Red Hills Township
GREEN EARTH DEVELOPERS · Sangareddy · RERA P01100002317
RED HILLS TOWNSHIP is a plotted development at Khasimpur, ZAHEERABAD, Sangareddy. The registered promoter is GREEN EARTH DEVELOPERS, described in the project record as a partnership. The registered land area is 102921 sqmts, with net area of 71598.33 sqmts; the draft layout approval describes 269 plots, and plot-size configurations are not stated. TG-RERA registration number P01100002317 was granted 10/11/2020, and the promoter’s completion undertaking gives a proposed completion date of 5th July 2024.
📘 Project brochure from the promoter’s website ↗More from Green Earth Developers · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | RED HILLS TOWNSHIP RERA record |
| Project type | Plotted development RERA record RERA filing |
| Phase / registered portion | No separate phase is identified in the supplied record. TG-RERA registration is P01100002317 RERA record. |
| TG-RERA registration | P01100002317; granted 10/11/2020, with stated validity from 10/11/2020 to 05/07/2024. The certificate records no extension. |
| Registered promoter | GREEN EARTH DEVELOPERS, described in the project record as a partnership RERA filing Corporate record |
| RERA status | The certificate gives an original validity period ending 05/07/2024. Current registration status is not established by the supplied evidence; no extension is recorded in the certificate. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Khasimpur; the layout approval identifies Khasimpur Gram Panchayat. No other project revenue village is identified in the supplied record RERA record RERA filing. |
| Mandal / district / PIN | ZAHEERABAD / Sangareddy / 502221 in the project header and filing; the registration certificate also states Sangareddy and gives promoter-office PIN 502220 RERA record RERA filing. |
| Project survey numbers | 100, 101, 102, 165, 166 RERA record RERA filing. |
| Subdivisions | The registration record states parent survey numbers only. The draft layout approval identifies 100/P, 101/P, 102/P, 165/P and 166/P; deed and title materials also refer to subdivisions, including 100/E2_2/1, 100/P8 P81, 100/82 1/1, 100/Đ6 2/1, 100/Gs 2/1, 100/o 1; 100/Aa, 102/A7, 100/A2/1, 102/A7/1; 102/67, 102/66; 100/Q, 100/22, 100/60; 165/8/1/3; 166/2; 101/98, 101/2, 166/8, 101/982, 101/3, 166/B1; 100/2/1, 100/2/2, 100/3/1/1, 100/M 2/1; 100/61; 165/Aa, 165/A, 165/1/2, 165/1/1, 165/6/1; 102/A1, 102/A3, 102/A6/p, 102/Aa1/1, 102/A3/1, 102/A4, 102/A4/1, 102/A6/1; 100/A1; 166/M; 165/Aa; 100/U and 100/Ruu; 100/66 and 100/o; 100/E3, 100/U2, 100/Ru2; 165/Aa and 165/A; 100/E1, 100/E2 and 100/Aa; 102/A3, 102/A4, 102/A1 and 102/Aa2; and 166/A, 166/Aa, 101/A, 101/E, 100/Uu, 100/Eel, 100/A and 102/Aa. These are document-extracted references, not a reconciled parcel schedule. |
| Registered site extent | RERA land details state total area 102921 sqmts, area affected in road widening/FTL of tanks/nala widening 31322.67 sqmts, and net area 71598.33 sqmts RERA filing Land records. |
| Boundaries | East: AGRICULTURE LAND OF PENTAPPA; west: AGRICULTURE LAND OF BADRAPPA; north: GOVERNAMENT LAND; south: AGRICULTURE LAND OF BEERANNA RERA filing Land records. |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning; the document describes delegation to Khasimpur Gram Panchayat Approvals record. |
| Principal layout approval | Draft - TLP.No. 143/2019/H, dated 06/07/2019 as recorded in the filing. Related references include file no. DTCP-HT1/17/2018-HYD Sec-DTCP, letter Lr.Roc.No.4858/2018/H, circular memo Circular Memo.No. 1637/2018/P, and annexure layout number Draft-TLP No.143/2019/H Approvals record. |
| Approved layout content | The draft layout approval describes a 269-plot layout. Its stated land-use schedule is layout area Ac. 25.4325 Cents; 123093.30 Sq. Yds, open space Ac. 2.54 Cents; 12293.60 Sq. Yds (10.00%), roads Ac. 7.74 Cents; 37461.60 Sq. Yds. (30.44%), plotted area Ac. 15.15 Cents; 73326.00 Sq. Yds. (59.56%), and mortgage area Ac. 2.30 Cents; 11132.00 Sq. Yds. (15.18%). |
| Approved built-up area / buildings / floors | The RERA fields state approved built-up area 61310 sqmts and do not give a building count or floor configuration. This is a plotted layout; no building-floor schedule is supplied RERA filing. |
| Mortgage area | RERA fields state mortgage area 9308.0 sqmts. The layout approval identifies Plot Nos. 81 to 106 and 132 to 151 as mortgage plots RERA filing. |
Offering and status
| Item | Project record |
|---|---|
| What is offered | Plots in a plotted layout. The supplied RERA material does not give plot-size bands, plot-wise inventory, or booked/available counts RERA filing. |
| Construction / development stage | The RERA amenities schedule records percentage figures for selected infrastructure items; these are reported schedule values, not independent site verification. No independently verified construction-stage assessment is supplied RERA amenities. |
| Completion deadline | The promoter’s Form-B declaration undertakes completion by 5th July 2024. |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied project documents Document index. |
| Building or unit configuration | No RERA-filed apartment configuration, flat count, saleable-area schedule, or floor plan is supplied for this plotted project Document index Floor plans. |
2. The project story
RED HILLS TOWNSHIP is registered as a plotted development at Khasimpur, Zaheerabad Mandal, Sangareddy District, on the five parent survey numbers 100, 101, 102, 165 and 166. The filed project record describes the land area as 102921 sqmts total and 71598.33 sqmts net, with 31322.67 sqmts affected by road widening/FTL of tanks/nala widening RERA record RERA filing Land records.
The layout document is a draft technical layout pattern for 269 plots, with recorded areas for plots, roads, open space and mortgage land. Its conditions call for the designated open spaces and roads to be handed to the Gram Panchayat by registered gift deed before release of the final layout; it also requires development works such as roads, drains, greenery, street lighting, electricity, sewerage disposal and protected water supply. The supplied evidence does not establish completion of those works, final layout release, plot-wise sales or current on-site progress. The promoter’s completion undertaking is a declaration, not independent verification of completion.
3. Master plan, architecture & building design
This is a plotted layout rather than a tower or apartment scheme. The draft layout approval identifies 269 plots and assigns 10.00% to open space, 30.44% to roads, 59.56% to plotted area and 15.18% to mortgage area, with the stated areas set out in the development table above. The approval conditions identify Plot Nos. 81 to 106 and 132 to 151 as mortgage plots and say they are not to be sold while mortgaged to the Gram Panchayat.
The approved document calls for roads to be formed and opened for access to neighbouring sites, storm-water drainage and nala channelization, greenery and avenue planting, rainwater-harvesting pits, fencing of open spaces, street lighting, electricity, sewerage disposal and protected water supply. These are approval conditions, not evidence that the works have been completed.
No legible plot-by-plot drawing schedule, plot-size plan, road-width schedule, building design, or completed-work certification is included in the supplied material. The RERA filing’s 61310 sqmts approved built-up area is reported as filed; the available documents do not explain its measurement scope for this plotted layout RERA filing.
4. Homes, configurations & floor plans
The registered offering is plots, not flats. The supplied RERA materials do not provide plot-wise area bands, plot counts by size, booked or available inventory, or a measured plot schedule. The project’s RERA allotment-letter file is a blank template, without a plot number, extent, allottee, or payment amount.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | Not disclosed in supplied RERA inventory | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
The layout approval’s 269 plots is the approved layout count in the draft approval; it is not a booked or available inventory count. The floor-plan review records two drawings, both scans pending, and no measured plans; no carpet-area or room-measurement result is available Floor plans.
5. Parking & vehicle circulation
No project-wide parking count, parking allocation schedule, visitor parking provision, accessible parking, or parking design is established in the supplied RERA documents. The draft layout approval requires roads to be formed and opened for access to neighbouring sites, but the supplied extract does not state road widths, entry/exit arrangements, or pedestrian separation. No exclusive parking entitlement for any plot is evidenced.
6. Amenities, recreation & open spaces
The RERA-filed amenities schedule gives completion percentages for some layout infrastructure. These percentages are recorded values in the filing, not independent verification of completed facilities RERA amenities. The draft layout approval also sets out development conditions; those requirements should not be read as confirmation of delivery.
| Description / size | No size stated in the RERA amenities schedule. Layout approval records open space as Ac. 2.54 Cents; 12293.60 Sq. Yds (10.00%). |
|---|---|
| Evidence source | RERA amenities schedule; draft layout approval |
| Declared progress / verified status | Schedule records 0%; not independently verified complete RERA amenities. |
| Description / size | No size or capacity stated |
|---|---|
| Evidence source | RERA amenities schedule |
| Declared progress / verified status | 0% recorded; not independently verified complete RERA amenities. |
| Description / size | Approval condition calls for greenery including avenue plantation; no quantity stated |
|---|---|
| Evidence source | Draft layout approval |
| Declared progress / verified status | Required by the approval conditions; completion not established. |
| Description / size | No dimensions stated |
|---|---|
| Evidence source | RERA amenities schedule; draft layout approval |
| Declared progress / verified status | 20% recorded; not independently verified complete RERA amenities. |
| Description / size | No fixture count stated |
|---|---|
| Evidence source | RERA amenities schedule; draft layout approval |
| Declared progress / verified status | 0% recorded; not independently verified complete RERA amenities. |
| Description / size | Approval condition calls for rainwater-harvesting pits; no count or capacity stated |
|---|---|
| Evidence source | RERA amenities schedule; draft layout approval |
| Declared progress / verified status | 5% recorded; not independently verified complete RERA amenities. |
No clubhouse, indoor recreation or sports facilities are established in the supplied RERA evidence.
7. Utilities, building services & safety
The draft layout approval requires provision of protected water supply, a sewerage-disposal system, storm-water drains and nala channelization, street lighting and electricity facilities, along with rainwater-harvesting pits. The RERA amenities schedule records water supply at 20%, storm-water drains at 10%, sewerage and sewage-treatment/disposal items at 0%, street lighting at 0%, and water conservation/rainwater harvesting at 5% RERA amenities. These are filing figures, not independent inspections.
The supplied evidence does not specify water source or storage, sewage treatment capacity, reuse arrangements, electrical substation capacity, backup power, solid-waste arrangements, security systems, accessibility measures, or fire-safety systems. The RERA amenities schedule records fire protection/fire safety and electrical meter room/sub-station/receiving station at 0% RERA amenities.
8. Location, access & connectivity
The official project identity places the site in Khasimpur, Zaheerabad Mandal, Sangareddy District, PIN 502221 RERA record RERA filing RERA filing. The approval identifies Khasimpur Gram Panchayat and the same five parent survey numbers.
A supplied geocode is labelled cadastral parcel centroid (17.41528, 78.35459) Location record. No project approach-road description, public-transport information, or verified nearby landmark distances are supplied. The location dataset lists Financial District (Nanakramguda) at 1.2 km as an anchor, but does not establish a route or travel time Location record.
9. Developer & development status
The registered promoter is GREEN EARTH DEVELOPERS, identified in the RERA project record as a partnership. The filing names KHAJA SHAHABUDDIN SHAHABUDDIN as authorised signatory and MOHAMMED ARSHAD HUSSAIN as partner RERA filing Parties record. The supplied corporate information does not establish a company registration number or other corporate identifier. The promoter address in the filing is 2-5-294/C/3, MILAN HOTEL, ZAHEERABAD, KHASIMPUR, ZAHEERABAD, Sangareddy, 502221 RERA filing Parties record.
The Form-B filing contains the promoter’s undertaking to complete by 5th July 2024 and declarations concerning title, encumbrances, project funds and pending approvals. These are promoter declarations. The supplied record does not establish a revised completion date, an extension, an independently verified construction status, or an occupancy/completion certificate.
10. Approvals, official records & documents
| What the supplied document establishes | Form C records registration of RED HILLS TOWNSHIP, P01100002317, granted under section 5, with validity stated from 10/11/2020 to 05/07/2024; certificate states no extension. |
|---|
| What the supplied document establishes | Director of Town and Country Planning’s Draft - TLP.No. 143/2019/H, dated 06/07/2019, for a 269-plot layout at Khasimpur Gram Panchayat; includes land-use schedule, mortgage plots and conditions. |
|---|
| What the supplied document establishes | File DTCP-HT1/17/2018-HYD Sec-DTCP; letter Lr.Roc.No.4858/2018/H; Circular Memo.No. 1637/2018/P; annexure Draft-TLP No.143/2019/H. |
|---|
| What the supplied document establishes | Document contains Gram Panchayat resolutions, but its extracted extent is corrupted and no legible approval heading or number is supplied. |
|---|
| What the supplied document establishes | OCR references TLP.No. 143/2019/H dated 06.07.2019, but does not provide readable approval terms. |
|---|
| What the supplied document establishes | Form-B declarations include completion undertaking to 5th July 2024, title and encumbrance statements, and project-account and approval undertakings. |
|---|
| What the supplied document establishes | Blank plot-allotment template; no plot-specific sale or allotment particulars are completed. |
|---|
The supplied materials do not include a final layout-release document, a completion/occupancy certificate, or evidence establishing completion of the approval-required development works.
1. Project at a glance
Project identity
Registered name: RED HILLS TOWNSHIP
Project type: Plotted development
Phase / registered portion: No separate phase is identified in the supplied record. TG-RERA registration is P01100002317.
TG-RERA registration: P01100002317; granted 10/11/2020, with stated validity from 10/11/2020 to 05/07/2024. The certificate records no extension.
Registered promoter: GREEN EARTH DEVELOPERS, described in the project record as a partnership
RERA status: The certificate gives an original validity period ending 05/07/2024. Current registration status is not established by the supplied evidence; no extension is recorded in the certificate.
Land and geographic identity
Locality / revenue village: Khasimpur; the layout approval identifies Khasimpur Gram Panchayat. No other project revenue village is identified in the supplied record.
Mandal / district / PIN: ZAHEERABAD / Sangareddy / 502221 in the project header and filing; the registration certificate also states Sangareddy and gives promoter-office PIN 502220.
Project survey numbers: 100, 101, 102, 165, 166.
Subdivisions: The registration record states parent survey numbers only. The draft layout approval identifies 100/P, 101/P, 102/P, 165/P and 166/P; deed and title materials also refer to subdivisions, including 100/E2_2/1, 100/P8 P81, 100/82 1/1, 100/Đ6 2/1, 100/Gs 2/1, 100/o 1; 100/Aa, 102/A7, 100/A2/1, 102/A7/1; 102/67, 102/66; 100/Q, 100/22, 100/60; 165/8/1/3; 166/2; 101/98, 101/2, 166/8, 101/982, 101/3, 166/B1; 100/2/1, 100/2/2, 100/3/1/1, 100/M 2/1; 100/61; 165/Aa, 165/A, 165/1/2, 165/1/1, 165/6/1; 102/A1, 102/A3, 102/A6/p, 102/Aa1/1, 102/A3/1, 102/A4, 102/A4/1, 102/A6/1; 100/A1; 166/M; 165/Aa; 100/U and 100/Ruu; 100/66 and 100/o; 100/E3, 100/U2, 100/Ru2; 165/Aa and 165/A; 100/E1, 100/E2 and 100/Aa; 102/A3, 102/A4, 102/A1 and 102/Aa2; and 166/A, 166/Aa, 101/A, 101/E, 100/Uu, 100/Eel, 100/A and 102/Aa. These are document-extracted references, not a reconciled parcel schedule.
Registered site extent: RERA land details state total area 102921 sqmts, area affected in road widening/FTL of tanks/nala widening 31322.67 sqmts, and net area 71598.33 sqmts.
Boundaries: East: AGRICULTURE LAND OF PENTAPPA; west: AGRICULTURE LAND OF BADRAPPA; north: GOVERNAMENT LAND; south: AGRICULTURE LAND OF BEERANNA.
Development identity
Sanctioning authority: Director of Town and Country Planning; the document describes delegation to Khasimpur Gram Panchayat.
Principal layout approval: Draft - TLP.No. 143/2019/H, dated 06/07/2019 as recorded in the filing. Related references include file no. DTCP-HT1/17/2018-HYD Sec-DTCP, letter Lr.Roc.No.4858/2018/H, circular memo Circular Memo.No. 1637/2018/P, and annexure layout number Draft-TLP No.143/2019/H.
Approved layout content: The draft layout approval describes a 269-plot layout. Its stated land-use schedule is layout area Ac. 25.4325 Cents; 123093.30 Sq. Yds, open space Ac. 2.54 Cents; 12293.60 Sq. Yds (10.00%), roads Ac. 7.74 Cents; 37461.60 Sq. Yds. (30.44%), plotted area Ac. 15.15 Cents; 73326.00 Sq. Yds. (59.56%), and mortgage area Ac. 2.30 Cents; 11132.00 Sq. Yds. (15.18%).
Approved built-up area / buildings / floors: The RERA fields state approved built-up area 61310 sqmts and do not give a building count or floor configuration. This is a plotted layout; no building-floor schedule is supplied.
Mortgage area: RERA fields state mortgage area 9308.0 sqmts. The layout approval identifies Plot Nos. 81 to 106 and 132 to 151 as mortgage plots.
Offering and status
What is offered: Plots in a plotted layout. The supplied RERA material does not give plot-size bands, plot-wise inventory, or booked/available counts.
Construction / development stage: The RERA amenities schedule records percentage figures for selected infrastructure items; these are reported schedule values, not independent site verification. No independently verified construction-stage assessment is supplied.
Completion deadline: The promoter’s Form-B declaration undertakes completion by 5th July 2024.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied project documents.
Building or unit configuration: No RERA-filed apartment configuration, flat count, saleable-area schedule, or floor plan is supplied for this plotted project.
2. The project story
RED HILLS TOWNSHIP is registered as a plotted development at Khasimpur, Zaheerabad Mandal, Sangareddy District, on the five parent survey numbers 100, 101, 102, 165 and 166. The filed project record describes the land area as 102921 sqmts total and 71598.33 sqmts net, with 31322.67 sqmts affected by road widening/FTL of tanks/nala widening.
The layout document is a draft technical layout pattern for 269 plots, with recorded areas for plots, roads, open space and mortgage land. Its conditions call for the designated open spaces and roads to be handed to the Gram Panchayat by registered gift deed before release of the final layout; it also requires development works such as roads, drains, greenery, street lighting, electricity, sewerage disposal and protected water supply. The supplied evidence does not establish completion of those works, final layout release, plot-wise sales or current on-site progress. The promoter’s completion undertaking is a declaration, not independent verification of completion.
3. Master plan, architecture & building design
This is a plotted layout rather than a tower or apartment scheme. The draft layout approval identifies 269 plots and assigns 10.00% to open space, 30.44% to roads, 59.56% to plotted area and 15.18% to mortgage area, with the stated areas set out in the development table above. The approval conditions identify Plot Nos. 81 to 106 and 132 to 151 as mortgage plots and say they are not to be sold while mortgaged to the Gram Panchayat.
The approved document calls for roads to be formed and opened for access to neighbouring sites, storm-water drainage and nala channelization, greenery and avenue planting, rainwater-harvesting pits, fencing of open spaces, street lighting, electricity, sewerage disposal and protected water supply. These are approval conditions, not evidence that the works have been completed.
No legible plot-by-plot drawing schedule, plot-size plan, road-width schedule, building design, or completed-work certification is included in the supplied material. The RERA filing’s 61310 sqmts approved built-up area is reported as filed; the available documents do not explain its measurement scope for this plotted layout.
4. Homes, configurations & floor plans
The registered offering is plots, not flats. The supplied RERA materials do not provide plot-wise area bands, plot counts by size, booked or available inventory, or a measured plot schedule. The project’s RERA allotment-letter file is a blank template, without a plot number, extent, allottee, or payment amount.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | Not disclosed in supplied RERA inventory | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
The layout approval’s 269 plots is the approved layout count in the draft approval; it is not a booked or available inventory count. The floor-plan review records two drawings, both scans pending, and no measured plans; no carpet-area or room-measurement result is available.
5. Parking & vehicle circulation
No project-wide parking count, parking allocation schedule, visitor parking provision, accessible parking, or parking design is established in the supplied RERA documents. The draft layout approval requires roads to be formed and opened for access to neighbouring sites, but the supplied extract does not state road widths, entry/exit arrangements, or pedestrian separation. No exclusive parking entitlement for any plot is evidenced.
6. Amenities, recreation & open spaces
The RERA-filed amenities schedule gives completion percentages for some layout infrastructure. These percentages are recorded values in the filing, not independent verification of completed facilities. The draft layout approval also sets out development conditions; those requirements should not be read as confirmation of delivery.
| Description / size | No size stated in the RERA amenities schedule. Layout approval records open space as Ac. 2.54 Cents; 12293.60 Sq. Yds (10.00%). |
|---|---|
| Evidence source | RERA amenities schedule; draft layout approval |
| Declared progress / verified status | Schedule records 0%; not independently verified complete. |
| Description / size | No size or capacity stated |
|---|---|
| Evidence source | RERA amenities schedule |
| Declared progress / verified status | 0% recorded; not independently verified complete. |
| Description / size | Approval condition calls for greenery including avenue plantation; no quantity stated |
|---|---|
| Evidence source | Draft layout approval |
| Declared progress / verified status | Required by the approval conditions; completion not established. |
| Description / size | No dimensions stated |
|---|---|
| Evidence source | RERA amenities schedule; draft layout approval |
| Declared progress / verified status | 20% recorded; not independently verified complete. |
| Description / size | No fixture count stated |
|---|---|
| Evidence source | RERA amenities schedule; draft layout approval |
| Declared progress / verified status | 0% recorded; not independently verified complete. |
| Description / size | Approval condition calls for rainwater-harvesting pits; no count or capacity stated |
|---|---|
| Evidence source | RERA amenities schedule; draft layout approval |
| Declared progress / verified status | 5% recorded; not independently verified complete. |
No clubhouse, indoor recreation or sports facilities are established in the supplied RERA evidence.
7. Utilities, building services & safety
The draft layout approval requires provision of protected water supply, a sewerage-disposal system, storm-water drains and nala channelization, street lighting and electricity facilities, along with rainwater-harvesting pits. The RERA amenities schedule records water supply at 20%, storm-water drains at 10%, sewerage and sewage-treatment/disposal items at 0%, street lighting at 0%, and water conservation/rainwater harvesting at 5%. These are filing figures, not independent inspections.
The supplied evidence does not specify water source or storage, sewage treatment capacity, reuse arrangements, electrical substation capacity, backup power, solid-waste arrangements, security systems, accessibility measures, or fire-safety systems. The RERA amenities schedule records fire protection/fire safety and electrical meter room/sub-station/receiving station at 0%.
8. Location, access & connectivity
The official project identity places the site in Khasimpur, Zaheerabad Mandal, Sangareddy District, PIN 502221. The approval identifies Khasimpur Gram Panchayat and the same five parent survey numbers.
A supplied geocode is labelled cadastral parcel centroid (17.41528, 78.35459). No project approach-road description, public-transport information, or verified nearby landmark distances are supplied. The location dataset lists Financial District (Nanakramguda) at 1.2 km as an anchor, but does not establish a route or travel time.
9. Developer & development status
The registered promoter is GREEN EARTH DEVELOPERS, identified in the RERA project record as a partnership. The filing names KHAJA SHAHABUDDIN SHAHABUDDIN as authorised signatory and MOHAMMED ARSHAD HUSSAIN as partner. The supplied corporate information does not establish a company registration number or other corporate identifier. The promoter address in the filing is 2-5-294/C/3, MILAN HOTEL, ZAHEERABAD, KHASIMPUR, ZAHEERABAD, Sangareddy, 502221.
The Form-B filing contains the promoter’s undertaking to complete by 5th July 2024 and declarations concerning title, encumbrances, project funds and pending approvals. These are promoter declarations. The supplied record does not establish a revised completion date, an extension, an independently verified construction status, or an occupancy/completion certificate.
10. Approvals, official records & documents
| What the supplied document establishes | Form C records registration of RED HILLS TOWNSHIP, P01100002317, granted under section 5, with validity stated from 10/11/2020 to 05/07/2024; certificate states no extension. |
|---|
| What the supplied document establishes | Director of Town and Country Planning’s Draft - TLP.No. 143/2019/H, dated 06/07/2019, for a 269-plot layout at Khasimpur Gram Panchayat; includes land-use schedule, mortgage plots and conditions. |
|---|
| What the supplied document establishes | File DTCP-HT1/17/2018-HYD Sec-DTCP; letter Lr.Roc.No.4858/2018/H; Circular Memo.No. 1637/2018/P; annexure Draft-TLP No.143/2019/H. |
|---|
| What the supplied document establishes | Document contains Gram Panchayat resolutions, but its extracted extent is corrupted and no legible approval heading or number is supplied. |
|---|
| What the supplied document establishes | OCR references TLP.No. 143/2019/H dated 06.07.2019, but does not provide readable approval terms. |
|---|
| What the supplied document establishes | Form-B declarations include completion undertaking to 5th July 2024, title and encumbrance statements, and project-account and approval undertakings. |
|---|
| What the supplied document establishes | Blank plot-allotment template; no plot-specific sale or allotment particulars are completed. |
|---|
The supplied materials do not include a final layout-release document, a completion/occupancy certificate, or evidence establishing completion of the approval-required development works.
Frequently asked questions
Is RED HILLS TOWNSHIP registered with Telangana RERA?
Yes. RED HILLS TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P01100002317; the registration status is New Project.
Who is the developer of RED HILLS TOWNSHIP?
The promoter named in the RERA registration is GREEN EARTH DEVELOPERS.
Where is RED HILLS TOWNSHIP located?
RED HILLS TOWNSHIP is in KHASIMPUR, ZAHEERABAD, Sangareddy, Telangana (502221).
When will RED HILLS TOWNSHIP be completed?
The promoter's proposed date of completion filed with RERA is 05/07/2024. This is the promoter's declaration, not a guarantee.