Sai Prakruthi Sai Adi
SAI NEERAJ CONSTRUCTIONS IND PVT LTD · Medchal-Malkajgiri · RERA P02200002815
SAI PRAKRUTHI SAI ADI is a residential apartment project in Alwal, Alwal mandal, Medchal-Malkajgiri district. The registered promoter is SAI NEERAJ CONSTRUCTIONS IND PVT LTD. The project is on 412.30 sq.m of land and comprises one residential building with 1 Stilt + 5 upper floors and 10 3BHK apartments. Its TG-RERA registration number is P02200002815, and its proposed completion date is 18 April 2027.
More from Sai Neeraj Constructions Ind Pvt Ltd · 14 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | SAI PRAKRUTHI SAI ADI RERA record |
| Project type | Residential apartment project RERA record RERA filing |
| Phase / registered portion | No phase name or phase-wise portion is disclosed in the supplied record; the registration covers the project described at Survey No. 564. RERA record Land records |
| TG-RERA registration | P02200002815; granted 30 April 2021; registration certificate states validity through 18 December 2026. This is registration validity, not the stated construction completion date. RERA record |
| Registered promoter | SAI NEERAJ CONSTRUCTIONS IND PVT LTD, a private limited company. RERA record Corporate record |
| RERA status | Listed as On-Going Project. Registration record captured 10 September 2026; no extension is recorded in the supplied registration-certificate extraction. RERA record Approvals record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | Alwal; the building-permit extraction also describes the location as Old Alwal. RERA record RERA filing |
| Revenue village | Alwal. The title material also uses “Alwal/Arwal” in some deed descriptions; the RERA land record identifies the village as Alwal. RERA record Land records |
| Mandal / district / PIN | Alwal / Medchal-Malkajgiri / 500010. RERA record RERA filing |
| Survey number(s) | Survey No. 564. Title documents describe the subject land as Survey No. 564, “as per revenue records Sy.No.564/12”; the RERA land filing does not state a subdivision. RERA record Land records |
| Plot reference | Plot No. 19/C Part. RERA filing |
| Site extent | RERA land filing: 412.30 sq.m total, 18.33 sq.m affected by road widening/FTL/Nala widening, and 393.97 sq.m net. The building-permit extraction records site area 415.3 sq.m and net area 392.95 sq.m. RERA filing |
| Boundaries | East: Neighbours Land; West: Road; North: Road; South: Plot No 19C Part. RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building permit | Permit No. 1/C27/12651/2020, approved 18 December 2020; file No. 1/C27/20723/2019. The RERA filing lists the plan approval number as 1/C27/12651/2020. Approvals record RERA filing |
| Approved built-up area | 1,148.75 sq.m residential area in the building-permit extraction; the RERA filing separately reports approved built-up area of 1,148.75 sq.m. RERA filing |
| Building / floors | One residential building; sanctioned configuration 1 Stilt + 5 upper floors. The permit extract states height 14.5 m. RERA filing |
| Parking provision | The permit identifies 214.80 sq.m of stilt parking area. A parking-space count or unit-by-unit allocation is not established by the supplied evidence. |
| Unit counts | RERA filing records 10 proposed 3BHK units. The approval document’s extracted unit count is not separately stated. RERA unit table RERA unit details |
Offering and status
| Item | Project record |
|---|---|
| Configuration | 3BHK apartments; RERA-filed saleable area 128.2 sq.m per unit. RERA unit table RERA unit details |
| Booked / available | 0 booked / 10 available, as last read from the TG-RERA portal; the portal record provides no as-of date, so the counts are indicative. RERA unit table |
| Construction stage | The project is recorded as ongoing. No independently verified site-progress assessment is supplied. RERA record Document index |
| Completion dates | Proposed and revised proposed completion: 18 April 2027. This is separate from the registration validity date of 18 December 2026. RERA record RERA filing |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied documents. The building permit requires an occupancy certificate before occupation. Document index |
2. The project story
SAI PRAKRUTHI SAI ADI is registered as a residential apartment project at Plot No. 19/C Part, Survey No. 564, in Alwal village, Alwal mandal, Medchal-Malkajgiri district. The RERA filing identifies ten 3BHK apartments in one proposed building. The GHMC building permit describes a residential building with one stilt level and five upper floors. RERA record RERA filing RERA unit table
The project is recorded as ongoing, with a proposed completion date of 18 April 2027. The supplied record does not provide a reliable percentage-complete figure or independent site inspection, so actual construction progress cannot be confirmed from these materials. Nor is an occupancy or completion certificate supplied; proposed completion should not be read as evidence that the building is complete or occupiable. RERA record RERA filing Document index
3. Master plan, architecture & building design
The GHMC permit is for one residential building, Building - RES-1, with 1 Stilt + 5 upper floors and a stated height of 14.5 m. It records residential area of 1,148.75 sq.m, stilt parking area of 214.80 sq.m, site area of 415.3 sq.m, road-affected area of 18.33 sq.m, and net area of 392.95 sq.m. The RERA land filing separately reports total area 412.30 sq.m and net area 393.97 sq.m. RERA filing RERA filing
These are permit and filing measurements; they are not interchangeable with apartment saleable area or software-measured carpet area. The drawing-derived record identifies a second-floor plan, but the supplied material does not establish a complete, independently reviewed description of the building footprint, floor-by-floor unit arrangement, lift/stair dimensions, circulation, or open-space design. Floor plans
The permit lists no commercial area and records a tot-lot area of 0. It also includes conditions concerning a rainwater-harvesting structure, transformer space, garbage house, ETP, and a 12 m-wide road on the north side before an occupancy certificate is obtained. These are permit conditions, not evidence that the works have been completed.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 128.2 sq.m | Software-measured: median 120.8 sq.m; range 119.9–121.8 sq.m | Not supplied |
The RERA filing records ten 3BHK units and saleable area of 128.2 sq.m. The booked and available counts are portal-read figures without an as-of date and should be treated as indicative. RERA unit table RERA unit details
The carpet-area range above is software-measured from the supplied approved floor-plan drawing record, not a RERA-filed carpet-area disclosure; the measurement record says two flat designs were measured and requires review. Carpet area and saleable area are distinct measures, and the supplied evidence does not provide a verified loading figure. Floor plans RERA unit details
The drawing extraction identifies a second-floor plan and includes room labels such as bedroom, kitchen, living/dining, toilet and wash area. Because the drawing-measurement record is flagged for review, those extracted room dimensions should be checked against the actual approved drawing before being relied on. RERA unit details
5. Parking & vehicle circulation
The GHMC permit records 214.80 sq.m of stilt parking area. The RERA filing marks the units as mortgaged, but the supplied evidence does not establish the number of parking spaces, whether any are visitor or accessible spaces, or the parking allocation for a particular apartment. A drawn or designated parking area does not by itself establish an exclusive allotment to a buyer. RERA unit table
The permit extraction references a 12 m-wide road on the north side as a condition to be laid before obtaining an occupancy certificate. The supplied material does not describe a parking ramp, internal driveway, separate pedestrian route, or vehicle entry/exit arrangement.
6. Amenities, recreation & open spaces
The following are identified in RERA-filed amenity data or the GHMC permit. Listed availability or permit conditions are not proof of completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Amenity record says “YES”; permit extract records tot-lot area 0. | RERA amenities | Amenity listed; no verified completion evidence supplied. |
| Community buildings | Amenity record says “YES”; no size or description supplied. | RERA amenities | Listed; no verified completion evidence supplied. |
| Rainwater harvesting | Permit requires a rainwater-harvesting structure (percolation pit); permit parameters list 3 RWHPs. | Permit requirement; completion not verified. | |
| Garbage house | Required by the building permit; no size supplied. | Permit condition; completion not verified. |
No supported project-specific evidence in the supplied RERA and permit records establishes a clubhouse, gym, sports facility, or other indoor recreation facility. RERA amenities Document index
7. Utilities, building services & safety
The RERA amenity record marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Treatment and Disposal of Sewage and Sullage Water, Water Conservation, Rain water Harvesting, Electrical Meter Room, Sub-Station, Receiving Station, and Lift as listed provisions. It records 10% against the electrical meter room/sub-station/receiving station item and 0% against the other listed infrastructure items; these are recorded figures, not independent verification of completed services. RERA amenities
The GHMC permit requires rainwater harvesting, transformer space, a garbage house, and an ETP, and states that an occupancy fire NOC is to be obtained from the Director (EV&DM) before an occupancy certificate is issued. It also says an occupancy certificate is compulsory before occupation. The supplied materials do not include an issued fire NOC, occupancy certificate, water-storage or treatment capacities, lift capacity, backup-power specification, waste-management operating details, or accessibility design evidence.
8. Location, access & connectivity
The registered location is Alwal village, Alwal mandal, Medchal-Malkajgiri district, PIN 500010; the building-permit extraction specifies Old Alwal. The RERA filing gives the site boundaries as roads to the west and north, neighbouring land to the east, and Plot No. 19C Part to the south. RERA record RERA filing RERA filing
The project-location data supplies a cadastral parcel-centroid coordinate of 17.41528, 78.35459. No verified project-specific distances to public transport or local landmarks are supplied in the RERA location record. Location record
9. Developer & development status
The registered promoter is SAI NEERAJ CONSTRUCTIONS IND PVT LTD, identified as a private limited company. The supplied corporate record gives GSTIN 36AAXCS0170R2ZF; the incorporation document identifies SAINEERAJ CONSTRUCTIONS (INDIA) PRIVATE LIMITED and CIN U45202TG2016PTC109444. RERA record Corporate record
The registration record names VENKATA SURESH TUMPUDI as authorized signatory and RAJESWARI TUMPUDI as director. The supplied materials do not establish a separate official project contact or website for this overview. Parties record Corporate record
The promoter’s RERA Form B declares a six-year completion period; the project information currently lists proposed and revised completion as 18 April 2027. The project is recorded as ongoing, but no independently verified construction-progress report is supplied here. RERA filing RERA record
10. Approvals, official records & documents
| Record | What the supplied evidence establishes |
|---|---|
| TG-RERA registration certificate | Form C registration for SAI PRAKRUTHI SAI ADI, No. P02200002815, issued 30 April 2021 and stated valid through 18 December 2026. |
| GHMC building permit | Permit No. 1/C27/12651/2020, approved 18 December 2020, for a residential building at Old Alwal, Survey No. 564. |
| Building-plan drawing | A drawing record is filed under the project; the supplied extraction identifies a second-floor plan. |
| Title documents filed with RERA | Legal title report, title-report copy containing sale-deed material, and development-agreement material are present in the supplied document register. |
| RERA Form B | Promoter affidavit-cum-declaration dated December 2020, including promoter declarations concerning title, encumbrances, project funds, approvals and completion. |
| Occupancy / completion certificate | None is included in the supplied documents. The permit states that an occupancy certificate is required before occupation. Document index |
| Layout approval | A RERA filing entry requests layout approval or a stamped layout plan; the supplied evidence does not provide an extracted, independently reviewed layout approval. Document index |
1. Project at a glance
Project identity
Registered name: SAI PRAKRUTHI SAI ADI
Project type: Residential apartment project
Phase / registered portion: No phase name or phase-wise portion is disclosed in the supplied record; the registration covers the project described at Survey No. 564.
TG-RERA registration: P02200002815; granted 30 April 2021; registration certificate states validity through 18 December 2026. This is registration validity, not the stated construction completion date.
Registered promoter: SAI NEERAJ CONSTRUCTIONS IND PVT LTD, a private limited company.
RERA status: Listed as On-Going Project. Registration record captured 10 September 2026; no extension is recorded in the supplied registration-certificate extraction.
Land and geographic identity
Locality: Alwal; the building-permit extraction also describes the location as Old Alwal.
Revenue village: Alwal. The title material also uses “Alwal/Arwal” in some deed descriptions; the RERA land record identifies the village as Alwal.
Mandal / district / PIN: Alwal / Medchal-Malkajgiri / 500010.
Survey number(s): Survey No. 564. Title documents describe the subject land as Survey No. 564, “as per revenue records Sy.No.564/12”; the RERA land filing does not state a subdivision.
Plot reference: Plot No. 19/C Part.
Site extent: RERA land filing: 412.30 sq.m total, 18.33 sq.m affected by road widening/FTL/Nala widening, and 393.97 sq.m net. The building-permit extraction records site area 415.3 sq.m and net area 392.95 sq.m.
Boundaries: East: Neighbours Land; West: Road; North: Road; South: Plot No 19C Part.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building permit: Permit No. 1/C27/12651/2020, approved 18 December 2020; file No. 1/C27/20723/2019. The RERA filing lists the plan approval number as 1/C27/12651/2020.
Approved built-up area: 1,148.75 sq.m residential area in the building-permit extraction; the RERA filing separately reports approved built-up area of 1,148.75 sq.m.
Building / floors: One residential building; sanctioned configuration 1 Stilt + 5 upper floors. The permit extract states height 14.5 m.
Parking provision: The permit identifies 214.80 sq.m of stilt parking area. A parking-space count or unit-by-unit allocation is not established by the supplied evidence.
Unit counts: RERA filing records 10 proposed 3BHK units. The approval document’s extracted unit count is not separately stated.
Offering and status
Configuration: 3BHK apartments; RERA-filed saleable area 128.2 sq.m per unit.
Booked / available: 0 booked / 10 available, as last read from the TG-RERA portal; the portal record provides no as-of date, so the counts are indicative.
Construction stage: The project is recorded as ongoing. No independently verified site-progress assessment is supplied.
Completion dates: Proposed and revised proposed completion: 18 April 2027. This is separate from the registration validity date of 18 December 2026.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied documents. The building permit requires an occupancy certificate before occupation.
2. The project story
SAI PRAKRUTHI SAI ADI is registered as a residential apartment project at Plot No. 19/C Part, Survey No. 564, in Alwal village, Alwal mandal, Medchal-Malkajgiri district. The RERA filing identifies ten 3BHK apartments in one proposed building. The GHMC building permit describes a residential building with one stilt level and five upper floors.
The project is recorded as ongoing, with a proposed completion date of 18 April 2027. The supplied record does not provide a reliable percentage-complete figure or independent site inspection, so actual construction progress cannot be confirmed from these materials. Nor is an occupancy or completion certificate supplied; proposed completion should not be read as evidence that the building is complete or occupiable.
3. Master plan, architecture & building design
The GHMC permit is for one residential building, Building - RES-1, with 1 Stilt + 5 upper floors and a stated height of 14.5 m. It records residential area of 1,148.75 sq.m, stilt parking area of 214.80 sq.m, site area of 415.3 sq.m, road-affected area of 18.33 sq.m, and net area of 392.95 sq.m. The RERA land filing separately reports total area 412.30 sq.m and net area 393.97 sq.m.
These are permit and filing measurements; they are not interchangeable with apartment saleable area or software-measured carpet area. The drawing-derived record identifies a second-floor plan, but the supplied material does not establish a complete, independently reviewed description of the building footprint, floor-by-floor unit arrangement, lift/stair dimensions, circulation, or open-space design.
The permit lists no commercial area and records a tot-lot area of 0. It also includes conditions concerning a rainwater-harvesting structure, transformer space, garbage house, ETP, and a 12 m-wide road on the north side before an occupancy certificate is obtained. These are permit conditions, not evidence that the works have been completed.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 128.2 sq.m | Software-measured: median 120.8 sq.m; range 119.9–121.8 sq.m | Not supplied |
The RERA filing records ten 3BHK units and saleable area of 128.2 sq.m. The booked and available counts are portal-read figures without an as-of date and should be treated as indicative.
The carpet-area range above is software-measured from the supplied approved floor-plan drawing record, not a RERA-filed carpet-area disclosure; the measurement record says two flat designs were measured and requires review. Carpet area and saleable area are distinct measures, and the supplied evidence does not provide a verified loading figure.
The drawing extraction identifies a second-floor plan and includes room labels such as bedroom, kitchen, living/dining, toilet and wash area. Because the drawing-measurement record is flagged for review, those extracted room dimensions should be checked against the actual approved drawing before being relied on.
5. Parking & vehicle circulation
The GHMC permit records 214.80 sq.m of stilt parking area. The RERA filing marks the units as mortgaged, but the supplied evidence does not establish the number of parking spaces, whether any are visitor or accessible spaces, or the parking allocation for a particular apartment. A drawn or designated parking area does not by itself establish an exclusive allotment to a buyer.
The permit extraction references a 12 m-wide road on the north side as a condition to be laid before obtaining an occupancy certificate. The supplied material does not describe a parking ramp, internal driveway, separate pedestrian route, or vehicle entry/exit arrangement.
6. Amenities, recreation & open spaces
The following are identified in RERA-filed amenity data or the GHMC permit. Listed availability or permit conditions are not proof of completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot-lot / park | Amenity record says “YES”; permit extract records tot-lot area 0. | Amenity listed; no verified completion evidence supplied. | |
| Community buildings | Amenity record says “YES”; no size or description supplied. | Listed; no verified completion evidence supplied. | |
| Rainwater harvesting | Permit requires a rainwater-harvesting structure (percolation pit); permit parameters list 3 RWHPs. | Permit requirement; completion not verified. | |
| Garbage house | Required by the building permit; no size supplied. | Permit condition; completion not verified. |
No supported project-specific evidence in the supplied RERA and permit records establishes a clubhouse, gym, sports facility, or other indoor recreation facility.
7. Utilities, building services & safety
The RERA amenity record marks Water Supply, Sewerage (Chamber, Lines, Septic Tank, STP), Treatment and Disposal of Sewage and Sullage Water, Water Conservation, Rain water Harvesting, Electrical Meter Room, Sub-Station, Receiving Station, and Lift as listed provisions. It records 10% against the electrical meter room/sub-station/receiving station item and 0% against the other listed infrastructure items; these are recorded figures, not independent verification of completed services.
The GHMC permit requires rainwater harvesting, transformer space, a garbage house, and an ETP, and states that an occupancy fire NOC is to be obtained from the Director (EV&DM) before an occupancy certificate is issued. It also says an occupancy certificate is compulsory before occupation. The supplied materials do not include an issued fire NOC, occupancy certificate, water-storage or treatment capacities, lift capacity, backup-power specification, waste-management operating details, or accessibility design evidence.
8. Location, access & connectivity
The registered location is Alwal village, Alwal mandal, Medchal-Malkajgiri district, PIN 500010; the building-permit extraction specifies Old Alwal. The RERA filing gives the site boundaries as roads to the west and north, neighbouring land to the east, and Plot No. 19C Part to the south.
The project-location data supplies a cadastral parcel-centroid coordinate of 17.41528, 78.35459. No verified project-specific distances to public transport or local landmarks are supplied in the RERA location record.
9. Developer & development status
The registered promoter is SAI NEERAJ CONSTRUCTIONS IND PVT LTD, identified as a private limited company. The supplied corporate record gives GSTIN 36AAXCS0170R2ZF; the incorporation document identifies SAINEERAJ CONSTRUCTIONS (INDIA) PRIVATE LIMITED and CIN U45202TG2016PTC109444.
The registration record names VENKATA SURESH TUMPUDI as authorized signatory and RAJESWARI TUMPUDI as director. The supplied materials do not establish a separate official project contact or website for this overview.
The promoter’s RERA Form B declares a six-year completion period; the project information currently lists proposed and revised completion as 18 April 2027. The project is recorded as ongoing, but no independently verified construction-progress report is supplied here.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C registration for SAI PRAKRUTHI SAI ADI, No. P02200002815, issued 30 April 2021 and stated valid through 18 December 2026.
GHMC building permit: Permit No. 1/C27/12651/2020, approved 18 December 2020, for a residential building at Old Alwal, Survey No. 564.
Building-plan drawing: A drawing record is filed under the project; the supplied extraction identifies a second-floor plan.
Title documents filed with RERA: Legal title report, title-report copy containing sale-deed material, and development-agreement material are present in the supplied document register.
RERA Form B: Promoter affidavit-cum-declaration dated December 2020, including promoter declarations concerning title, encumbrances, project funds, approvals and completion.
Occupancy / completion certificate: None is included in the supplied documents. The permit states that an occupancy certificate is required before occupation.
Layout approval: A RERA filing entry requests layout approval or a stamped layout plan; the supplied evidence does not provide an extracted, independently reviewed layout approval.
Frequently asked questions
Is SAI PRAKRUTHI SAI ADI registered with Telangana RERA?
Yes. SAI PRAKRUTHI SAI ADI is registered with the Telangana Real Estate Regulatory Authority as P02200002815; the registration status is On-Going Project.
Who is the developer of SAI PRAKRUTHI SAI ADI?
The promoter named in the RERA registration is SAI NEERAJ CONSTRUCTIONS IND PVT LTD.
Where is SAI PRAKRUTHI SAI ADI located?
SAI PRAKRUTHI SAI ADI is in Alwal, Medchal-Malkajgiri, Telangana (500010).
When will SAI PRAKRUTHI SAI ADI be completed?
The promoter's proposed date of completion filed with RERA is 18/04/2027. This is the promoter's declaration, not a guarantee.
More projects in Alwal





