Gmr Springfield

ALPINE INFRATECH · Medchal-Malkajgiri · RERA P02200002172

GMR SPRINGFIELD is a residential apartment project in Turkapally, Alwal mandal, Medchal-Malkajgiri district, developed by the registered promoter ALPINE INFRATECH. The site area is 14,913.81 m², with 3 buildings: Blocks A and B, each with 1 Cellar + Ground + 5 upper floors, and an amenities building with Ground + 1 upper floors. The RERA unit record lists 172 2BHK and 12 3BHK homes, with saleable areas of 104.81 m² and 119.0 m², respectively. It is registered under TG-RERA P02200002172, with a proposed completion date of 28/12/2024.

📘 Project brochure from the promoter’s website ↗

More from Alpine Infratech · 2 projects →

01What we found

Period endedTG-RERA registration ran to 30 Jun 2023 - check its extension on TG-RERA
18documents on file - each fact links to its page
1court case on this project's land (survey 86, Turkapally)
11items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from squareyards.com

1. Project at a glance

Project identity

FieldRecord
Registered project nameGMR SPRINGFIELD RERA record
Project typeResidential apartment project RERA record
Phase / registered portionRERA registration is for the project; the supplied record does not identify a separate phase number. GHMC building-permit evidence names Blocks A and B and an amenities building. RERA record
TG-RERA registrationP02200002172 RERA record
Registration validity30/10/2020 to 30/06/2023; the supplied certificate says “2 years” and that registration could be extended under the Act and Rules. No extension is recorded in the supplied certificate. Registration validity is distinct from the project completion date and the later GHMC occupancy certificate. RERA record
Registered promoterALPINE INFRATECH; the RERA filing identifies it as a partnership. RERA record Corporate record
RERA status in supplied recordRegistration certificate issued under section 5. The certificate’s stated validity ended 30/06/2023; current registration status is not established by the supplied record.

Land and geographic identity

FieldRecord
LocalityTurkapally RERA record RERA filing
Revenue villageTurkapally RERA record Land records
MandalAlwal RERA record RERA filing
DistrictMedchal-Malkajgiri in the project header and RERA certificate; the GHMC OC extraction states “MEDCHAL.” RERA record
PIN500014 RERA record
Project survey numbersSurvey Nos. 82 and 86; the supplied project-level records do not give a definitive subdivision-by-subdivision schedule linking the whole site to the registered project. RERA record Land records
Revenue-record subdivisions appearing under the filed survey numbersSurvey 82: 82/అ/1/1, 82/అ/1/3, 82/అ/2, 82/అ/3, 82/ఆ. Survey 86: 86/1/1, 86/1/2, 86/2/1, 86/2/2, 86/3, 86/4, 86/5, 86/6. The revenue-record match is to the parent survey numbers; the filing does not state which listed subdivisions make up the project parcel. Land records
Site area / net areaGHMC permit: 14,913.81 m² site area and 14,906.03 m² net area. RERA land details give 14,913.81 m² total area, 7.78 m² affected area and 14,906.03 m² net area. RERA filing
Boundaries in RERA filingEast: VACANT LAND; West: VACANT LAND; North: VACANT LAND; South: ROAD. RERA filing

Development identity

FieldRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approvalBuilding Permit No. 1/C27/10582/2020, approved 01 October, 2020; file no. 1/C27/11874/2019. Approvals record
Sanctioned buildings and floorsBlock A: 1 Cellar + Ground + 5 upper floors; Block B: 1 Cellar + Ground + 5 upper floors; amenities building: Ground + 1 upper floors.
Approved built-up areaThe RERA filing states 19,446.63 m² approved built-up area. The permit extraction also gives building-specific floor-area figures; these are reproduced in the design section below and are not substituted for the RERA-filed total. RERA filing
Building count3 total building units in the approved-plan field, also described in the permit as Blocks A and B plus an amenities building. RERA filing
Parking levelsCellars are shown in the sanctioned floor configuration; the permit condition says cellar and stilt areas approved for parking are to be used exclusively for parking. The supplied material does not give a sanctioned parking-space count.
Unit count186 total units in the RERA unit record: 184 configured homes (172 2BHK and 12 3BHK) plus two floor-labelled entries that are not identified as homes for sale. The RERA land field states 3 proposed building units, matching the three-building permit description. RERA unit table RERA unit details RERA filing

Offering and status

FieldRecord
RERA-filed home types2BHK and 3BHK RERA unit table
RERA-filed saleable areas2BHK: 104.81 m²; 3BHK: 119.0 m² RERA unit table
Portal booking figures2BHK: 172 total, 134 booked, 38 available; 3BHK: 12 total, 10 booked, 2 available. Counts are as last read from the TG-RERA portal; no as-of date is supplied, so they are indicative. RERA unit table
Original completion dates in the recordThe RERA certificate/Form B completion undertaking is 30 June 2023. The project header separately lists a proposed completion date of 28/12/2024. These dates are kept distinct; the supplied evidence does not identify a revised registration order. RERA record
GHMC completion/OC recordGHMC issued OC 0833/GHMC/KPL/2025-OC on 29 April, 2025. The certificate covers the inspected Club House and Blocks A and B; it says an Occupancy Fire NOC for the Amenities Block is required before an OC for Blocks C and D. The supplied materials do not establish an OC for Blocks C and D.
Construction stageGHMC’s 2025 certificate identifies Blocks A and B and the Club House as completed/fit for occupation within its stated scope. This is an authority record, not an independent current site inspection.

2. The project story

GMR SPRINGFIELD is registered with TG-RERA as a residential apartment project at Turkapally, Alwal, Medchal-Malkajgiri, on the project filing’s Survey Nos. 82 and 86. The GHMC permit describes two residential buildings—Blocks A and B—and a separate amenities building. Blocks A and B are sanctioned with a cellar, ground floor and five upper floors; the amenities building is ground plus one upper floor. RERA record Land records

The RERA unit record lists 172 2BHK and 12 3BHK homes. It also contains “FIRST FLOOR” and “GROUND FLOOR” entries; these are floor labels, not additional homes for sale. The portal’s booked and available figures are indicative because the record does not provide their retrieval date. RERA unit table RERA unit details

The GHMC occupancy certificate dated 29 April, 2025 covers the Club House and Blocks A and B. It records a balcony-projection deviation in Block B for which a compounding fee was levied, and specifies a fire-NOC requirement for the Amenities Block before an OC for Blocks C and D. The supplied record does not establish that Blocks C or D form part of this registration or that they have received an OC.

3. Master plan, architecture & building design

The RERA filing records a 14,913.81 m² total site area and 14,906.03 m² net area; GHMC’s permit provides the same site and net-area figures. The permit lists a 2,246.87 m² “Tot-lot” area. RERA filing

Sanctioned buildingUse in permitSanctioned floor configurationPermit parameters
A-1 (Block A)Residential1 Cellar + Ground + 5 upper floorsHeight 17.9 m; residential ground area 1,228.51 m²; five upper floors area 6,729.60 m²; cellar area 12,472.40 m².
PROPOSED-1 (Block B)Residential1 Cellar + Ground + 5 upper floorsHeight 17.6 m; residential ground area 1,797.23 m²; five upper floors area 8,986.15 m²; cellar area 5,362.60 m².
PROPOSED-1 (Amenities)AmenitiesGround + 1 upper floorHeight 6.96 m; ground area 352.57 m² and upper-floor area 352.57 m².

The RERA filing reports 19,446.63 m² as approved built-up area; the supplied permit extraction separately lists building-specific ground, upper-floor and cellar areas. No FSI-counted area or RERA-filed carpet-area schedule is provided here. RERA filing

The permit calls for a fenced and maintained tot-lot, peripheral greenery, tree planting, rainwater-harvesting structures, transformer space and a garbage house. It also states that cellar and any approved stilt parking must remain for vehicle parking, and that construction is to follow the sanctioned plan. The supplied material does not specify the number of flats per floor, lift or stair counts, or a detailed internal-road and circulation plan.

4. Homes, configurations & floor plans

The table separates RERA-filed saleable area from software-measured carpet area. The latter was measured from the approved floor-plan drawing geometry, is not a RERA disclosure, and is noted as requiring review. The drawing source cautions that carpet area is smaller than saleable area, which includes the home’s share of common areas. RERA unit table RERA unit details Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK17213438104.81 m²71.4–96.1 m²; median 75.7 m² (software-measured)28%
3BHK12102119.0 m²101.3–104.6 m²; median 102.9 m² (software-measured)Not supplied

Drawing measurements cover 52 2BHK and 6 3BHK designs. A representative drawing-measured plan shows a living room, dining area, kitchen, bedrooms, toilets and wash area; room dimensions are drawing measurements, not separate RERA disclosures. For example, the measured 2BHK plan includes a living area of 3.19 × 4.97 m, dining area of 3.49 × 3.51 m, kitchen of 2.04 × 3.05 m and master bedroom of 3.34 × 4.34 m. RERA unit details Floor plans

The RERA unit table also has one “FIRST FLOOR” and one “GROUND FLOOR” entry, each shown as 352.57 m² and available. These are not counted as homes or included in the 184 configured 2BHK/3BHK homes. RERA unit details RERA unit table

5. Parking & vehicle circulation

The GHMC permit provides for cellar parking and requires any sanctioned cellar or stilt area approved for parking to be used exclusively for parking. The later OC extraction records a Parking Area: 17,835 m². The supplied records do not state a count of car or two-wheeler spaces, visitor or accessible spaces, mechanical parking, or a unit-wise parking allocation. A parking area figure alone does not establish an exclusive parking entitlement for a particular apartment.

6. Amenities, recreation & open spaces

The RERA filing marks the following project facilities as available at 100%; these are filing declarations and do not by themselves establish independent completion. GHMC’s permit separately includes site conditions and amenity provisions. RERA amenities

Community buildings
Description / sizeBuilding facility; permit identifies a separate amenities building, Ground + 1 upper floors
Evidence sourceRERA amenities
Declared progress / verified statusRERA filing: 100%; GHMC OC scope includes Club House, but the permit’s amenities building has a separate fire-NOC condition for the stated later OC scope.
Tot-lot / recreational open space
Description / sizeGHMC permit: 2,246.87 m² tot-lot; OC extraction: 1,776.25 m² tot-lot area
Declared progress / verified statusPermit requires fencing and greenery; no independent current inspection supplied.
Green strip / park
Description / sizeRERA filing marks available at 100%; permit requires peripheral greenery and tree planting
Evidence sourceRERA amenities
Declared progress / verified statusRERA-declared; independent completion status not supplied.
Internal roads and footpaths
Description / sizeRERA filing marks available at 100%
Evidence sourceRERA amenities
Declared progress / verified statusRERA-declared; no separate completion verification supplied.
Street lighting
Description / sizeRERA filing marks available at 100%
Evidence sourceRERA amenities
Declared progress / verified statusRERA-declared; no separate completion verification supplied.

7. Utilities, building services & safety

The RERA filing marks water supply, sewerage/STP, storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, rainwater harvesting, energy management, fire-protection requirements, and electrical meter/sub-station/receiving-station facilities as available at 100%. These are project disclosures, not independent verification of operating status or capacity. RERA amenities

GHMC’s permit requires rainwater-harvesting structures, transformer space and a garbage house. It also requires fire-safety systems, an Occupancy Fire NOC before issuance of an OC, and qualified technical supervision for services including sanitation, plumbing, fire safety, lifts and electrical installations. The supplied evidence does not give water-source or storage capacity, STP capacity, electrical or backup capacity, lift numbers/capacities, or a detailed accessibility schedule.

8. Location, access & connectivity

The registered project location is Turkapally village, Alwal mandal, Medchal-Malkajgiri district, PIN 500014. The RERA-filed site boundaries identify vacant land on the east, west and north, and a road to the south. RERA record RERA filing RERA filing

The supplied location data gives an approximate distance of 5.4 km to the nearest sampled Outer Ring Road interchange. The project record does not provide a verified travel time or additional independently measured connectivity distances. Location record

9. Developer & development status

The registered promoter is ALPINE INFRATECH, identified in the RERA record as a partnership. The filing lists AAMIR HUSSAIN MOHAMMED as authorized signatory and SRINIVAS REDDY GUMMADI as partner. GSTIN: 36ABFFA8265R1ZO. The registered address supplied is H NO 301, JANAKPURI COLONY, TURKAPALLY, TURKAPALLY, Alwal, Medchal-Malkajgiri, 500014. Corporate record Parties record

The promoter’s RERA Form B affidavit undertakes completion by 30th June 2023. GHMC’s later OC record is dated 29 April, 2025 and covers the Club House and Blocks A and B within its stated scope. The supplied evidence does not provide a current, independently inspected construction-progress percentage.

10. Approvals, official records & documents

TG-RERA registration certificate, Form C
Identifier / dateP02200002172; issued 30/10/2020; validity to 30/06/2023
Scope or noteProject registration certificate for GMR SPRINGFIELD.
GHMC building permit order
Identifier / date1/C27/10582/2020; approved 01 October, 2020; file no. 1/C27/11874/2019
Scope or noteSanctions Blocks A and B and an amenities building at Turkapally, Survey Nos. 82 and 86.
RERA Form B affidavit-cum-declaration
Identifier / dateDated 8thday of October 2020
Scope or notePromoter declaration, including the completion undertaking and project-account disclosures.
Approved drawing / layout-plan filing
Identifier / dateDrawing document 137438, page 1 stamp read as 03-10-2020
Scope or noteSupplied as the filed plan drawing; stamp reading is identified in the record as needing review.
GHMC occupancy certificate
Identifier / date0833/GHMC/KPL/2025-OC; 29 April, 2025
Scope or noteCertificate extraction covers the Club House and Blocks A and B; records the Amenities Block fire-NOC condition for an OC for Blocks C and D.
RERA land and unit records
Identifier / dateSurvey Nos. 82 and 86; RERA registration P02200002172
Scope or noteFiling records site-area and unit information; portal booking counts have no supplied as-of date. RERA record Land records RERA unit table

The supplied approvals include GHMC’s building permit and occupancy-certificate records. The public HMDA layout-status lookup is reported as unavailable in the supplied evidence; that limitation does not establish approval or refusal of a separate layout record. HMDA

Frequently asked questions

Is GMR SPRINGFIELD registered with Telangana RERA?

Yes. GMR SPRINGFIELD is registered with the Telangana Real Estate Regulatory Authority as P02200002172; the registration status is New Project.

Who is the developer of GMR SPRINGFIELD?

The promoter named in the RERA registration is ALPINE INFRATECH.

Where is GMR SPRINGFIELD located?

GMR SPRINGFIELD is in TURKAPALLY, Alwal, Medchal-Malkajgiri, Telangana (500014).

When will GMR SPRINGFIELD be completed?

The promoter's proposed date of completion filed with RERA is 28/12/2024. This is the promoter's declaration, not a guarantee.