Sunrise Abode
SUNRISE CONSTRUCTIONS · Hyderabad · RERA P02500004912
SUNRISE ABODE is a residential apartment project in MALLIKARJUNA NAGAR-13, Mallikarjuna Nagar village; the mandal is not disclosed, and the TG-RERA certificate identifies the district as Sangareddy. The registered promoter is SUNRISE CONSTRUCTIONS, a partnership firm. The project is recorded on a land area of 2485.11 sqmts and comprises one building with 1 Cellar + Stilt + 5 upper floors and 66 apartments: 42 2BHK units of 112.47 sqmts each and 24 3BHK units of 142.83 sqmts each. Its TG-RERA registration number is P02500004912, and the proposed completion date is 28/02/2028.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name / type | SUNRISE ABODE; residential apartment project. RERA record |
| Phase / registered portion | No separate phase name is disclosed. The registration is for the project identified with the survey numbers listed below. RERA record |
| TG-RERA registration | P02500004912; registered from 29/08/2022 to 28/10/2027. This is the registration validity period, not the construction completion deadline. RERA record |
| Registered promoter | SUNRISE CONSTRUCTIONS, a partnership firm. RERA record RERA filing |
| RERA record status | The supplied certificate records registration under section 5; it does not record an extension. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | MALLIKARJUNA NAGAR-13. RERA record |
| Revenue village | Mallikarjuna Nagar is the village stated in the project identity record. The building-permit extraction separately names BANDELGUDA as the village; the RERA certificate identifies the district as Sangareddy. RERA record |
| Mandal | Not disclosed in the supplied project identity record. Land records |
| District / PIN | The project identity record states Hyderabad, PIN 500068. The registration certificate extraction states Sangareddy, while its promoter-office address gives PIN 502032; the supplied records do not establish a single district/PIN for every listed address. RERA record |
| Project survey numbers and subdivisions | 141/AA, 142/AA, 141/EE2, 142/EE1, 141/EE1, 142/EE, 141/E, 142/E. RERA record |
| Registered site area | RERA land details state total area 2485.11 sqmts and net area 2485.11 sqmts. RERA filing |
| Permit-extraction area figures | The building-permit extraction states site area 2485.11 m2, road-affected area 57.18 m2, net area 2425.51 m2, and nala-affected area 123.68 m2. These are the figures transcribed from that permit extraction. |
| Boundaries | Not disclosed in the supplied land record. Land records |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC). Approvals record |
| Principal building approval | 1/C22/10074/2021, approved 28 October, 2021. The permit also gives file number 1/C22/14176/2020. Approvals record |
| Approved built-up area | RERA project information records approved built-up area 8706.45 sqmts. RERA filing |
| Buildings / blocks | One building/unit is recorded in the RERA land details; the permit identifies BLDG-1 (UDAY BHASKER REEDY). RERA filing |
| Sanctioned floors and parking levels | Building permit: 1 Cellar + Stilt + 5 upper floors; the permit extraction says the cellar and stilt are approved for vehicle parking. |
| Unit counts | RERA filing records 66 units: 42 2BHK and 24 3BHK. The same filing records one building. RERA unit table RERA filing |
| Parking area recorded | RERA records 625.97 sqmts as mortgage area; the supplied record does not establish a parking-space count or individual parking allocation. RERA filing |
Offering and status
| Item | Project record |
|---|---|
| Configurations / RERA saleable area | 2BHK: 42 units, 112.47 sqmts each as filed. 3BHK: 24 units, 142.83 sqmts each as filed. RERA unit table |
| Booked / available | The portal-derived counts show 0 booked / 42 available for 2BHK and 0 booked / 24 available for 3BHK. The record has no as-of date, so treat these as indicative rather than current inventory. RERA unit table |
| Construction stage | The supplied evidence does not provide a verified current site-progress measurement. A permit extraction contains the phrase “Floor handed over: first floor,” but does not establish current completion or occupancy status. |
| Completion dates | The building permit states construction was to commence before 28 April, 2023 and be completed before 28 October, 2027. The RERA project identity record gives proposed completion 28/02/2028; Form B declares a completion period ending 28-10-2027. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents. The permit says occupancy certification is compulsory before occupation. |
2. The project story
SUNRISE ABODE is registered with TG-RERA as a residential apartment project promoted by SUNRISE CONSTRUCTIONS. The filing identifies an 2485.11 sqmts site and eight survey numbers/subdivisions: 141/AA, 142/AA, 141/EE2, 142/EE1, 141/EE1, 142/EE, 141/E and 142/E. The project record gives the locality as MALLIKARJUNA NAGAR-13 and village as Mallikarjuna Nagar. RERA record RERA filing
The GHMC permit describes one residential building, BLDG-1, with a cellar, stilt and five upper floors. The RERA filing lists 66 apartments: 42 two-bedroom and 24 three-bedroom units. These are approved/filed project particulars, not evidence that construction is complete. The materials supplied do not establish current construction progress or an issued occupancy certificate. RERA unit table RERA record
The available completion information is not uniform in its stated dates: the permit and Form B declare 28 October 2027, while the RERA project identity record gives 28 February 2028 as the proposed completion date. Registration remains a separate matter: the certificate records validity through 28 October 2027. RERA record
3. Master plan, architecture & building design
The filed project describes a single building on a RERA-recorded total/net site area of 2485.11 sqmts, with approved built-up area of 8706.45 sqmts. These are distinct figures as recorded in the project filing; the supplied material does not provide a separate FSI-counted area, carpet-area total, or building-footprint measurement. RERA filing RERA filing
The GHMC building permit extraction describes BLDG-1 (UDAY BHASKER REEDY) as a residential building with 1 Cellar + Stilt + 5 upper floors, with a stated height of 14.39 m. It lists 10 m2 for the tot-lot, 11 rainwater-harvesting pits, 120 Trees, and 193.9 RM; the extraction does not label the last figure clearly enough to identify its measurement category.
The supplied drawing record lists two drawings, but neither is recorded as having flats that could be measured; there are no drawing-derived unit measurements available here. Details such as flats per floor, footprint, lift and stair arrangement, internal circulation, landscaping plan, and residential/common-area breakdown are not established by the supplied extracts. Floor plans
4. Homes, configurations & floor plans
The following unit counts and saleable areas are from the TG-RERA filing. Booked and available counts are portal-derived and have no stated as-of date. RERA unit table RERA unit details
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 42 | 0 | 42 | 112.47 sqmts | Not available | Not supplied |
| 3BHK | 24 | 0 | 24 | 142.83 sqmts | Not available | Not supplied |
The floor-plan record states that the two supplied drawings have not yielded software-measured flat areas. Accordingly, no drawing-based carpet area, room dimensions, orientation, balcony or utility measurements can be reported. The filed saleable-area figures should not be read as carpet area; no loading calculation is supplied. Floor plans RERA unit table
5. Parking & vehicle circulation
The building permit states that the cellar and stilt are approved for parking and must be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide a count of car or two-wheeler spaces, visitor or accessible spaces, or unit-specific parking allocations.
The RERA filing records a 625.97 sqmts mortgage area, but the supplied evidence does not identify this as a parking-space count or establish how spaces are allocated to buyers. A drawing of a parking bay, if present, would not by itself establish exclusive ownership. RERA filing
6. Amenities, recreation & open spaces
The permit extraction and RERA-filed amenity records list the following. The percentage entries are recorded as 0 in the amenity data; no independent completion verification is supplied. RERA amenities
| Description / size | 10 m2 in permit parameters; permit requires it to be fenced and maintained as greenery before issue of occupancy certificate. |
|---|---|
| Evidence source | GHMC permit extraction; RERA amenity record. RERA amenities |
| Declared progress / verified status | Required by permit; completion not independently verified. |
| Description / size | No further size stated. |
|---|---|
| Evidence source | RERA amenity record. RERA amenities |
| Declared progress / verified status | Progress recorded as 0; not verified complete. |
| Description / size | No description or size supplied. |
|---|---|
| Evidence source | RERA amenity record. RERA amenities |
| Declared progress / verified status | Progress recorded as 0; not verified complete. |
Other recreation and clubhouse features are not established by the supplied RERA project documents and are therefore not described as project-provided facilities here.
7. Utilities, building services & safety
| Evidence in the project record | RERA amenity record marks water supply “YES.” |
|---|---|
| Status / limitation | No source, storage or capacity details supplied; completion not verified. RERA amenities |
| Evidence in the project record | RERA amenity record marks sewerage (including STP) “YES”; the building permit requires an STP as indicated in the plans. |
|---|---|
| Status / limitation | No capacity, reuse arrangement or completion evidence supplied. RERA amenities |
| Evidence in the project record | Listed in the RERA amenity record. |
|---|---|
| Status / limitation | No system details or completion evidence supplied; progress recorded as 0. RERA amenities |
| Evidence in the project record | Permit requires a rainwater-harvesting structure (percolation pit); its parameter extract lists 11 RWHPs. RERA amenity data marks water conservation/rainwater harvesting “YES.” |
|---|---|
| Status / limitation | Required/filed provision; installation is not independently verified. RERA amenities |
| Evidence in the project record | Permit requires space for a transformer; RERA amenity data marks electrical meter room/sub-station/receiving station “YES.” |
|---|---|
| Status / limitation | No supply, backup or capacity details supplied; completion not verified. RERA amenities |
| Evidence in the project record | Permit requires a garbage house within the premises; RERA lists solid-waste management and disposal. |
|---|---|
| Status / limitation | No operating arrangements or completion evidence supplied. RERA amenities |
| Evidence in the project record | RERA amenity data marks fire protection and fire-safety requirements “YES.” |
|---|---|
| Status / limitation | Specific systems, escape-stair details, clearances and completion status are not supplied. RERA amenities |
| Evidence in the project record | No project-specific lift, service-lift or accessibility details are available in the supplied RERA extracts. |
|---|---|
| Status / limitation | Not established. |
The building permit states that an occupancy certificate is compulsory before occupation and requires a completion notice after the building is completed.
8. Location, access & connectivity
The registered project identity gives the locality as MALLIKARJUNA NAGAR-13, revenue village Mallikarjuna Nagar, and district Hyderabad. The cadastral-parcel centroid supplied for the project is 17.41528, 78.35459. RERA record Location record
The building-permit extraction names BANDELGUDA and Mallikarjuna Nagar -13, while the TG-RERA certificate extraction records locality Hyderabad and district Sangareddy. The mandal is not disclosed in the project land record. These are the recorded location descriptions; the supplied material does not establish an approach-road route or public-transport details. Land records
A connectivity record gives Financial District (Nanakramguda): 1.2 km. This is the supplied measured-distance entry; no travel time is provided. Location record
9. Developer & development status
The registered promoter is SUNRISE CONSTRUCTIONS, identified in the RERA filing as a partnership. The supplied GST identifier is 36ADDFS0685D1Z5. The filing names CH BAL REDDY as authorized signatory and lists the promoter address as V GOPAL REDDY COMPLE, MALLIKARJUNA NAGAR, 5TH LINE, BANDELGUDA, MALLIKARJUNA NAGAR-13, Hyderabad, 500068. RERA filing Corporate record Parties record
The RERA certificate extraction gives a promoter-office address of Village: Mandal: District: Sangareddy, PIN 502032, without further address details.
The building permit identifies one building and states the building configuration and completion deadline; the supplied records do not provide current, independently verified construction progress. The promoter’s Form B declares completion by 28-10-2027.
10. Approvals, official records & documents
| Details | Form C; project SUNRISE ABODE; registration P02500004912; issued 29/08/2022; validity through 28/10/2027. |
|---|
| Details | Building Permit Order dated 28 October, 2021; approval 1/C22/10074/2021; file 1/C22/14176/2020; one building, 1 Cellar + Stilt + 5 upper floors. |
|---|
| Details | Permit extract lists, among other items, a tot-lot, transformer space, garbage house, STP and rainwater-harvesting structure, and states that an occupancy certificate is compulsory before occupation. |
|---|
| Details | Signed for SUNRISE CONSTRUCTIONS by CH BAL REDDY; declares land free from encumbrances and states a completion period ending 28-10-2027. The verification date/place are not legible or stated in the extraction. |
|---|
| Details | None included in the supplied project documents. |
|---|---|
| Source | Document index |
The building-permit extraction states that the permission does not confer ownership rights. Detailed approval conditions and land-title matters are addressed in the relevant report sections.
1. Project at a glance
Project identity
Registered name / type: SUNRISE ABODE; residential apartment project.
Phase / registered portion: No separate phase name is disclosed. The registration is for the project identified with the survey numbers listed below.
TG-RERA registration: P02500004912; registered from 29/08/2022 to 28/10/2027. This is the registration validity period, not the construction completion deadline.
Registered promoter: SUNRISE CONSTRUCTIONS, a partnership firm.
RERA record status: The supplied certificate records registration under section 5; it does not record an extension.
Land and geographic identity
Locality: MALLIKARJUNA NAGAR-13.
Revenue village: Mallikarjuna Nagar is the village stated in the project identity record. The building-permit extraction separately names BANDELGUDA as the village; the RERA certificate identifies the district as Sangareddy.
Mandal: Not disclosed in the supplied project identity record.
District / PIN: The project identity record states Hyderabad, PIN 500068. The registration certificate extraction states Sangareddy, while its promoter-office address gives PIN 502032; the supplied records do not establish a single district/PIN for every listed address.
Project survey numbers and subdivisions: 141/AA, 142/AA, 141/EE2, 142/EE1, 141/EE1, 142/EE, 141/E, 142/E.
Registered site area: RERA land details state total area 2485.11 sqmts and net area 2485.11 sqmts.
Permit-extraction area figures: The building-permit extraction states site area 2485.11 m2, road-affected area 57.18 m2, net area 2425.51 m2, and nala-affected area 123.68 m2. These are the figures transcribed from that permit extraction.
Boundaries: Not disclosed in the supplied land record.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC).
Principal building approval: 1/C22/10074/2021, approved 28 October, 2021. The permit also gives file number 1/C22/14176/2020.
Approved built-up area: RERA project information records approved built-up area 8706.45 sqmts.
Buildings / blocks: One building/unit is recorded in the RERA land details; the permit identifies BLDG-1 (UDAY BHASKER REEDY).
Sanctioned floors and parking levels: Building permit: 1 Cellar + Stilt + 5 upper floors; the permit extraction says the cellar and stilt are approved for vehicle parking.
Unit counts: RERA filing records 66 units: 42 2BHK and 24 3BHK. The same filing records one building.
Parking area recorded: RERA records 625.97 sqmts as mortgage area; the supplied record does not establish a parking-space count or individual parking allocation.
Offering and status
Configurations / RERA saleable area: 2BHK: 42 units, 112.47 sqmts each as filed. 3BHK: 24 units, 142.83 sqmts each as filed.
Booked / available: The portal-derived counts show 0 booked / 42 available for 2BHK and 0 booked / 24 available for 3BHK. The record has no as-of date, so treat these as indicative rather than current inventory.
Construction stage: The supplied evidence does not provide a verified current site-progress measurement. A permit extraction contains the phrase “Floor handed over: first floor,” but does not establish current completion or occupancy status.
Completion dates: The building permit states construction was to commence before 28 April, 2023 and be completed before 28 October, 2027. The RERA project identity record gives proposed completion 28/02/2028; Form B declares a completion period ending 28-10-2027.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents. The permit says occupancy certification is compulsory before occupation.
2. The project story
SUNRISE ABODE is registered with TG-RERA as a residential apartment project promoted by SUNRISE CONSTRUCTIONS. The filing identifies an 2485.11 sqmts site and eight survey numbers/subdivisions: 141/AA, 142/AA, 141/EE2, 142/EE1, 141/EE1, 142/EE, 141/E and 142/E. The project record gives the locality as MALLIKARJUNA NAGAR-13 and village as Mallikarjuna Nagar.
The GHMC permit describes one residential building, BLDG-1, with a cellar, stilt and five upper floors. The RERA filing lists 66 apartments: 42 two-bedroom and 24 three-bedroom units. These are approved/filed project particulars, not evidence that construction is complete. The materials supplied do not establish current construction progress or an issued occupancy certificate.
The available completion information is not uniform in its stated dates: the permit and Form B declare 28 October 2027, while the RERA project identity record gives 28 February 2028 as the proposed completion date. Registration remains a separate matter: the certificate records validity through 28 October 2027.
3. Master plan, architecture & building design
The filed project describes a single building on a RERA-recorded total/net site area of 2485.11 sqmts, with approved built-up area of 8706.45 sqmts. These are distinct figures as recorded in the project filing; the supplied material does not provide a separate FSI-counted area, carpet-area total, or building-footprint measurement.
The GHMC building permit extraction describes BLDG-1 (UDAY BHASKER REEDY) as a residential building with 1 Cellar + Stilt + 5 upper floors, with a stated height of 14.39 m. It lists 10 m2 for the tot-lot, 11 rainwater-harvesting pits, 120 Trees, and 193.9 RM; the extraction does not label the last figure clearly enough to identify its measurement category.
The supplied drawing record lists two drawings, but neither is recorded as having flats that could be measured; there are no drawing-derived unit measurements available here. Details such as flats per floor, footprint, lift and stair arrangement, internal circulation, landscaping plan, and residential/common-area breakdown are not established by the supplied extracts.
4. Homes, configurations & floor plans
The following unit counts and saleable areas are from the TG-RERA filing. Booked and available counts are portal-derived and have no stated as-of date.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 42 | 0 | 42 | 112.47 sqmts | Not available | Not supplied |
| 3BHK | 24 | 0 | 24 | 142.83 sqmts | Not available | Not supplied |
The floor-plan record states that the two supplied drawings have not yielded software-measured flat areas. Accordingly, no drawing-based carpet area, room dimensions, orientation, balcony or utility measurements can be reported. The filed saleable-area figures should not be read as carpet area; no loading calculation is supplied.
5. Parking & vehicle circulation
The building permit states that the cellar and stilt are approved for parking and must be used exclusively for vehicle parking, without partition walls or rolling shutters. It does not provide a count of car or two-wheeler spaces, visitor or accessible spaces, or unit-specific parking allocations.
The RERA filing records a 625.97 sqmts mortgage area, but the supplied evidence does not identify this as a parking-space count or establish how spaces are allocated to buyers. A drawing of a parking bay, if present, would not by itself establish exclusive ownership.
6. Amenities, recreation & open spaces
The permit extraction and RERA-filed amenity records list the following. The percentage entries are recorded as 0 in the amenity data; no independent completion verification is supplied.
| Description / size | 10 m2 in permit parameters; permit requires it to be fenced and maintained as greenery before issue of occupancy certificate. |
|---|---|
| Evidence source | GHMC permit extraction; RERA amenity record. |
| Declared progress / verified status | Required by permit; completion not independently verified. |
| Description / size | No further size stated. |
|---|---|
| Evidence source | RERA amenity record. |
| Declared progress / verified status | Progress recorded as 0; not verified complete. |
| Description / size | No description or size supplied. |
|---|---|
| Evidence source | RERA amenity record. |
| Declared progress / verified status | Progress recorded as 0; not verified complete. |
Other recreation and clubhouse features are not established by the supplied RERA project documents and are therefore not described as project-provided facilities here.
7. Utilities, building services & safety
| Evidence in the project record | RERA amenity record marks water supply “YES.” |
|---|---|
| Status / limitation | No source, storage or capacity details supplied; completion not verified. |
| Evidence in the project record | RERA amenity record marks sewerage (including STP) “YES”; the building permit requires an STP as indicated in the plans. |
|---|---|
| Status / limitation | No capacity, reuse arrangement or completion evidence supplied. |
| Evidence in the project record | Listed in the RERA amenity record. |
|---|---|
| Status / limitation | No system details or completion evidence supplied; progress recorded as 0. |
| Evidence in the project record | Permit requires a rainwater-harvesting structure (percolation pit); its parameter extract lists 11 RWHPs. RERA amenity data marks water conservation/rainwater harvesting “YES.” |
|---|---|
| Status / limitation | Required/filed provision; installation is not independently verified. |
| Evidence in the project record | Permit requires space for a transformer; RERA amenity data marks electrical meter room/sub-station/receiving station “YES.” |
|---|---|
| Status / limitation | No supply, backup or capacity details supplied; completion not verified. |
| Evidence in the project record | Permit requires a garbage house within the premises; RERA lists solid-waste management and disposal. |
|---|---|
| Status / limitation | No operating arrangements or completion evidence supplied. |
| Evidence in the project record | RERA amenity data marks fire protection and fire-safety requirements “YES.” |
|---|---|
| Status / limitation | Specific systems, escape-stair details, clearances and completion status are not supplied. |
| Evidence in the project record | No project-specific lift, service-lift or accessibility details are available in the supplied RERA extracts. |
|---|---|
| Status / limitation | Not established. |
The building permit states that an occupancy certificate is compulsory before occupation and requires a completion notice after the building is completed.
8. Location, access & connectivity
The registered project identity gives the locality as MALLIKARJUNA NAGAR-13, revenue village Mallikarjuna Nagar, and district Hyderabad. The cadastral-parcel centroid supplied for the project is 17.41528, 78.35459.
The building-permit extraction names BANDELGUDA and Mallikarjuna Nagar -13, while the TG-RERA certificate extraction records locality Hyderabad and district Sangareddy. The mandal is not disclosed in the project land record. These are the recorded location descriptions; the supplied material does not establish an approach-road route or public-transport details.
A connectivity record gives Financial District (Nanakramguda): 1.2 km. This is the supplied measured-distance entry; no travel time is provided.
9. Developer & development status
The registered promoter is SUNRISE CONSTRUCTIONS, identified in the RERA filing as a partnership. The supplied GST identifier is 36ADDFS0685D1Z5. The filing names CH BAL REDDY as authorized signatory and lists the promoter address as V GOPAL REDDY COMPLE, MALLIKARJUNA NAGAR, 5TH LINE, BANDELGUDA, MALLIKARJUNA NAGAR-13, Hyderabad, 500068.
The RERA certificate extraction gives a promoter-office address of Village: Mandal: District: Sangareddy, PIN 502032, without further address details.
The building permit identifies one building and states the building configuration and completion deadline; the supplied records do not provide current, independently verified construction progress. The promoter’s Form B declares completion by 28-10-2027.
10. Approvals, official records & documents
| Details | Form C; project SUNRISE ABODE; registration P02500004912; issued 29/08/2022; validity through 28/10/2027. |
|---|
| Details | Building Permit Order dated 28 October, 2021; approval 1/C22/10074/2021; file 1/C22/14176/2020; one building, 1 Cellar + Stilt + 5 upper floors. |
|---|
| Details | Permit extract lists, among other items, a tot-lot, transformer space, garbage house, STP and rainwater-harvesting structure, and states that an occupancy certificate is compulsory before occupation. |
|---|
| Details | Signed for SUNRISE CONSTRUCTIONS by CH BAL REDDY; declares land free from encumbrances and states a completion period ending 28-10-2027. The verification date/place are not legible or stated in the extraction. |
|---|
| Details | None included in the supplied project documents. |
|---|
The building-permit extraction states that the permission does not confer ownership rights. Detailed approval conditions and land-title matters are addressed in the relevant report sections.
Frequently asked questions
Is SUNRISE ABODE registered with Telangana RERA?
Yes. SUNRISE ABODE is registered with the Telangana Real Estate Regulatory Authority as P02500004912; the registration status is New Project.
Who is the developer of SUNRISE ABODE?
The promoter named in the RERA registration is SUNRISE CONSTRUCTIONS.
Where is SUNRISE ABODE located?
SUNRISE ABODE is in MALLIKARJUNA NAGAR-13, Hyderabad, Telangana (500068).
When will SUNRISE ABODE be completed?
The promoter's proposed date of completion filed with RERA is 28/02/2028. This is the promoter's declaration, not a guarantee.