Sravanthis Mangalam
SRAVANTHI DEVELOPERS PRIVATE LIMITED · Hyderabad · RERA P02500001414
SRAVANTHIS MANGALAM is a residential apartment project located at PLOT NO 7 in PADMARAONAGAR 18, Hyderabad, Telangana; the mandal is not disclosed. The registered promoter is SRAVANTHI DEVELOPERS PRIVATE LIMITED. The project is on a site of 1345.97 sq m and comprises one building, Building - A, with 1Cellar + 1Stilt + 5 upper floors and 15 3BHK apartments, each with a saleable area of 218.2 sq m. Its TG-RERA registration is P02500001414, and the promoter’s declared completion date is 31/12/2022.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SRAVANTHIS MANGALAM RERA record |
| Project type / registered portion | Residential apartment project; phase or separately registered portion is not identified in the supplied record. RERA record RERA filing |
| TG-RERA registration | P02500001414, granted under section 5; issued 25/11/2019. |
| Registration validity | 25/11/2019 to 31/12/2022; the supplied certificate records no extension. This is registration validity, not a current completion or occupancy certification. |
| Registered promoter | SRAVANTHI DEVELOPERS PRIVATE LIMITED; company. RERA record Corporate record |
| TG-RERA status shown in record | Registered; the registration period stated in the certificate has ended. |
Land and geographic identity
| Field | Record |
|---|---|
| Registered locality | PADMARAONAGAR 18; plot PLOT NO 7. RERA record RERA filing |
| Revenue village / mandal | Revenue village: not disclosed. Mandal: not disclosed. Land records |
| District / PIN | Hyderabad, Telangana; 500025. RERA record |
| Survey number / subdivision | Not disclosed in the supplied project identity and land records. The building-permit extraction identifies the site as khantam/Abadi, not a survey number. Land records |
| Site area | Total area 1345.97 sq m; road-affected area 69.65 sq m; net area is recorded as 1276.32 sq m in the RERA land details and 1276.33 sq m in the permit extraction. RERA filing |
| Boundaries recorded in RERA filing | East: ROAD WIDTH 9 METER; west: RAOD WIDTH 9 METER; north and south: EXISTING BUILDING. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building-permit number / date | 1/C30/02768/2019, approved 15 February, 2019. A related permit file number is _1/18B/04154/2017. Approvals record |
| Approved built-up area | RERA filing records 2839.71 sq m as approved built-up area. The permit extraction separately lists residential upper-floor area 2,793.50 m²; these figures are not treated as interchangeable. RERA filing |
| Building count / configuration | One building, Building - A; permit describes 1Cellar + 1Stilt + 5 upper floors. Permit-stated height: 14.9 m. |
| Parking levels | Cellar parking: 1, area 714.67 m²; stilt parking: 1, area 585.49 m². The supplied extraction does not give a bay count. |
| Unit counts | Permit extraction does not state a unit count. The RERA filing records 15 apartments; the project fields record one proposed building/unit entry, which does not specify the apartment count. RERA unit table RERA filing |
Offering and status
| Field | Record |
|---|---|
| RERA-filed configuration | 3BHK; 15 units; saleable area 218.2 sq m per unit. RERA unit table |
| Booking / availability | 10 booked; 5 available, as last read from the TG-RERA portal; the record has no as-of date, so these counts are indicative. RERA unit table |
| Construction stage | No independently verified present construction stage is supplied. The portal’s amenity-progress percentages and the 2019 permit do not establish current site completion. RERA amenities |
| Completion date | Promoter’s Form B declaration gives 31/12/2022 as the project completion undertaking. The registration certificate also ends on that date. |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied; the permit extraction records completion_certified: false. |
2. The project story
SRAVANTHIS MANGALAM is recorded with TG-RERA as a residential apartment project on PLOT NO 7 in PADMARAONAGAR 18, Hyderabad. The filed land details describe a site of 1345.97 sq m, including 69.65 sq m affected by road widening, with the net area recorded as 1276.32 sq m. The record does not identify a revenue village, mandal or survey number. RERA record RERA filing Land records
GHMC’s building-permit order describes one residential building, Building - A, with 1 cellar, 1 stilt and 5 upper floors, and records a height of 14.9 m. The TG-RERA filing lists 15 three-bedroom apartments. It shows 10 booked and 5 available, but provides no as-of date for those counts. RERA unit table
The promoter declared a completion date of 31/12/2022. The supplied record does not establish current construction progress or provide an occupancy/completion certificate; permit status and reported progress should not be read as independent verification of completed works or permission to occupy. RERA amenities
3. Master plan, architecture & building design
The approved GHMC permit extraction identifies a single residential building, Building - A, on a site of 1345.97 m², with a road-affected area of 69.65 m² and net area recorded in that extraction as 1276.33 m². The RERA land record gives the net area as 1276.32 sq m. The permit describes 1Cellar + 1Stilt + 5 upper floors and a height of 14.9 m. RERA filing
The RERA filing records 2839.71 sq m as approved built-up area. The permit extraction lists residential upper-floor area of 2,793.50 m², alongside separate cellar and stilt parking areas; these are distinct recorded measures, not substitutes for one another. RERA filing
The permit lists 65 Trees, a 77.43 m² tot-lot, a transformer space, a garbage house and a rainwater-harvesting percolation pit. The supplied material does not establish the building footprint, flats per floor, lift/stair arrangement, detailed circulation, or current completion of these features.
4. Homes, configurations & floor plans
The TG-RERA filing records 15 3BHK apartments with saleable area of 218.2 sq m each. The portal-derived booking count is 10 booked and 5 available, with no as-of date supplied. RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 15 | 10 | 5 | 218.2 sq m | Software-measured range: 119.0–162.0 sq m; median 142.5 sq m | 35% (software-derived drawing record) |
The carpet-area range and median are software measurements from five flat designs in the approved floor-plan drawing; they are not TG-RERA-filed carpet areas and are flagged in the supplied record as needing review. The RERA filing provides saleable area, which includes a share of common areas; it is not the same measure as a drawing-measured carpet area. RERA unit details Floor plans
One measured typical-floor flat drawing labels bedrooms, a master bedroom, living/dining, kitchen, puja, toilets, balconies and a utility area. For that drawing, the listed living/dining dimensions are 7.23 m × 7.45 m, kitchen 3.0 m × 4.04 m, and utility 1.5 m × 4.84 m. These are drawing-derived measurements, not RERA area disclosures. RERA unit details
5. Parking & vehicle circulation
The GHMC permit identifies one cellar and one stilt level for parking, with areas of 714.67 m² and 585.49 m², respectively. Its conditions state that the approved cellar and stilt areas are to be used exclusively for vehicle parking, without partition walls or rolling shutters.
No parking-space or vehicle-bay count, visitor or accessible-parking allocation, mechanical-parking provision, ramp arrangement, EV charging, or unit-specific parking allocation is established in the supplied records. A parking area in the sanctioned plan does not by itself establish exclusive ownership or allocation to a particular apartment.
6. Amenities, recreation & open spaces
| Description / size | 77.43 m²; permit also specifies 65 Trees and requires the tot-lot to be fenced and maintained as greenery before occupancy certification. |
|---|---|
| Declared progress / verified status | Permit-stated provision; current completion not independently verified. |
| Description / size | RERA progress record marks YES, 100%. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal-reported; not independently verified. |
| Description / size | RERA progress record marks YES, 100% for “Sewerage (Chamber, Lines, Septic Tank, STP)”. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Portal-reported; specific system configuration and current operation are not established. |
| Description / size | Permit requires a percolation pit; RERA progress record marks water conservation/rainwater harvesting YES, 100%. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Permit condition and portal-reported progress; current completion not independently verified. |
| Description / size | Listed in the permit. |
|---|---|
| Declared progress / verified status | Permit-stated provision; installation or energisation not established. |
| Description / size | Listed in the permit as required within the premises. |
|---|---|
| Declared progress / verified status | Permit-stated provision; completion not independently verified. |
No project-specific TG-RERA amenity schedule in the supplied records establishes a clubhouse, gym, sports facility or other indoor recreation space. The supplied third-party/vendor amenity list is not used here as evidence of a sanctioned or delivered facility.
7. Utilities, building services & safety
The GHMC permit requires a rainwater-harvesting percolation pit, provides for transformer space and a garbage house, and states that structural and fire-safety requirements are the responsibility of the owner, builder/developer, architect and structural engineer. It also makes an occupancy certificate compulsory before occupation. These are permit conditions; the supplied records do not establish current installation, testing, clearance or compliance.
The TG-RERA amenity record marks water supply, sewerage and rainwater harvesting as 100% and the electrical meter room/substation/receiving station as 90%. These are reported progress fields, not independent verification. The material does not specify water sources or storage capacity, treatment or reuse systems, storm-water arrangements, electrical backup, lift capacity, fire-fighting equipment, escape-stair details, CCTV, waste segregation, security arrangements or accessibility features. RERA amenities
8. Location, access & connectivity
The registered location is PADMARAONAGAR 18, PLOT NO 7, Hyderabad, Telangana, PIN 500025. The revenue village and mandal are not disclosed; the supplied records give no project survey number or subdivision. The RERA-filed boundary description records roads to the east and west, each stated as 9 METER, and existing buildings to the north and south. RERA record RERA filing Land records
The GHMC permit extraction separately records 18 mt. road widths. No approach-road description, public-transport information or measured distances to local landmarks are supplied. A location dataset provides a 1.2 km distance to Financial District (Nanakramguda); the supplied record does not establish this as a site-verified route distance. Location record
9. Developer & development status
The registered promoter is SRAVANTHI DEVELOPERS PRIVATE LIMITED, a company. The RERA filing gives a Hyderabad address at SRI SATYA SUDERSHAN RESIDENCY, SBH COLONY, STREET NO.2, PADMARAONAGAR 18, Hyderabad, 500025. The supplied material does not provide a verified official website or contact details. Corporate record Parties record
In Form B, director Srinivas Chaitanya Reddy Mariwada declared 31/12/2022 as the project completion date and stated that the land was free from encumbrances. These are promoter declarations. The available records do not establish a present construction stage or provide an occupancy/completion certificate.
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C for SRAVANTHIS MANGALAM, registration P02500001414, granted under section 5; validity 25/11/2019–31/12/2022; no extension recorded in the supplied certificate. |
| GHMC building permission | Building Permit Order 1/C30/02768/2019, approved 15 February, 2019; related file number _1/18B/04154/2017. The order describes Building - A and gives permit conditions and a validity date of 15 February, 2025. |
| Approved drawing / plan | A plan document is filed as doc 71231; its drawing stamp is read as 1/C30/02768/2019, dated 16-02-2019, from the drawing text layer and marked as needing review. Approvals record |
| Promoter declaration | Form B affidavit-cum-declaration by the promoter, dated 24" July, 2019 in the extraction; includes the completion undertaking and other promoter declarations. |
| Title report / encumbrance material | RERA-filed title report doc 71229 and encumbrance statement doc 71230 are available in the shared project record; detailed title and encumbrance review is addressed in the relevant due-diligence sections. |
| Occupancy / completion certificate | No such certificate is included in the supplied documents; the permit extraction records completion_certified: false. |
1. Project at a glance
Project identity
Registered project name: SRAVANTHIS MANGALAM
Project type / registered portion: Residential apartment project; phase or separately registered portion is not identified in the supplied record.
TG-RERA registration: P02500001414, granted under section 5; issued 25/11/2019.
Registration validity: 25/11/2019 to 31/12/2022; the supplied certificate records no extension. This is registration validity, not a current completion or occupancy certification.
Registered promoter: SRAVANTHI DEVELOPERS PRIVATE LIMITED; company.
TG-RERA status shown in record: Registered; the registration period stated in the certificate has ended.
Land and geographic identity
Registered locality: PADMARAONAGAR 18; plot PLOT NO 7.
Revenue village / mandal: Revenue village: not disclosed. Mandal: not disclosed.
District / PIN: Hyderabad, Telangana; 500025.
Survey number / subdivision: Not disclosed in the supplied project identity and land records. The building-permit extraction identifies the site as khantam/Abadi, not a survey number.
Site area: Total area 1345.97 sq m; road-affected area 69.65 sq m; net area is recorded as 1276.32 sq m in the RERA land details and 1276.33 sq m in the permit extraction.
Boundaries recorded in RERA filing: East: ROAD WIDTH 9 METER; west: RAOD WIDTH 9 METER; north and south: EXISTING BUILDING.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building-permit number / date: 1/C30/02768/2019, approved 15 February, 2019. A related permit file number is _1/18B/04154/2017.
Approved built-up area: RERA filing records 2839.71 sq m as approved built-up area. The permit extraction separately lists residential upper-floor area 2,793.50 m²; these figures are not treated as interchangeable.
Building count / configuration: One building, Building - A; permit describes 1Cellar + 1Stilt + 5 upper floors. Permit-stated height: 14.9 m.
Parking levels: Cellar parking: 1, area 714.67 m²; stilt parking: 1, area 585.49 m². The supplied extraction does not give a bay count.
Unit counts: Permit extraction does not state a unit count. The RERA filing records 15 apartments; the project fields record one proposed building/unit entry, which does not specify the apartment count.
Offering and status
RERA-filed configuration: 3BHK; 15 units; saleable area 218.2 sq m per unit.
Booking / availability: 10 booked; 5 available, as last read from the TG-RERA portal; the record has no as-of date, so these counts are indicative.
Construction stage: No independently verified present construction stage is supplied. The portal’s amenity-progress percentages and the 2019 permit do not establish current site completion.
Completion date: Promoter’s Form B declaration gives 31/12/2022 as the project completion undertaking. The registration certificate also ends on that date.
Occupancy / completion certificate: No occupancy or completion certificate is supplied; the permit extraction records completion_certified: false.
2. The project story
SRAVANTHIS MANGALAM is recorded with TG-RERA as a residential apartment project on PLOT NO 7 in PADMARAONAGAR 18, Hyderabad. The filed land details describe a site of 1345.97 sq m, including 69.65 sq m affected by road widening, with the net area recorded as 1276.32 sq m. The record does not identify a revenue village, mandal or survey number.
GHMC’s building-permit order describes one residential building, Building - A, with 1 cellar, 1 stilt and 5 upper floors, and records a height of 14.9 m. The TG-RERA filing lists 15 three-bedroom apartments. It shows 10 booked and 5 available, but provides no as-of date for those counts.
The promoter declared a completion date of 31/12/2022. The supplied record does not establish current construction progress or provide an occupancy/completion certificate; permit status and reported progress should not be read as independent verification of completed works or permission to occupy.
3. Master plan, architecture & building design
The approved GHMC permit extraction identifies a single residential building, Building - A, on a site of 1345.97 m², with a road-affected area of 69.65 m² and net area recorded in that extraction as 1276.33 m². The RERA land record gives the net area as 1276.32 sq m. The permit describes 1Cellar + 1Stilt + 5 upper floors and a height of 14.9 m.
The RERA filing records 2839.71 sq m as approved built-up area. The permit extraction lists residential upper-floor area of 2,793.50 m², alongside separate cellar and stilt parking areas; these are distinct recorded measures, not substitutes for one another.
The permit lists 65 Trees, a 77.43 m² tot-lot, a transformer space, a garbage house and a rainwater-harvesting percolation pit. The supplied material does not establish the building footprint, flats per floor, lift/stair arrangement, detailed circulation, or current completion of these features.
4. Homes, configurations & floor plans
The TG-RERA filing records 15 3BHK apartments with saleable area of 218.2 sq m each. The portal-derived booking count is 10 booked and 5 available, with no as-of date supplied.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 15 | 10 | 5 | 218.2 sq m | Software-measured range: 119.0–162.0 sq m; median 142.5 sq m | 35% (software-derived drawing record) |
The carpet-area range and median are software measurements from five flat designs in the approved floor-plan drawing; they are not TG-RERA-filed carpet areas and are flagged in the supplied record as needing review. The RERA filing provides saleable area, which includes a share of common areas; it is not the same measure as a drawing-measured carpet area.
One measured typical-floor flat drawing labels bedrooms, a master bedroom, living/dining, kitchen, puja, toilets, balconies and a utility area. For that drawing, the listed living/dining dimensions are 7.23 m × 7.45 m, kitchen 3.0 m × 4.04 m, and utility 1.5 m × 4.84 m. These are drawing-derived measurements, not RERA area disclosures.
5. Parking & vehicle circulation
The GHMC permit identifies one cellar and one stilt level for parking, with areas of 714.67 m² and 585.49 m², respectively. Its conditions state that the approved cellar and stilt areas are to be used exclusively for vehicle parking, without partition walls or rolling shutters.
No parking-space or vehicle-bay count, visitor or accessible-parking allocation, mechanical-parking provision, ramp arrangement, EV charging, or unit-specific parking allocation is established in the supplied records. A parking area in the sanctioned plan does not by itself establish exclusive ownership or allocation to a particular apartment.
6. Amenities, recreation & open spaces
| Description / size | 77.43 m²; permit also specifies 65 Trees and requires the tot-lot to be fenced and maintained as greenery before occupancy certification. |
|---|---|
| Declared progress / verified status | Permit-stated provision; current completion not independently verified. |
| Description / size | RERA progress record marks YES, 100%. |
|---|---|
| Declared progress / verified status | Portal-reported; not independently verified. |
| Description / size | RERA progress record marks YES, 100% for “Sewerage (Chamber, Lines, Septic Tank, STP)”. |
|---|---|
| Declared progress / verified status | Portal-reported; specific system configuration and current operation are not established. |
| Description / size | Permit requires a percolation pit; RERA progress record marks water conservation/rainwater harvesting YES, 100%. |
|---|---|
| Declared progress / verified status | Permit condition and portal-reported progress; current completion not independently verified. |
| Description / size | Listed in the permit. |
|---|---|
| Declared progress / verified status | Permit-stated provision; installation or energisation not established. |
| Description / size | Listed in the permit as required within the premises. |
|---|---|
| Declared progress / verified status | Permit-stated provision; completion not independently verified. |
No project-specific TG-RERA amenity schedule in the supplied records establishes a clubhouse, gym, sports facility or other indoor recreation space. The supplied third-party/vendor amenity list is not used here as evidence of a sanctioned or delivered facility.
7. Utilities, building services & safety
The GHMC permit requires a rainwater-harvesting percolation pit, provides for transformer space and a garbage house, and states that structural and fire-safety requirements are the responsibility of the owner, builder/developer, architect and structural engineer. It also makes an occupancy certificate compulsory before occupation. These are permit conditions; the supplied records do not establish current installation, testing, clearance or compliance.
The TG-RERA amenity record marks water supply, sewerage and rainwater harvesting as 100% and the electrical meter room/substation/receiving station as 90%. These are reported progress fields, not independent verification. The material does not specify water sources or storage capacity, treatment or reuse systems, storm-water arrangements, electrical backup, lift capacity, fire-fighting equipment, escape-stair details, CCTV, waste segregation, security arrangements or accessibility features.
8. Location, access & connectivity
The registered location is PADMARAONAGAR 18, PLOT NO 7, Hyderabad, Telangana, PIN 500025. The revenue village and mandal are not disclosed; the supplied records give no project survey number or subdivision. The RERA-filed boundary description records roads to the east and west, each stated as 9 METER, and existing buildings to the north and south.
The GHMC permit extraction separately records 18 mt. road widths. No approach-road description, public-transport information or measured distances to local landmarks are supplied. A location dataset provides a 1.2 km distance to Financial District (Nanakramguda); the supplied record does not establish this as a site-verified route distance.
9. Developer & development status
The registered promoter is SRAVANTHI DEVELOPERS PRIVATE LIMITED, a company. The RERA filing gives a Hyderabad address at SRI SATYA SUDERSHAN RESIDENCY, SBH COLONY, STREET NO.2, PADMARAONAGAR 18, Hyderabad, 500025. The supplied material does not provide a verified official website or contact details.
In Form B, director Srinivas Chaitanya Reddy Mariwada declared 31/12/2022 as the project completion date and stated that the land was free from encumbrances. These are promoter declarations. The available records do not establish a present construction stage or provide an occupancy/completion certificate.
10. Approvals, official records & documents
TG-RERA registration: Form C for SRAVANTHIS MANGALAM, registration P02500001414, granted under section 5; validity 25/11/2019–31/12/2022; no extension recorded in the supplied certificate.
GHMC building permission: Building Permit Order 1/C30/02768/2019, approved 15 February, 2019; related file number _1/18B/04154/2017. The order describes Building - A and gives permit conditions and a validity date of 15 February, 2025.
Approved drawing / plan: A plan document is filed as doc 71231; its drawing stamp is read as 1/C30/02768/2019, dated 16-02-2019, from the drawing text layer and marked as needing review.
Promoter declaration: Form B affidavit-cum-declaration by the promoter, dated 24" July, 2019 in the extraction; includes the completion undertaking and other promoter declarations.
Title report / encumbrance material: RERA-filed title report doc 71229 and encumbrance statement doc 71230 are available in the shared project record; detailed title and encumbrance review is addressed in the relevant due-diligence sections.
Occupancy / completion certificate: No such certificate is included in the supplied documents; the permit extraction records completion_certified: false.
Frequently asked questions
Is SRAVANTHIS MANGALAM registered with Telangana RERA?
Yes. SRAVANTHIS MANGALAM is registered with the Telangana Real Estate Regulatory Authority as P02500001414; the registration status is New Project.
Who is the developer of SRAVANTHIS MANGALAM?
The promoter named in the RERA registration is SRAVANTHI DEVELOPERS PRIVATE LIMITED.
Where is SRAVANTHIS MANGALAM located?
SRAVANTHIS MANGALAM is in PADMARAONAGAR 18, Hyderabad, Telangana (500025).
When will SRAVANTHIS MANGALAM be completed?
The promoter's proposed date of completion filed with RERA is 31/12/2022. This is the promoter's declaration, not a guarantee.