Sunshine Blue Peral
SUNSHINE INFRA PVT LTD · Hyderabad · RERA P02500000158
SUNSHINE BLUE PERAL is a residential apartment project in Hafeezpet, Serilingampally, Hyderabad district, developed by registered promoter SUNSHINE INFRA PVT LTD. It is planned on a 392.98 sq. m. site as one residential building with 1 Stilt + 5 upper floors and 10 homes, configured as 3BHK apartments. The TG-RERA registration number is P02500000158, and the proposed completion date is 03/07/2024.
More from Sunshine Infra Pvt Ltd · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name | SUNSHINE BLUE PERAL RERA record |
| Project type | Residential apartment project RERA record |
| Phase / registered portion | One registered building; no separate phase name is disclosed RERA record |
| TG-RERA registration | P02500000158 RERA record |
| Registration validity | 16/01/2019 to 03/07/2024, as stated in the TG-RERA certificate. This is the registration period, not a completion certificate or evidence of an extension. |
| RERA status | Listed as “On-Going Project” in the project record. RERA record |
| Registered promoter | SUNSHINE INFRA PVT LTD RERA record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | Hafeezpet / Hafeezpet Village RERA record Land records |
| Mandal | Serilingampally appears on the filed building-plan record; the project land record does not disclose a mandal. Land records |
| District | Hyderabad in the TG-RERA project record RERA record |
| PIN | 500049 in the project record RERA record |
| Project survey numbers | 105 to 112, 113Part and 114Part RERA record Land records |
| Plot number | 76 |
| Registered site extent | 392.98 sq. m.; net area 392.98 sq. m. and road-affected area recorded as 0.00 sq. m. in the building-permit extraction |
| Boundaries in RERA land details | East: 40 ROAD; West: PLOT NO 75; North: PLOT NO 77; South: 30 ROAD Land records |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building approval | 1/C20/10803/2018, dated 03 July 2018 Approvals record |
| Building permit / file reference | File No. 1/C11/09437/2018 |
| Approved built-up area | The filed drawing extraction records “BUILT UP AREA 1386.66”; it separately records “Net BUA Residential 1155.54” and “Total Net Built up Area (Sq.mt.) 1180.68.” These are distinct drawing labels and are not treated as interchangeable. |
| Buildings / floors | One residential building, 1 Stilt + 5 upper floors; the plan records six floors and a building height of 14.88 m. |
| Parking levels / provision | Stilt parking is identified in the approval conditions. A separate filed plan extraction records “Proposed Number of Parkings 0”; an approved parking-space count is not established by the supplied record. |
| Units | 10 dwelling units are recorded in the proposed building plan and the RERA configuration data. RERA unit table |
Offering and status
| Item | Project record |
|---|---|
| Configuration | 3BHK; 10 units in the RERA unit data RERA unit table |
| RERA saleable area | 140.28 sq. m. per unit RERA unit table |
| Booked / available | 0 booked / 10 available, as last read from the TG-RERA portal; the record has no as-of date, so these counts are indicative. RERA unit table |
| Construction stage | The RERA filing lists 80% completeness; this is a declared record, not an independent site inspection. The supplied amenity-progress record separately reports water supply at 50% and most other listed items at 0%. RERA record RERA amenities |
| Completion dates | The project record gives proposed and revised proposed completion as 03/07/2024. The Form-B declaration states an undertaking to complete by 6th March 2024. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied project documents. The GHMC permit requires an occupancy certificate before occupation. Document index |
2. The project story
SUNSHINE BLUE PERAL is registered as a residential apartment development in Hafeezpet Village, on Plot No. 76, covering the project’s stated survey range of 105 to 112, 113Part and 114Part. The registered development is one building, planned as a stilt level with five upper floors and 10 homes. RERA record Land records
The GHMC building-permit record describes a residential building and specifies a sanctioned configuration of Stilt + 5. The RERA unit record identifies the offering as 3BHK apartments. The filing records 80% completeness, but this is not independently verified construction progress. No occupancy certificate or completion certificate is present in the supplied documents. RERA unit table RERA record Document index
3. Master plan, architecture & building design
The filed GHMC building permit and plan concern a single residential building on a 392.98 sq. m. site. The plan specifies one stilt and five upper floors, with a stated building height of 14.88 m. The plan extraction records proposed coverage of 231.11 sq. m. (58.81%), a vacant plot area of 161.03 sq. m., and an accessory-use area of 0.85 sq. m.
The drawing extraction labels several area measures separately: built-up area 1386.66; Net BUA Residential 1155.54; and Total Net Built up Area 1180.68 sq. m. These figures are reproduced as labelled in the supplied plan data and are not treated as equivalent area measures.
The approval records a tot-lot and 15 trees, as well as a requirement to maintain a strip of greenery around the site. It also calls for a transformer space, garbage house, rainwater-harvesting structure and ETP. These are approval requirements or plan provisions; the supplied record does not establish that they have been completed.
The supplied material does not establish a floor-by-floor apartment arrangement, flats per floor, lift or stair count, building entrances, common-area distribution, or a phase-wise arrangement beyond the single registered building. The plan describes stilt parking, but no reliable approved parking-space count is established.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 140.28 sq. m. | 91.4–99.3 sq. m.; median 93.2 sq. m. | 34% |
The configuration, unit count, booking count and saleable area are from the TG-RERA unit record; booking figures have no recorded as-of date and are indicative. Carpet-area figures are software measurements from the approved-plan drawing, not RERA-filed measurements, and are flagged as needing review. Four flat designs were measured. RERA unit table RERA unit details Floor plans
For one drawn flat, the extracted room schedule includes a master bedroom, two other bedrooms, living/dining, kitchen, wash area, three toilets and a balcony. The listed room dimensions include living/dining at 5.66 × 8.58 m, kitchen at 2.33 × 3.28 m and balcony at 1.11 × 3.15 m. These are drawing-derived measurements, not independent measurements of a completed unit. RERA unit details
Carpet area is a drawing-measured estimate of usable internal area; the RERA saleable area is a separate filed figure and includes the basis used for the saleable unit area. The supplied material does not give a separately verified allocation of balcony, utility or common-area loading for each apartment. RERA unit details Floor plans RERA unit table
5. Parking & vehicle circulation
The GHMC permit conditions state that approved cellar and stilt areas for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied approval extraction identifies stilt parking, but does not establish the number of approved spaces. A separate plan extraction records “Proposed Number of Parkings 0”; accordingly, a definitive parking count cannot be confirmed from the available record.
No project-specific information is supplied on visitor or accessible parking, two-wheeler spaces, parking allocation to individual homes, ramps, vehicle entry/exit points, internal driveways, pedestrian separation or EV charging. A plan reference to parking does not by itself establish exclusive ownership or allotment of a bay.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Tot-lot; the permit also requires a peripheral greenery strip. No size is supplied. | GHMC permit and proposed plan | Approval/plan provision; RERA progress record reports Green Strip/TOT LOT/Park at 0%. Not independently verified complete. RERA amenities |
| Trees | 15 trees recorded in the permit. | GHMC permit | Permit figure; planting/completion not verified. |
| Community buildings | No specific facility description or size supplied. | RERA progress record RERA amenities | Progress recorded at 0%. |
| Recreational open space | No area supplied. | RERA progress record RERA amenities | Progress recorded at 0%. |
The RERA progress record lists 14 development and service items. Other than water supply, recorded at 50%, the listed items—including roads and footpaths, sewerage, storm-water drains, street lighting, community buildings, sewage treatment/disposal, solid-waste management, rainwater harvesting, energy management, fire safety, electrical room/substation and recreational open space—are each recorded at 0%. These are portal progress entries, not independent completion findings. RERA amenities
7. Utilities, building services & safety
The proposed-plan extraction lists a bore well, water-supply line, drainage line, sump, septic tank, soak pit, distribution transformer, rainwater harvesting and garbage house. The GHMC permit separately requires a rainwater-harvesting percolation pit, transformer space, garbage house and ETP. These are plan or approval records; the supplied evidence does not confirm installation or operating capacity.
The RERA progress record reports water supply at 50%. It records sewerage, storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection and electrical meter room/substation/receiving station at 0%. No capacities, utility connection details, lift information, fire-system specifications, escape-stair details, CCTV/access-control provisions or accessibility features are supplied. RERA amenities
The GHMC permit requires an occupancy certificate before occupation and requires construction in accordance with the sanctioned plan. The supplied documents do not include an occupancy certificate or independently verified evidence of completed life-safety systems. Document index
8. Location, access & connectivity
The registered project location is Hafeezpet, Hafeezpet Village, Hyderabad district, PIN 500049. The project’s recorded site boundaries identify roads to the east and south; the building-permit extraction refers to 18 mt. road widths, while the proposed-plan records list 12.00 m and 9.00 m road widths. RERA record Land records
The supplied location record lists Financial District (Nanakramguda) at 1.2 km. No public-transport details, other measured landmark distances or travel-time estimates are supplied. Location record
9. Developer & development status
The registered legal promoter is SUNSHINE INFRA PVT LTD, recorded as a company. The project material names V. Konda Reddy as managing director and authorized signatory in the filed permit and Form-B declaration. Corporate record Parties record
The RERA project record lists a proposed and revised completion date of 03/07/2024; the Form-B declaration states a completion undertaking of 6th March 2024. The RERA registration certificate records validity through 03/07/2024. No extension document or occupancy/completion certificate is supplied here. The project’s 80% completeness entry is a RERA-recorded figure, not an independent site assessment. RERA record Document index
The project record gives the promoter address as Sai Ram Nilayam, Ayyappa Coci(e)ty, Hafeezpet, Hyderabad, 500049. The registration certificate separately lists the promoter office as Village: Mandal: District: Hyderabad, PIN 500082. No verified official contact details are supplied. Parties record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C registration certificate for P02500000158, issued 16/01/2019; validity stated through 03/07/2024. |
| GHMC building permit | Building Permit Order dated 03 July 2018; approval No. 1/C20/10803/2018; file No. 1/C11/09437/2018; covers the residential building on the stated Hafeezpet survey numbers. |
| Proposed/sanctioned building plan | Plan record for Plot No. 76, with 1 Stilt + 5 upper floors and 10 dwelling units. |
| Promoter declaration | Form-B affidavit dated 11 October 2018, including declared title and encumbrance statements, project-account undertakings and completion undertaking. |
| Occupancy/completion certificate | Not included in the supplied project documents. Document index |
The building-permit record states that the permission does not confer ownership rights, requires construction to follow the sanctioned plan, and requires an occupancy certificate before occupation. It also records a requirement to surrender the road-affected portion to GHMC without compensation; the permit extraction lists the road-affected area as 0.00 sq. m.
1. Project at a glance
Project identity
Registered name: SUNSHINE BLUE PERAL
Project type: Residential apartment project
Phase / registered portion: One registered building; no separate phase name is disclosed
TG-RERA registration: P02500000158
Registration validity: 16/01/2019 to 03/07/2024, as stated in the TG-RERA certificate. This is the registration period, not a completion certificate or evidence of an extension.
RERA status: Listed as “On-Going Project” in the project record.
Registered promoter: SUNSHINE INFRA PVT LTD
Land and geographic identity
Locality / revenue village: Hafeezpet / Hafeezpet Village
Mandal: Serilingampally appears on the filed building-plan record; the project land record does not disclose a mandal.
District: Hyderabad in the TG-RERA project record
PIN: 500049 in the project record
Project survey numbers: 105 to 112, 113Part and 114Part
Plot number: 76
Registered site extent: 392.98 sq. m.; net area 392.98 sq. m. and road-affected area recorded as 0.00 sq. m. in the building-permit extraction
Boundaries in RERA land details: East: 40 ROAD; West: PLOT NO 75; North: PLOT NO 77; South: 30 ROAD
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building approval: 1/C20/10803/2018, dated 03 July 2018
Building permit / file reference: File No. 1/C11/09437/2018
Approved built-up area: The filed drawing extraction records “BUILT UP AREA 1386.66”; it separately records “Net BUA Residential 1155.54” and “Total Net Built up Area (Sq.mt.) 1180.68.” These are distinct drawing labels and are not treated as interchangeable.
Buildings / floors: One residential building, 1 Stilt + 5 upper floors; the plan records six floors and a building height of 14.88 m.
Parking levels / provision: Stilt parking is identified in the approval conditions. A separate filed plan extraction records “Proposed Number of Parkings 0”; an approved parking-space count is not established by the supplied record.
Units: 10 dwelling units are recorded in the proposed building plan and the RERA configuration data.
Offering and status
Configuration: 3BHK; 10 units in the RERA unit data
RERA saleable area: 140.28 sq. m. per unit
Booked / available: 0 booked / 10 available, as last read from the TG-RERA portal; the record has no as-of date, so these counts are indicative.
Construction stage: The RERA filing lists 80% completeness; this is a declared record, not an independent site inspection. The supplied amenity-progress record separately reports water supply at 50% and most other listed items at 0%.
Completion dates: The project record gives proposed and revised proposed completion as 03/07/2024. The Form-B declaration states an undertaking to complete by 6th March 2024.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied project documents. The GHMC permit requires an occupancy certificate before occupation.
2. The project story
SUNSHINE BLUE PERAL is registered as a residential apartment development in Hafeezpet Village, on Plot No. 76, covering the project’s stated survey range of 105 to 112, 113Part and 114Part. The registered development is one building, planned as a stilt level with five upper floors and 10 homes.
The GHMC building-permit record describes a residential building and specifies a sanctioned configuration of Stilt + 5. The RERA unit record identifies the offering as 3BHK apartments. The filing records 80% completeness, but this is not independently verified construction progress. No occupancy certificate or completion certificate is present in the supplied documents.
3. Master plan, architecture & building design
The filed GHMC building permit and plan concern a single residential building on a 392.98 sq. m. site. The plan specifies one stilt and five upper floors, with a stated building height of 14.88 m. The plan extraction records proposed coverage of 231.11 sq. m. (58.81%), a vacant plot area of 161.03 sq. m., and an accessory-use area of 0.85 sq. m.
The drawing extraction labels several area measures separately: built-up area 1386.66; Net BUA Residential 1155.54; and Total Net Built up Area 1180.68 sq. m. These figures are reproduced as labelled in the supplied plan data and are not treated as equivalent area measures.
The approval records a tot-lot and 15 trees, as well as a requirement to maintain a strip of greenery around the site. It also calls for a transformer space, garbage house, rainwater-harvesting structure and ETP. These are approval requirements or plan provisions; the supplied record does not establish that they have been completed.
The supplied material does not establish a floor-by-floor apartment arrangement, flats per floor, lift or stair count, building entrances, common-area distribution, or a phase-wise arrangement beyond the single registered building. The plan describes stilt parking, but no reliable approved parking-space count is established.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 140.28 sq. m. | 91.4–99.3 sq. m.; median 93.2 sq. m. | 34% |
The configuration, unit count, booking count and saleable area are from the TG-RERA unit record; booking figures have no recorded as-of date and are indicative. Carpet-area figures are software measurements from the approved-plan drawing, not RERA-filed measurements, and are flagged as needing review. Four flat designs were measured.
For one drawn flat, the extracted room schedule includes a master bedroom, two other bedrooms, living/dining, kitchen, wash area, three toilets and a balcony. The listed room dimensions include living/dining at 5.66 × 8.58 m, kitchen at 2.33 × 3.28 m and balcony at 1.11 × 3.15 m. These are drawing-derived measurements, not independent measurements of a completed unit.
Carpet area is a drawing-measured estimate of usable internal area; the RERA saleable area is a separate filed figure and includes the basis used for the saleable unit area. The supplied material does not give a separately verified allocation of balcony, utility or common-area loading for each apartment.
5. Parking & vehicle circulation
The GHMC permit conditions state that approved cellar and stilt areas for parking must be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied approval extraction identifies stilt parking, but does not establish the number of approved spaces. A separate plan extraction records “Proposed Number of Parkings 0”; accordingly, a definitive parking count cannot be confirmed from the available record.
No project-specific information is supplied on visitor or accessible parking, two-wheeler spaces, parking allocation to individual homes, ramps, vehicle entry/exit points, internal driveways, pedestrian separation or EV charging. A plan reference to parking does not by itself establish exclusive ownership or allotment of a bay.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green strip | Tot-lot; the permit also requires a peripheral greenery strip. No size is supplied. | GHMC permit and proposed plan | Approval/plan provision; RERA progress record reports Green Strip/TOT LOT/Park at 0%. Not independently verified complete. |
| Trees | 15 trees recorded in the permit. | GHMC permit | Permit figure; planting/completion not verified. |
| Community buildings | No specific facility description or size supplied. | RERA progress record | Progress recorded at 0%. |
| Recreational open space | No area supplied. | RERA progress record | Progress recorded at 0%. |
The RERA progress record lists 14 development and service items. Other than water supply, recorded at 50%, the listed items—including roads and footpaths, sewerage, storm-water drains, street lighting, community buildings, sewage treatment/disposal, solid-waste management, rainwater harvesting, energy management, fire safety, electrical room/substation and recreational open space—are each recorded at 0%. These are portal progress entries, not independent completion findings.
7. Utilities, building services & safety
The proposed-plan extraction lists a bore well, water-supply line, drainage line, sump, septic tank, soak pit, distribution transformer, rainwater harvesting and garbage house. The GHMC permit separately requires a rainwater-harvesting percolation pit, transformer space, garbage house and ETP. These are plan or approval records; the supplied evidence does not confirm installation or operating capacity.
The RERA progress record reports water supply at 50%. It records sewerage, storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection and electrical meter room/substation/receiving station at 0%. No capacities, utility connection details, lift information, fire-system specifications, escape-stair details, CCTV/access-control provisions or accessibility features are supplied.
The GHMC permit requires an occupancy certificate before occupation and requires construction in accordance with the sanctioned plan. The supplied documents do not include an occupancy certificate or independently verified evidence of completed life-safety systems.
8. Location, access & connectivity
The registered project location is Hafeezpet, Hafeezpet Village, Hyderabad district, PIN 500049. The project’s recorded site boundaries identify roads to the east and south; the building-permit extraction refers to 18 mt. road widths, while the proposed-plan records list 12.00 m and 9.00 m road widths.
The supplied location record lists Financial District (Nanakramguda) at 1.2 km. No public-transport details, other measured landmark distances or travel-time estimates are supplied.
9. Developer & development status
The registered legal promoter is SUNSHINE INFRA PVT LTD, recorded as a company. The project material names V. Konda Reddy as managing director and authorized signatory in the filed permit and Form-B declaration.
The RERA project record lists a proposed and revised completion date of 03/07/2024; the Form-B declaration states a completion undertaking of 6th March 2024. The RERA registration certificate records validity through 03/07/2024. No extension document or occupancy/completion certificate is supplied here. The project’s 80% completeness entry is a RERA-recorded figure, not an independent site assessment.
The project record gives the promoter address as Sai Ram Nilayam, Ayyappa Coci(e)ty, Hafeezpet, Hyderabad, 500049. The registration certificate separately lists the promoter office as Village: Mandal: District: Hyderabad, PIN 500082. No verified official contact details are supplied.
10. Approvals, official records & documents
TG-RERA registration: Form C registration certificate for P02500000158, issued 16/01/2019; validity stated through 03/07/2024.
GHMC building permit: Building Permit Order dated 03 July 2018; approval No. 1/C20/10803/2018; file No. 1/C11/09437/2018; covers the residential building on the stated Hafeezpet survey numbers.
Proposed/sanctioned building plan: Plan record for Plot No. 76, with 1 Stilt + 5 upper floors and 10 dwelling units.
Promoter declaration: Form-B affidavit dated 11 October 2018, including declared title and encumbrance statements, project-account undertakings and completion undertaking.
Occupancy/completion certificate: Not included in the supplied project documents.
The building-permit record states that the permission does not confer ownership rights, requires construction to follow the sanctioned plan, and requires an occupancy certificate before occupation. It also records a requirement to surrender the road-affected portion to GHMC without compensation; the permit extraction lists the road-affected area as 0.00 sq. m.
Frequently asked questions
Is SUNSHINE BLUE PERAL registered with Telangana RERA?
Yes. SUNSHINE BLUE PERAL is registered with the Telangana Real Estate Regulatory Authority as P02500000158; the registration status is On-Going Project.
Who is the developer of SUNSHINE BLUE PERAL?
The promoter named in the RERA registration is SUNSHINE INFRA PVT LTD.
Where is SUNSHINE BLUE PERAL located?
SUNSHINE BLUE PERAL is in HAFEEZPET, Hyderabad, Telangana (500049).
When will SUNSHINE BLUE PERAL be completed?
The promoter's proposed date of completion filed with RERA is 03/07/2024. This is the promoter's declaration, not a guarantee.