Sign in

Apple Tree Sunshine

KANUMURI · Rangareddy · RERA P02400003224

APPLE TREE SUNSHINE is a residential apartment project in NALLAGANDLA HUDA RESIDENTIAL COMPLEX, Serilingampally, Ranga Reddy district. The registered promoter is Kanumuri Ravi Varma. The project has a registered site extent of 370.28 sq.mts and one residential building, A-1, with 1 Stilt + 5 upper floors; the RERA unit record lists 10 3BHK apartments, each with a saleable area of 135.63 sq.m. It is registered under TG-RERA registration P02400003224, with a proposed completion date of 19/10/2025.

01What we found

Period endedTG-RERA registration ran to 19 Oct 2025 - check its extension on TG-RERA
15documents on file - each fact links to its page
6court cases on this project's land (survey 302, Nallagandla Huda Residential Complex)
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRERA-filed / recorded information
Registered project nameAPPLE TREE SUNSHINE RERA record
Project typeResidential apartment project RERA record
Phase / registered portionNo separate phase name disclosed; the registration is for this project. RERA record
TG-RERA registrationP02400003224 Approvals record
Registration validity06/08/2021 to 19/10/2025; the certificate says four years and permits extension in accordance with the Act and Rules. No extension is recorded in the supplied evidence. Approvals record
Registered promoterKanumuri Ravi Varma
RERA statusThe project record describes it as “On-Going Project.” The registration certificate’s stated validity ended on 19/10/2025; no extension or current registration-status confirmation is supplied. RERA record Approvals record

Land and geographic identity

ItemRERA-filed / recorded information
Locality / project addressNALLAGANDLA HUDA RESIDENTIAL COMPLEX; Plot No. 110/K RERA record RERA filing
Revenue villageRERA project record: Nallagandla Huda Residential Complex. Filed title and building documents identify Nallagandla Village. RERA record RERA filing
Mandal / district / PINSerilingampally / Ranga Reddy / 500035 RERA record RERA filing
Project survey numbers302 TO 310, 320 TO 322, 324 TO 361, 363 TO 365, 384, 385, 387 TO 391 AND 399 RERA record
Registered site extent370.28 sq.mts; land record states total area 370.28 sq.mts and net area 370.28 sq.mts. RERA filing Land records
BoundariesEast: 9 MTRS WIDE ROAD; West: PLOT NO 110BYL CATEGORY III; North: PLOT NO 110BYK PART CATEGORY III; South: PLOT NO 110BY J CATEGORY III RERA filing

Development identity

ItemRERA-filed / sanctioned information
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC) Approvals record
Principal building approvalGHMC approval 1/C20/15147/2019, dated 19 October, 2019; file no. 1/C20/04803/2019 Approvals record
Approved buildingBuilding A-1, residential; 1 Stilt + 5 upper floors
Approved built-up area1,072.50 m² for residential upper floors, as stated in the building-permit extraction. This is not a carpet or saleable-area figure.
Height / stilt parking areaSanctioned height: 14.95 m; stilt parking area: 185.56 m²
Building / unit countOne building is recorded in the project fields. The RERA unit record lists 10 3BHK units; the GHMC permit extraction does not provide a separate sanctioned unit count. RERA filing RERA unit table

Offering and status

ItemRERA-filed / recorded information
Configuration3BHK RERA unit table
RERA saleable area135.63 sq.m per recorded configuration RERA unit table
Booked / available0 booked / 10 available, as last read from the TG-RERA portal; the supplied record has no as-of date, so counts are indicative. RERA unit table
Construction stageThe project is recorded as “On-Going Project”; no independently verified site-progress percentage or current construction-stage report is supplied. RERA record
Completion datesGHMC permit extraction states construction was to be completed before 19 October, 2025; the RERA project record gives proposed and revised completion dates of 19/10/2025. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied project documents. The GHMC permit requires an Occupancy Certificate before occupation. Document index

2. The project story

APPLE TREE SUNSHINE is a residential apartment development registered under TG-RERA as P02400003224. Its filed site identity is Plot No. 110/K, in NALLAGANDLA HUDA RESIDENTIAL COMPLEX, Serilingampally, Ranga Reddy district. The project survey-number schedule is 302 TO 310, 320 TO 322, 324 TO 361, 363 TO 365, 384, 385, 387 TO 391 AND 399. RERA record RERA filing

The GHMC building-permit record describes one residential building, A-1, with a stilt and five upper floors. The RERA unit record lists ten 3BHK apartments, each with a filed saleable area of 135.63 sq.m. RERA unit table

The record labels the project “On-Going Project,” but supplies no independently verified construction-progress measurement. The stated completion date was 19/10/2025. No occupancy or completion certificate is in the supplied documents, so the evidence does not establish that the building or any part of it has been completed or certified for occupation. RERA record Document index

3. Master plan, architecture & building design

The GHMC building-permit extraction identifies a site area of 370.28 m², road-affected area of 0 m², and net area of 370.28 m². It describes Building A-1 as a residential building with 1 Stilt + 5 upper floors, a recorded height of 14.95 m, and residential upper-floor area of 1,072.50 m². The stilt parking area is recorded as 185.56 m².

The permit extraction lists setbacks of 2 m Side I, 2 m Side II, 3 m Front, and 2 m Rear. It also records 75 RM of compound wall and 15 Trees. The supplied material does not include a readable, complete floor-plan description sufficient to establish the building footprint, apartment arrangement per floor, lift or stair configuration, internal circulation, or residential common-area layout. Document index

The approved drawing record is identified as document 173564, but the supplied extraction does not provide a complete architectural plan narrative. Accordingly, no additional floor, circulation, landscaping or common-area design details are stated here. Document index

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010135.63 sq.m89.0–92.6 sq.m; median 90.7 sq.m (software-measured from drawings)33% (software-derived)

The TG-RERA unit record lists ten 3BHK apartments and a saleable area of 135.63 sq.m. The booking counts are portal-read figures without an as-of date. RERA unit table RERA unit details

Carpet-area measurements are software measurements from the approved floor-plan drawing geometry, not RERA-filed disclosures; the supplied drawing-measurement record says four flat designs were measured and that the result needs review. The measured median is 90.7 sq.m (977 sq.ft), with a range of 89.0–92.6 sq.m (958–996 sq.ft). The supplied record labels the loading as 33%. These drawing-derived figures are distinct from RERA saleable area, which includes the home’s share of common areas. Floor plans RERA unit details

A measured first-floor flat plan records a master bedroom, two bedrooms, living room, dining area, kitchen, two toilets and a utility area. The utility is excluded from the supplied carpet-area measurement. Room dimensions are drawing measurements, not RERA-filed unit specifications. RERA unit details

5. Parking & vehicle circulation

The GHMC permit identifies 185.56 m² of stilt parking and states that the cellar and stilt areas approved for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The supplied permit extraction identifies a stilt parking area but does not provide a count of parking spaces or a separate cellar level.

No project-specific resident, visitor or accessible-space counts, parking allocation schedule, ramp or driveway details, pedestrian separation, EV charging provision, or legally documented unit-to-parking allocation are supplied. A parking area shown or described in a plan does not, by itself, establish exclusive ownership or allocation. Document index

6. Amenities, recreation & open spaces

Water supply
Description / sizeListed as available: YES
Evidence sourceRERA-filed amenities record
Declared progress / verified statusProgress shown as 0%; no independent completion verification supplied. RERA amenities
Sewerage / sewage treatment
Description / size“Sewerage (Chamber, Lines, Septic Tank, STP)” listed as available: YES
Evidence sourceRERA-filed amenities record
Declared progress / verified statusProgress shown as 0%; no independent completion verification supplied. RERA amenities
Water conservation / rainwater harvesting
Description / sizeListed as available: YES
Evidence sourceRERA-filed amenities record; GHMC permit also requires a rainwater-harvesting structure (percolation pit).
Declared progress / verified statusRERA progress shown as 50%; completion not independently verified. RERA amenities
Electrical meter room / sub-station / receiving station
Description / sizeListed as available: YES
Evidence sourceRERA-filed amenities record
Declared progress / verified statusProgress shown as 50%; completion not independently verified. RERA amenities
Green strip / tot-lot / park
Description / sizeGHMC extraction lists tot-lot as 0 m² and requires the tot-lot to be fenced and maintained as greenery before issue of the occupancy certificate.
Evidence sourceRERA-filed amenities record; GHMC permit
Declared progress / verified statusRERA progress shown as 0%; delivery not independently verified. RERA amenities
Internal roads and footpaths
Description / sizeListed in the amenities register
Evidence sourceRERA-filed amenities record
Declared progress / verified statusProgress shown as 0%. RERA amenities
Storm-water drains
Description / sizeListed in the amenities register
Evidence sourceRERA-filed amenities record
Declared progress / verified statusProgress shown as 0%. RERA amenities
Street lighting
Description / sizeListed in the amenities register
Evidence sourceRERA-filed amenities record
Declared progress / verified statusProgress shown as 0%. RERA amenities
Community buildings
Description / sizeListed in the amenities register
Evidence sourceRERA-filed amenities record
Declared progress / verified statusProgress shown as 0%. RERA amenities
Solid-waste management and disposal
Description / sizeListed in the amenities register
Evidence sourceRERA-filed amenities record
Declared progress / verified statusProgress shown as 0%. RERA amenities
Energy management
Description / sizeListed in the amenities register
Evidence sourceRERA-filed amenities record
Declared progress / verified statusProgress shown as 0%. RERA amenities
Fire protection and fire-safety requirements
Description / sizeListed in the amenities register
Evidence sourceRERA-filed amenities record
Declared progress / verified statusProgress shown as 0%. RERA amenities
Recreational open space
Description / sizeAggregate area listed in the amenities register; no area value supplied
Evidence sourceRERA-filed amenities record
Declared progress / verified statusProgress shown as 0%. RERA amenities

The GHMC permit extraction also lists space for a transformer and a garbage house within the premises. These are approval-record provisions, not evidence that the facilities are complete.

7. Utilities, building services & safety

Water and drainage: Water supply and sewerage are marked “YES” in the RERA amenities record, with no system capacity or detailed source information supplied. The GHMC permit requires a rainwater-harvesting structure (percolation pit); the RERA amenities register reports 50% progress for water conservation/rainwater harvesting. The record does not establish the status or capacity of an STP, reuse system, storm-water system or water storage. RERA amenities

Electrical services: The RERA amenities record marks an electrical meter room, sub-station or receiving station as available, at 50% progress. The GHMC permit lists transformer space. No electrical-supply capacity, backup system or EV charging provision is established by the project-specific RERA evidence. RERA amenities

Fire, access and building safety: The GHMC permit makes fire-safety installations and structural safety the responsibility of the owner, builder/developer, architect and site engineer, and requires services including sanitation, plumbing, fire safety, lifts and electrical installations to be executed under qualified technical supervision. These are permit conditions; the supplied evidence does not independently verify installation, inspection or clearance.

Other services: The permit requires a garbage house and specifies that the stilt/cellar parking areas are to remain dedicated to parking. No lift count or capacity, security/CCTV system, waste-segregation arrangement, accessibility features or completed-service evidence is supplied in the project-specific records. Document index

8. Location, access & connectivity

The registered project location is NALLAGANDLA HUDA RESIDENTIAL COMPLEX, Plot No. 110/K, Serilingampally mandal, Ranga Reddy district, Telangana, PIN 500035. The recorded eastern boundary is a 9 MTRS WIDE ROAD. The GHMC permit also records an 18 mt. road width in its approval extraction. RERA record RERA filing RERA filing

The supplied cadastral-parcel-centroid location record gives these measured distances: Financial District (Nanakramguda), 1.2 km; IndusInd Bank, 0.4 km; unnamed bus station, 2.2 km; Manuu Polytechnic Hyderabad, 1.6 km; Sankaraya Eye Hospital, 1.6 km; ADP, 0.0 km; South india shopping mall, 2.6 km; unnamed park, 1.2 km; Nanakramguda Govt primary school, 0.5 km. These are recorded distances to listed points; no travel times are supplied. Location record

9. Developer & development status

The TG-RERA registration certificate names Kanumuri Ravi Varma as promoter. The supplied records identify an authorized signatory, Ravi Varma Kanumuri, and a partner, Shiva Kumar Surakanti; the promoter’s legal-entity type and corporate identifiers are not established in the supplied evidence. Corporate record

A Form-B declaration dated 29-06-2021 is made by Kanumuri Ravi Varma as promoter. It declares title to the stated project land, says the land is free from encumbrances, and undertakes completion on or before 19/10/2025. These are promoter declarations in the filed affidavit.

The RERA project record describes the project as “On-Going Project” and records 19/10/2025 as both the proposed and revised completion date. The supplied evidence does not include a current construction-progress certificate, an extension order or an occupancy certificate. RERA record Document index

10. Approvals, official records & documents

RecordSupplied project evidence
TG-RERA registrationForm C certificate for APPLE TREE SUNSHINE, registration P02400003224, issued 06/08/2021, with validity stated through 19/10/2025.
GHMC building permitBuilding Permit Order for Building A-1, approved 19 October, 2019; approval 1/C20/15147/2019, file no. 1/C20/04803/2019.
Approved drawing / planDrawing document 173564 is listed as the layout-plan document; the supplied drawing-derived record identifies first-floor plan material used for software measurements. Document index
Title and land declarationForm-B affidavit dated 29-06-2021, declaring title and project undertakings.
Title opinionAdvocate title-search report dated 15-07-2021, identified as document 176075. Document index
Encumbrance statementFiled encumbrance statement, document 172970; its recorded search period ends 31-05-20z1 as transcribed in the supplied evidence. Document index
Occupancy / completion certificateNo such certificate is included in the supplied project documents. Document index

The GHMC permit states that an Occupancy Certificate is compulsory before occupation and that public-amenity connections are to be provided on production of the certificate.

Frequently asked questions

Is APPLE TREE SUNSHINE registered with Telangana RERA?

Yes. APPLE TREE SUNSHINE is registered with the Telangana Real Estate Regulatory Authority as P02400003224; the registration status is On-Going Project.

Who is the developer of APPLE TREE SUNSHINE?

The promoter named in the RERA registration is KANUMURI.

Where is APPLE TREE SUNSHINE located?

APPLE TREE SUNSHINE is in NALLAGANDLA HUDA RESIDENTIAL COMPLEX, Serilingampally, Rangareddy, Telangana (500035).

When will APPLE TREE SUNSHINE be completed?

The promoter's proposed date of completion filed with RERA is 19/10/2025. This is the promoter's declaration, not a guarantee.

More projects in Serilingampally