BSSR TECH PARK is a commercial project at Nanakramguda, Serilingampally, Ranga Reddy. It is being developed by registered promoter BSSR INFRATECH LLP on a site with a total area of 8024.64 sq m and a net area of 7468.97 sq m; the project filing records one building, and the permit describes it as 2 Cellar + Ground + 2 upper floors. The RERA unit table lists FIRST FLOOR, GROUND FLOOR and SECOND FLOOR, with saleable areas of 2923.24 sq m, 200.0 sq m and 2923.24 sq m, respectively. The project is registered under TG-RERA number P02400002307, and the promoter’s Form B declaration states completion by 19 December 2025.

01What we found

Period endedTG-RERA registration ran to 19 Dec 2025 - check its extension on TG-RERA
13documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from justdial.comPhoto from justdial.com
▦ View all 2 photos
Nanakaramguda, Serilingampally, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemTG-RERA / project record
Registered project nameBSSR TECH PARK RERA record
Project typeCommercial, as recorded in the project filing. The filed building-permit extraction describes a residential building; the project’s use and approval details should therefore be checked in the Approvals review. RERA record RERA filing
Phase / registered portionNo phase name is supplied. TG-RERA registration is P02400002307; the certificate identifies Survey No. 96.
Registered promoterBSSR INFRATECH LLP (also styled “Bssr Infratech Llp” on the certificate). RERA record Corporate record
Registration validity31/10/2020 to 19/12/2025; the certificate states a five-year term. The supplied record says no extension is recorded. Registration validity is separate from the completion undertaking and does not establish completion. Approvals record
RERA status in supplied recordRegistration certificate issued under section 5. The record does not establish a later extension, completion certificate or occupancy certificate.

Land and geographic identity

ItemFiled identity
Locality / revenue villageNanakramguda / Nanakaramguda (the supplied records use both spellings). RERA record RERA filing
Mandal / district / PINSerilingampally / Ranga Reddy / 500008. RERA record
Project survey numberSurvey No. 96; no project subdivision is stated in the registration certificate or project land filing. Land records
Filed site extentTotal area 8024.64 sq m; affected area 555.67 sq m; net area 7468.97 sq m in the project land filing. The permit extraction records net area as 7468.96 m2. RERA filing
Filed boundariesEast: 40 FEET WIDE ROAD; West: SURVEY NO 96 PART; North: SURVEY NO 93; South: SURVEY NO 96 PART. RERA filing

Development identity

ItemSupplied record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal approvalBuilding Permit Order 1/C20/18378/2019, dated 19 December, 2019; the filing also lists GHMC file no. 1/C20/14003/2019. Approvals record
Approved built-up area6046.48 sq m in the project filing. The permit extraction separately lists “Residential area: 9,613.48 m2,” “Commercial area: 2,232.17 m2,” and “Others area: 200.00 m2”; these are distinct filed figures and are not presented here as interchangeable area measures. RERA filing
Building count / configurationOne building is recorded in the project filing. The building-permit extraction describes “BLDG-1 (RESIDENCE)” as 2 Cellar + Ground + 2 upper floors, with a stated height of 11.65 m. RERA filing
Parking provision in permit extractionCellar 5,846.48 m2; G/U Floors 2,232.17 m2, both listed under “Parking floors.” The project filing separately records mortgage area of 629.41 sq m. RERA filing
Unit countThe filing records one total building unit and one proposed building unit. Its unit table lists three floor-label rows; these are not a verified count of separately purchasable commercial units. RERA filing RERA unit table RERA unit details

Offering and status

ItemSupplied record
RERA-listed unit rowsFIRST FLOOR, GROUND FLOOR and SECOND FLOOR: one row each. RERA-listed saleable areas are 2923.24 sq m, 200.0 sq m and 2923.24 sq m, respectively. The filing shows 0 booked and 1 available for each row; the portal capture does not provide an as-of date. These floor labels are not verified unit configurations. RERA unit table RERA unit table
Construction stageNo independently verified site-progress figure is supplied. The permit extraction records “completion_certified” as false.
Completion dateThe promoter’s Form B declaration states completion by 19 December 2025. This is a declared undertaking, not evidence of completed works.
Occupancy certificateNot supplied in the reviewed project record. The building permit states that an occupancy certificate is compulsory before occupation.

2. The project story

  • BSSR TECH PARK is registered with TG-RERA as a commercial project at Nanakramguda, Serilingampally Mandal, Ranga Reddy District. Its filed land identity is Survey No. 96, with a total site area of 8024.64 sq m and a net area of 7468.97 sq m in the project land filing. RERA record RERA filing
  • The project filing records one building. The GHMC permit extraction describes that building as “BLDG-1 (RESIDENCE),” with two cellars, a ground floor and two upper floors. It also identifies parking areas and site provisions including a tot-lot, transformer space, garbage house and rainwater-harvesting structure. These are permit-record descriptions; no supplied evidence verifies the current construction stage or delivery of those provisions. RERA filing
  • TG-RERA’s unit table contains three rows named by floor rather than by a commercial unit configuration. Although each row is shown as available in the portal data, the filing does not establish that the rows correspond to three separately saleable units. No occupancy certificate or independently verified completion status is provided. RERA unit table RERA unit details

3. Master plan, architecture & building design

  • The project filing identifies Survey No. 96 and records total area 8024.64 sq m, affected area 555.67 sq m and net area 7468.97 sq m. The GHMC permit extraction records a net area of 7468.96 m2. The approved built-up area filed for the project is 6046.48 sq m; the permit extraction separately records residential area 9,613.48 m2, commercial area 2,232.17 m2 and others area 200.00 m2. The record does not supply a floor-by-floor area schedule that would reconcile these differently labelled figures. RERA filing RERA filing
  • The permit extraction describes one building, “BLDG-1 (RESIDENCE),” configured as 2 Cellar + Ground + 2 upper floors, at 11.65 m high. It lists cellar parking area of 5,846.48 m2 and G/U Floors parking area of 2,232.17 m2. No architectural schedule of lifts, stairs, floor-by-floor commercial space, building footprint or internal circulation is supplied in the reviewed extracts.
  • The permit extraction lists a tot-lot of 781.6 m2 and 148 Trees, alongside a transformer space, garbage house and rainwater-harvesting structure. These are recorded permit provisions; delivered condition is not established.
  • The approved floor-plan drawing set contains two drawings, with no measured plans or flat plans identified in the supplied extraction. Accordingly, no drawing-based carpet-area or room-layout measurements are available for this Overview. Floor plans

4. Homes, configurations & floor plans

The RERA unit table uses floor labels rather than verified commercial-unit configurations. Its counts and areas are reproduced below as filed; “available” counts are portal data without an as-of date, and the table does not establish that the floor rows are independently saleable units. RERA unit table RERA unit details RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
FIRST FLOOR (filed floor label)1012923.24 sq mNot suppliedNot supplied
GROUND FLOOR (filed floor label)101200.0 sq mNot suppliedNot supplied
SECOND FLOOR (filed floor label)1012923.24 sq mNot suppliedNot supplied

No software-measured carpet areas, room dimensions, balcony or utility measurements are supplied. The filed areas are identified as saleable area, not carpet area; no loading figure is provided. RERA unit details Floor plans

5. Parking & vehicle circulation

  • The GHMC permit extraction lists parking floors as Cellar 5,846.48 m2 and G/U Floors 2,232.17 m2. It also states that cellar and stilt areas approved for parking must be used exclusively for vehicle parking and not partitioned or converted. The extraction does not provide a count of car or two-wheeler spaces, visitor or accessible spaces, or unit-wise parking allocations.
  • The project filing records a mortgage area of 629.41 sq m. The supplied record does not establish how parking is allocated to purchasers or that any drawn or approved parking area conveys exclusive ownership. RERA filing

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Tot-lot / green provision781.6 m2; permit condition says it is to be fenced and maintained as greenery before issue of occupancy certificate.GHMC permit extractionPermitted provision; completion not verified.
Trees148 TreesGHMC permit extractionPermit-record figure; planting or survival not verified.
Garbage houseNo size supplied.GHMC permit extractionListed provision; completion not verified.
Internal roads and footpathsNo dimensions supplied.TG-RERA amenities RERA amenitiesListed as available in filing; progress percentage shown as 0.
Community buildingsNo description or size supplied.TG-RERA amenities RERA amenitiesListed without an availability value; progress percentage shown as 0.
Other recreational facilitiesNo additional project-specific facility or size established by the supplied RERA extracts.RERA amenitiesDelivery not independently verified.

7. Utilities, building services & safety

Water and rainwater
Evidence in supplied project recordTG-RERA amenities list water supply and water conservation/rainwater harvesting. The permit extraction lists a rainwater-harvesting structure (percolation pit).
Status limitationFiled or permitted provision; source, capacity and completion are not supplied. RERA amenities
Sewerage and drainage
Evidence in supplied project recordTG-RERA amenities list sewerage, treatment/disposal of sewage and sullage water, and storm-water drains.
Status limitationNo STP capacity, treatment details or verified completion evidence is supplied. RERA amenities
Electrical
Evidence in supplied project recordTG-RERA amenities list energy management and an electrical meter room/sub-station/receiving station. The permit extraction requires space for a transformer.
Status limitationNo supply capacity, backup specification or completion evidence is supplied. RERA amenities
Fire and life safety
Evidence in supplied project recordTG-RERA amenities list fire protection and fire-safety requirements; the permit requires compliance with conditions stipulated in the Fire Services Department NOC and AAL.
Status limitationThe supplied extract does not include the NOC details or establish completed fire systems or statutory clearance. RERA amenities
Waste and security
Evidence in supplied project recordTG-RERA amenities list solid-waste management and disposal; the permit extraction lists a garbage house.
Status limitationNo waste-process details or project-specific security-system specification is supplied. RERA amenities
Vertical transportation and accessibility
Evidence in supplied project recordNo project-specific lift, ramp or accessible-circulation details are supplied.
Status limitationNot disclosed in the reviewed material. Document index Floor plans

8. Location, access & connectivity

  • The registered project location is Nanakramguda, Serilingampally Mandal, Ranga Reddy District, PIN 500008. The filed eastern boundary is a 40 FEET WIDE ROAD. The GHMC permit extraction also refers to an 18 mt. road-width condition, without providing a route or travel-distance measurement to the project. RERA record RERA filing RERA filing
  • Supplied location records list Financial District (Nanakramguda) at 1.1 km, Accenture Services Private Limited at 0.5 km, Continental Hospitals at 1.4 km, Maulana Azaad National Urdu University at 1.5 km, South India Shopping Mall at 2.4 km, an unnamed bus station at 1.7 km, and Nanakramguda Govt primary school at 0.0 km. These are supplied location-record distances, not stated travel times. Location record

9. Developer & development status

  • The TG-RERA-registered promoter is BSSR INFRATECH LLP, an LLP. The filing identifies SESHA REDDY SADDA as authorized signatory and lists PHANEENDRA BOSE NUTAKKI and TRR INFRA PRIVATE LIMITED, represented by its director SADDA SESHA REDDY, as partners. The promoter address recorded in the project pack is JANARDHAN HILLS, GACHIBOWLI, NANAKRAMGUDA, NANAKRAMGUDA, Serilingampally, Ranga Reddy, 500008. Corporate record Parties record
  • The GHMC permit extraction separately identifies BSSR Infratech LLP as DAGPA holder/applicant and MS TRR INFRA PRIVATE LIMITED as developer/builder. This is the permit’s stated development structure; the registered promoter remains BSSR INFRATECH LLP.
  • The promoter’s Form B declaration states that the project would be completed by 19 December 2025. The supplied record does not include independently verified construction progress or an occupancy certificate, and the permit extraction records completion as not certified.

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm “C” certificate for BSSR TECH PARK, registration no. P02400002307, issued 31/10/2020, valid to 19/12/2025; certificate states registration under section 5.
Principal building approvalGHMC Building Permit Order no. 1/C20/18378/2019, approved 19 December, 2019; file no. 1/C20/14003/2019; stated validity through 19 December, 2025.
Building-plan drawingDrawing-stamp record for approval no. 1/C20/18378/2019, dated 21-12-2019; extraction says the stamp was read from the drawing text layer and needs review. Approvals record
Promoter declarationForm B affidavit-cum-declaration by SADDA SESHA REDDY, with a completion undertaking of 19 December 2025 and reference to Development Agreement-cum-Irrevocable GPA Doc. No. 7223/2019.
Occupancy / completion certificateNo occupancy or completion certificate is supplied in the reviewed records; the permit extraction marks completion certification as false.

Frequently asked questions

Is BSSR TECH PARK registered with Telangana RERA?

Yes. BSSR TECH PARK is registered with the Telangana Real Estate Regulatory Authority as P02400002307; the registration status is New Project.

Who is the developer of BSSR TECH PARK?

The promoter named in the RERA registration is BSSR INFRATECH LLP.

Where is BSSR TECH PARK located?

BSSR TECH PARK is in NANAKRAMGUDA, Nanakaramguda, Serilingampally, Rangareddy, Telangana (500008).

When will BSSR TECH PARK be completed?

The promoter's proposed date of completion filed with RERA is 19/12/2025. This is the promoter's declaration, not a guarantee.

More projects in Nanakaramguda