit table RERA unit details |
| Booked / available | 0 booked / 10 available, as last read from the TG-RERA portal; no as-of date is attached, so counts are indicative. RERA unit table |
| Construction stage | No independently verified construction-progress evidence is supplied. The permit extract records completion_certified: false; this does not by itself establish the current site stage. |
| Completion deadline | Promoter’s Form B undertaking gives 28/02/2026. The project header also records proposed completion 30/11/2026; the supplied record does not establish a revised TG-RERA approval for that date. RERA record |
| Occupancy / completion certificate | No OC or completion certificate is included in the supplied project documents. The GHMC permit requires an occupancy certificate before occupation. |
2. The project story
SLS s SEETHARAMA RESIDENCY is registered as a residential apartment project in Kapra, Hyderabad, on plots 16 and 17 in survey numbers 612 TO 618 & 619. The GHMC building permit describes one residential building, Building A-1, with one stilt level and five upper floors. RERA record
The TG-RERA unit schedule lists ten 3BHK apartments, all shown as available in the portal snapshot, with a filed saleable area of 164.82 sq. m each. The supplied material does not provide verified construction progress or establish that any part of the building is complete or occupancy-certified. The permit extract records no completion certification, and requires an OC before occupation. RERA unit table
3. Master plan, architecture & building design
- The GHMC permit identifies one residential building, Building - A-1, configured as 1 Stilt + 5 upper floors, with a stated height of 14.95 m.
- The permit extract lists Net Area(m2) 800, residential area 1,648.25, and stilt parking area 323.04; the RERA filing separately reports approved built-up area of 2,010.97 sq. m. These are distinct recorded figures and are not interchangeable. RERA filing
- The RERA land details report a site extent of 627 sq. m, whereas the permit extract reports site and net area of 800 m². The permit also lists a 94 RM compound wall and 30 Trees. A layout approval document is listed in the RERA file, but its supplied record is not extracted; building footprint, internal circulation, floor-by-floor arrangements, lifts, stairs and open-space dimensions are not established by the supplied drawings. RERA filing Document index
- The floor-plan record contains two drawings, both pending scan review; no software-measured drawing areas or room dimensions are available. Floor plans
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 164.82 sq. m | Not measured | Not supplied |
The configuration, count, bookings and saleable area are from the TG-RERA unit record; the booking snapshot has no stated as-of date. RERA unit details RERA unit table
No carpet-area measurement from the approved floor-plan drawings is available: both listed drawings are scans pending review. Carpet area is not interchangeable with RERA-filed saleable area, which is the only unit-area figure supplied in the RERA schedule here. Floor plans
5. Parking & vehicle circulation
- The GHMC permit lists a stilt parking area of 323.04 and states that the sanctioned stilt parking is to be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide a number of parking spaces, distinguish resident from visitor or accessible bays, or document unit-wise parking allocation.
- The RERA unit schedule marks the units as mortgaged, and the permit states that the mortgaged built-up area may be registered only after an occupancy certificate is produced. The supplied material does not establish the scope of that mortgage or any parking rights attached to an individual apartment. RERA unit table
6. Amenities, recreation & open spaces
The following are items recorded in the GHMC permit or the RERA-filed amenity schedule. The schedule reports 0% progress for its listed items; this is a filed progress figure, not independent verification of construction or delivery. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | No size or facility detail supplied | RERA-filed amenities RERA amenities | Listed; 0%; completion not independently verified |
| Internal roads & footpaths | No dimensions supplied | RERA-filed amenities RERA amenities | Listed; 0%; completion not independently verified |
| Green strip / tot lot / park | Permit lists 30 Trees and requires a strip of greenery at the site perimeter; no park or tot-lot size supplied | RERA-filed amenities; GHMC permit RERA amenities | Listed; 0%; completion not independently verified |
| Street lighting | No specification supplied | RERA-filed amenities RERA amenities | Listed; 0%; completion not independently verified |
| Open recreational space | No aggregate area supplied | RERA-filed amenities RERA amenities | Listed; 0%; completion not independently verified |
7. Utilities, building services & safety
| Evidence in the project record | GHMC permit requires a rainwater-harvesting percolation pit; RERA schedule lists water conservation and rainwater harvesting. RERA amenities |
|---|---|
| Status / limitation | Required/listed; installation is not independently verified. |
| Evidence in the project record | RERA schedule lists water supply. RERA amenities |
|---|---|
| Status / limitation | Source, storage, treatment and capacity are not supplied. |
| Evidence in the project record | RERA schedule lists sewerage and treatment/disposal of sewage and sullage water; GHMC permit extract says the applicant shall provide an ETP. RERA amenities |
|---|---|
| Status / limitation | Listed/required; capacity and completed status are not supplied. |
| Evidence in the project record | RERA schedule lists storm-water drains and solid-waste management/disposal; permit requires a garbage house within the premises. RERA amenities |
|---|---|
| Status / limitation | Listed/required; design and completed status are not supplied. |
| Evidence in the project record | RERA schedule lists an electrical meter room, sub-station and receiving station; GHMC permit requires transformer space. RERA amenities |
|---|---|
| Status / limitation | Listed/required; capacity and installation status are not supplied. |
| Evidence in the project record | RERA schedule lists fire-protection and fire-safety requirements. The permit requires an occupancy Fire NOC from the Director (EV&DM) before issue of an OC. RERA amenities |
|---|---|
| Status / limitation | Listed/required; no Fire NOC or completed-system evidence supplied. |
| Evidence in the project record | No project-specific lift, accessible-circulation, CCTV or access-control details are established in the supplied RERA filing and permit extracts. |
|---|---|
| Status / limitation | Not established. |
8. Location, access & connectivity
The registered project location is Kapra, Hyderabad, PIN 500094; the building permit and title report identify Manik Sai Enclave, with the village also appearing as Khapra in the permit. RERA record
The RERA-filed east boundary is ROAD WIDTH 9. The location record supplies a cadastral parcel centroid at 17.41528, 78.35459 and one measured connectivity entry: Financial District (Nanakramguda), 1.2 km. No additional project-specific approach-road, public-transport or landmark distances are supplied. RERA filing Location record
9. Developer & development status
The registered promoter is SRI LAKSHMI SRINIVASA DEVELOPERS, identified in the project filing as a partnership. The RERA record names BATHULA RAJGOPAL REDDY as authorized signatory and BATTULA TIRUPATHI as partner. The registration certificate gives the promoter office location only as Hyderabad district, PIN 500094; a more complete registered-office address or official contact details are not established by the certificate extract. Corporate record Parties record
The promoter’s Form B is a declaration that the project land has a legal-title basis and is free from encumbrances, and that completion would be by 28/02/2026; these are promoter declarations in the RERA filing. The certificate records registration through 28/02/2026 and says no extension. No verified construction-progress report, completion certificate or occupancy certificate is supplied. Document index
10. Approvals, official records & documents
| Identifier / date | P02500002217, issued 30/10/2020; stated validity to 28/02/2026 |
|---|---|
| What the supplied record establishes | Registration of SLS s SEETHARAMA RESIDENCY under section 5; certificate conditions include sale agreements, conveyance and separate-account obligations. |
| Identifier / date | 2/C1/02949/2020, approved 28 February, 2020; file no. 2/C1/16078/2019 |
|---|---|
| What the supplied record establishes | Sanctions Building A-1 as 1 Stilt + 5 upper floors and lists project-specific conditions, including OC before occupation. |
| Identifier / date | Layout / Sub Divn. No. 2478/MP2/HUDA/97; structural engineer licence 19/STRL.ENGINEER/TP10/GHMC |
|---|---|
| What the supplied record establishes | Identifiers recorded in the permit extract. |
| Identifier / date | Document 132097, dated 18-08-2020 |
|---|---|
| What the supplied record establishes | Advocate’s title-search report concerning plots 16 and 17 in survey numbers 612 to 618,619 at Manik Sai Enclave, Kapra. |
| Identifier / date | Document 131428 |
|---|---|
| What the supplied record establishes | RERA-filed title material describes a registered development agreement-cum-GPA concerning plots 16 and 17. |
| Identifier / date | Document 134376 |
|---|---|
| What the supplied record establishes | Promoter’s affidavit-cum-declaration for the project, including its completion undertaking. |
| Identifier / date | Document 131429 |
|---|---|
| What the supplied record establishes | Listed in the RERA file, but no extracted approval particulars are supplied. Document index |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The supplied permit extract records completion certified as false and states that an OC is compulsory before occupation. |
1. Project at a glance
Project identity
Registered project name: SLS s SEETHARAMA RESIDENCY
Project type: Residential apartment project
Phase / registered portion: Phase not separately identified; the registration is for the project on the land described below.
TG-RERA registration: P02500002217
Registration validity: Certificate states 30/10/2020 to 28/02/2026; this is registration validity, not the completion deadline. The certificate records an end date of 28/02/2026 and no extension. The supplied record does not establish a current registration status beyond that date.
Registered promoter: Sri Lakshmi Srinivasa Developers
TG-RERA status in supplied record: Registration certificate issued.
Land and geographic identity
Locality / site description: Kapra; Manik Sai Enclave is identified in the building permit and title material.
Revenue village: Kapra is the project record’s village; the permit and title report also spell it Khapra in places.
Mandal: Not disclosed in the project identity record.
District / PIN: Hyderabad / 500094
Survey numbers: 612 TO 618 & 619; the registration certificate separates these as 612 TO 618 and 619.
Plot numbers: 16 & 17
Site extent: RERA land details report 627 sq. m total and net area. The building permit extract separately states site area and net area of 800 m².
Boundaries (RERA filing): East: ROAD WIDTH 9; West, North and South: OTHER LAND.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: Building Permit Order 2/C1/02949/2020, approved 28 February, 2020; associated file no. 2/C1/16078/2019.
Approved built-up area: RERA project information records 2,010.97 sq. m; the permit extract separately lists residential area 1,648.25 and stilt parking area 323.04 (the extract does not state a unit beside these figures).
Building count / configuration: One building, Building - A-1, sanctioned as 1 Stilt + 5 upper floors. The permit lists height 14.95 m.
Parking provision in sanction: Stilt parking area 323.04 is listed in the permit extract; a parking-space count is not supplied.
Unit counts: RERA land details record 1 total building unit and 1 proposed building unit as per agreement; the unit schedule records 10 proposed 3BHK apartments. The supplied extracts do not explain the “building units” field.
Offering and status
RERA-filed configuration: 3BHK, 10 units; filed saleable area 164.82 sq. m per unit.
Booked / available: 0 booked / 10 available, as last read from the TG-RERA portal; no as-of date is attached, so counts are indicative.
Construction stage: No independently verified construction-progress evidence is supplied. The permit extract records completion_certified: false; this does not by itself establish the current site stage.
Completion deadline: Promoter’s Form B undertaking gives 28/02/2026. The project header also records proposed completion 30/11/2026; the supplied record does not establish a revised TG-RERA approval for that date.
Occupancy / completion certificate: No OC or completion certificate is included in the supplied project documents. The GHMC permit requires an occupancy certificate before occupation.
2. The project story
SLS s SEETHARAMA RESIDENCY is registered as a residential apartment project in Kapra, Hyderabad, on plots 16 and 17 in survey numbers 612 TO 618 & 619. The GHMC building permit describes one residential building, Building A-1, with one stilt level and five upper floors.
The TG-RERA unit schedule lists ten 3BHK apartments, all shown as available in the portal snapshot, with a filed saleable area of 164.82 sq. m each. The supplied material does not provide verified construction progress or establish that any part of the building is complete or occupancy-certified. The permit extract records no completion certification, and requires an OC before occupation.
3. Master plan, architecture & building design
- The GHMC permit identifies one residential building, Building - A-1, configured as 1 Stilt + 5 upper floors, with a stated height of 14.95 m.
- The permit extract lists Net Area(m2) 800, residential area 1,648.25, and stilt parking area 323.04; the RERA filing separately reports approved built-up area of 2,010.97 sq. m. These are distinct recorded figures and are not interchangeable.
- The RERA land details report a site extent of 627 sq. m, whereas the permit extract reports site and net area of 800 m². The permit also lists a 94 RM compound wall and 30 Trees. A layout approval document is listed in the RERA file, but its supplied record is not extracted; building footprint, internal circulation, floor-by-floor arrangements, lifts, stairs and open-space dimensions are not established by the supplied drawings.
- The floor-plan record contains two drawings, both pending scan review; no software-measured drawing areas or room dimensions are available.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 164.82 sq. m | Not measured | Not supplied |
The configuration, count, bookings and saleable area are from the TG-RERA unit record; the booking snapshot has no stated as-of date.
No carpet-area measurement from the approved floor-plan drawings is available: both listed drawings are scans pending review. Carpet area is not interchangeable with RERA-filed saleable area, which is the only unit-area figure supplied in the RERA schedule here.
5. Parking & vehicle circulation
- The GHMC permit lists a stilt parking area of 323.04 and states that the sanctioned stilt parking is to be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide a number of parking spaces, distinguish resident from visitor or accessible bays, or document unit-wise parking allocation.
- The RERA unit schedule marks the units as mortgaged, and the permit states that the mortgaged built-up area may be registered only after an occupancy certificate is produced. The supplied material does not establish the scope of that mortgage or any parking rights attached to an individual apartment.
6. Amenities, recreation & open spaces
The following are items recorded in the GHMC permit or the RERA-filed amenity schedule. The schedule reports 0% progress for its listed items; this is a filed progress figure, not independent verification of construction or delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | No size or facility detail supplied | RERA-filed amenities | Listed; 0%; completion not independently verified |
| Internal roads & footpaths | No dimensions supplied | RERA-filed amenities | Listed; 0%; completion not independently verified |
| Green strip / tot lot / park | Permit lists 30 Trees and requires a strip of greenery at the site perimeter; no park or tot-lot size supplied | RERA-filed amenities; GHMC permit | Listed; 0%; completion not independently verified |
| Street lighting | No specification supplied | RERA-filed amenities | Listed; 0%; completion not independently verified |
| Open recreational space | No aggregate area supplied | RERA-filed amenities | Listed; 0%; completion not independently verified |
7. Utilities, building services & safety
| Evidence in the project record | GHMC permit requires a rainwater-harvesting percolation pit; RERA schedule lists water conservation and rainwater harvesting. |
|---|---|
| Status / limitation | Required/listed; installation is not independently verified. |
| Evidence in the project record | RERA schedule lists water supply. |
|---|---|
| Status / limitation | Source, storage, treatment and capacity are not supplied. |
| Evidence in the project record | RERA schedule lists sewerage and treatment/disposal of sewage and sullage water; GHMC permit extract says the applicant shall provide an ETP. |
|---|---|
| Status / limitation | Listed/required; capacity and completed status are not supplied. |
| Evidence in the project record | RERA schedule lists storm-water drains and solid-waste management/disposal; permit requires a garbage house within the premises. |
|---|---|
| Status / limitation | Listed/required; design and completed status are not supplied. |
| Evidence in the project record | RERA schedule lists an electrical meter room, sub-station and receiving station; GHMC permit requires transformer space. |
|---|---|
| Status / limitation | Listed/required; capacity and installation status are not supplied. |
| Evidence in the project record | RERA schedule lists fire-protection and fire-safety requirements. The permit requires an occupancy Fire NOC from the Director (EV&DM) before issue of an OC. |
|---|---|
| Status / limitation | Listed/required; no Fire NOC or completed-system evidence supplied. |
| Evidence in the project record | No project-specific lift, accessible-circulation, CCTV or access-control details are established in the supplied RERA filing and permit extracts. |
|---|---|
| Status / limitation | Not established. |
8. Location, access & connectivity
The registered project location is Kapra, Hyderabad, PIN 500094; the building permit and title report identify Manik Sai Enclave, with the village also appearing as Khapra in the permit.
The RERA-filed east boundary is ROAD WIDTH 9. The location record supplies a cadastral parcel centroid at 17.41528, 78.35459 and one measured connectivity entry: Financial District (Nanakramguda), 1.2 km. No additional project-specific approach-road, public-transport or landmark distances are supplied.
9. Developer & development status
The registered promoter is SRI LAKSHMI SRINIVASA DEVELOPERS, identified in the project filing as a partnership. The RERA record names BATHULA RAJGOPAL REDDY as authorized signatory and BATTULA TIRUPATHI as partner. The registration certificate gives the promoter office location only as Hyderabad district, PIN 500094; a more complete registered-office address or official contact details are not established by the certificate extract.
The promoter’s Form B is a declaration that the project land has a legal-title basis and is free from encumbrances, and that completion would be by 28/02/2026; these are promoter declarations in the RERA filing. The certificate records registration through 28/02/2026 and says no extension. No verified construction-progress report, completion certificate or occupancy certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P02500002217, issued 30/10/2020; stated validity to 28/02/2026 |
|---|---|
| What the supplied record establishes | Registration of SLS s SEETHARAMA RESIDENCY under section 5; certificate conditions include sale agreements, conveyance and separate-account obligations. |
| Identifier / date | 2/C1/02949/2020, approved 28 February, 2020; file no. 2/C1/16078/2019 |
|---|---|
| What the supplied record establishes | Sanctions Building A-1 as 1 Stilt + 5 upper floors and lists project-specific conditions, including OC before occupation. |
| Identifier / date | Layout / Sub Divn. No. 2478/MP2/HUDA/97; structural engineer licence 19/STRL.ENGINEER/TP10/GHMC |
|---|---|
| What the supplied record establishes | Identifiers recorded in the permit extract. |
| Identifier / date | Document 132097, dated 18-08-2020 |
|---|---|
| What the supplied record establishes | Advocate’s title-search report concerning plots 16 and 17 in survey numbers 612 to 618,619 at Manik Sai Enclave, Kapra. |
| Identifier / date | Document 131428 |
|---|---|
| What the supplied record establishes | RERA-filed title material describes a registered development agreement-cum-GPA concerning plots 16 and 17. |
| Identifier / date | Document 134376 |
|---|---|
| What the supplied record establishes | Promoter’s affidavit-cum-declaration for the project, including its completion undertaking. |
| Identifier / date | Document 131429 |
|---|---|
| What the supplied record establishes | Listed in the RERA file, but no extracted approval particulars are supplied. |
| Identifier / date | Not supplied |
|---|---|
| What the supplied record establishes | The supplied permit extract records completion certified as false and states that an OC is compulsory before occupation. |
Frequently asked questions
Is SLS s SEETHARAMA RESIDENCY registered with Telangana RERA?
Yes. SLS s SEETHARAMA RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P02500002217; the registration status is New Project.
Who is the developer of SLS s SEETHARAMA RESIDENCY?
The promoter named in the RERA registration is SRI LAKSHMI SRINIVASA DEVELOPERS.
Where is SLS s SEETHARAMA RESIDENCY located?
SLS s SEETHARAMA RESIDENCY is in KAPRA, Hyderabad, Telangana (500094).
When will SLS s SEETHARAMA RESIDENCY be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.